Page 1: KF 102 Open Space 1 and Entrance Area - Knockboy · 0340 102 Knockboy Housing, Co. Waterford Open Space 1 and Entrance Area Open Space 1 + Entrance Area | 1:200 Proposed native hedgerow

1

2

3

4

5

6

+29.3

+28.5

+31.1

THIS DRAWING IS COPYRIGHT ©

Rev.

PassedChd.Drn.

Status

Drawing No.

Date

Job No.

Scalesjob

drg.

notes DO NOT SCALE figured dimensions only to be taken from this drawing

descriptiondrawnrev date

Kevin Fitzpatrick│Landscape Architecture7 Abbey Business ParkGrange DriveDublin 13T- 00353 (0)1 8326715 E- [email protected] W- www.kfla.ie

PLANNING

KFMM

1:200 @ A2

15.04.19

1020340

Knockboy Housing, Co. Waterford

Open Space 1 and Entrance Area

Open Space 1 + Entrance Area | 1:200

Proposed native hedgerow and tree planting tosite boundary enhances local biodiversity,improves green infrastructure links andprovides extra screening to the development.

Planted bank - Maximum 1 in 2 embankmentplanted with shrub and groundcover planting.

Informal flat lawn area suitable for active playand passive recreation.

Copses of native parkland trees define lawnspace and provide visual interest throughoutthe space.

Formal clipped hedges frame the open spaceand provide screening from the entranceroad.

Proposed steps between upper and lowerlevels.

Planted terrace - consisting of 2x 1.5m highretaining walls planted with a mix ofornamental shrub and groundcover plantingand multi-stemmed trees. Line of fastigiatetrees planted to the front of the wall to reducevisual effects.

Entrance Feature - contrasting bands offeature paving, a mix of ornamental shrub andgroundcover planting with multi-stemmedtrees and space for signage.

Proposed 1.2m high stub wall and railing tosite boundary, refer to dwg no. 105. Formalhedge planting to inside of railing. Plantedbuffer between apartments and publicfootpath.

Existing line of mature trees to site boundaryto be retained.

Proposed wildflower meadow improveslocal biodiversity and reduces repetitivemaintenance operations.

Recommended