1
Case Study RS Temporary Foundations | Buckingham Palace Project: Temporary Traffic Signals, The Mall and Buckingham Palace Product: Temporary Foundations with RS115 Client: TfL RS Temporary Foundations | Buckingham Palace... The NAL Temporary Foundation systems were recently utilised by TFL during the renewal and upgrading of the traffic signals outside Buckingham Palace. The existing signals were removed for four months and during these works the Temporary Foundations allowed the site to operate as normal with full pedestrian facilities. This solution was used due to their stable footprint, ability to conceal all cables from the public and the ease of moving them away from site for the London Marathon, Parades and State Visits. Weir Lane, Worcester WR2 4AY Tel: 01905 427100 Fax: 01905 427030 Email: [email protected] www.nal.ltd.uk Paul Bryne - TfL With the help of NAL and their innovative solutions, we managed this project effectively and efficiently and ensured the safety to pedestrians and road users at all times. Also the Royal Parks insisted on an aesthetically pleasing solution. NAL’s Temporary Foundations produced this.

Case Study RS Temporary Foundations | Buckingham Palace · renewal and upgrading of the traffic signals outside Buckingham Palace. The existing signals were removed for four months

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Case Study RS Temporary Foundations | Buckingham Palace · renewal and upgrading of the traffic signals outside Buckingham Palace. The existing signals were removed for four months

Case Study

RS Temporary Foundations | Buckingham Palace

Project: Temporary Traffic Signals, The Mall and Buckingham PalaceProduct: Temporary Foundations with RS115Client: TfL

RS Temporary Foundations | Buckingham Palace...The NAL Temporary Foundation systems were recently utilised by TFL during the renewal and upgrading of the traffic signals outside Buckingham Palace.

The existing signals were removed for four months and during these works the Temporary Foundations allowed the site to operate as normal with full pedestrian facilities. This solution was used due to their stable footprint, ability to conceal all cables from the public and the ease of moving them away from site for the London Marathon, Parades and State Visits.

Weir Lane, Worcester WR2 4AY Tel: 01905 427100 Fax: 01905 427030 Email: [email protected]

www.nal.ltd.uk

Paul Bryne - TfL

With the help of NAL and their

innovative solutions, we managed

this project effectively and

efficiently and ensured the safety

to pedestrians and road users at

all times. Also the Royal Parks

insisted on an aesthetically

pleasing solution. NAL’s

Temporary Foundations

produced this.