Introduction toWork Breakdown Structure (WBS) &
SOW Templates for TWAs of GES-Chapter H
July 10, 2014
GES-TWA vs. WOs
TWA WBS & SOW
TWA Examples
TWA SOW Templates7 (a)7 (b)7 (c)7 (d)7 (e)7 (f)
Questions & Comments
Discussion Items
Watershed Management Plan
Watershed Management Plan Update
Drainage Improvement Study
Water Quality Assessment & BMPs
Stormwater Inventory
Peer Review
Misc. Engineering Support
ENG/GIS ReviewFEMA DFIRM SupportOther Support
The Nature of a GES-H Project Can be
GES-TWA vs. Traditional Work Orders
TWA
WO#1WO#2WO#3WO#4WO#5
……
WatershedEvaluation
WO#1
WO#2
WO#3
WO#4
WO#5
……
WMP –Floodplain
Analysis
NTP
WO#1
WO#2
WO#3
……
WMP –SWRA,
WQ BMPs
NTP
WO#1
WO#2
WO#3
……
WMP –FPLOS,
Alternatives Analysis
NTP
?
Project Development
Master Agreement Requires a “Proposal” for Each TWA
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Peer Review &
As-needed Engineering Support
GES-TWA WBS & SOW
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
Note: 7 (a), (b), (c) … indicates the new SOW template for corresponding element.
7 (c)
7 (b)
7 (a)
7 (f)
7 (d) 7 (e)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (c)
7 (b)
7 (a)
7 (d) 7 (e)
WMP/WMP Update – Full RangeExample Project: City of Williston WMP (FY15 CFI)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (c)
7 (b)
7 (a)
WMP/WMP Update – Floodplain AnalysisExample Project: Mill Creek WMP (FY15 CFI)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (d)
7 (a)
7 (e)
WMP – FPLOS, Alternatives Analysis, SWRA & BMPs of Water Quality
Example Project: Powell WMP
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Peer Review &
As-needed Engineering Support
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (f)
WMP/WMP Update – Peer ReviewExample Project: Lake Stafford/Priest Prairie/W.
Marion WMP Peer Review
7 (a)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Peer Review &
As-needed Engineering Support
GES-TWA WBS & SOW
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
Note: 7 (a), (b), (c) … indicates the new SOW template for corresponding element.
7 (c)
7 (b)
7 (a)
7 (f)
7 (d) 7 (e)
District Defined Submittals, Stopping Points, and Reviews Generic WMP – Floodplain Analysis
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (d)
7 (a)
Drainage Improvement StudyExample Project: Southway Villas BMP Alternatives Analysis (FY15
CFI)
Stopping Points (i.e., District Notice)
“Pre-submittal Meeting” in New SOWs
Example List of Deliverables (Task 2.2.3)
Deliverables – Data Delivery Structure