Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/7/2011 ...\New_Revision_Sheet.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
SIGNATURE BLOCK:
BYNo.
REV. DATEdd/mm/yy
SHEET No.
NE
W
RE
V.
DE
L.
DESCRIPTION BYNo.
REV.mm/dd/yy
SHEET No.
NE
W
RE
V.
DE
L.
DESCRIPTIONDATE
BYNo.
REV.mm/dd/yy
SHEET No.
NE
W
RE
V.
DE
L.
DESCRIPTIONDATE
OFFICE OF ENGINEERING
mm/dd/yy
DATE
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
02.01.A1