Download pdf - Event Report 100

Transcript
Page 1: Event Report 100

7/26/2019 Event Report 100

http://slidepdf.com/reader/full/event-report-100 1/1

REPORTE EVENTO VOLADURA 100 CERRO NEGRO

Printed: August 1, 2014 (V 10.60 - 10.60) Format © 1995-2013 Xmark Corporation

Date/TimeTrigger SourceRangeRecord TimeJob Number:

Long at 11:55:15 June 6, 2014Geo: 0.300 mm/s, Mic: 69.0 pa.(L)Geo: 31.7 mm/s4.75 sec (Auto=3Sec) at 1024 sps1

Serial Number Battery LevelUnit CalibrationFile Name

BE20805 V 10.60-8.17 MiniMate Plus6.2 VoltsJanuary 7, 2014 by InstantelV805FCWM.G30

NotesLocation: Mina Constancia

Client: STGyM

User Name: Pevoex Contratistas SAC

General:

Extended Notes

Post Event NotesVOLADURA 100 CERRO NEGRO DH=440 DI=445.9 DV=70.1

MicrophonePSPLZC FreqChannel Test

Linear Weighting11.5 pa.(L) at 1.312 sec6.1 HzPassed (Freq = 19.7 Hz Amp = 558 mv )

PPVZC FreqTime (Rel. to Trig)Peak AccelerationPeak DisplacementSensor Check  Frequency

Overswing Ratio

Tran1.30

120.759

0.02150.0127Passed

7.63.8

Vert1.19

100.869

0.01490.0124

Passed7.53.8

Long1.89

140.782

0.02980.0201

Passed7.43.8

mm/sHzsecgmm Hz

Peak Vector Sum 1.92 mm/s at 0.783 sec

CRITERIO PREVENCION (UNE 22.381)

   V  e   l  o  c   i   t  y   (  m  m   /  s   )

Frequency (Hz)

III

II

I

1 2 5 10 20 50 100

1

2

5

10

20

50

100

200

254

Tran: + Vert: x Long: ø

++

+++ ++

++x

ø

ø

øøø

øøø

øø

ø

ø ø

>

0.00.0 1.0 2.0 3.0 4.0 5.0

Trigger =

0.0MicL

0.0Long

0.0Vert

0.0Tran

Time Scale:0.20 sec/div  Ampl itude Scale:Geo: 0.500 mm/s/div Mic: 10.00 pa.(L)/div Sensor Check