Comparative cost of doing business
Location Water Electricity
Office Rents
Legal minimum
wage
Regular gasoline price
Industrial estate (land) purchase
rate
(USD/cu.m3)
(USD/kwH) (price/ sq. m /year, in USD)
(monthly, in USD)
(1 liter, in USD)
(Cost /sq m, in USD)
Malaysia 0.43 0.11 288 296 0.63 30-67
Thailand 0.37 0.11 252 197 1.44 144
Vietnam 0.43 0.09 420 113 1.11 -
Philippines 0.91 0.27 240 220 1.27 98-112
Indonesia 1.01 0.09 276 226 0.71 180-297
Singapore 1.80 0.23 960 - 1.71 209-1,180
China 0.64 0.13 540 231 1.23 143-167
India 0.30 0.12 528 128 1.35 55-91
Source: The 23rd Survey of Investment Related Costs in Asia and Oceania, Japan External Trade Organization (JETRO), FY 2012 Survey Salary Comparison
Location Managers (department chief level)
Engineers (mid-level engineers)
Staffs (Non-manufacturing, general level)
Workers (general workers)
monthly (in USD)
Malaysia 1,966 944 858 344
Thailand 1,574 698 664 345
Vietnam 787 342 418 145
Philippines 1,070 452 493 301
Indonesia 1057 433 423 239
Singapore 4,268 2,325 2,330 1,230
China 1,456 835 824 449
India 1,395 641 562 276
Source: The 23rd Survey of Investment Related Costs in Asia and Oceania, Japan External Trade Organization (JETRO), FY 2012 Survey
Cost of Doing Business – March 2014
3 | P a g e
Cost of Doing Business in Malaysia/ Penang
1. Starting a Business
Main fees to be paid to the Companies Commission of Malaysia (SSM)
RM US$
Reservation of a name 30 9
For registration of a company, fees range according to nominal share capital, e.g.:
• Not exceeding RM100,000 (US$31,250) 1,000 313
• RM100,001 - 500,000 (US$31,250 - 156,250) 3,000 938
• RM500,001 - RM1 million (US$156,250 - US$312,500) 5,000 1,563
• RM1,000,001 - RM5 million (US$312,500 - US$1.6 million) 8,000 2,500
• RM5,000,001 - RM10 million (US$1.6 million - US$3.13 million) 10, 000 3,125
• RM10,000,001 - RM25 million (US$3.13 million - US$7.81 million) 20,000 6,250
• RM25,000,001 - RM50 million (US$7.81 million - US$15.63 million) 40,000 12,500
• RM50,000,001 - RM100 million (US$15.63 million - US$31.25 million) 50,000 15,625
• Exceeding RM100 million (US$15.63 million) 70,000 21,875
(USD 1 = RM3.20) For the full range of fees, please go to CCM's website at www.ssm.com.my Source: MIDA
Recommended Fees for Company Secretarial Services
RM US$
Incorporation of a Sdn. Bhd. (private limited company) 2,000 625
Incorporation of a Bhd. (public limited company) 3,500 1,094
Monthly Fees Professional Fees Retainer Fees
RM US$ RM US$
Private Company:
- Dormant 50 16 100 31
- Semi-active 100 31 150 47
- Active 150 47 300 94
Public Company:
- Non-Listed 200 63 750 234
- Listed 300 94 2,000 625
Consultancy and advisory fee (minimum, per hour)
Minimum RM300(USD 94) per hour or part thereof (subject to negotiation )
USD 1 = RM3.20 Source: MIDA
Cost of Doing Business – March 2014
4 | P a g e
Rental Rates for Prime Office Space
Location RM US$
Alor Setar, Kedah 21.50 - 27.00 6.72 - 8.44
Georgetown, Penang 27.00 - 30.00 8.44 - 9.38
Ipoh, Perak 10.70 - 20.40 3.34 - 6.38
Kuala Lumpur* 64.60 - 102.25 20.19 - 31.95
Petaling Jaya, Selangor 37.70 - 53.80 11.78 - 16.81
Seremban, Negeri Sembilan 19.40 - 25.80 6.06 - 8.06
Melaka 10.70 - 27.00 3.34 - 8.44
Johor Bahru, Johor 27.00 - 32.30 8.44 - 10.09
Kuantan, Pahang 13.00 - 27.00 4.06 - 8.44
Kuala Terengganu, Terengganu 21.50 - 27.00 6.72 - 8.44
Kota Bharu, Kelantan 16.00 - 27.00 3.34 - 8.44
Kota Kinabalu, Sabah 27.00 - 32.30 5.00 - 8.44
Kuching, Sarawak 15.00 - 27.00 8.44 - 10.09
USD 1 = RM3.20 The above rates are approximate rentals (gross) per sq. metre per month inclusive of service charge. Note: 1 sq. metre = 10.76 sq.ft. *Rental excludes Petronas Twin Towers Source: MIDA Cost of Prime Office Space for Penang
Penang Island Mainland, Penang
Georgetown (RM psf)
Bayan Lepas/ Bayan Baru (RM psf)
(RM psf)
Rent 1.50-3.00 1.50-2.00
Sale Depends on the owner & agreement
Source: Different consultants in Penang
Cost of Doing Business – March 2014
5 | P a g e
Cost of Industrial Land & Factory
Ready Built Factory Unit
Location Unit Type Built-Up (sq.ft)
Land Area (sq.ft)
Purchase Price Rental
Bukit Minyak Industrial Park
Semi-Detached 5,834 15,518-22,848
RM630,000 USD 196,875
RM4,083.80 USD 1,276.19
Terrace - Standard Unit
2,303 2,594 RM243,000 USD 75,937.50
RM1,612.80 USD 504
Corner Unit 2,335 3,417- 6,148
From RM253,000 From USD 79,063
RM1,633.80 USD 510.56
Bayan Lepas Industrial Park (Phase IV)
Semi-Detached 5,834 16,221-16,533
RM1,100,000 USD 343,750
RM7,613.80 USD 2,379.31
Terrace - Standard
Unit
2,303 2,594 RM 420,000 USD 131,250
RM2,994.00 USD 935.63
Corner Unit 2,334 4,079-4,585 From RM460,000 From USD 143,750
RM3,035.00 USD 948.44
USD 1 = RM3.20 Source: PDC
Cost of Ready-built Factory in Penang
Type Location RM USD
Selling price per ft² of floor area
Penang RM168.00 - 400.00 *Depends on the owner &
agreement
US$53.76 - 128.00 *Depends on the
owner & agreement
Rental per ft² per month
Bayan Lepas/ Bayan Baru
RM1.50 - 3.53 US$0.48 - 1.13
Mainland RM0.70 -1.70 US$0.22 - 0.54
Source: MIDA
Cost of Industrial Land
Location
Selling Price (per sq. ft.) (Subject to change)
RM USD
Penang Science Park 35.00 10.94
Bukit Minyak Industrial Park 30.00 9.40
Batu Kawan Industrial Park 35.00 10.94
USD 1 = RM3.20 Source: PDC
Cost of Doing Business – March 2014
6 | P a g e
Property Assessment Property assessment, also known as assessment rates is a form of taxation imposed by the local municipal council on all properties based on the 'Annual Value' and the Annual 'Percentage Rate'. The percentage rate is fixed annually by the Council according to its annual budgetary needs. The assessment rate payable for rateable properties is calculated with the following formula: Assessment rate = Annual Value x Rate % Property Assessment Rate (Penang Island)
No. Type of Property Area 1 Area 2
1. Industrial 13.50% 13.50%
2. Commercial 10.30% 10.30%
3. Landed (Residential) 8.30% 8.30%
4. Strata (Residential) 7.50% 7.50%
5. Low Cost (Residential) 7.00% 7.00%
6. Associations / Kongsi 7.00% 7.00%
7. Development (Vacant Land) 4.50% 1.70%
8. Agricultural (Vacant Land) 0.00% 1.00%
9. Hotel 13.50% 13.50%
10. Small Industry (Agricultural) 6.80% 6.80%
*Area 1 covers the area within the City of George Town and Area 2 covers the area outside the City of George Town. Source: MPPP Property Assessment Rate (Mainland)
No. Type of Property Mainland
1. Industrial 10.00%
2. Small and Medium Industries 9.50%
3. Commercial 7.00% - 9.50%
4. Landed (Residential) 7.00%
5. Strata (Residential) 6.00%
6. Strata (Low Cost) 4.50%
7. Village (Residential) 0.40%
8. Development Land 2.10%
Source: MPSP
Cost of Doing Business – March 2014
7 | P a g e
Quit Rent (a) Town Land (b) Country Land
Location Industrial Purpose Location Industrial Purpose
Georgetown RM1.29 m2 minimum RM300 per lot
Prai RM 1.08 m2 minimum RM150 per lot
Jelutong -same- Valdor -same-
Air Itam -same- Bukit Minyak -same-
Gelugor -same- Bukit Panchor -same-
Bukit Bendera -same- Tasek -same-
Butterworth -same- Seberang Jaya -same-
Prai -same- Bayan Baru -same-
Tanjong Bungah -same- Batu Maung RM0.65m2 minimum RM100 per lot
Batu Ferringhi -same- Sungai Ara -same-
Bukit Mertajam -same- Batu Kawan -same-
Bayan Lepas -same- Sungai Rambai -same-
Balik Pulau RM1.08 m2 minimum RM200 per lot
Bertam -same-
Nibong Tebal -same- Simpang Empat -same-
Kapala Batas -same- Areas other than the above
RM0.65 m2 minimum RM80 per lot
Sungai Bakap -same- Source: Penang Lands and Mines Office
Construction labor rates in Penang
Types of Labor Unit
Residential & Commercial
Projects
Rate (RM)
1 Concretor per 8 hour day 98.00
2 Bricklayer per 8 hour day 90.00
3 Tler per 8 hour day 107.00
4 Carpenter per 8 hour day 100.20
5 Barbender per 8 hour day 94.00
6 Welder per 8 hour day 83.50
7 Plasterer per 8 hour day 96.70
8 Plumber per 8 hour day 97.50
9 Painter per 8 hour day 98.50
Source: CIDB
Cost of Doing Business – March 2014
8 | P a g e
Average Construction Costs of Factory Building (per sq. ft.)
Penang Island Mainland
RM US$ RM US$
Factory with reinforced concrete structure 200-270 62.50-84.38 190-265 59.38-82.81
Steel portal frame on reinforced concrete 220-300 68.75 -93.75 200-295 62.5-92.19
Factory with clean room facilities 270-350 84.38-109.38 260-360 81.25-112.5
USD 1 = RM3.20 Source from different consultants Additional Information: Unit Cost also very much depending on cleanroom class, floor loading, column spacing and building height which already include the MEP(Mechanical, Electrical, and Plumbing) rates as follow: Mechanical estimate. No or negligible cost variance between Penang island and mainland.
Types RM per sq. ft
1 Clean room and ACMV(Air Conditioning and Mechanical Ventilation)
137
Assumptions: Chilled water system (CH’s, CT’s, piping and fittings within chiller plant room)
45
Clean room floor, ceiling, plenum, wall 32
Clean room electrical outgoing cable, clean room lighting, clean room DB’s
12
Clean room AHU, control, ducting, piping 48
2 Non-clean room ACMV (water-cooled packaged units) 25
3 Fire protection (sprinklers, hydrants, hose reel, conventional FA, etc.) 12
Source from different consultants 2. Taxation
Note: Effective the year of assessment 2004, SMEs with a paid-up capital of RM2.5 million and below are eligible for a reduced corporate tax rate of 20% on the chargeable income of up to RM500,000. Note: As announced in budget 2014,corporate tax rate be reduced by 1 percentage point from 25% to 24% and corporate tax rate for SMEs will be reduced by 1 percentage point from 20% to 19%, from the year of assessment 2016. Source: MIDA
Tax Rate
Company Tax 20% – 25%
Personal Income Tax 0% - 26%
Withholding Tax 3% – 15%
Sales Tax 5% – 10%
Capital Allowance Rate
Initial Allowances 10 %– 40%
Annual Allowances 3% - 40%
Cost of Doing Business – March 2014
9 | P a g e
25%
17%
30% 30%25% 25%
33.99%
26%
20%
37%32%
35%
45%
30.90%
0%5%
10%15%20%25%30%35%40%45%50%
Corporate Tax Personal Income Tax
Source: TaxRates.cc; http://www.taxrates.cc/
3. Human Resources
Minimum Conditions of Employment
The Employment Act, 1955 is the main legislation on labor matters in Malaysia.
Paid maternity leave 60 days
Normal work hours Not exceeding eight hours in one day or 48 hours in one week
Paid holiday At least 11 gazetted public holidays (inclusive of five compulsory public holidays; National Day, Birthday of the Yang Dipertuan Agong, Birthday of Ruler/Federal Territory Day, Labour day and Malaysia Day) in one calendar year and on any day declared as a public holiday under section 8 of the Holiday Act 1951
Paid annual leave for employees:
Less than two years of service 8 days
Two or more but less than 5 years of service 12 days
Over five years of service 16 days
* Minimum paid annual leave to be provided for employees
Paid sick leave per calendar year:
Less than two years of service 14 days
Two or more but less than five years of service
18 days
Over five years of service 22 days
Where hospitalisation is necessary up to 60 days (inclusive of the paid sick leave entitlement stated above)
* Minimum paid annual leave to be provided for employees
Cost of Doing Business – March 2014
10 | P a g e
Payment for overtime work:
Normal working days one-and-a-half times the hourly rate of pay
Rest days two times the hourly rate of pay
Public holidays three times the hourly rate of pay
Source: MIDA Shift Work: An employee who is engaged under his contract of service in shift work may be required by his employer to work more than eight hours in any one day or more than forty-eight hours in any one week but the average number of hours worked over any period of three weeks, or over any period exceeding three weeks as may be approved by the Director General, shall not exceed forty-eight per week. Souce: International Labour Organization http://www.ilo.org/dyn/natlex/docs/WEBTEXT/48055/66265/E55mys01.htm#c60c
Statutory Contributions
Employees Provident Fund
The compulsory contributions under the Employees Provident Fund (EPF) Act 1991:
Age Group Employers Employees
60 years and below Minimum of 12% of the employees' monthly wages
Minimum of 11% of the employees' monthly wages
60-75 years Minimum of 6% of the employees' monthly wages
Minimum of 5.5% of the employees' monthly wages
All foreign workers and expatriates and their employers are exempted from compulsory contributions. They can, however choose to contribute and the applicable rates are as follows:
Age Group Employers Employees
60 years and below RM5.00 (US$1.57) per employee per month
11% of the employees' monthly wages
60-75 years RM5.00 (US$1.57) per employees per month
5.5% of the employees' monthly wages
USD 1 = RM3.20 Note: Employers’ statutory contribution rate is 13% for employees earning less than RM5,000 (Effective from 1 January 2012) Source: MIDA
Cost of Doing Business – March 2014
11 | P a g e
Social Security Organisation (SOCSO)
SOCSO administers two social security schemes for workers earning wages not exceeding RM3,000 (US$938) per month. Once covered, workers remain covered irrespective of their wages. However, the maximum contribution is based on wages of RM3,000 (US$938) per month.
All Malaysian employees and permanent residents who have been employed by an employer under a contract of service or apprenticeship are liable under SOCSO's act. Categories of employees exempted from SOCSO's coverage are:
• Government employees
• Domestic servants
• Self-employed persons
• Foreign workers
• Business owner and spouses of sole-proprietorship or partnership
Contribution under Employment Injury Insurance Scheme:
• Employers - 1.25% of the employee's wages
• Employees - Nil
Contribution under the Invalidity Pension Scheme:
• 1% of the employee's wages shared equally by the employer and employee.
Source: MIDA
Human Resources Development Fund (HRDF)
HRDF operates on the basis of a levy/grant system. Employers who have paid the Human Resources Development levy will qualify for training grants from the HRDF to defray or subsidise training costs for their Malaysian employees. Manufacturing companies cover under the Human Resources Development Berhad Act, 2001 are as follows:
Categories of Employers Rate of Levy Contributions
Employers with 50 employees and above 1% of employees' monthly wages
Employers with 10 to 49 employees and a paid-up capital of RM2.5 million (US$781,250) and above
1% of employees' monthly wages
Employers with 10 to 49 bemployees and a paid-up capital of less than RM2.5 million (US$781,250), are given the option to register with HRDF
0.5% of employees' monthly wages
USD 1 = RM3.20 Source: MIDA
Cost of Doing Business – March 2014
12 | P a g e
Employment of Expatriates
An employment pass is issued to expatriate to enable him to stay and work legally in the country. There are two types of passes issued by the Immigration Department subject to the period of employment’s contract and the monthly salary received by the expatriates.
Type of Passes Payments of Fees
A Employment Pass (PG) This pass is issued for key-post and term-post position subject to the following conditions:
• minimum period of employment’s contract is (2) years and stamping; and
• salary not less than RM3,000 (US$938)
i. Employment Pass:
• Key Post RM300 (USD94)
• Term Post RM200 (USD63)
ii. Processing Fees RM50 (USD16)
iii. Journey Perform Visa
RM500 (USD156)
per post/application (subject to visa entry requirement according to each country of origin)
iv. No levy
B Visit Pass Visit Pass (Temporary Employment) is issued only for domestic helpers.
i. PLKS/VP(TE) Pass:
RM60 (USD19) per year
ii. Levy: RM410 (USD128)
iii. Processing fees:
RM50 (USD16)
iv. Journey Perform Visa (if applicable)
RM500 (USD157) including Visa based on country
USD 1 = RM3.20 Source: MIDA Wage Rates (Monthly)
Position Qualification(s) Experience Minimum Maximum
RM USD RM USD
Finance
Financial Analyst Degree 3-4 years 4,000 1,250 6,000 1,875
Accountant Degree/Profession
al Cert 4-5 years 5,000 1563 7,000 2,188
Office support
Front Desk Assistant High School 1-2 years 1,500 469 2,200 688
Data Entry Assistant High School 1-2 years 1,200 375 1,600 438
Despatch High School 1-2 years 1,000 313 1,500 469
Administrator Diploma/Degree 3-5 years 3,000 938 4,500 1,406
Cost of Doing Business – March 2014
13 | P a g e
Sales, Marketing & Advertising
Customer Service Executive Diploma/Degree 2-3 years 1,800 563 2,800 875
Sales Executive High School/ Diploma/Degree
2-3 years 2,000 625 3,000 938
Marketing Executive Diploma/Degree 2-4 years 2,300 719 3,000 938
Marketing Manager Higher
Diploma/Degree 4-5 years 4,500 1,406 6,500 2,031
Human Resources
HR Manager Diploma/Degree 5-6 years 6,000 1,875 8,000 2,500
HR Officer / Executive Diploma/Degree 2-3 years 2,500 781 4,000 1,250
HR Assistant High
School/Diploma 1-2 years 1,500 469 2,500 781
Information Technology
IT Executive Degree 2-3 years 3,000 938 3,500 1,094
Programmer Degree 2-3 years 3,500 1,094 4,500 1,406
Help Desk Analyst Degree 2-3 years 4,000 1,250 5000 1,563
Web Designer Degree 2-3 years 3,500 1,094 4,500 1,406
Software Engineer Degree 2-3 years 3,500 1,094 4,500 1,406
Systems Analyst Degree 3-5 years 5,500 1,719 7,000 2,188
Business Development Manager
Degree 8 years 7,000 2,188 10,00
0 3,125
Project Manager Degree 3-5 years 6,500 2,031 10000 3,125
Helpdesk Tech Support (Foreign Languages)
Degree 2-3 years 4,000 1,250 5,000 1,563
Logistic & Warehousing
Shipping Supervisor Diploma/Degree 3-5 years 2,200 563 3,500 1,094
Warehouse Executive Diploma 2-3 years 3,000 938 5,500 1,719
Buyer Diploma/Degree 2-3 years 2,500 781 4,000 1,094
Logistic Coordinator Diploma/Degree 3-5 years 2,200 625 3,500 938
Warehouse Manager Diploma/Degree 4-6 years 4,500 1,250 8,000 2,500
Engineering & Technical
QA Inspector Degree 4-5 years 3,000 938 5,000 1,563
Electrical Technician Technical Diploma 1-2 years 1,800 563 2,500 781
Sales Engineer Technical/Diploma/ Degree
3-4 years 2,800 875 4,000 1,250
Mechanical Engineer Engineering
Degree 3-4 years 3,500 1,094 5,000 1,563
Product Engineer Engineering 4-6 years 5,000 1,563 7,000 2,188
Cost of Doing Business – March 2014
14 | P a g e
Degree
Service Engineer Degree 3-4 years 3,500 1,094 5,500 1,563
Technical Manager Technical/Diploma/ Degree
4-5 years 6,000 1,875 8,000 2,500
Assembly Engineer Degree 2-3 years 2,800 875 4,000 1,250
R&D Engineer Diploma/Degree 2-3 years 3,000 938 5,000 1,563
USD 1 = RM3.20 Note: Salary figures are industry average. Figures may vary according to depth of expertise and experience. Source: Malaysia Employment Outlook & Salary Guide 2011/12 by Kelly Services
0
1000
2000
3000
4000
Malaysia Singapore India Philippines
Salary Comparison in Engineering Field (USD)
Manager
Senior executive
fresh graduate
Source: Jobstreet Salary Report
Source: Jobstreet Salary Report
USD1= MYR3.2
USD1= SGD1.25
USD1= INR62.45
USD1= PHP43.25
Cost of Doing Business – March 2014
15 | P a g e
4. Utilities
Electricity Rates
This tariff is effective from 1st January 2014 and supersedes the previous tariff schedule which was effective on 12th August 2011.
Tariff Category Unit RM USD
1
Tariff A - Domestic Tariff sen/kWh
For the first 200 kWh (1 - 200 kWh) per month sen/kWh 21.80 sen/kWh 6.81
For the next 100 kWh (201 - 300 kWh) per month
sen/kWh 33.40 sen/kWh 10.44
For the next 100 kWh (301 - 400 kWh) per month
sen/kWh 51.60 sen/kWh 16.13
For the first 100kWh (401 - 500 kWh) per month
sen/kWh 51.60 sen/kWh 16.13
For the next 100 kWh (501 - 600 kWh) per month
sen/kWh 51.60 sen/kWh 16.13
For the next 100 kWh (601 - 700 kWh) per month
sen/kWh 54.60 sen/kWh 17.06
For the next 100 kWh (701 - 800 kWh) per month
sen/kWh 54.60 sen/kWh 17.06
For the next 100 kWh (801 - 900 kWh) per month
sen/kWh 54.60 sen/kWh 17.06
For the next kWh (901 kWh onwards) per month
sen/kWh 57.10 sen/kWh 17.84
The minimum monthly charge is RM3.00
Tariff B - Low Voltage Commercial Tariff
For Overall Monthly Consumption Between 0-200 kWh/month
For all kWh sen/kWh 43.5 13.59
The minimum monthly charge is RM7.20 (USD 2.37)
For Overall Monthly Consumption More Than 200 kWh/month
For all kWh (From 1kWh onwards) sen/kWh 50.9 15.91
The minimum monthly charge is RM7.20 (USD 2.3)
2
Tariff C1 - Medium Voltage General Commercial Tariff
For each kilowatt of maximum demand per month
RM/kW 30.3 9.47
For all kWh sen/kWh 36.5 11.41
The minimum monthly charge is RM600.00 (USD 197.2)
3
Tariff C2 - Medium Voltage Peak/Off-Peak Commercial Tariff
For each kilowatt of maximum demand per month during the peak period
RM/kW 45.1 14.09
For all kWh during the peak period sen/kWh 36.5 11.41
For all kWh during the off-peak period sen/kWh 22.4 7.00
The minimum monthly charge is RM600.00 (USD197.2)
Cost of Doing Business – March 2014
16 | P a g e
Industrial Tariffs
Tariff Category Unit RM USD
1
Tariff D - Low Voltage Industrial Tariff
For Overall Monthly Consumption Between 0-200 kWh/month
For all kWh sen/kWh 38.0 11.88
The minimum monthly charge is RM7.20 (USD 2.3)
For Overall Monthly Consumption More Than 200 kWh/month
For all kWh (From 1kWh onwards) sen/kWh 44.1 13.78
The minimum monthly charge is RM7.20 (USD 2.3)
Tariff Ds – Special Industrial Tariff (for consumers who qualify only)
For all kWh sen/kWh 42.7 13.34
The minimum monthly charge is RM7.20 (USD 2.3)
2
Tariff E1 - Medium Voltage General Industrial Tariff
For each kilowatt of maximum demand per month
RM/kW 29.6 9.25
For all kWh sen/kWh 33.7 10.53
The minimum monthly charge is RM600.00 (USD 187.5)
Tariff E1s – Special Industrial Tariff (for consumers who qualify only)
For each kilowatt of maximum demand per month
RM/kW 23.7 7.41
For all kWh sen/kWh 33.6 10.5
The minimum monthly charge is RM600.00 (USD197.2)
3
Tariff E2 - Medium Voltage Peak/Off-Peak Industrial Tariff
For each kilowatt of maximum demand per month during the peak period
RM/kW 37.0 11.56
For all kWh during the peak period sen/kWh 35.5 11.09
For all kWh during the off-peak period sen/kWh 21.9 6.84
The minimum monthly charge is RM600.00 (USD197.2)
Tariff E2s – Special Industrial Tariff (for consumers who qualify only)
For each kilowatt of maximum demand per month during the peak period
RM/kW 32.9 10.28
For all kWh during the peak period sen/kWh 33.6 10.5
For all kWh during the off-peak period sen/kWh 19.1 5.97
The minimum monthly charge is RM600.00 (USD 197.2)
4
Tariff E3 - High Voltage Peak/Off-Peak Industrial Tariff
For each kilowatt of maximum demand per month during the peak period
RM/kW 35.5 11.09
For all kWh during the peak period sen/kWh 33.7 10.53
For all kWh during the off-peak period sen/kWh 20.2 6.31
The minimum monthly charge is RM600.00 (USD 197.2)
Tariff E3s – Special Industrial Tariff (for consumers who qualify only)
For each kilowatt of maximum demand per month during the peak period
RM/kW 29.0 9.06
For all kWh during the peak period sen/kWh 31.7 9.91
For all kWh during the off-peak period sen/kWh 17.5 5.47
The minimum monthly charge is RM600.00 (USD 197.2)
Cost of Doing Business – March 2014
17 | P a g e
Note: SIT has a 2% higher increase than normal Industrial tariff in line with the Government's effort to gradually phase out the SIT subsidy Note: The revision of the surcharge on electricity bill for the RE Fund from 1.0 per cent to 1.6 per cent is to facilitate the implementation of Feed-in Tariff (FiT) mechanism USD1 = RM3.20 (Source: Tenaga National Berhad)
Water Rate (Penang)
Category RM per 1,000 litres USD per 1,000 litres
Tariff 1: Domestic (Individual)
Minimum charge: 2.50 per month 0.78
WATER CONSERVATION SURCHARGE (WCS)
Consumption above 35,000 liters per month 0.48 0.15
First 20,000 litres 0.22 (no WCS) 0.07
20,001 - 35,000 litres 0.42 (no WCS) 0.13
35,000 - 40,000 litres 0.90 (0.42+ 0.48 WCS) 0.28
40,000 - 60,000 litres 1.00 (0.52+0.48 WCS) 0.31
60,000 – 200,000 litres 1.38 (0.90+0.48 WCS) 0.43
More than 200,000 litres 1.48 (1.00+0.48 WCS) 0.46
Tariff 2: Trade (Ordinary)
Minimum charge: 10.00 per month 3.13 per month
First 20,000 litres 0.66 0.21
20,001 - 40,000 litres 0.89 0.28
40,001 - 200,000 litres 1.15 0.36
More than 200,000 litres 1.27 0.40
Tariff 3: Trade (Special)
Minimum charge: 10.00 per month 3.13 per month
Flat rate 1.52 0.48
Tariff 4: Trade (Shipping)
Minimum charge: 10.00 per month 3.13 per month
Flat rate 2.54 0.79
Tariff 5: Domestic (Bulk)
Minimum charge: 26.00 per month 8.13
Flat rate 0.35 0.11
USD 1= RM3.20 (Source: Perbadanan Bekalan Air Pulau Pinang Sdn Bhd, as on 2 July 2012) (Penang water conservation surcharge increased from RM0.24 to RM0.48 effectively from 1st September 2013)
Cost of Doing Business – March 2014
18 | P a g e
Comparison of Water Rate by State
State Usage Price per m³ (RM)
Min. Payment/month
(RM)
Penang Industrial/Commercial 0-20,000m3 21-40m3 41 - 200 m3 Above 200m3
0.66 0.89 1.15 1.27
10.00
Selangor Industrial/Commercial 0-35m3
35 m3 and above 2.07 2.28
36.00
Johor Industrial/Commercial 0-35 m³ 35m³ and above
2.60 2.96
25.00
Kedah Commercial 0 - 50 m³ 51 - 200 m³ 201- 350 m³ More than 350 m³
1.40 1.50 1.60 1.80
15.00
Industrial 0 – 1,000m³ 1,001 – 10,000 m³ 10,0001- 50,000 m³ More than 50,001 m³
1.40 1.60 1.80 2.10
15.00
Sewerage Rates
Sewerage services in Malaysia were privatised in 1994 and are managed by Indah Water Konsortium Sdn. Bhd., a company wholly owned by Minister of Finance Incorporated. It operates in 86 Local Authorities areas except those in Johor Bahru, Kelantan, Sabah and Sarawak.
Domestic Customers
Houses receiving connected sewerage services RM8 (US$2.50) per month
Houses with individual septic tanks RM6 (US$1.88) per month
Village/Estate dwelling houses with individual septic tanks or receiving connected sewerage services
RM3 (US$0.94) per month
Low cost dwelling houses and houses with annual value of less than RM600 (US$188) with individual septic tanks or receiving connected sewerage services
RM2 (US$0.94) per month
Cost of Doing Business – March 2014
19 | P a g e
Industrial Customers
Premises receiving connected sewerage services RM2.50 (US$0.78) per head per month
Premises with individual septic tanks RM2 (US$0.63) per head per month
Commercial Customer
Monthly sewerage services charges for commercial premises is the sum of the Basic Charge based on the premises Annual Value and the Excess Charge based on average water consumption in excess of 100 meter cube (m³).
Annual Value of Property Monthly charge for premises receiving
connected sewerage services
Monthly charge for premises with
individual septic tanks
RM US$ RM US$ RM US$
2,000 or less 625 or less 8 2.50 7 2.19
2,001 - 5,000 625.31 -1,563 14 4.38 8 2.50
5,001 - 10,000 1,563 - 3,125 20 6.25 14 4.38
10,001 - 20,000 3,125 - 6,250 26 8.13 19 5.94
20,001 - 30,000 6,250 - 9,375 29 9.06 21 6.56
30,001 - 40,000 9,375 - 12,500 32 10.00 23 7.19
40,001 - 50,000 12,500 - 15,625 35 10.94 25 7.81
50,001 - 60,000 13,902 - 16,682 38 11.88 27 8.44
60,001 - 70,000 18,750 - 21,875 41 12.81 29 9.06
70,001 - 80,000 21,875 - 25,000 44 13.75 31 9.69
80,001 - 90,000 25,000 - 28,125 47 14.69 33 10.31
90,001 - 100,000 28,125 - 31,250 50 15.63 35 10.94
100,001 - 200,000 31,250 - 62,500 180 56.25 120 37.50
200,001 - 400,000 62,500 - 125,000 495 154.69 330 103.13
400,001 - 600,000 125,000 - 187,500 522 163.13 348 108.75
600,001 - 800,000 187,500 - 250,000 1,980 618.75 1,320 412.50
800,001 - 1,000,000 250,000 - 312,500 2,160 675 1,440 450
1,000,001 - 3,000,000 312,500 - 937,500 4,320 1,350 2,880 900
3,000,001 - 5,000,000 937,500 -1,562,500 8,800 2,750 5,400 1,875
5,000,001 - 7,000,000 1,562,500 - 2,187,500 9,200 2,875 6,000 1,875
More than 7,000,001 More than 2,187,500 9,600 3,000 6,600 2,063
Monthly Excess Charge
Water Usage Excess Charge
Up to 100 m³ No charge
More than 100 m³ 30 sen (9 US cents) per m³
More than 200 m³ 45 sen (14.06 US cents) per m³
*The excess charges are subject to an annual revision based on the water consumption data for the previous year obtained from the Water Authority. USD 1= RM3.20 (Source: MIDA)
Cost of Doing Business – March 2014
20 | P a g e
Scheduled Waste Treatment Rates
Kualiti Alam Sdn. Bhd. is a designated company providing off-site scheduled waste treatment disposal services in Peninsular Malaysia. Its waste management centre is located at Bukit Nanas in Negeri Sembilan. Scheduled wastes must be disposed through department of enviroment licensed scheduled waste with recovery contractors. For non-scheduled wastes, collection and disposal rates vary according to location and contractor.
Waste Group Waste Type
A Mineral Oil Wastes Wastes containing lubricating oil, hydraulic oil, etc.
B Organic Chemical Wastes Containing Halogens and/or Sulphur > 1% Freon, PVC wastes, chloroform, solvents, capacitors and transformers containing PCB, etc.
C Waste Solvents Containing Halogens and/or Sulphur < 1% Acetone, alcohols (eg. ethanol, methanol), benzene, turpentine, xylene, etc. Waste should be pumpable, containing < 50% water and 18MJ/kg calorofic value
H Organic Chemical Wastes Containing Halogens and/or Sulphur < 1% Glue, latex, paint, phenol, printing ink, synthetic oils, soap, epoxy, etc.
K Wastes Containing Mercury Mercury, vapour lamps, COD-fluids, mercury batteries, etc.
T Pesticide Wastes Insecticides, fungus and weed killers, rat poison, etc
X Inorganic Wastes Acids, alkaline, sodium hypochlorite, inorganic salts, metal hydroxide sludge, chromate and cyanide waste, etc.
Z Miscellaneous Medicine wastes, lab-packs, asbestos wastes, mineral sludges, isocyanates (MDI,TDI), batteries, etc.
Organic Wastes for Incineration
Waste Group
Packaged Wastes* Bulk Wastes
Pumpable liquid
(per tonne)
Solid
(per tonne)
Pumpable liquid
(per tonne)
Solid
(per tonne)
RM US$ RM US$ RM US$ RM US$
A 810 253 - - 630 197 - -
B 3,150 984 3,600 1,125 - - -
-
C 1,350 422 - - - - - -
H/Z 1,890 591 2,790 872 1,800 563 2,700 844
T 3,150 984 3,600 1,125 - - - - *Note: Packaged wastes refers to wastes packed in standard 200-litre drums or 1m3 PP Bags.
Cost of Doing Business – March 2014
21 | P a g e
Liquid Inorganic Wastes for Physical/Chemical Treatment
Waste Group
800-litre Pallet Tank (per tonne)
200-litre Drum (per tonne)
RM US$ RM US$
Acid Wastes Without Chromate (X) 1,440 450 1,620 506
Alkaline Wastes Without Cyanide (X) 1,440 450 1,620 506
Chromate Wastes (X) 1,800 563 1,980 619
Cyanide Wastes (X) 1,800 563 1,980 619
Mercury Wastes (K) 3,600 1,125 3,780 1,181
Inorganic Wastes for Solidification
Waste Group
Packaged Wastes* per tonne
Waste in Bulk per tonne
RM US$ RM US$
X / Z 810 253 765 239
Inorganic Waste for Direct Landfill
Waste Group
Packaged Wastes* per tonne
Waste in Bulk per tonne
RM US$ RM US$
X / Z 495 155 450 141
Encapsulation
Waste Group (Z)
Packaged Wastes* per tonne
RM US$
Contaminated Crushed Drum and Other Contaminated Waste 1,500 469
Cementation
Waste Group (Z)
Packaged Wastes* per tonne
RM US$
Dry Cell Batteries and Other Miscellaneous Wastes 900 281
Source: MIDA
Cost of Doing Business – March 2014
22 | P a g e
Natural Gas Tariff
Tariff Category Price (RM/MMBTU)
Applicable Range MMBTU/MONTH (MMBTU/YEAR)
1 Tariff B – Commercial Unit Charge
20.61 0 – 50 mmBtu (0 – 600 mmBtu)
2 Tariff C – Commercial & Industrial Unit Charge
13.98 51 – 416 mmBtu (601 – 5,000 mmBtu)
3 Tariff D – Commercial & Industrial Unit Charge
14.61 417 – 4,166 mmBtu (5,001 – 50,000 mmBtu)
4 Tariff E – Commercial & Industrial Unit Charge
16.07 4,167 – 16,666 mmBtu (50,001 – 200,000 mmBtu)
5 Tariff F – Commercial & Industrial Unit Charge
16.07 16,667 – 62,500 mmBtu (200,001 – 750,000mmBtu)
6 Tariff L – Commercial & Industrial Unit Charge
16.45 >62,500 mmBtu (>750,000mmBtu)
Source: Gas Malaysia Berhad
Transportation Rates
KM State
Per Pallet Per Metric
Tonne 1st Tier 2nd Tier
min. 18 pallet Above 18 pallet
RM US$ RM US$ RM US$
114 Negeri Sembilan 52.88 16.53 26.44 8.26 66.10 20.66
248 Kuala Lumpur (Wilayah Persekutuan)
59.73 18.67 29.87 9.33 74.66 23.33
274 Melaka 60.71 18.97 30.36 9.49 75.89 23.72
374 Selangor 65.61 20.50 32.80 10.25 82.01 25.63
652 Perak 79.32 24.79 39.66 12.39 99.14 30.98
722 Johor 82.25 25.70 41.13 12.85 102.82 32.13
760 Pahang 84.21 26.32 42.11 13.16 105.26 32.89
1050 Penang 113.59 35.50 56.79 17.75 141.98 44.37
1152 Terengganu 180.17 56.30 90.09 28.15 225.22 70.38
1166 Kedah 181.15 56.61 90.58 28.31 226.44 70.76
1190 Kelantan 183.11 57.22 91.56 28.61 228.89 71.53
1240 Perlis 184.09 57.53 92.04 28.76 230.11 71.91
Note: For palletises pickup, the rates are in tier's, the 1st tier for minimum pickup of 18 pallets and the 2nd tier is for any subsequent pallet pickup. from a single consignment CTI request. *Packaged wastes refers to wastes packed in standard 200-litre drums or 1m3 PP Bags. USD 1= RM3.20 Source: MIDA
Cost of Doing Business – March 2014
23 | P a g e
5. Transportation Costs
Container Haulage Rates
Haulage base: Port Klang (North Port)
Area
Haulage Rates
Road Tolls FAF Total
20' & 40'
(RM)
Effective from 1st Jan. 2007
12.47% Period
from 1st May 2006
20' & 40'
(Actual at cost) (RM)
RM US$
PORT KLANG - Shah Alam 444.00 19.80 55.37 519.17 162
PETALING JAYA - Sungai Way 504.00 23.20 62.85 590.05 184
SELANGOR - Banting 564.00 0.00 70.33 634.33 198
PERAK - Tanjung Malim 1,262.00 59.80 157.37 1,479.17 462
PENANG - Butterworth/ Seberang Prai 2,402.00 194.80 299.53 2,896.33 905
KEDAH - Kulim 2,372.00 240 295.79 2,907.79 908
PERLIS - Kangar 2,906.00 240 362.38 3,508.38 1,096
NEGERI SEMBILAN - Nilai 968.00 56.40 120.71 1,145.11 357
MELAKA - Air Keroh Industrial Area 1,468.00 103.40 183.06 1,754.46 548
KELANTAN - Kota Bharu 3,302.00 197.80 411.76 3,911.56 1,222
PAHANG - Kuantan 1,940.00 197.80 241.92 2,379.72 743
TERENGGANU - Kerteh 2,318.00 197.80 289.05 2,804.85 876
JOHOR - Pasir Gudang 2,348.00 211 292.80 2,851.60 891
Source: MIDA
Cost of Doing Business – March 2014
24 | P a g e
Ocean Freight Rates
Rates quoted are subject to: 1. THL/THD/DOC and EDI 2. BAF/ CAF/WAR RISK/ PEAK SEASON surcharges as per Conference announcement.
From Port Klang to : 20-ft container 40-ft container
US$ US$
AUSTRALIA Main ports
900 1,800
CHINA Shanghai
100 200
EUROPE Main ports
900 1,800
INDIA Navasheva
600 1,800
JAPAN Main ports
400 800
KOREA Pusan
400 800
WEST MEDITERRANEAN Main ports
900 1,800
NEW ZEALAND 950 1,900
SOUTH AFRICA 1,300 2,600
USA West Coast Los Angeles
1,725
2,300
USA East Coast New York
2,625
3,500
Source: MIDA
Courier Service Rates
Various Malaysian and international companies provide courier services in Malaysia.
Destination Country
Documents Merchandise Max. Weight Limit (kg) First 500 gm Next 500 gm First 500 gm Next 500 gm
RM US$ RM US$ RM US$ RM US$
Australia 60.00 18.75 15.00 4.69 75.00 22.44 14.00 4.38 20
Germany 70.00 21.88 20.00 6.25 100.00 31.25 19.00 5.94 23
Japan 47.00 14.69 12.00 3.75 64.00 20.00 15.00 4.69 30
UK 70.00 21.88 20.00 6.25 100.00 31.25 15.00 4.69 20
USA 65.00 20.31 20.00 6.25 100.00 31.25 20.00 6.25 No Limit
Source: MIDA
Cost of Doing Business – March 2014
25 | P a g e
Penang Bridge
Source: Penang Bridge Sdn Bhd, www.penangbridge.com.my
Penang Port Ferry Tariff
Price structure for the latest tariff of ferry services are as follows :- RM USD
I. Passenger
a. Children age 5 and below 12 years of age 0.60 0.19
b. Adult 1.20 0.38
Monthly ticket (not valid for travel with bicycle)
a. Student (not exceeding 21 years of age) 6.00 1.88
b. Adult 30.00 9.38
II. Bicycle 1.40 0.44
III. Motorcycle 2.00 0.63
IV. Trishaw and Tricycle 3.30 1.03
V. Motorcar including Station Wagon, Four Wheel Drive, Three Wheel Drive, Three Wheel Commercial Vehicle and Motorcycle with Side Car.
7.70 2.41
Vl. Lorry, Van and Bus
a. Vehicle with 2 axles and 4 wheels 13.20 4.13
b. Vehicle with 2 axles and 6 wheels 27.50 8.59
Source : Penang Port Commission