Envision™-ing a Green 30th
Street CorridorRe-imagining the Heart of Milwaukee
Jerome Flogel, P.E.Sr. Project Manager, MMSD
1
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
2/30
AGENDA
The District….a Culture of Sustainability
30th Street Industrial Corridor: Stormwater
and a Whole Lot More….
Partnerships Present Opportunities
The Corridor Grey to Green Planning/DesignProcesses
What Do We Hope to Accomplish?
2
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
3/30
What is MMSD?
• WI State Chartered Agency
• Water Reclamation
• Flood Management
• 1.1 Million Residents
• 28 Municipalities
• 411 Square Miles
33
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
4/30
4
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
5/30
MMSD SUSTAINABILITY
5
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
6/30
MMSD WATERCOURSE
6
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
7/30
7
Corridor Water History:
7,000 acres (11 mi2)
~3,000 acres drain northto Lincoln Creek
~4,000 acres drain south
to the Menomonee River
Before development, a
complex network of wetlands
and streams existed.
Industrial era engineering
confined and routed
stormwater to channels and
pipes.
W. Hampton Ave
N .
1 0 t h
S t .
N .
6 8 t h
S
t .
W. Townsend St.
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
8/30
8
The Watershed Project Area
Capitol Drive
3 5 t h S
t .
2 7 t h S
t
.
Townsend
Street
Located northwest of
Milwaukee downtown. Corridor stretches for
5-miles along the
railroad.
Major industries along
Canadian PacificRailroad.
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
9/30
9
JULY 2010
Photos from the Milwaukee Journal Sentinel
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
10/30
PROBLEMS/OPPORTUNITIES
July 2010 Storm Event
Reported Problems 3,000 + properties reported
basement backups.
Approximately 50 locations
experienced flooding.
Private sector damages
alone exceeded $32 million.
10
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
11/30
PROBLEMS/OPPORTUNITIES
1,000 plus foreclosure and
tax delinquent properties.
Industrial flight due to
flooding problems.
Highest rates of violent and
property crime.
Approximately 770 acres of
brownfields.
Extremely depressed
property values.
11
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
12/30
PLANNING PROCESS
12
Stakeholder andagency input
Public and
resident input
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
13/30
ASSEMBLING THE PUZZLE
13
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
14/30
14
“Develop a cost -effective, implementable
stormwater management solution to address
the 100-year drainage problems within theTarget Area of the 30th Street Industrial
Corridor, considering redevelopment,
stormwater management requirements, and
green infrastructure initiatives.”
PROJECT MISSION
Capitol Drive
North Avenue
3 5 t h S
t
.
2 7 t h S
t .
Townsend
Street
“Identify and characterize basement backups
and regional stormwater drainage problems
and solutions in the South Corridor area and
formulate a complementary Green Corridor
strategy to enable smart redevelopment and
an enhanced quality of life for business and
residents in the area.”
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
15/30
30th ST. CORRIDOR PROPOSED SOLUTION
Capitol Drive
North Avenue
3 5 t h S
t
.
2 7 t h S
t .
Townsend
Street
• North and South: 52.2
MG of surface
stormwater storage at 9locations.
• North: 3,700 LF of storm
conveyance box culvert.
(range 4’x6’ to 5.5’x8.5’)
• South: 2,200 LF of 24”storm sewer.
• South: 7,000 LF of 72” to
144” storm sewer.
• South: 13,500 LF of
green drainage way.
• South: 5,000 street
storm inlet restrictors.
15
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
16/30
16
NORTH SEGMENT FLOODING PROBLEMS
Limited pipe capacity.
Lack of defined and
continuous overland
flow paths.
Limited capacity of
receiving system.
Capitol Driv
3 5 t h S
t .
2 7 t h S
t .
Lincoln Creek
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
17/30
30th CORRIDOR PROPOSED SOLUTION - NORTH
Capitol Drive
North Avenue
2 7 t h S
t .
Townsend
Street
DRS Basins
DRS North Basin – 16acre-feet. (5 million
gallons)
DRS East Basin – 8
acre-feet. (2.6 million
gallons)
1,200 LF of 5’x 8’ box
culvert.
965 LF of 4’x 6’ box
culvert.
17
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
18/30
30th CORRIDOR PROPOSED SOLUTION - NORTH
Capitol Drive
North Avenue
2 7 t h S
t .
Townsend
Street
Bee Bus Basin
Storage Volume – 75 acre-feet. (25
million gallons)
1,500 LF of 5.5’x
8.5’ box culvert.
18
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
19/30
19
BUILDING RELATIONSHIPS
Capitol Driv
3 5 t h S
t .
2 7 t h S
t .
Lincoln Creek
Past Experience……
Trust ……
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
20/30
20
PLANNING: MMSD SUSTAINABILITY WORKSHEET
Capitol Driv
3 5 t h S
t .
2 7 t h S
t .
Lincoln Creek
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
21/30
21
PLANNING: MMSD SUSTAINABILITY WORKSHEET
Capitol Driv
3 5 t h S
t .
2 7 t h S
t .
Lincoln Creek
Identify appropriate sustainability criteria and complete the
Sustainability Worksheet in Appendix F for each of the three
alternatives. Include as attachments to the report. The worksheet
evaluates the sustainability impacts of each alternative using the
following criteria: energy, water, waste, financial, and social. The
following steps shall be followed for completion of the SustainabilityWorksheet.
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
22/30
Lyons Park Creek: Flood Management
Preliminary Alternatives• Do Nothing
• Conveyance Only
• Upgrade culverts
•
Increased Storage In ROW• Property Acquisitions
ENVISION™ HISTORY AT MMSD
22
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
23/30
Lyons Park Creek: Flood Management
Preliminary Alternatives
ENVISION™ HISTORY AT MMSD
23
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
24/30
24
DESIGN: ENVISION™
Capitol Driv
3 5 t h S
t .
2 7 t h S
t .
Lincoln Creek
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
25/30
25
Capitol Driv
3 5 t h S
t .
2 7 t h S
t .
Lincoln Creek
DESIGN: ENVISION™
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
26/30
26
Capitol Driv
3 5 t h S
t .
2 7 t h S
t .
Lincoln Creek
DESIGN: ENVISION™
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
27/30
27
Capitol Driv
3 5 t h S
t .
2 7 t h S
t .
Lincoln Creek
DESIGN: ENVISION™
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
28/30
PROJECT BENEFITS
28
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
29/30
PROJECT BENEFITS
Environmental
Water Quality Benefits - Reduced CSO volumes by 20 to 90 million gallons
Flood Damage Reductions - Savings of $130 million over 20 years
Area of Green Space - 65 acres of added green space
EconomicForeclosed Property Maintenance - $1.5 million in annual savings
Property Values - 2- to 3-fold increases in property values
Social
Recreational Opportunities - Playfields, game courts, and walk /bike path trails
Jobs Creation - 1,300 short term and 70 long term jobs
Connectivity to Neighborhoods - 8.5 miles of porous pavement bike path
29
8/9/2019 Envision (TM) ing a Green 30th St. Corridor
30/30
QUESTIONS?
30
Jerome Flogel, P.E.Sr. Project Manager