8/20/2019 Contract Change Order No. 14 Redacted
1/7
Citv of Carmel-bv-the-Sea
PUBLIC WORKS DEPARTMENT
POST OFFICE BOX CC , CARMEL-BY-THE-SEA , CA 93921
(831) 620-2070
CONTRACT CHANGE ORDER NO. 14
CONTR CT W RDED BY
: City Council
DATE OF AWARD
Apr
7, 2015
~ ~ R ~ O ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t e ~ r ~ R ~ ~ ~ ~ = S H E E T ____
_
~ ~
~
PROJECT
10#
: 13-70903 Purchase Order#: 76-004428
TO: Otto Construction Company; 2150 Garden Road, Suite A-1, Monterey, CA 94940 ,C
ON
TRACTOR
You are hereby requested to make the herein described chang
es
from the plans and specifica tions or do the
fo
ll
owing described work not included in the
pl
ans and specifications on this
co
nt ract.
NOTE: THIS CHANGE IS NOT EFFECTIVE UNTIL FULLY EXECUTED.
Cha
Description:
1 CHANGES TO CONTRACT PLANS AND SPECIFICATIONS.
Addit ion: Supply all labor and materials necessary
to
complete the following: Reference RFP
#23r1 , Bulletin #8 (revised
),
and PCO #40 (Otto's tracking number). Summary of Work;
reconfigure floor plan for dressing rooms from two small dressing
ro
oms to one large dressing
room and add electrical outlets, and other electrical. Changes made as requested by
user
groups.
Agreed Lump
Sum
........ .... .. ...... ... .
..
..... ... .... .
.. ..
. .... ..
..
..... .
2 CONTRACT PRICE
Total Increase in contract price
3 CONTRACT TIME
One weather day added for the following date: 11-2-15
4,992.00
Increase
Sum net change in Contr
ac
t Price is
1,462,236.00
73,73
1.00
78 723.00
of the original Contract Pr
ic
e 5.4%
Decrease
$
4,992.00
$
4,992.00
1
8/20/2019 Contract Change Order No. 14 Redacted
2/7
of the original Contract Pr e 5.4%
DATE:
REQUEST FOR PROPOSAL
City ofCarmel by the Sea
PUBLIC
WORKS DEPARTMENT
POST OFFICE BOX CC
CARMEL-BY-THE-SEA, CA 93921
(831) 620-2070 OFFICE
September 14, 2015
PROPOSAL
PROJECT 10.
CONTRACT: Forest Theater Renovation
TO
:
John Garayalde
FROM:
Andy Vanderford
23, rev. 1
13-70904
Otto Construction City of Carmel-by-the-Sea
2150 Garden Road, Suite A-1
Monterey, C 94940
SUBJECT
escription
ofProposed
Changes
REVISED 9-14-15
Location: Dressing Room on stage.
Scope of work: Change floor plan and add electrical pursuant
to
Bulletin 8.
This request for proposal is neither a change in the subject Contract,
nor
an order to the Contractor
to
perform any
work
. However, it pertains to certain proposed modifications
to
the
work
covered
by
said
contract. The provisions, drawings and specifications of said Contract and previous modifications t hereto
will apply, as applicable, unless specifically indicated otherwise herein.
The City
of
Carmel-by-the-Sea hereby requests that the Contractor submit within ten
1
0) working
days
after receipt
of
this request a proposal
to
make the changes described herein. All changes
to
the Contract
Price and Contract Time should be detailed for each separate item listed. Detailed breakdown must include
8/20/2019 Contract Change Order No. 14 Redacted
3/7
TT
Potential Change
Order
(PCO)
Cost
Breakdown
&
Summary
Project
Forest
Theater Renovation
Description o f
Change
Pr
o ject
15-3141..00
Below and attached pricing
relates
to
RFP #40
Dressing Room Layout
Changes
.
CHANGE
ESTIMATE ITEM
GC
DIRECT
COSTS
GC DIRECT LABOR
GC
DIRECT MATERIALS
GC DIRECT EQUIPMENT
GC
OTHERIINDIRECTS
GC M
ARKUP ON
DIRECT COST
GC MARKUP
ON
DIRECT LABOR
GC
MARKUP ON DIRECT MATERIAL
GC ARKUP
ON
DIRECT EQUIPMENT
GC MARKUP
ON
DIRECT OTHER/INDIRECTS
GC SUBCONTRACT(S) OR 'OTHERS'
Circle C
COST
$2 ,580
$282
$0
$0
$2,580
$282
$0
$0
$1
,686
M/U M/U TOTAL
10.0%
10
.
0%
10 .0%
10 .0%
$258
$28
$0
$0
PCO #:
Related RFP #:
Re l
at
ed BU L
:
Related RFI #
DATE:
TOTAL L, M, & E DIRECT COST
TOTAL MARKUP
ON
DIRECT COST
TOTAL SU BCONTRACT COST
40
23
8
N/A
10/29/1 5
$2,862
$286
$1,686
8/20/2019 Contract Change Order No. 14 Redacted
4/7
Otto Construction
2150 Garden Road, Suite A-1
Monter
ey
CA 93940
TEL 831.657.9805 FAX
831
.657.9820
License #178809
OTTO ESTIMATE SUMMARY SHEET
Below and attached pricing relates to RFP 40 Dressing Room
Layout Changes.
ID
Description Hrs Rate Labor
1 Carpenter 24.0
78 1.872
2 Laborer 12.0 59 708
4 (Re-use existing plywood sheeting 0
5 w here possible.)
0
6
0
.
7
0
8 0
9
0
10 0
11
0
12 0
13
0
.
14 0
15
0
16
0
17
0
18
0
19 0
20 0
Matt
282
-
-
.
Job .:
15-3141-00
Project: Forest Theater Renovation
PCO
40
Date·
10/29/2015
Equip Sub Mise TOTAL
0 0
2,154
708
.
-
.
..
..
-
-
-
-
-
.
. -
-
-
-
-
8/20/2019 Contract Change Order No. 14 Redacted
5/7
©
Project
Name:
Forest
Theater Renovation
KPDY
, AND ERSON &
WASNEY
ARCHITECTS
PROJECT
#14017
PROPOSED
CHANGE
ORDER
:
#
18003
DATE
WORK
PERFORMED:
Circle C Electric Service, Inc.
P.O. Bo x 648
Pacific Grove,
CA 93950
(831) 372-1875 Fax (831} 626-4063
Contractor's Lie . No. 524044
C 1
0 C 61 D-48
DSA FILE NUMBER:
DSAAPPLICATION NUMBER
: #01-
DATE OF THIS REPORT:
DESCRIPTION OF
WORK
: Bullet in 08
Dressing Room Layout,
Carmel
Proposal 23, rev.
1.
Any change order
not
accepted w i
thin
10 days is s u
bject
to price inc
reases
.
AS A RESULT
OF
THIS CHANGE ORDER , THE TIME FOR COMPLETION
OF
THE ABOVE
ME
NTIONED CONTRACT
IS
HEREBY EXTENDED BY DAYS.
CIRCLE
C ELECTRIC'S
MATERIAL
Number
Unit extended
CIRCLE C ELECTRIC'S EQUIPMENT Number
Unit
MATERIAL DESCRIPTION
of Units
Cost
Fee EQUIPMENT DESCRIPTION
of Units Cost
M1sc . matenals 1
$295.
$295.
00
$0.00 Skid Steer $0 00
$0
.
00
Trailer
$0
.
00
$0.00 Lift (
da
y rental) $0.00
$0.00 Wackerjday rental)
$0.00
$0
.
00
Com
pr
essor (day rental)
$0
.00
$0
.
00
Grade-All
$0.00
$0
.00
$0.00
$0.
00
$0.00 Sub Total of Equipment
$0.
00
Circle C El
ect
ric
's
5% Mark-up
Sub Total of Material $295.
00
TOTAL
of EQUIPMENT
Tax:8.625% $26.55
TOTAL of
MATERIAL
$321 .55 SUBCONTRAC TOR'S FEES
Number
un1t
SUBCONTRACTORNAME
&
WORKDESCRIPTION
of Units Cost
CIRCLE
C
ELECTRIC'S
LABOR
COST
Numbe
r Hourly Extended
EMPLOYEE'S NAME & WORK DESCRIPTION
of
Hours Rate
7
Sub Total
of
Subcontractor Fees
7
TOTAL
of
EQUIPMENT
TOTAL
of MATERIAL
Subtotal
TOTAL of SUBCONTRACTOR
FEES
Em
lo ee Burden 0% TOTAL
of
CONTRACTOR'S
LABOR
Subtotal
SUBTOTAL
Circle C Electr ic's 10% Mark-up 10%
Mark-u
TOTAL of
CONTRACTOR'S
LABOR
$1,211 .
00
TOT L
OF COP
Extended
I
Fee
I
$0.
00
$0
00
$0 00
$0.00
$0.
00
$0.00
$0.00
$0.00
$0.00
$0.
00
$0.00
$0.00
t:xtenoed
Fee
$0
00
$0 00
$0 00
$0 00
$0
.00
$0
.
00
.0
$0.00
$321 .
55
$0
00
$1.211 .00
$1,532
55
$153
.2
6
$1 ,685 .
81
8/20/2019 Contract Change Order No. 14 Redacted
6/7
I
CODY NDERSON W SNEV RCHITECTS
ULLETIN
BULLETIN NO.: 08 Dressing
Room
Layout
PROJECT
NAME Carme l Forest Theater
ISSUE OA
TE
09/09/15
RFI No
.:
PROJECT No.:
ISSUED
TO
14017
Otto
Construction
2150
Ga
rden
Road.
Suite
A-1
Monterey
,
CA 93940
ISSUED BY
CC
Jilian
Cadouri
Andrew
Vanderford
Monique Wood
Allmaterials
and work hereinafter shall
conformtoall
the requirements
of
he
project Drawings
and Specifications, except as otherwise described.
Choose
one of the follo
wi
ng)
D
D
DESCRIPTION
Item No
.
01
I.
Execute
promptl
y the ins tructions given herein, which i
nterpret
the
Contract
Documents or order m
nor
changes in the
Wo
rkwithout change in Con
tract
Sum or Contract Time. If youconsider that a change in
Contract
Sum orContract Time
is requ
ir
ed,
sutlmit
an
itemized proposal
to
the Architect
imme
diate lyand
tl
efore proceeding with
this
Work. If your
proposal
is found to
tle satisfactory and
inproper order,
thi
s
Bulletin
will
tle
su
perseded
tly a Change Order.
II.
Changes described he
re
in are
tleing
consider
ed
for incor
po
ration
into
t
he
Work. Sutlmit an temizedquotation, in
fonn at requiredby theCon
tract
D
oc
ument
s indicat
ing your proposed changes to he Contract
Sum
or Contract Time.
Do not
proceed
with
the changes
described
herein
unt
i
further
wri tten instructions are issued
by
theArchi tect.
Ill. In order to exped ite the Work and avoid or m1nimize delays n the
Work
which may
af
f
ec
t Con tract
Sum
or Contract
Time. the Contract D
oc
uments are heretly amended asdescritledbe low. Proceed with this work promptly and sutlm it
final costs for Wo l< involved a
nd
change inContract Time if any . for inclus ion in asutlsequ
en
t
Change
Or de r.
Dress
i
ng
Room Layout Revision
at
Scene
Dock Right
Dem
o
inte
r
io
r pa
rtitions and doors as shown on
1
C
A
-2
6
As shown on
2/C
A-
26,
Prov
ide
new
inte
rior partition
per
2/A6.4.
Both
sides
of stud to
rece iv
e p
lywood
to
8/20/2019 Contract Change Order No. 14 Redacted
7/7
FOREST THEATRE DRESSING ROOM, :LECTRIC/\'- SCKETCH
FROJECT
NO:
2014-0414
DATE: 2015-09-10
Bi LUMINAIRE
HOMERUN
DEDICATED
CIRCUIT TO
PANELBO/\R
BELOW.
SENSOR SWIT
AT 48" AFF,
COMPATIBLE
WITH
LUMINAIRES
DUPLEX
RECEPTACLE AT 18"
AFF, HOMERUN TO
PANELBOARD 'S'
RSSTRCCH AOA
CL..EARA/'o.'CSS
TC
/ TA>:E PRE
CE
DENCE
CV E
R
D R E S S
RCCH OlMENSICNS.
SEE 3
A:2
3 AN D Po/3 0
TYPICAL ABOVE
COUNTER
DUPLEX
RECEPTACLE AT 42"
AFF, HOMERUN TO
PANELBOARD 'S'
BELOW. (PROVIDE
DEDICATED CIRCUIT
·r i l EVERY 2 OUTLETS)
1:
;
~ G F
U P L E X
- \ : ............; . 'I RECEPTACLE AT 3"
/ • . ABOVE SINK,
\ ... -.. ~ · r ~ ~ ~ ~ ~ ~ ~ ~ D CIRCUIT
~
1
0
PANELBOARD 'S'
i BELO\'/.
~ ~ ~ c t ~ ~ I G H T
SCENE DOCK PLAN 0
,
....
: :.
.
I _ ; . . .
w
l
v ~ ~ ~ ~
( :
- - ~ -
COOl
ANC£RS3N llo\SIHY
ARCHITECTS
C od
y Anderson W
as ney Ar chi te
ct s, I
nc
.
455 l a m
be
r
t
A
ve
n u e • P a I o A
It o
, CA 94306
6 50 .
328.18
1 8 · F
ax 328.1888
Copyrlghl 2008 by CODY ANDERSON WASNEY ARCHITECTS, INC.
'
. ::;01
STAGE RIGHT SCENE DOCK DEMO PLAN
SCAJ E: V4 : -0
FOREST THEATER
ProtectName·
14017
i O j ~
Nu ri
r
0'7':2:2115
Dci e
·
A2 4
·-Re
tereflce
sli
·
i
CA-26
. · · .. · .. Sheet"Numtiei