Case Study

RS Temporary Foundations | Buckingham Palace

Project: Temporary Traffic Signals, The Mall and Buckingham PalaceProduct: Temporary Foundations with RS115Client: TfL

RS Temporary Foundations | Buckingham Palace...The NAL Temporary Foundation systems were recently utilised by TFL during the renewal and upgrading of the traffic signals outside Buckingham Palace.

The existing signals were removed for four months and during these works the Temporary Foundations allowed the site to operate as normal with full pedestrian facilities. This solution was used due to their stable footprint, ability to conceal all cables from the public and the ease of moving them away from site for the London Marathon, Parades and State Visits.

Weir Lane, Worcester WR2 4AY Tel: 01905 427100 Fax: 01905 427030 Email: [email protected]

www.nal.ltd.uk

Paul Bryne - TfL

With the help of NAL and their

innovative solutions, we managed

this project effectively and

efficiently and ensured the safety

to pedestrians and road users at

all times. Also the Royal Parks

insisted on an aesthetically

pleasing solution. NAL’s

Temporary Foundations

produced this.