Fargo Flood Control Southside Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Fargo Flood Control Southside Flood Protection Landowner Meeting, Chrisan West September 15, 2008

  • Upload
    tia

  • View
    50

  • Download
    3

Embed Size (px)

DESCRIPTION

Fargo Flood Control Southside Flood Protection Landowner Meeting, Chrisan West September 15, 2008. Fargo. Moorhead. Interstate 29. Rose Coulee. Frontier. 25 th Street South. Red River. Cass Co Hwy 81. Wild Rice River. 1997 Spring Flood – South of Fargo. Southside Flood Control. - PowerPoint PPT Presentation

Citation preview

Page 1: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Fargo Flood Control

Southside FloodProtection

Landowner Meeting, Chrisan WestSeptember 15, 2008

Page 2: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

1997 Spring Flood – South of Fargo

Cass

Co H

wy 81

25th Street SouthInterstate 29

Rose Coulee

Wild Rice River

Red River

Fargo Moorhead

Frontier

Page 3: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Wild Rice LeveeAlternative with

Channel Extensions& Recoverable

Storage

Southside Flood

Control

Page 4: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Southside Flood Control

Existing 100 & 500

YearFloodplain

s

Preliminary 100 & 500

YearFloodplains

Page 5: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Basic ProtectionChrisan West

Project Cost: $1.4 Million

Page 6: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Option 1: FEMA Protection – Levee West of Cass County Highway 81

Chrisan West

Project Cost: $1.6 Million

Page 7: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Option 2: FEMA Protection – Raise Cass County Highway 81

Chrisan West

Project Cost: $3.2 Million

Page 8: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Base Option Option 1 Option 2

$1.4 Million $1.6 Million $3.2 MillionIncrease over Base Option $0 $0.2 Million $1.8 Million

1 0 0

0 17 17

$0 $2,477,200 $2,477,200

Number of Homes Acquired

Number of Homes Protected

Property Protected (Assessed Value)

Southside Flood Control ProjectChrisan West

Total Cost of Option

Page 9: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Chrisan West – Resident Feedback

Page 10: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Chrisan West – Resident Feedback

Option No Project Base Option Option 1 Option 2Average Ranking* 4.00 3.30 1.33 2.60

* Ranking is on a scale of 1 to 4 (1-Most Favorable; 4-Least Favorable)12 surveys returned out of 18 mailed

Survey Results - Chrisan West

Page 11: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Technical Committee Preferred Option: FEMA Protection – Levee West of Cass County

Highway 81

Chrisan West

Page 12: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Chrisan West – Concerns Raised

• Snow Removal• Parking• Interior Drainage• City utilities under frontage road• Frontage road paving (desire to have paved road)• Disruption to trees/landscaping• Property value reduction (with levee in front)• Annexation• Existing drainage west of homes

Page 13: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

SE Cass WRD - Preliminary Assessment Analysis Residential Property - Total Amount Assessed

Parcel Area in Acres Parcel 0.50 1.00 2.00 5.00Value 125' X 175' 200' X 215' 275' X 315' 400' X 545'

$100,000 $2,653 $4,182 $5,756 $6,023$150,000 $3,024 $4,553 $6,127 $6,394$200,000 $3,395 $4,924 $6,498 $6,765$350,000 $4,508 $6,037 $7,610 $7,877$500,000 $5,620 $7,149 $8,723 $8,990$750,000 $7,475 $9,004 $10,577 $10,844

Total Number of Residential Parcels 9,033

Page 14: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

SE Cass WRD - Preliminary Assessment Analysis Residential Property - Average Annual Payment

Parcel Area in Acres Parcel 0.50 1.00 2.00 5.00Value 125' X 175' 200' X 215' 275' X 315' 400' X 545'

$100,000 $218 $343 $472 $494$150,000 $248 $373 $502 $524$200,000 $278 $404 $533 $555$350,000 $370 $495 $624 $646$500,000 $461 $586 $715 $737$750,000 $613 $738 $867 $889

Assumed a 25 Year Payment Schedule at 6.50% Interest

Page 15: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Project ScheduleDevelopment of options east of University Drive April-June 2008

City Commission Selection of preferred base alternative

July 14, 2008

Public input meetings April 15 - September 2008

Environmental Assessment July – December 2008

Consultant Selection July - December 2008

Begin Design December 2008

CLOMR Submittal July – December 2008

CLOMR Approval March 2009

ROW Acquisitions October 2008 – October 2009

Permitting September 2008 – April 2009

Special Assessment District September – December 2008

Begin Construction June 2009

Functional Completion March 2011

Final Completion July 2012

Page 16: Fargo Flood Control Southside  Flood Protection Landowner Meeting, Chrisan West September 15, 2008

Questions / Discussion

Southside Flood Control