Ward Works Programme 2011/12
TREATMENT DEFINITIONS
Pot Hole/Patch
Minor repairs to carriageways and footways often in the region of 1 to 3 square metres in size and normally in the surface layer
Surface Dressing
A machine laid material, a binder is applied to the surface to seal the road and a layer of stone chippings is applied to create the skidding and ride properties.
Micro Asphalt
A cold machine laid road material with thickness between 6 and 15 millimetres, it is laid in two layers with the first layer, levelling the surface, fills the potholes and seals the surface, the second layer provides the ride quality and the skid resisting qualities Micro Seal A cold hand laid material up to 10 millimetres in thickness on footways; it is laid in one layer which levels and seals the surface.
Resurfacing
Where the road surface, due to age, is starting to crack and craze with larger areas de-laminating from the sub layers, the existing surface is removed and replaced with a new layer of Macadam or Asphalt. This reinstates the structural properties that had failed prior to the work being undertaken. Reconstruction
Page 2 of 41
Reconstruction of the road is undertaken when failure of the sub layers occurs; this is undertaken when the previously mentioned treatments would not restore the road integrity.
Page 3 of 41
Bickenhill Programme 2011/12
Jim Ryan Robert Sleigh Alan Martin
Speed Aware ProgrammeDamson Parkway 30mph ‘Mini SpeedVisor’ speed activated temporary sign - July 2011Coleshill Heath Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - August 2011Coleshill Road 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - November, December and January 2011/12
Solihull Partnership Speed Watch Coleshill Road 30mph speed monitoring and awareness activity - August 2011Coleshill Heath Road 30mph speed monitoring and awareness activity - October 2011High Street, Hampton-in-Arden 30mph speed monitoring and awareness activity - December 2011
Fentham Road Improvements Junction improvements and proposed extension of 20mph Speed Limit - to be complete December 2011
Marston Green Primary SchoolPossible widening of existing footpath in Elm Farm Avenue to be completed in 2011/12, subject to satisfactory consultation
Integrated Highway Programme
Carriageway Micro AsphaltElmdon Lane - from Station Road to End Elmdon Road - from Station Road to Elmdon LaneMiddle Bickenhill Lane - from Middle Bickenhill Lane to Mill HouseOakfields Way - from Lugtrout Lane to endShadowbrook Lane - from High Street to Sports Hall
Bickenhill Programme 2011/12 - continued
Page 4 of 41
Jim Ryan Robert Sleigh Alan Martin
Carriageway Overlay Henwood Lane - from Nr Ford Section to Mill House
Bridge MaintenanceStation Road - from Marston Green Station Footbridge
Footway Micro SealHazel Croft - from Moorend Avenue to end
LTP Programme
Local Safety Scheme and Facilities for PedestriansSolihull Bypass / Yew Tree Lane / Hampton Lane - pedestrian crossing facilities and right turn only stage at existing traffic signals - July / August 2011
Highway Improvements and Facilities for PedestriansFentham Road – Extension of 20mph speed limit and introduction of gateway into Fentham Road.
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC ProjectANITA scheme - ongoing bus priority works around town centre and main routes into Solihull from Airport/NEC area - May / June 2011 onwards
UTC Major SchemeCommunications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network. Development of Quinton control centre - June 2011 to 2013
Blythe Programme 2011/12
Page 5 of 41
Brian Burgess Ken Hawkins Martin McCarthy
Speed Aware Programme Creynolds Lane 40mph ‘Mini SpeedVisor’ speed activated temporary sign - May 2011Tilehouse Lane 30mph ‘Mini SpeedVisor’ speed activated temporary sign - May 2011Frankholmes Drive 30mph ‘Mini SpeedVisor’ speed activated temporary sign - November 2011Tanworth Lane 40mph ‘Mini SpeedVisor’ speed activated temporary sign - November 2011Dickens Heath Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - November 2011
Solihull Partnership Speed WatchDickens Heath Road 30mph speed monitoring and awareness activity - April 2011Shutt Lane 30mph speed monitoring and awareness activity - January 2012
Permanent Vehicle Activated SignsA34 Stratford Road (M42 Junction 4 to Monkspath Hall Road): Proposed electronic Speed Limit Sign (Vehicle Actuated) to be completed in 2011/12 A34 Stratford Road (Monkspath Hall Road to M42 Junction 4): Proposed electronic Speed Limit Sign (Vehicle Actuated) to be completed in 2011/12 Monkspath Hall Road (Frankholmes Drive to Lakeside Drive): Proposed electronic Speed Limit Sign (Vehicle Actuated) to be completed in 2011/12
Integrated Highway Programme
Footway Micro Seal Baywell Close - from Whitemore Drive to end Burnthurst Crescent - from Knowlands Road to end Cryersoak Close - from Whitemore Drive to endHimbleton Croft - from Whitemore Drive to endKitebrook Close - from Knowlands Road to endKnowlands Road - from Caldeford Avenue to Whitemoor DriveMillison Grove - from Whitemoore Drive to endWatery Lane - from Tanworth Lane to Coppice WalkWhitemoor Drive - from Knowlands Road to Monkspath Hall Road
Bridge MaintenanceRumbush Lane - over railway line
Blythe Programme 2011/12 - continuedPage 6 of 41
Brian Burgess Ken Hawkins Martin McCarthy
Integrated Highway Programme - continued
Carriageway Micro AsphaltKineton Lane - from Stratford Road to Illshaw Heath RoadWood Lane - from Rumbush Lane to Norton LaneSchool Road - from Rotherhams Oak Road to adj Cheedon FarmThornton Road - from Monkspath Hall Road to Hay LaneElmbridge Drive - Shelly Crescent to Denby Croft
Carriage ResurfacingFrankholmes Drive - from Hay Lane to Monkspath Hall RoadFulford Hall Road - from Lowbrook Lane to Norton LaneIllshaw Heath Road - from Vicarage Road to Dyers LaneTilehouse Lane - from Whitlocks End Bridge to Tythe Barn LaneStratford Road - Monkspath Roundabout LTP Programme
Local Safety SchemeNorton Lane - at Junction with Wood Lane
Facilities for Cyclists and PedestriansStratford Road - from Dog Kennel Lane to Monkspath Hall Road Stratford Road - from Dog Kennel Lane to Monkspath Hall Road - Cycle links to Dog Kennel Lane and Highlands Road / Solihull Business Park from the A34 Stratford Road. Scheme approved at CDS 1st July 2010. Link to related plans where available - http://www.solihull.gov.uk/akssolihull/images/att25072.pdfStratford Road Dog Kennel Lane - Cycle Link (PHAS)
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network. Development of Quinton control centre - June 2011 to 2013
Page 7 of 41
Castle Bromwich Programme 2011/12
Ted Richards Michael Robinson Gail Sleigh
Speed Aware ProgrammeB4418 Chester Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - April 2011Marlborough Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - April 2011
Solihull Partnership Speed WatchWater Orton Road 30mph speed monitoring and awareness activity - February 2011B4114 Bradford Road 30mph speed monitoring and awareness activity - May 2011B4114 Chester Road 30mph speed monitoring and awareness activity - September 2011B4118 Chester Road 30mph speed monitoring and awareness activity - January 2012Water Orton Road 30mph speed monitoring and awareness activity - February 2012
Integrated Highway Programme:
Carriageway Micro AsphaltKingsleigh Drive - from Chester Road to Danzey Green Road Parkfield Drive - from A452 Collector Road to B4118 Water Orton RoadWater Orton Road/service road - from No 108 to No 164 Yew Tree Road - From Hazlehurst Road to Windleaves Road
Carriageway ReconstructionGreen Lane - from Auckland Drive to Water Orton Road Hurst Lane North – from Chester Road to Green Lane
Page 8 of 41
Castle Bromwich Programme 2011/12 - continued
Ted Richards Michael Robinson Gail Sleigh
LTP Programme
Local Safety Schemes & Facilities for Pedestrians:
B4114 Chester Road - Unsignalised Pedestrian crossing facility in vicinity of Morrison’s Store.B4114 Chester Road - Removal of Deceleration Lane - Modifications to junction to remove deceleration lane into Hazelhurst Road. Link to related plans where available - http://www.solihull.gov.uk/roadworksHurst Lane North – Proposed pedestrian facility in the vicinity of the schoolSt. Mary & St. Margaret’s Church of England Primary School - Proposed shared use footpath for Southfield Avenue to be completed in 2011/12.Park Hall School: In the vicinity of the school, change the existing segregated footway/cycle route to a shared facility and consider whether the length of shared pedestrian/cycle route should be extended. To be completed in 2011/12.Smiths Wood Cycle Route (North Solihull Cycling Programme)
Facilities for Cyclists Smiths Wood Cycle Route (North Solihull Cycling Project) - Phase 1 of North Solihull Cycle project. Extended off road cycle routes along Windward Way and additional pedestrian / cycle crossing facility on B4114 Chester Road. CDS approval 1st July 2010 subject to EDRF funding. Link to related plans where available - http://www.solihull.gov.uk/akssolihull/images/att25070.pdf
Facilities for the disabled: Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major Scheme
Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Page 9 of 41
Chelmsley Wood Programme 2011/12
Alf Hill Karl Macnaughton Nick Stephens
Speed Aware ProgrammeColeshill Heath Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - August 2011Yorkminster Drive 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - July, August, September 2011
Solihull Partnership Speed Watch Yorkminster Drive 30mph speed monitoring and awareness activity - April 2011Coleshill Heath Road 30mph speed monitoring and awareness activity – October 2011
20mph Speed Limit Pilot SchemeWindy Arbor Junior & Infant School - Proposed Part-Time 20mph Speed Limit outside School. Department for Transport approval in 2011/12: Proposed installation and completion in 2012/13
Integrated Highway Programme:
Carriageway Micro AsphaltChelmsley Road - from Blackcat Close to Island Cooks Lane Chilham Drive - from Yorkminster Drive to Ludlow CloseLambeth Close - from Forth Drive to endLudlow Close - from Chilham Drive to end
Carriageway Resurfacing Coleshill Heath Road - from A452 Chester Road to Nr Yorkminster
Page 10 of 41
Chelmsley Wood - continued
Alf Hill Karl Macnaughton Nick Stephens
LTP Programme:
Local Safety SchemeChester Road - Signing and lining improvements on approach to junction with Moorend Avenue
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Page 11 of 41
Dorridge & Hockley Heath Programme 2011/12
Ian Courts Andy Mackiewocz Ken Meeson
Speed Aware ProgrammePoplar Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - June 2011Four Ashes Road 40mph ‘Mini SpeedVisor’ speed activated temporary sign - June 2011Browns Lane 30mph ‘Mini SpeedVisor’ speed activated temporary sign - September 2011A3400 Stratford Road, Hockley Heath 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - January, February, March 2012
Solihull Partnership Speed WatchA3400 Stratford Road, Hockley Heath 30mph speed monitoring and awareness activity - May 2011Earlswood Road 30mph speed monitoring and awareness activity - December 2011Browns Lane 30mph speed monitoring and awareness activity - February 2012
Traffic ManagementHockley Heath Primary School - Installation of parking restrictions outside school to be completed in July 2011
Dorridge & Hockley Heath Programme 2011/12 – continuedPage 12 of 41
Ian Courts Andy Mackiewocz Ken Meeson
Integrated Highway Programme
Carriageway Micro AsphaltAlcott Close - from Arden Road to end Apsley Grove - from Arden Road to endCopstone Drive - from Hanbury Road to end Fennis Close - from Poplar Road to endSchool Road - from Rotherhams Oak Road to adj Cheedon Farm
Station Approach - from Avenue Road to Grange RoadWestfield Close - from Manor Road to endMeadow Close - Parkview to endParkview - Aylesbury Road to EndField Way - Meadow Close to endBlacksmiths Lane - to A34
Carriageway ResurfacingHanbury Road - from Poplar Road to Poplar Road
Carriageway PatchingClifford Road - from Mill Lane to JunctionBox Trees/A3400 RBT
Footway Micro SealFennis Close - from Poplar Road to end Spring Coppice Drive - from Avenue Road to endWarren Drive - from Avenue Road to endMeadow Close – Parkview to end
Carriageway ReconstructionSchool Road - from Stratford Road to Bridge
Tree MaintenanceSlater Road - from Widney Road to Mill Lane
Page 13 of 41
LTP Programme:
Facilities for CyclistsBentley Heath – Proposed cycle route
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Elmdon Programme 2011/12Page 14 of 41
Jean Hamilton Martin Hewings Glenis Slater
Speed Aware ProgrammeVentnor Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - July 2011
Solihull Partnership Speed WatchOld Lode Lane 30mph speed monitoring and awareness activity - June 2011
20mph Speed Limit Pilot SchemeCoppice Junior School - Proposed Part-Time 20mph Speed Limit outside School. Department for Transport approval in 2011/12: Proposed installation and completion in 2012/13
Integrated Highway Programme
Carriageway Micro AsphaltBarnfield Drive - from Damson Parkway to end Coventry Road S/Rd - from Goodway Road to Glencroft RoadForedrove Lane - from Wheeley Road to Walsgrave DriveKendrick Close - from Barnfield Drive to endOdensil Green - from Old Lode Lane to end
Carriageway ResurfacingRangoon Road - from Glencroft to Goodway Road
Page 15 of 41
Elmdon Programme 2011/12 - continued
Jean Hamilton Martin Hewings Glenis Slater
Integrated Highway Programme - continued
Footway Micro SealSpooners Close - from Wilberforce Way to endBarnfield Drive - from Damson Parkway to end Burgess Croft - from Wilberforce Way to end Cloudbridge Drive - from Damson Parkway to Wilberforce Way De Moram Grove - from Cloudbridge Drive to end Foredrove Lane - O/S No. 1 to O/S No.7 Kendrick Close - from Barnfield Drive to endMarling Croft - from Wilberforce Way to endStoney Close - from Marling Croft to endWilberforce Way - from Cloudbridge Drive to Marling Croft / end
LTP Programme
Local Safety SchemeOld Lode Lane – traffic calming and 20mph zone near Hatchford Brook School
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Page 16 of 41
Kingshurst & Fordbridge Programme 2011/12
Debbie Evans David Jamieson Alan Nash
Speed Aware ProgrammeChelmsley Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - April 2011Wheeley Moor Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - April 2011Cooks Lane 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - July, August, September 2011
Solihull Partnership Speed WatchCooks Lane 30mph speed monitoring and awareness activity - March 2011Chelmsley Road 30mph speed monitoring and awareness activity - July 2011Cooks Lane 30mph speed monitoring and awareness activity - March 2012
Traffic ManagementYorkswood Primary School: Amend existing ‘School Keep Clear’ marking to cater for new entrance. To be completed before September 2011
Integrated Highway Programme
Bridge Maintenance Chelmsley Road - Kingshurst Brook
Footway Micro SealGilson Way - from Meriden Drive to endOakthorpe Drive - from Kinghurst Way to Gilson Way
Carriageway Micro AsphaltShelly Close - from Bosworth Drive to endHeathmere Drive - from Leahill Croft to Bosworth DriveLeahill Croft - from Bosworth Drive to endLyons Close - from Lowerstack Croft to Craneberry RoadMaytree Close - from Bosworth drive to end
Page 17 of 41
Kingshurst & Fordbridge Programme 2011/12 - continued
Debbie Evans David Jamieson Alan Nash
LTP Programme
Local Safety SchemesCooks Lane (Chelmsley Road – Forth Drive) – Proposed traffic calming measures - road humps & raised table top junctions.Cooks Lane (near Forth Drive) Zebra crossing to the west of Forth Drive junction. Existing sub-way to be retainedB4114 Chester Road - Unsignalised Pedestrian crossing facility in vicinity of Morrison’s Store.B4114 Chester Road - Removal of Deceleration Lane - Modifications to junction to remove deceleration lane into Hazelhurst Road. Link to related plans where available - http://www.solihull.gov.uk/roadworks
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Page 18 of 41
Knowle Programme 2011/12
Mrs Diana Holl-Allen Jeffrey Potts Alan Rebeiro
Speed Aware Programme B4101 Kenilworth Road, Knowle 30mph ‘Mini SpeedVisor’ speed activated temporary sign - May 2011A4141 Warwick Road, Chadwick End 30mph ‘Mini SpeedVisor’ speed activated temporary sign - May 2011Longdon Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - June 2011Jacobean Lane 30mph ‘Mini SpeedVisor’ speed activated temporary sign - June 2011B4101 Station Road, Knowle 30mph ‘Mini SpeedVisor’ speed activated temporary sign - September 2011Tilehouse Green Lane 30mph ‘Mini SpeedVisor’ speed activated temporary sign - September 2011
Proposed Vehicle Activated SignWarwick Road, Chadwick End - Proposed electronic speed limit sign (Vehicle Activated)
Solihull Partnership Speed Watch B4101 Station Road, Knowle 30mph speed monitoring and awareness activity - February 2011B4101 Kenilworth Road, Knowle 30mph speed monitoring and awareness activity - June 2011Lady Byron Lane 30mph speed monitoring and awareness activity - October 2011Longdon Road 30mph speed monitoring and awareness activity - November 2011Tilehouse Green Lane 30mph speed monitoring and awareness activity - March 2012
Integrated Highway programme
Bridge MaintenanceJacobean Lane - Grand Union CanalKenilworth Road - River Blythe Temple Balsall
Knowle Programme 2011/12 - continued
Page 19 of 41
Mrs Diana Holl-Allen Jeffrey Potts Alan Rebeiro
Integrated Highway programme - continued
Footway Micro SealStation Road - from Arden School to Widney Road IslandMicro Seal: Station Road - Lodge Road - from Station Road to A41 Warwick Road
Carriage PatchingA4141 Warwick Road - from J5 M42 to Langfield Road
Carriageway Micro AsphaltA4141 Warwick Road - from J5 M42 to Lodge RoadLodge Road - from Station Road to A41 Warwick Road Easenhall Close - from Hollywell Road to end Gilberry Close - from Hollywell Road to endHigh Street - from A41 Warwick Road to A41 Warwick RoadHollywell Road - from Barcheston Road to Barcheston RoadLightwood Close - from Warwick Road to end
LTP Programme
Local Safety SchemeA4141 Warwick Road / Jacobean Lane – Signing and lining improvements
Facilities for PedestriansSafer Routes to School - Station Road from Lodge Road to Purnells Way
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major SchemeCommunications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Lyndon Programme 2011/12
Page 20 of 41
Irene Chamberlain Ken Rushen Teresa Tedd
Speed Aware Programme Harvard Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - July 2011Brackleys Way 30mph ‘Mini SpeedVisor’ speed activated temporary sign - July 2011Wichnor Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - October 2011Highwood Avenue 30mph ‘Mini SpeedVisor’ speed activated temporary sign - October 2011Pierce Avenue 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement -January, February, March 2012.
Solihull Partnership Speed WatchUlleries Road 30mph speed monitoring and awareness activity - July 2011Pierce Avenue 30mph speed monitoring and awareness activity - September 2011Castle Lane 30mph speed monitoring and awareness activity - November 2011Melton Avenue 30mph speed monitoring and awareness activity - March 2012
20mph Speed Limit Pilot SchemeLyndon Safer Routes to School - Proposed Part-Time 20mph Speed Limit outside Lyndon School
Integrated Highway Programme
Footway Micro Seal/ReconHighwood Avenue - from Rodney Road to Castle Lane
Footway ReconstructionBrackleys Way - from Moordown Avenue to endMoordown Avenue - from Ulleries Road to Castle LaneRodney Road - from Lode Lane to Highwood Avenue
Lyndon Programme 2011/12 - continued
Page 21 of 41
Irene Chamberlain Ken Rushen Teresa Tedd
Integrated Highway Programme - continued
Carriageway ResurfacingCastle Lane - from Whole Island Castle Lane - from Island Moordown Ave to Island Ulverley GreenCampden Green - from Melton Avenue to Daylesford Road Kimberley Road - from Summerfield Road to Castle Lane
Carriageway Micro AsphaltBrackleys Way - from Moordown Avenue to endCoverdale Road - from Lyndon Road to Lyndon RoadHighwood Avenue - from Rodney Road to Castle Lane Knightsbridge Road - from Castle Lane to Highwood Avenue Birchley Rise - from Lode Lane to Highwood Avenue
Tree Maintenance Thurleston AvenueLyndon RoadBrackleys Way Coverdale Road Coniston Avenue
LTP Programme
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Meriden Programme 2011/12
Page 22 of 41
Ken Allsopp David Bell Dr Peter Lea
Speed Aware Programme A452 Kenilworth Road, Balsall Common 30mph ‘Mini SpeedVisor’ speed activated temporary sign - June 2011Stoneton Crescent 30mph ‘Mini SpeedVisor’ speed activated temporary sign - June 2011Leys Lane 30mph ‘Mini SpeedVisor’ speed activated temporary sign - August 2011B4101 Balsall Street/Balsall Street East 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - November, December, January 2011/12
20mph Speed Limit Pilot SchemeBalsall Common Primary School: Proposed Part-Time 20mph Speed Limit outside School to be completed in 2011/12.Solihull Partnership Speed Watch Station Road, Balsall Common 30mph speed monitoring and awareness activity - March 2011B4101 Balsall Street/Balsall Street East 30mph speed monitoring and awareness activity - July 2011Meriden Road, Berkswell 30mph speed monitoring and awareness activity - August 2011Main Road, Meriden 30mph speed monitoring and awareness activity - September 2011
Integrated Highway Programme
Footway Micro SealBalsall Street East - from Alder Lane to Balsall StreetFillongley Road - from Leys Lane to Bridge Station Road - from B4101 Balsall Street East to A452 Truggist Lane
Carriageway Micro AsphaltFinford Croft - from Kemps Green to end Kemps Green - from Station Road to Stoneton CrescentLongbrook Lane - from Magpie Lane to Fen End RoadNeedlers End Lane - from Balsall Street to Station RoadOakley Estate - from Oldwich Lane to Whole EstateWooton Green Lane - from Wooton Lane to Kenilworth RoadOld Road - from Main Road to Birmingham Road
Footway ReconstructionFillongley Road - from Winspear Close to The Green
Meriden Programme 2011/12 – continued
Page 23 of 41
Ken Allsopp David Bell Dr Peter Lea
LTP Programme
C and Unclassified (Local) Road Speed Limit Review Scheme development, consultation and implementation of agreed speed limit changes in Berkswell - to be complete December 2011
Community Road Safety Initiative Berkswell Village Gateways - enhanced village entrance - Stone pillars at locations on approach roads to Berkswell Village. Proposals approved by CDS 2nd June 2011 subject to funding. Link to related plans where available - http://www.solihull.gov.uk/akssolihull/images/att29987.pdf
Facilities for Pedestrians Station Road, Balsall Common - Provision of an unsignalised crossing facility in Station Road fronting parade of shops in Station Road
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major SchemesKenilworth Rd / Kelsey Lane / Alder - Splitting Kelsey Lane and Alder Lane signals so that they run separately - July / August 2011 Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Olton Programme 2011/12
Page 24 of 41
Norman Davies Claire O’Kane John Windmill
Speed Aware Programme Brookvale Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - July 2011Brook Lane 30mph ‘Mini SpeedVisor’ speed activated temporary sign - October 2011Swanswell Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - October 2011A41 Warwick Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - January 2012
Integrated Highway Programme
Footway ReconstructionBraemar Road - from Richmond Road to Ulverley Green RoadBrook Lane - from Gospel Lane to Kineton Green Road Oban Road - from Braemar Road to endSherwood Close - from Warwick Road to end
Footway Micro SealMarsden Close - from Bickenhill Park Road to end
Carriageway ResurfacingBickenhill Park Road - from Old Warwick Road to end Marsden Close - from Bickenhill Park Road to end
Carriageway PatchingGrange Road - from Warwick Road to St Bernards Road
Carriageway Micro AsphaltKineton Green Road - from St Margarets Road to Raddington DriveMasons Way - from Parking Bays to Parking BaysSt Margarets Road - from Kineton Green Road to Warwick RoadThe Close – from Reservoir Road to end
Tree MaintenanceDovehouse Lane
Olton Programme 2011/12 – continued
Page 25 of 41
Norman Davies Claire O’Kane John Windmill
LTP Programme
Local Safety SchemeWarwick Road, Olton Hollow - Proposed road humps at two existing zebra crossings on Warwick Road in Olton hollow and related alterations to adjacent on street parking provision
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major SchemeCommunications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Shirley East Programme 2011/12
Page 26 of 41
Ian Hedley Mark Parker Sue Rose
Speed Aware ProgrammeOlton Road 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - September, October, November 2011
Solihull Partnership Speed WatchOlton Road 30mph speed monitoring and awareness activity - April 2011
Traffic ManagementRalph Road - Installation of ‘H’ carriageway markings to be completed in July 2011
Integrated Highway Programme
Carriageway Micro AsphaltBarford Road - from Blenheim Road to Lawnswood Avenue Headly Rise - from Barford Road to end
Carriageway ResurfacingSolihull Road - from Wayfield Road to Radbourne Road Solihull Road - from Island Danford Lane to Prospect Lane
Tree Maintenance Ralph Road
Shirley East Programme 2011/12 - continued
Page 27 of 41
Ian Hedley Mark Parker Sue Rose
LTP Programme
Facilities for Cyclists and PedestriansStratford Road / Union Road Cycle Scheme Phase 2 - On and off road cycle routes east side of junction. Scheme approved at 4th November CDS. Link to related plans where available -http://www.solihull.gov.uk/akssolihull/images/att26863.pdfStratford Road / Union Road Cycle Scheme Phase 3 - Upgrade of existing Pelican crossings to Toucan crossings to accommodate cyclists. Linked to above scheme.Blossomfield Rd/ Widney Lane - Provision of pedestrian crossing facilities at signalised junction. All red stage for traffic.
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major SchemeCommunications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Shirley South Programme 2011/12Page 28 of 41
Gary Allport Peter Doyle Andrew Hodgson
Speed Aware ProgrammeStretton Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - November 2011Bills Lane 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - May, June, July 2011
Solihull Partnership Speed WatchBills Lane 30mph speed monitoring and awareness activity - May 2011Widney Lane 30mph speed monitoring and awareness activity - August 2011Cranmore Boulevard 30mph speed monitoring and awareness activity - December 2011Proposed Zebra Crossing Cranmore Boulevard, subject to Cabinet approval in July, - construction September/October 2011
Integrated Highway Programme
Footway Micro SealBellamy Close - from Bellamy Farm Road to endBellamy Farm Road - from Longmore Road to Bronte Farm RoadBronte Close - from Bronte Farm Road to endBronte Farm Road - from Union Road to endCranmore Boulevard - from Stratford Road to Swallows MeadowHighlands Road - from Cranmore Boulevard to Monkspath Hall RoadKingswood Close - from Longmore Road to endSandfield Close - from Baxters Green to endSt Georges Road - Stratford Road to Swallows MeadowSwallows Meadow - from Cranmore Boulevard to St Georges Road
Carriageway ResurfacingLoxley Avenue - from Sansome Road to Burman Road Sansome Road - from Haslucks Green Road to Loxley Aveune Stretton Road - from Tanworth Lane to Woodloes RoadA34 Stratford Road - from Monkspath Hall Island to Monkspath Hall Island
Shirley South Programme 2011/12 – continuedPage 29 of 41
Gary Allport Peter Doyle Andrew Hodgson
Integrated Highway Programme - continued
Carriageway Micro AsphaltDrayton Road - from Highlands Road to end Hathaway Road - from Stretton Road to Shakespeare Drive Northdown Road - from Dingle Lane to Pinewood Grove Radway Road - from Highlands Road to endSt Georges Road - from Stratford Road to Swallows Meadow Stirling Road - from Highlands Road to endStretton Road - from Woodloes Road to Hathaway Road Tanworth Lane cds - from Tanworth Lane to end
Footway ReconstructionLoxley Avenue - from Burman Road to Neville RoadRegan Avenue - from Shakespeare Drive to endTanworth Lane cds - from Tanworth Lane to end
Tree Maintenance Dovedale Avenue Oberon Drive
Shirley South Programme 2011/12 - continued
Page 30 of 41
Gary Allport Peter Doyle Andrew Hodgson
LTP Programme
Facilities for Cyclists and Pedestrians Blossomfield Rd/ Widney Lane - Provision of pedestrian crossing facilities at signalised junction. All red stage for traffic.Stratford Road / Union Road Cycle Scheme Phase 2 - On and off road cycle routes east side of junction. Scheme approved at 4th November CDS. Link to related plans where available -http://www.solihull.gov.uk/akssolihull/images/att26863.pdfStratford Road / Union Road Cycle Scheme Phase 3 - Upgrade of existing Pelican crossings to Toucan crossings to accommodate cyclists. Linked to above scheme.Stratford Road - from Dog Kennel Lane to Monkspath Hall Road - Cycle links to Dog Kennel Lane and Highlands Road / Solihull Business Park from the A34 Stratford Road. Scheme approved at CDS 1st July 2010. Link to related plans where available - http://www.solihull.gov.uk/akssolihull/images/att25072.pdf
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major SchemeCommunications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Shirley West Programme 2011/12
Page 31 of 41
Howard Allen Dr Simon Slater Hannah Tildesley
Speed Aware Programme
Sandy Hill Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - May 2011Delrene Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - May 2011Velsheda Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - October 2011High Street, Solihull Lodge 30mph ‘Mini SpeedVisor’ speed activated temporary sign - November 2011Peterbrook Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - November 2011Bills Lane 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - May, June, July 2011Haslucks Green Road 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - May, June, July 2011Yardley Wood Road 30mph ‘Main SpeedVisor’ speed activated temporary sign, poster campaign and Police enforcement - September, October, November 2011
Solihull Partnership Speed Watch Haslucks Green Road 30mph speed monitoring and awareness activity - February 2011 High Street, Solihull Lodge 30mph speed monitoring and awareness activity - March 2011Bills Lane 30mph speed monitoring and awareness activity - May 2011Yardley Wood Road 30mph speed monitoring and awareness activity - February 2012
20mph Speed Limit Pilot SchemeMill Lodge Primary School: Proposed Part -Time 20mph Speed Limit outside School to be approved by Department for Transport in 2011/12. Proposed installation and completion in 2012/13
Integrated Highway Programme
Footway Micro SealBurman Close - from Burman Road to endHaslucks Green Road - from Colebrook Island to Green LaneHaslucks Green Road - from Stratford Road to Colebrook Island
Shirley West Programme 2011/12 – continued
Page 32 of 41
Howard Allen Dr Simon Slater Hannah Tildesley
Integrated Highway Programme - continued
Footway Micro SealHazeloak Road - from Burman Road to Hurdis Road
Footway ReconstructionMiddleton Road - from Hurdis Road to Velsheda Road
Footway Recon (part) Haslucks Green Road - from Colebrook Island to Green Lane Carriageway ResurfacingHazeloak Road - from Burman Road to Hurdis Road
Carriageway Micro AsphaltAtherstone Close - from Colebrook Road to end Colebrook Road - from Aqueduct Road to Atherstone CloseLambscote Close - from Hytall Road to end Sandy Hill Road - from Stratford Road to Skelcher RoadSnowford Close - from Bills Lane to end
LTP Programme
Facilities for Cyclists and PedestriansStratford Road / Union Road Cycle Scheme Phase 2 - On and off road cycle routes east side of junction. Scheme approved at 4th November CDS. Link to related plans where available -http://www.solihull.gov.uk/akssolihull/images/att26863.pdfStratford Road / Union Road Cycle Scheme Phase 3 - Upgrade of existing Pelican crossings to Toucan crossings to accommodate cyclists. Linked to above scheme.Haslucks Green Road (Colebrook) - Zebra crossing on Haslucks Green Road in vicinity of Colebrook Pub. Link to related plans where available http://www.solihull.gov.uk/Attachments/HaslucksRoadImprovmentsPlan.pdf
Shirley West Programme 2011/12 – continued
Page 33 of 41
Howard Allen Dr Simon Slater Hannah Tildesley
LTP Programme – continued
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Silhill Programme 2011/12
Page 34 of 41
Peter Hogarth Robert Hulland Mrs Shelia Pittaway
Speed Aware Programme Damson Parkway 30mph ‘Mini SpeedVisor’ speed activated temporary sign - July 2011 Buryfield Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - July 2011Heaton Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - August 2011Ashleigh Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - August 2011Broad Oaks Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - October 2011Yew Tree Lane 30mph ‘Mini SpeedVisor’ speed activated temporary sign - January 2012A41 Warwick Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - January 2012
Solihull Partnership Speed WatchAshleigh Road 30mph speed monitoring and awareness activity - October 2011Buryfield Road 30mph speed monitoring and awareness activity - January 2012
Integrated Highway Programme
Carriageway PatchingDamson Lane - from Oakslade Drive to Damson Parkway
Footway ReconstructionBuryfield Road - from A41 Warwick Road to B425 Lode Lane
Tree Maintenance Ashleigh Road Broomfields AvenueBroomfields Farm Road
Silhill Programme 2011/12 - continued
Page 35 of 41
Peter Hogarth Robert Hulland Mrs Shelia Pittaway
LTP Programme Local Safety Schemes & Facilities for PedestriansSolihull Bypass / Yew Tree Lane / Hampton Lane - installing pedestrian crossing facilities and right turn filter at existing traffic signals - July / August 2011 - Modifications to junction to convert lane three on Solihull By-Pass northbound approach to a dedicated right turn lane only into Yew Tree Lane and the provision of a pedestrian crossing facility on the north side of the junction across Solihull By-pass.Warwick Road nr Silverbirch Road - pedestrian refugeWarwick Rd / New Rd - installing pedestrian crossing facilities at existing traffic signals Warwick Road/Lode Lane RBT (Inc scheme carried forward from 2009/10) - improvement to roundaboutCranmore Boulevard - zebra crossing facility and extension of existing road hump
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Projects Warwick Rd (Town Centre) - improving traffic signal operation; assessing results with journey time monitoring cameras - May/June 2011
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Smiths Wood Programme 2011/12
Page 36 of 41
Don Cornock Mike Sheridan Alison Walters
Speed Aware ProgrammeAuckland Drive 30mph ‘Mini SpeedVisor’ speed activated temporary sign - April 2011Windward Way 30mph ‘Mini SpeedVisor’ speed activated temporary sign - April 2011
Solihull Partnership Speed WatchAuckland Drive 30mph speed monitoring and awareness activity - June 2011Windward Way 30mph speed monitoring and awareness activity - November 2011
Safer Routes to SchoolKingshurst Primary School - pedestrian crossing assessment on Chester Road and complete report by September 2011
Integrated Highway Programme
Footway Micro SealLanchester Way - near Auckland Drive
Carriageway Micro AsphaltBallard Walk - from Meriden Drive to end
LTP Programme
Local Safety SchemeBirmingham Road / Auckland Drive – Signing and lining improvements B4114 Chester Rd - New vehicle activated warning signs on approach to Windward Way junction.
Smiths Wood Programme 2011/12 - continued
Page 37 of 41
Don Cornock Mike Sheridan Alison Walters
LTP Programme – continued
Facilities for Cyclists and PedestriansSmiths Wood Cycle Route (North Solihull Cycling Project) - Phase 1 of North Solihull Cycle project. Extended off road cycle routes along Windward Way and additional pedestrian / cycle crossing facility on A47 Chester Road: CDS approval 1st July 2010 subject to EDRF funding. Link to related plans where available - http://www.solihull.gov.uk/akssolihull/images/att25070.pdfArran Way - St John The Baptist School (cycle link) - cycle facilities - Conversion of existing footway fronting St.John the Baptist School to a shared use cycleway / footway linking to existing Windward Way cycle route.North Solihull Cycle Project - VariousWindward Way Cycle Improvement Scheme - from Chester Road to Auckland Drive
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC Major SchemeCommunications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
St Alphege Programme 2011/12
Page 38 of 41
Stuart Davis Joe Tildesley Mrs Kate Wild
Speed Aware ProgrammeWhitefields Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - August 2011Alderbrook Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - August 2011Dorchester Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - September 2011Blossomfield Road 30mph ‘Mini SpeedVisor’ speed activated temporary sign - September 2011Widney Lane 30mph ‘Mini SpeedVisor’ speed activated temporary sign - September 2011
Solihull Partnership Speed WatchWidney Lane 30mph speed monitoring and awareness activity - August 2011
Permanent Vehicle Activated SignMonkspath Hall Road (Widney Lane to Whitefields Road): Proposed electronic Speed Limit Sign (Vehicle Actuated) to be completed in 2011/12
Integrated Highway Programme
Footway Micro Seal Alderton Close - from Chalgrave Crescent to end Alderbrook Road - from Danford Lane to Blossomfield RoadBarbourne Close - from Sandhills Crescent to end Billingham Close - from Kinsham Drive to endBranthill Croft - from Shelsey Way to endBufferys Close - from Kindsbrook Drive to end Bushley Croft - from Sandhills Crescent to end
Carriageway ResurfacingBrueton Avenue - from Warwick Road to end
St Alphege Programme 2011/12
Page 39 of 41
Stuart Davis Joe Tildesley Mrs Kate Wild
Integrated Highway Programme - continued
Footway Micro SealStreetsbrook Road (Service Road) - from Streetsbrook Road to Streetsbrook Road Chadbury Croft - from Kingsrook Drive to end Chalgrave Crescent - from Alderminster Road to endChesterton Close - from Streetsbrook Road to endEldersfield Grove - from Sandhills Crescent to endHunningham Grove - from Stonebow Avenue to endHollings Grove - from Kinsham Drive to endKingsbrook Drive - from Monkspath Hall Road to endKinsham Drive - from Sandhills Crescent to endMartley Croft - from Sandhills Crescent to endPerryford Drive - from Widney Lane to endSandhills Crescent - from Widney Lane to endShelsey Way - from Monkspath Hall Road to endStonebow Avenue - from Widney Lane to endStoneythorpe Close - from Shelsey Way to end Woodbury Road - from Shelsey Way to endWoodston Grove - from Perryford Drive to endAlder Park Road – from Blossomfield Road to endMerrington Close – Perryford Road to end
Carriageway Micro AsphaltLibbards Way - from Alderminster Road to end Sandhills Crescent - from No 29 to end Warwick Road - from Brueton Park IslandAlderbrook Road – from Blossomfield Road to No3 and Danford Lane to no 100Streetsbrook Service Rd
St Alphege Programme 2011/12 – continued
Page 40 of 41
Stuart Davis Joe Tildesley Mrs Kate Wild
LTP Programme
Local Safety SchemePoplar Road / Station Road - Measures to reduce vehicle speeds and improve pedestrian safety.Warwick Road/Lode Lane RBT (Inc scheme carried forward from 2009/10) - Modifications to road layout, additional anti skid surfacing & road markings. Works complete.
Facilities for Cyclists and Pedestrians Homer Road Cycle Scheme- from Herbert Road to Church Hill RoadTudor Grange Park - enhanced entrance from Homer Road
Facilities for the Disabled - Dropped kerbs at various locations in the Borough in response to community requests made through Neighbourhood Management
UTC ProjectsWarwick Rd (Town Centre) - improving traffic signal operation; assessing results with journey time monitoring cameras - May/June 2011
UTC Major Scheme Communications upgrades Solihull - wide to all traffic signals under UTC control. Expansion of VMS around strategic network: Development of Quinton control centre - June 2011 to 2013
Page 41 of 41