Download pptx - Common transition nps

Transcript
Page 1: Common transition nps

CEM& NPS

Page 2: Common transition nps

Content

CEMNPS implementation timeline

Page 3: Common transition nps

Questions to MCe

Page 4: Common transition nps

What is CEM?

Page 5: Common transition nps

How wouldYou describe theLevel of CEM in AIESEC?

Page 6: Common transition nps

What international Strategies and tool are introduced to support CEM?

Page 7: Common transition nps

What is NPS?

Page 8: Common transition nps

And how NPS implementation will affect work of AIESEC?

Page 9: Common transition nps

implementation of NPS,

Globally and in Spain

Page 10: Common transition nps

• Concept of NPS explored

• Decision to pilot it internally on their own

• Internal pilot with 19 entities

• 18.000 participants emails

• Presented at IPM 2012, Hungary

Oct – Dec / 2011 Jan – Feb / 2012

Page 11: Common transition nps

• Signed a contract for a pilot with CustomerGague

• 11 participating entities

• 30000+ participants to be emailed

• Using a new IT system

• Evaluation of the pilot

• Presenting updates & report to the Global plenary at IC Russia

• Defining the Implementation plan

IPM - May / 2012 Until IC / 2012

Page 12: Common transition nps

• 2nd pilots• Education of

entities• Negotiation with

vendor

• NPS access to all countries

• Education/ CEM challenge

IC 2012 - IPM IPM

Page 13: Common transition nps

AiS creating its own GCP

Page 14: Common transition nps

• Signed agreement with Customer Gauge• Pilots are run across the network

AI announce NPS implementation

Page 15: Common transition nps

SEPTEMBERdesicion to implement

NPS on our own

SEPTEMBERLCP + OGX session in

Kick Off “What is NPS”

Page 16: Common transition nps

NOVEMBEREducation in LEX ->

OCTOBERdesicion to implement

NPS on our own TM + OGX

Page 17: Common transition nps
Page 18: Common transition nps

DECEMBER/JANUARYDevelopment of pilots

MARCHResults

presented in Jump In

Page 19: Common transition nps

Results

Page 20: Common transition nps

TMPTLP

GIP EP MaGIP EP ReCIP EP Completed

GCDP EP MaGCDP EP ReGCDP EP Completed

Page 21: Common transition nps

Format of survey was based on AI Pilot surveys

Page 22: Common transition nps
Page 23: Common transition nps
Page 24: Common transition nps

So... What are

the results...detailed results

Page 25: Common transition nps

TMP

Page 26: Common transition nps

185 surveys sent 71 answers

38%answered

Page 27: Common transition nps

10 detractors – 14,09%

16 promoters- 22,53%

Answered 0-6

Answered 9-10

Page 28: Common transition nps

NPS=8.4

Page 29: Common transition nps

Main points for improvement• Planning preparations, Implement deadlines.• Improve the commitment in members• More cooperations between committees• Team building. Team working. Keep improving the

organizational learning• NST has to work in order that keep the LCs closer touch with the

MC• Global Network• Education trainings• Take care of the development of potencial in each member

Page 30: Common transition nps

TLP

Page 31: Common transition nps

90 surveys sent 75 answers

83%answered

Page 32: Common transition nps

10 detractors = 13.7%30 promoters=41.1%

Answered 0-6

Answered 9-10

Page 33: Common transition nps

NPS=27.4

Page 34: Common transition nps

Improvements points• Activities which develop an entrepreneurial and

responsible attitude towards being a better leader: 42

• Practical hard and soft skills development: 38

• Personal and professional development:30

• A practical team leader or executive leadership body experience: 29

• Access to a global network:21

Page 35: Common transition nps

oGIP

Page 36: Common transition nps

3 answersMa

1 detractor 1 promoter

Answered 0-6

Answered 9-10

Page 37: Common transition nps

NPS=0

Page 38: Common transition nps

Information provided about the GIP programme: 0Selection process: 2Induction to AIESEC: 0Matching support: 1Communication effectivity during acceptance procedure: 1 Visa documents and information

Areas of improvement

Page 39: Common transition nps

16 answersRe

2 detractors 10 promoters

Answered 0-6

Answered 9-10

Page 40: Common transition nps

NPS=50

Page 41: Common transition nps

Cultural preparation: 9%Integration by the hosting LC: 32%Logistical support 27%Job description clarity and alignment 32%

Areas of improvement

Page 42: Common transition nps

3 answersCompleted

2 detractors 0 promoters

Answered 0-6

Answered 9-10

Page 43: Common transition nps

NPS=- 33.3

Page 44: Common transition nps

Professional working environment: 2Professional development:1Support by the home entity during the experience: 1Re- integration by the home entity upon return:2

Areas of improvement

Page 45: Common transition nps

oGCDP

Page 46: Common transition nps

MA

Responses2 sent/

1 answer1 passive

Page 47: Common transition nps

RE

Responses17 sent/

3 answers

2 promoters1 passive

Page 48: Common transition nps

Completed

Responses18 sent/1 answer

1 promoter

Page 49: Common transition nps

Results SummaryOveral NPS

Page 50: Common transition nps

31.2

Page 51: Common transition nps

APRILEducation about CEM

APRIL3 month of work

not relevant->

Page 52: Common transition nps

Sad Story

Page 53: Common transition nps

Current StateLCMC

Page 54: Common transition nps

LC Level

LCs know what is NPSExpect that till September we continue manual pilotsKnow Results

X

X

X

Page 55: Common transition nps

MC Level

We have access to platform but right now we have SuperAdmin rightsHaven’t checked results

X

X


Recommended