Patent Pending
®
Aqua Shield ® Membrane
®
®
®
Pre-Planning Your InstallationGather all required tool and materials prior to starting your installation.
Recommended Tools:Circular Saw or Reciprocating SawWet SawImpact Driver / Cordless DrillFloat³/16” V-Notched Trowel
Hack SawUtility Knife or Heavy Duty Shears
•••••
••
Hammer•Screed•
PVC Pipe CleanerPVC/ABS Cement
••
Other Materials NeededSand/Mortar MixModi�ed Thin Set
2” x 4 “ Joist Hanger2” x 4” Lumber for BlockingDrain Grate (Sold Separately Available in Several Finishes)
••
•••
Sub FloorSub �oor must meet local building code requirements and Tile Council of North America (TCNA) guidelines.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
WWW.FINPAN.COM
Additional blocking on long edge
Avoid sloping mortar onto membrane that is adhered to the ClearPath DrainPlate.
membrane