Transcript
Page 1: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

EEMEMPRESA DE ELECTRICIDADEDA MADEIRA

PORTUGAL

SALZBURG AG

AUSTRIA

ELEKTROPRIVREDAHRVATSKE ZAJEDNICEHERCEG-BOSNE

BOSNIA AND HERZEGOVINA

JEP ELEKTROPRIVREDACRNE GORE

YUGOSLAVIA

D S IDEVLET SU ISLERI

TURKEY

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

SOCORRIDOS 1)

3 PELTON unitsN = 8000 kW/unitH = 460 m

KREUZBERGMAUT 1)

2 BULB unitsN = 10000 kW/unitH = 10.8 m

RAMARehabilitation2 FRANCIS unitsN = 85000 kW/unitH = 320 m

PERUCICARehabilitation1 PELTON unitN = 60000 kW H = 526 m

ÇATALAN 1)

3 FRANCIS unitsN = 56300 kW/unitH = 52 m

ACHENSEE 5 1)

Rehabilitation1 Twin PELTON unitN = 24200 kWH = 390 m

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

3

1

2

2

1

3

1

11

Hydropower Engineering

1

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Digital Governing SystemsHardware S5Processor 928BOil pressure 90 barDigital Supervisory Controland Measuring SystemMechanical - Electrical Auxiliary Plant

Digital Governing SystemsHardware S5Processor 928BOil pressure 60 bar

Digital Governing SystemsHardware S7-400, S7-300Processor 413-1, 312-IFMOil pressure 25 bar

Digital Governing System Hardware S7-400, S7-300Processor 413-1, 312-IFMOil pressure 40 bar

Digital Governing SystemsHardware S5Processor 928BOil pressure 60 barDigital Supervisory Controland Measuring System Mechanical and Electrical Auxiliaries

Digital Turbine Governing SystemDigital Joint Control GovernorHardware S7-400Processor 413-1Oil pressure 95 bar

1994

1995

1996

1996

1997

1997

Page 2: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

ELEKTROPRIVREDABOSNE I HERCEGOVINE

BOSNIA AND HERZEGOVINA

ELEKTROPRIVREDAHRVATSKE ZAJEDNICEHERCEG-BOSNE

BOSNIA AND HERZEGOVINA

HYDRO-HIT

SLOVENIA

HE BISTRICA

SLOVENIA

HE BISTRICA

SLOVENIA

SELSAVSKE ELEKRARNELJUBLJANA

SLOVENIA

JABLANICA Small2 FRANCIS unitsN = 550 kW/unitH = 93 m

MOSTARRehabilitation3 KAPLAN unitsN = 23600 kW/unitH = 21.5 m

FUZINERehabilitation1 Twin FRANCIS unitN = 570 kWH = 5.6 m

BISTRICA1 FRANCIS unitN = 1665 kWH = 75 m

BISTRICA1 FRANCIS unitN = 995 kWH = 75 m

MOSTERehabilitation1 FRANCIS unitN = 5500 kWH = 68 m

Digital Governing SystemsHardware S7-300Processor 314-IFMOil pressure 30 barDigital Supervisory Control System

Digital Governing SystemsHardware S7-400, S7-300Processor 413-1, 312-IFMOil pressure 50 bar

Digital Governing SystemHardware S7-300Processor 314-IFMOil pressure 30 bar

Digital Governing System Hardware S7-300Processor 314-IFMOil pressure 60 barDigital Supervisory Controland Measuring System

Digital Governing SystemHardware S7-300Processor 314-IFMOil pressure 60 bar

Digital Positioning SystemHardware S7-300Processor 312-IFMOil pressure 50 bar

1997

1997

1997

1998

1998

1998

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

2

1

3

1

1

1

1

1

Hydropower Engineering

2Release date: 15.02.2010

Page 3: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

DOMLECDOMINICA ELECTRICITYSERVICES LTD.

DOMINICA - WEST INDIES

DEMDRAVSKE ELEKTRARNEMARIBOR

SLOVENIA

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

ELEKTROPRIVREDAHRVATSKE ZAJEDNICEHERCEG-BOSNE

BOSNIA AND HERZEGOVINA

ELEKTROPRIVREDAHRVATSKE ZAJEDNICEHERCEG-BOSNE

BOSNIA AND HERZEGOVINA

MERKURKRANJ

SLOVENIA

LAUDAT 1)

1 PELTON unitN = 1300 kWH = 211 m

FORMINRehabilitation2 KAPLAN unitsN = 70000 kW/unitH = 32 m

TIS ABBAY 1)

Rehabilitation3 FRANCIS unitsN = 4200 kW/unitH = 46 m

JAJCE LargeRehabilitation2 FRANCIS unitsN = 28000 kW/unit H = 88.5 m

JAJCE 1 SmallRehabilitation1 PELTON unitN = 600 kWH = 88.5 m

KOSUTNIKRehabilitation1 PELTON unitN = 700 kW H = 270 m

Digital Governing SystemHardware S7-400Processor 413-1Oil pressure 50 bar

Digital Positioning SystemsHardware S7-300Processor 314-IFMOil pressure 40 bar

Digital Governing SystemsHardware S7-400Processor 413-2Oil pressure 90 barDigital Supervisory Controland Measuring SystemMechanical and Electrical Auxiliaries

Digital Governing Systems Hardware S7-400Processor 413-1Oil pressure 160 bar

Digital Governing SystemHardware S7-300Processor 314-IFMOil pressure 60 bar

Digital Governing System Hardware S7-300Processor 314-IFMOil pressure 60 bar

1999

1999

1999

1999

1999

1999

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

1

2

3

1

2

1

1

Hydropower Engineering

3

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 4: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

SELSAVSKE ELEKTRARNELJUBLJANA

SLOVENIA

HEPHRVATSKA ELEKTROPRIVREDA

CROATIA

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

DSIDEVLET SU ISLERI

TURKEY

DSIDEVLET SU ISLERI

TURKEY

DSIDEVLET SU ISLERI

TURKEY

VRHOVORehabilitation3 BULB unitsN = 14300 kW/unitH = 8.12 m

SENJRehabilitation1 FRANCIS unitN = 72000 kWH = 441 m

KOKA 1)

3 FRANCIS unitsN = 15200 kW/unitH = 42 m

ÇAMLIGÖZE 1)

2 KAPLAN unitsN = 17200 kW/unitH = 25 m

BATMAN Large 1)

3 FRANCIS unitsN = 65500 kW/unitH = 68 m

BATMAN Small 1)

1 FRANCIS unitN = 6100 kWH = 58 m

Digital Governing SystemsHardware S7-300Processor 314-IFMOil pressure 64 barMechanical Auxiliaries

Spherical Valve Control SystemOil pressure 32 bar

Digital Governing SystemsHardware S7-400Processor 413-2Oil pressure 90 barLocal Supervisory Control BoardsMechanical and Electrical Auxiliaries

Digital Governing SystemsHardware S5Processor 928BOil pressure 60 bar

Digital Governing SystemsHardware S7-400, S7-300Processor 413-1, 314-IFMOil pressure 60 barDigital Supervisory Controland Measuring System Mechanical and Electrical Auxiliaries

Digital Governing SystemHardware S7-400, S7-300Processor 413-2, 314-IFMOil pressure 80 bar

1999

1999

2000

2000

2000

2000

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

3

1

3

3

2

3

1

1

Hydropower Engineering

4

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 5: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

5

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

INDRHIINSTITUTO NACIONAL DE RECURSOS HIDRAULICOS

DOMINICAN REP.

JEP ELEKTROPRIVREDACRNE GORE

YUGOSLAVIA

AE/EWAZIENDA ENERGETICA S.p.A.ETSCHWERKE AG

ITALY

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

JEP ELEKTROPRIVREDACRNE GORE

YUGOSLAVIA

MONCION 1)

2 FRANCIS unitsN = 30200 kW/unitH = 138 m

PERUCICA SmallRehabilitation2 PELTON unitsN = 1000 kW/unitH = 526 m

NATURNS 1)

Rehabilitation2 Twin PELTON unitsN = 30400 kW/unitH = 1129 m

ACHENSEE 1 & 2Rehabilitation2 Twin PELTON unitsN = 12500 kW/unitH = 396 m

DEBANT 2 2)

Rehabilitation1 PELTON unitN = 2800 kWH = 227 m

AWASH II Rehabilitation 2 FRANCIS unitsN = 16000 kW/unitH = 59 m

AWASH III Rehabilitation 2 FRANCIS unitsN = 16000 kW/unitH = 59 m

PERUCICA I-IV LargeRehabilitation4 PELTON unitsN = 40000 kW/unitH = 526 m

Digital Governing SystemsHardware S7-400Processor 413-1Oil pressure 60 bar

Digital Governing SystemsHardware S7-300Processor 314-IFMOil pressure 40 bar

Digital Governing SystemsHardware S7-400Processor 413-1Oil pressure 120 bar

Digital Governing SystemsHardware S7-400Processor 413-1Oil pressure 95 bar

Digital Governor and SequencerHardware S7-300Processor 314-IFMOil pressure 80 bar

Digital Governors and Unit ControllersHardware S7-400Processor 412-2Oil pressure 150 bar

Digital Governors and Unit ControllersHardware S7-400Processor 412-2Oil pressure 150 bar

Digital Governing SystemsHardware S7-400Processor 412-2Oil pressure 80 bar

2000

2000

2001

2001

2001

2001

2001

2001

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

2

2

2

2

1

2

2

4

Hydropower Engineering

Release date: 15.02.2010

Page 6: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

DOMLECDOMINICA ELECTRICITYSERVICES LTD.

DOMINICA - WEST INDIES

ELECTRO LJUBLJANA

SLOVENIA

HRVATSKAELEKTROPRIVREDA

CROATIA

LEPENKA D.D.ELEKTROPRIVREDA

SLOVENIA

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

AE/EWAZIENDA ENERGETICA S.p.A.ETSCHWERKE AG

ITALY

ELEKTRO LJUBLJANA

SLOVENIA

BORREGAARD INDUSTRIES Ltd.

NORWAY

NTENORD-TRØNDELAGELEKTRISITETSVERK

NORWAY

NEW TRAFALGARReplacement1 PELTON unitN = 1760 kWH = 280 m

LUKNJAReplacement1 FRANCIS unitN = 300 kWH = 10 m

ZAKUCAC 4 FRANCIS units N = 121000 kW/unitH = 265 m

LEPENKA 1 FRANCIS unit N = 360 kW H = 17 m

DEBANT 1 2)

2 PELTON units N = 920 kW/unit H = 156 m

NATURNS 1 twin PELTON unit N = 110000 kW H = 1129 m

SAVA BROD2 FRANCIS unitsN = 450 kW/unitH = 6 m

BORREGAARD4 FRANCIS unitsN = 8900 kW/unitH = 20 m

AUNFOSS 2 FRANCIS units N = 14500 kW/unitH = 30 m

Digital Governing SystemHardware S7-400Processor 412-1Oil pressure 50 bar

Governor and Unit ControllerHardware S7-300Processor 314-IFMOil pressure 40 bar

Digital Positioning Systems Controllers Hardware S7-300 Processor 314-IFM Oil pressure 20 bar

Digital Governor, Control, Protection, Synchronising Hardware S7-300 Processor 314-IFM

Digital Governors & Hydraulic Units Hardware S7-300Processor 314-IFMOil pressure 100 bar

Digital Governor & Hydraulic UnitHardware S7-400Processor 412-2Oil pressure 30 bar

Renovation of Protection, Control andLubrication System Digital GovernorHardware S7-400 Processor 412-2

Digital Governors & Hydraulic Units Hardware S7-300 Processor 313-C Oil pressure 180 bar

Digital Governors & Hydraulic Units Hardware S7-300 Processor 313-C Oil pressure 180 bar

2001

2001

2002

2002

2002

2002

2003

2003/2004

2003

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

1

1

2

1

2

1

1

1

4

2

Hydropower Engineering

6

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

^

Page 7: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

AE/EWAZIENDA ENERGETICA S.p.A.ETSCHWERKE AG

ITALY

ELECTROPRIVREDAHRVATSKE ZAJEDNICEHERCEG-BOSNE

BOSNIA AND HERZEGOVINA

HRVATSKAELEKTROPRIVREDA

CROATIA

HRVATSKAELEKTROPRIVREDA

CROATIA

ENEL GREEN POWER S.p.A.

ITALY

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

HEP PROIZVODNJA

CROATIA

HEP PROIZVODNJA

CROATIA

Plant Digital Governor Hardware S7-400 Processor 412-2

Digital Governors & ElectricalEquipment & Hydraulic Units Hardware S7-400Processor 412-2Oil pressure 150 bar

Digital Governors & Design of HydraulicUnits Hardware S7-400Processor 412-2Oil pressure 80 bar

Digital Governors & Hydraulic Units Hardware S7-400Processor 412-2Oil pressure 100 bar

Digital Governors & Unit Controllers,Hydraulic & Lubrication UnitsHardware S7-300Processor 314-C-DPOil pressure 180 bar

Digital Governor, Unit Controller &Hydraulic UnitHardware S7-300Processor 314-IFMOil pressure 80 bar

Digital Governors & Hydraulic UnitsHardware S7-400 & S7-300Processor 412-2 & 313 C-2DPOil pressure 120 bar

Rehabilitation of controland by-pass for butterfly valve

2003

2003

2003

2003

2003

2003

2003

2004

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

1

2

3

3

2

1

2

Hydropower Engineering

7

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

NATURNS 3 PELTON units N = 2 x 30400 kW

1 x 110000 kW H = 1129 m

PEC MLINI2 Francis unitsN = 15000 kW/unitH = 100 m

SENJ3 FRANCIS units N = 62500 kW/unitH = 437 m

VINODOL3 PELTON units N = 28000 kW/unitH = 650 m

VIGEVANO2 FRANCIS unitsN = 1670 kW/unit H = 18.3 m

SEEFELD 2)

1 PELTON unitN = 1215 kWH = 552.8 m

RIJEKA2 FRANCIS unitsN = 19300 kW/unitH = 213 m

ZAKUCAC2 Intake Butterfly Valves

Release date: 15.02.2010

^

Page 8: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

EPHZHB

BOSNIA AND HERZEGOVINA

ENELPOWER

ITALY

ELEKTRO LJUBLJANA

SLOVENIA

PAPIRNICA VEVCE

SLOVENIA

ENELPOWER

ITALY

ENELPOWER

ITALY

SALZBURG AG FÜR ENERGIE, VERKEHR UNDTELEKOMMUNIKATION

AUSTRIA

JEP ELEKTROPRIVREDACRNE GORE

MONTENEGRO

Governing SystemsHardware S7–400 & S7-300Processor 412-2 & 313-C-2DPOil pressure 180 bar

Digital GovernorHardware S7–400 & S7-300Processor 313-C-2DPOil pressure 120 bar

Digital Governors, Unit Control& Protection SystemsHardware S7-400Processor 412-2

Digital Governor & Hydraulic UnitHardware S7-300Processor 313-COil pressure 100 bar

Digital Governors & Hydraulic UnitsHardware S7-300Processor 314-C-2DPOil pressure 160 bar

Hydraulic UnitsOil pressure 160 bar

Digital Governing SystemHardware S7-300Processor 314-2DPOil pressure 80 bar

Digital Governing SystemHardware S7-400Processor 412-2Oil pressure 40 bar

2003

2004

2002/2004

2005

2005

2005

2005

2005

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

3

1

2

1

2

2

1

1

Hydropower Engineering

8

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

JAJCE 23 FRANCIS unitsN = 10000 kW/unitH = 42 m

CAMPLICCIOLI1 PELTON unitN = 9500 kWH = 884 m

SAVA BROD2 FRANCIS unitsN = 550 kW/unitH = 3.4 m

FUZINERehabilitation1 Twin FRANCIS unitN = 570 kWH = 5.6 m

GALLICANO2 FRANCIS unitsN = 13000 kW/unitH = 83 m

PESCARA2 FRANCIS unitsN = 5600 kW/unitH = 28 m

TRATTENBACH 2)

1 PELTON unitN = 5000 kWH = 594 m

PERUCICA VI LargeRehabilitation1 PELTON unitN = 60000 kWH = 526 m

Release date: 15.02.2010

Page 9: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

DEMDRAVSKE ELEKTRARNEMARIBOR

SLOVENIA

EEMEMPRESA DE ELECTRICIDADEDA MADEIRA

PORTUGAL

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

ACHENSEE 3 & 4Refurbishment2 Twin PELTON unitsN = 24700 kW/unitH = 396 m

MELKA WAKANARehabilitation1 FRANCIS unitN = 39200 kWH = 301 m

FORMIN2 KAPLAN unitsN = 61000 kW/unitH = 28 m

INVERNO DA CALHETA 3)

Rehabilitation1 PELTON unitN = 7750 kWH = 635 m

FINCHAARehabilitation3 PELTON unitsN = 42000 kW/unitH = 594 m

KOKARehabilitation3 FRANCIS unitsN = 15200 kW/unitH = 42 m

Digital Governing SystemsHardware S7-400Processor 412-2Oil pressure 95 bar

Digital Governing SystemHardware S7-400Processor 412-2Oil pressure 170 bar

Digital GovernorsHardware S7-400Processor 412-2

Digital GovernorHardware S7-400Processor 412-1

Digital Governors & Hydraulic UnitsHardware S7-400Processor 412-2Oil pressure 120 barSCADA System

SCADA SystemPlant controllerHardware S7-400

2006

2006

2006

2006

2006

2006

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

2

1

2

1

3

1

1

Hydropower Engineering

9

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 10: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

DOMLECDOMINICA ELECTRICITYSERVICES LTD.

DOMINICA - WEST INDIES

EEMEMPRESA DE ELECTRICIDADEDA MADEIRA

PORTUGAL

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

ENEL S.p.A.

ITALY

TIS ABBAYRehabilitation3 FRANCIS unitsN = 5500 kW/unitH = 46 m

LAUDATRehabilitation1 PELTON unitN = 1350 kWH = 211 m

RIBEIRA DA JANELA 3)

2 PELTON unitsN = 1300 kW/unitH = 345 m

FAJA DA NOGUEIRA 3)

2 PELTON unitsN = 1700 kW/unitH = 395 m

SERRA DE AGUA 3)

2 PELTON unitsN = 2600 kW/unitH = 407 m

DORFERBACH1 PELTON unitN = 10000 kWH = 632 m

PAISCO1 PELTON unitN = 8400 kWH = 570 m

SCADA SystemPlant controllerHardware S7-400

Digital Governor & Hydraulic UnitHardware S7-400Processor 412-1Oil pressure 80 bar

Digital GovernorsHardware S7-300Processor 313COil pressure 80 bar

Digital Governor & Hydraulic UnitHardware S7-400Processor 412-1Oil pressure 90 bar

Digital Governor & Hydraulic UnitHardware S7-300Processor 313COil pressure 120 bar

2006

2006

2007

2007

2007

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

1

1

6

1

1

Hydropower Engineering

10

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

1) Plant Reference Rights held by ANDINO under NOELL – ANDINO Transfer Agreement2) In collaboration with GEPPERT3) In collaboration with D’Proj

Page 11: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

ENEL S.p.A.

ITALY

ENEL S.p.A.

ITALY

DRINSKO LIMSKE HIDROELEKTRANE d.o.o.

SERBIA

DRINSKO LIMSKE HIDROELEKTRANE d.o.o.

SERBIA

ENEL S.p.A.

ITALY

ARENDALSFOSSEKOMPANI ASA

NORWAY

KIRCHBICHL1 KAPLAN unitN = 4820 kWH = 9 m

PALLANZENO2 PELTON unitsN = 21000 kW/unitH = 510 m

DIETRO LA TORRE1 PELTON unitN = 4400 kWH = 302 m

OVCAR BANJA2 KAPLAN unitsN = 5060/3290 kWH = 19 m

MEDJUVRSJE2 KAPLAN unitsN = 5480/3550 kWH = 20.5 m

VERAMPIO2 PELTON unitsN = 26400 kW/unitH = 565 m

FLATENFOSS 31 KAPLAN unitN = 7220 kWH = 10.25 m

Digital Governor & Hydraulic UnitHardware S7-400Processor 412-1Oil pressure 120 bar

Digital Governors & Hydraulic UnitsHardware S7-300Processor 313COil pressure 120 bar

Digital Governor & Hydraulic UnitHardware S7-300Processor B14COil pressure 120 bar

Digital Governors & Hydraulic UnitsHardware S7-300Processor 314-2DPOil pressure 150 bar

Digital Governors & Hydraulic UnitsHardware S7-300Processor 314-2DPOil pressure 150 bar

Digital Governors & Hydraulic UnitsHardware S7-400Processor 412Oil pressure 120 bar

Digital Governor & Hydraulic UnitHardware S7-400Processor 412-1Oil pressure 150 bar

2007

2008

2008

2009

2009

20082009

2009

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

1

2

1

2

2

2

1

Hydropower Engineering

11

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 12: Hydropower Engineering PLANT REFERENCE LIST · PLANT ANDINO SUPPLIES 3 1 2 2 1 3 1 1 1 Hydropower Engineering 1 DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANT EQUIPMENT

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

ELEKTRO LJUBLJANA

SLOVENIA

DRINSKO LIMSKE HIDROELEKTRANE d.o.o.

SERBIA

ENEL S.p.A.

ITALY

TESSENDERLO ITALIA S.r.l.

ITALY

ENEL S.p.A.

ITALY

ENEL S.p.A.

ITALY

CRNI POTOK,SOPOTA, SUŠJEKN = 100 kWH = 60 m

GAZIVODE1 FRANCIS unitN = 16700 kWH = 115 m

CREVOLA TOCE2 FRANCIS unitsN = 16600 kW/unitH = 201.7 m

MEGOLO2 KAPLAN unitsN = 3750 kW/unitH = 10.85 m

VARZO1 Twin PELTON unitN = 15910 kWH = 445.5 m

LEMIE2 PELTON unitsN = 12195 kW/unitH = 341.6 m

Digital Governors, Unit Control,SynchronizingProcessor 313-C

Digital GovernorHardware S7-300Processor 313-COil pressure 32 bar

Digital Governors & Hydraulic UnitsHardware S7-300Processor 313COil pressure 150 bar

Digital Governors & Hydraulic UnitsHardware S7-400Processor 412-1Oil pressure 160 bar

Digital Governor & Hydraulic UnitHardware S7-400Processor 412-1Oil pressure 120 bar

Digital Governors & Hydraulic UnitsHardware S7-400Processor 412-1Oil pressure 120 bar

2009

2009

2010

2010

2011

2011

CCUUSSTTOOMMEERRCCOOUUNNTTRRYY

YYEEAARR OOFFSSUUPPPPLLYY

AANNDDIINNOO SSUUPPPPLLIIEESSPPLLAANNTT

3

1

2

2

1

2

Hydropower Engineering

12

DIGITAL GOVERNING SYSTEMS, ELECTRICAL CONTROLS, AUXILIARY PLANTEQUIPMENT SUPPLIED SINCE 1994 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010


Recommended