Page 1: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Fargo Flood Control

Southside FloodProtection

Landowner Meeting, Chrisan WestSeptember 15, 2008

Page 2: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

1997 Spring Flood – South of Fargo

Cass

Co H

wy 81

25th Street SouthInterstate 29

Rose Coulee

Wild Rice River

Red River

Fargo Moorhead

Frontier

Page 3: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Wild Rice LeveeAlternative with

Channel Extensions& Recoverable

Storage

Southside Flood

Control

Page 4: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Southside Flood Control

Existing 100 & 500

YearFloodplain

s

Preliminary 100 & 500

YearFloodplains

Page 5: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Basic ProtectionChrisan West

Project Cost: $1.4 Million

Page 6: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Option 1: FEMA Protection – Levee West of Cass County Highway 81

Chrisan West

Project Cost: $1.6 Million

Page 7: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Option 2: FEMA Protection – Raise Cass County Highway 81

Chrisan West

Project Cost: $3.2 Million

Page 8: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Base Option Option 1 Option 2

$1.4 Million $1.6 Million $3.2 MillionIncrease over Base Option $0 $0.2 Million $1.8 Million

1 0 0

0 17 17

$0 $2,477,200 $2,477,200

Number of Homes Acquired

Number of Homes Protected

Property Protected (Assessed Value)

Southside Flood Control ProjectChrisan West

Total Cost of Option

Page 9: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Chrisan West – Resident Feedback

Page 10: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Chrisan West – Resident Feedback

Option No Project Base Option Option 1 Option 2Average Ranking* 4.00 3.30 1.33 2.60

* Ranking is on a scale of 1 to 4 (1-Most Favorable; 4-Least Favorable)12 surveys returned out of 18 mailed

Survey Results - Chrisan West

Page 11: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Technical Committee Preferred Option: FEMA Protection – Levee West of Cass County

Highway 81

Chrisan West

Page 12: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Chrisan West – Concerns Raised

• Snow Removal• Parking• Interior Drainage• City utilities under frontage road• Frontage road paving (desire to have paved road)• Disruption to trees/landscaping• Property value reduction (with levee in front)• Annexation• Existing drainage west of homes

Page 13: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

SE Cass WRD - Preliminary Assessment Analysis Residential Property - Total Amount Assessed

Parcel Area in Acres Parcel 0.50 1.00 2.00 5.00Value 125' X 175' 200' X 215' 275' X 315' 400' X 545'

$100,000 $2,653 $4,182 $5,756 $6,023$150,000 $3,024 $4,553 $6,127 $6,394$200,000 $3,395 $4,924 $6,498 $6,765$350,000 $4,508 $6,037 $7,610 $7,877$500,000 $5,620 $7,149 $8,723 $8,990$750,000 $7,475 $9,004 $10,577 $10,844

Total Number of Residential Parcels 9,033

Page 14: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

SE Cass WRD - Preliminary Assessment Analysis Residential Property - Average Annual Payment

Parcel Area in Acres Parcel 0.50 1.00 2.00 5.00Value 125' X 175' 200' X 215' 275' X 315' 400' X 545'

$100,000 $218 $343 $472 $494$150,000 $248 $373 $502 $524$200,000 $278 $404 $533 $555$350,000 $370 $495 $624 $646$500,000 $461 $586 $715 $737$750,000 $613 $738 $867 $889

Assumed a 25 Year Payment Schedule at 6.50% Interest

Page 15: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Project ScheduleDevelopment of options east of University Drive April-June 2008

City Commission Selection of preferred base alternative

July 14, 2008

Public input meetings April 15 - September 2008

Environmental Assessment July – December 2008

Consultant Selection July - December 2008

Begin Design December 2008

CLOMR Submittal July – December 2008

CLOMR Approval March 2009

ROW Acquisitions October 2008 – October 2009

Permitting September 2008 – April 2009

Special Assessment District September – December 2008

Begin Construction June 2009

Functional Completion March 2011

Final Completion July 2012

Page 16: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Questions / Discussion

Southside Flood Control


Recommended