Fargo Flood Control Southside Flood Protection Landowner Meeting, Chrisan West September 15, 2008. Fargo. Moorhead. Interstate 29. Rose Coulee. Frontier. 25 th Street South. Red River. Cass Co Hwy 81. Wild Rice River. 1997 Spring Flood – South of Fargo. Southside Flood Control. - PowerPoint PPT Presentation
Citation preview
Fargo Flood Control
Southside FloodProtection
Landowner Meeting, Chrisan WestSeptember 15, 2008
1997 Spring Flood – South of Fargo
Cass
Co H
wy 81
25th Street SouthInterstate 29
Rose Coulee
Wild Rice River
Red River
Fargo Moorhead
Frontier
Wild Rice LeveeAlternative with
Channel Extensions& Recoverable
Storage
Southside Flood
Control
Southside Flood Control
Existing 100 & 500
YearFloodplain
s
Preliminary 100 & 500
YearFloodplains
Basic ProtectionChrisan West
Project Cost: $1.4 Million
Option 1: FEMA Protection – Levee West of Cass County Highway 81
Chrisan West
Project Cost: $1.6 Million
Option 2: FEMA Protection – Raise Cass County Highway 81
Chrisan West
Project Cost: $3.2 Million
Base Option Option 1 Option 2
$1.4 Million $1.6 Million $3.2 MillionIncrease over Base Option $0 $0.2 Million $1.8 Million
1 0 0
0 17 17
$0 $2,477,200 $2,477,200
Number of Homes Acquired
Number of Homes Protected
Property Protected (Assessed Value)
Southside Flood Control ProjectChrisan West
Total Cost of Option
Chrisan West – Resident Feedback
Chrisan West – Resident Feedback
Option No Project Base Option Option 1 Option 2Average Ranking* 4.00 3.30 1.33 2.60
* Ranking is on a scale of 1 to 4 (1-Most Favorable; 4-Least Favorable)12 surveys returned out of 18 mailed
Survey Results - Chrisan West
Technical Committee Preferred Option: FEMA Protection – Levee West of Cass County
Highway 81
Chrisan West
Chrisan West – Concerns Raised
• Snow Removal• Parking• Interior Drainage• City utilities under frontage road• Frontage road paving (desire to have paved road)• Disruption to trees/landscaping• Property value reduction (with levee in front)• Annexation• Existing drainage west of homes
SE Cass WRD - Preliminary Assessment Analysis Residential Property - Total Amount Assessed
Parcel Area in Acres Parcel 0.50 1.00 2.00 5.00Value 125' X 175' 200' X 215' 275' X 315' 400' X 545'
$100,000 $2,653 $4,182 $5,756 $6,023$150,000 $3,024 $4,553 $6,127 $6,394$200,000 $3,395 $4,924 $6,498 $6,765$350,000 $4,508 $6,037 $7,610 $7,877$500,000 $5,620 $7,149 $8,723 $8,990$750,000 $7,475 $9,004 $10,577 $10,844
Total Number of Residential Parcels 9,033
SE Cass WRD - Preliminary Assessment Analysis Residential Property - Average Annual Payment
Parcel Area in Acres Parcel 0.50 1.00 2.00 5.00Value 125' X 175' 200' X 215' 275' X 315' 400' X 545'
$100,000 $218 $343 $472 $494$150,000 $248 $373 $502 $524$200,000 $278 $404 $533 $555$350,000 $370 $495 $624 $646$500,000 $461 $586 $715 $737$750,000 $613 $738 $867 $889
Assumed a 25 Year Payment Schedule at 6.50% Interest
Project ScheduleDevelopment of options east of University Drive April-June 2008
City Commission Selection of preferred base alternative
July 14, 2008
Public input meetings April 15 - September 2008
Environmental Assessment July – December 2008
Consultant Selection July - December 2008
Begin Design December 2008
CLOMR Submittal July – December 2008
CLOMR Approval March 2009
ROW Acquisitions October 2008 – October 2009
Permitting September 2008 – April 2009
Special Assessment District September – December 2008
Begin Construction June 2009
Functional Completion March 2011
Final Completion July 2012
Questions / Discussion
Southside Flood Control