    Envision™-ing a Green 30th 

    Street CorridorRe-imagining the Heart of Milwaukee 

    Jerome Flogel, P.E.Sr. Project Manager, MMSD

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    2/30

    AGENDA

    The District….a Culture of Sustainability 

    30th Street Industrial Corridor: Stormwater

    and a Whole Lot More…. 

    Partnerships Present Opportunities

    The Corridor Grey to Green Planning/DesignProcesses

    What Do We Hope to Accomplish?

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    3/30

    What is MMSD?

    •  WI State Chartered Agency

    •  Water Reclamation

    •  Flood Management

    •  1.1 Million Residents

    •  28 Municipalities

    •  411 Square Miles

    33 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    4/30

     

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    5/30

    MMSD SUSTAINABILITY

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    6/30

    MMSD WATERCOURSE

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    7/30

    7

    Corridor Water History:

    7,000 acres (11 mi2)

    ~3,000 acres drain northto Lincoln Creek

    ~4,000 acres drain south

    to the Menomonee River

    Before development, a

    complex network of wetlands

    and streams existed.

    Industrial era engineering

    confined and routed

    stormwater to channels and

    pipes.

    W. Hampton Ave

       N .

       1   0   t    h

        S   t .

       N .

       6   8   t    h

        S

       t .

    W. Townsend St.

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    8/30

    The Watershed Project Area

    Capitol Drive

       3   5   t   h    S

       t .

       2   7   t   h    S

       t

     .

    Townsend

    Street

    Located northwest of

    Milwaukee downtown. Corridor stretches for

    5-miles along the

    railroad.

    Major industries along

    Canadian PacificRailroad.

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    9/30

    JULY 2010

    Photos from the Milwaukee Journal Sentinel

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    10/30

    PROBLEMS/OPPORTUNITIES

    July 2010 Storm Event

    Reported Problems 3,000 + properties reported

    basement backups.

    Approximately 50 locations

    experienced flooding.

    Private sector damages

    alone exceeded $32 million.

    10 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    11/30

    PROBLEMS/OPPORTUNITIES

    1,000 plus foreclosure and

    tax delinquent properties.

    Industrial flight due to

    flooding problems.

    Highest rates of violent and

    property crime.

    Approximately 770 acres of

    brownfields.

    Extremely depressed

    property values.

    11 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    12/30

    PLANNING PROCESS

    12 

    Stakeholder andagency input

    Public and

    resident input

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    13/30

    ASSEMBLING THE PUZZLE

    13 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    14/30

    14 

    “Develop a cost -effective, implementable

    stormwater management solution to address

    the 100-year drainage problems within theTarget Area of the 30th Street Industrial

    Corridor, considering redevelopment,

    stormwater management requirements, and

    green infrastructure initiatives.”  

    PROJECT MISSION

    Capitol Drive

    North Avenue

       3   5   t   h    S

       t

     .

       2   7   t   h    S

       t .

    Townsend

    Street

    “Identify and characterize basement backups

    and regional stormwater drainage problems

    and solutions in the South Corridor area and

     formulate a complementary Green Corridor

    strategy to enable smart redevelopment and

    an enhanced quality of life for business and

    residents in the area.”  

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    15/30

    30th ST. CORRIDOR PROPOSED SOLUTION

    Capitol Drive

    North Avenue

       3   5   t   h    S

       t

     .

       2   7   t   h    S

       t .

    Townsend

    Street

    • North and South: 52.2

    MG of surface

    stormwater storage at 9locations.

    • North: 3,700 LF of storm

    conveyance box culvert.

    (range 4’x6’ to 5.5’x8.5’)

    • South: 2,200 LF of 24”storm sewer.

    • South: 7,000 LF of 72” to

    144” storm sewer.

    • South: 13,500 LF of

    green drainage way.

    • South: 5,000 street

    storm inlet restrictors.

    15 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    16/30

    16 

    NORTH SEGMENT FLOODING PROBLEMS

    Limited pipe capacity.

    Lack of defined and

    continuous overland

    flow paths.

    Limited capacity of

    receiving system.

    Capitol Driv

       3   5   t   h    S

       t .

       2   7   t   h    S

       t .

    Lincoln Creek

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    17/30

    30th CORRIDOR PROPOSED SOLUTION - NORTH

    Capitol Drive

    North Avenue

       2   7   t   h    S

       t .

    Townsend

    Street

    DRS Basins

    DRS North Basin – 16acre-feet. (5 million

    gallons)

    DRS East Basin  – 8

    acre-feet. (2.6 million

    gallons)

    1,200 LF of 5’x 8’ box

    culvert.

    965 LF of 4’x 6’ box

    culvert.

    17 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    18/30

    30th CORRIDOR PROPOSED SOLUTION - NORTH

    Capitol Drive

    North Avenue

       2   7   t   h    S

       t .

    Townsend

    Street

    Bee Bus Basin

    Storage Volume – 75 acre-feet. (25

    million gallons)

    1,500 LF of 5.5’x

    8.5’ box culvert.

    18 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    19/30

    19 

    BUILDING RELATIONSHIPS

    Capitol Driv

       3   5   t   h    S

       t .

       2   7   t   h    S

       t .

    Lincoln Creek

    Past Experience…… 

    Trust …… 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    20/30

    20 

    PLANNING: MMSD SUSTAINABILITY WORKSHEET

    Capitol Driv

       3   5   t   h    S

       t .

       2   7   t   h    S

       t .

    Lincoln Creek

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    21/30

    21 

    PLANNING: MMSD SUSTAINABILITY WORKSHEET

    Capitol Driv

       3   5   t   h    S

       t .

       2   7   t   h    S

       t .

    Lincoln Creek

    Identify appropriate sustainability criteria and complete the

    Sustainability Worksheet in Appendix F for each of the three

    alternatives. Include as attachments to the report. The worksheet

    evaluates the sustainability impacts of each alternative using the

    following criteria: energy, water, waste, financial, and social. The

    following steps shall be followed for completion of the SustainabilityWorksheet.

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    22/30

    Lyons Park Creek: Flood Management

    Preliminary Alternatives• Do Nothing

    • Conveyance Only

    • Upgrade culverts

    Increased Storage In ROW• Property Acquisitions

    ENVISION™ HISTORY AT MMSD

    22 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    23/30

    Lyons Park Creek: Flood Management

    Preliminary Alternatives

    ENVISION™ HISTORY AT MMSD 

    23 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    24/30

    24 

    DESIGN: ENVISION™ 

    Capitol Driv

       3   5   t   h    S

       t .

       2   7   t   h    S

       t .

    Lincoln Creek

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    25/30

    25 

    Capitol Driv

       3   5   t   h    S

       t .

       2   7   t   h    S

       t .

    Lincoln Creek

    DESIGN: ENVISION™ 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    26/30

    26 

    Capitol Driv

       3   5   t   h    S

       t .

       2   7   t   h    S

       t .

    Lincoln Creek

    DESIGN: ENVISION™ 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    27/30

    27 

    Capitol Driv

       3   5   t   h    S

       t .

       2   7   t   h    S

       t .

    Lincoln Creek

    DESIGN: ENVISION™ 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    28/30

    PROJECT BENEFITS

    28 

  • 8/9/2019 Envision (TM) ing a Green 30th St. Corridor

    29/30

    PROJECT BENEFITS

    Environmental 

    Water Quality Benefits - Reduced CSO volumes by 20 to 90 million gallons

    Flood Damage Reductions - Savings of $130 million over 20 years

    Area of Green Space -  65 acres of added green space 

    EconomicForeclosed Property Maintenance - $1.5 million in annual savings

    Property Values - 2- to 3-fold increases in property values

    Social

    Recreational Opportunities - Playfields, game courts, and walk /bike path trails

    Jobs Creation - 1,300 short term and 70 long term jobs

    Connectivity to Neighborhoods - 8.5 miles of porous pavement bike path