MONTGOMERY TOWNSHIPCOMMUNITY & RECREATION CENTERAUGUST 26, 2013 PROJECT UPDATE
7/30/2019 August 26 2013 Montgomery Township community center Update
2/12
Community and Recreation Center Project Update August 26, 2013
Since the Last Update KBA has:Since the Last Update KBA has:
Had kick off meetings with the structural, mechanical, electricaland plumbing engineers.
Continued to work with the Civil Engineer on the LandDevelopment plans.
Reviewed the building with Township code officials.
Received the Geotechnical Report.
Reviewed the building requirements for phone, cable, data,security, Wi-Fi, access controls and A/V with the Township.
7/30/2019 August 26 2013 Montgomery Township community center Update
3/12
Community and Recreation Center Project Update August 26, 2013
Updated Site PlanUpdated Site Plan
7/30/2019 August 26 2013 Montgomery Township community center Update
4/12
Community and Recreation Center Project Update August 26, 2013
Major Topics at the Steering CommitteeMajor Topics at the Steering Committee
Spray Park / PlaygroundSpray Park / Playground
7/30/2019 August 26 2013 Montgomery Township community center Update
5/12
Community and Recreation Center Project Update August 26, 2013
Proposed Building ImageProposed Building ImageAerial View
7/30/2019 August 26 2013 Montgomery Township community center Update
6/12
Community and Recreation Center Project Update August 26, 2013
Major Topics at the Steering CommitteeMajor Topics at the Steering Committee
Exterior Materials Phenolic PanelsExterior Materials Phenolic Panels
Wood look components proposed
as phenolic panels to besympathetic with the existingwood on the township building.
7/30/2019 August 26 2013 Montgomery Township community center Update
7/12
Community and Recreation Center Project Update August 26, 2013
Major Topics at the Steering CommitteeMajor Topics at the Steering Committee
Exterior Materials Metal PanelsExterior Materials Metal Panels
Blue areas on the building areproposed to be metal panels
7/30/2019 August 26 2013 Montgomery Township community center Update
8/12
Community and Recreation Center Project Update August 26, 2013
Major Topics at the Steering CommitteeMajor Topics at the Steering Committee
Exterior Materials Synthetic StuccoExterior Materials Synthetic Stucco
White areas on the buildingare proposed to be syntheticstucco otherwise known as
Dryvit or EIFS (exteriorinsulation & finish system).
7/30/2019 August 26 2013 Montgomery Township community center Update
9/12
Community and Recreation Center Project Update August 26, 2013
Major Topics at the Steering CommitteeMajor Topics at the Steering Committee
Selection of a HVAC SystemSelection of a HVAC System
Geothermal or Conventional Heating and Air Conditioning
The Mechanical Engineer prepared an Energy Model for the buildingusing the proposed materials for the exterior building envelope and
the proposed hours of operation from the Feasibility Study.
Conventional System consists of roof top mounted gas heating andelectric cooling units.
Geothermal System consists of approximately 40 450 bore holeson the site, piping, manifolds and heat pump units throughout thebuilding.
The proposed geothermal system has an additional up front
installation cost of approximately $400,000 over a conventionalsystem.
The energy model showed a simple payback of 40 years.
7/30/2019 August 26 2013 Montgomery Township community center Update
10/12
Community and Recreation Center Project Update August 26, 2013
Major Topics at the Steering CommitteeMajor Topics at the Steering Committee
Selection of a HVAC SystemSelection of a HVAC System
Geothermal or Conventional Heating and Air Conditioning
The payback of 40 years seemed counterintuitive to what we hadheard about geothermal systems.
We collected real world data from Haverford Rec Center, YMCA andthe existing Township Building as a check.
On a cost per year per square foot of building the Township Building
uses $2.69, the gas system at the Rec Center uses $1.46 and the RecCenter with geothermal would use $1.25.
Due to the low cost of natural gas and the high installation cost ofgeothermal the cost savings on the geothermal system is
approximately $8200 per year. Equal to over 40 year payback.
The BOS needs to provide direction on selection of an HVAC system.
7/30/2019 August 26 2013 Montgomery Township community center Update
11/12
Community and Recreation Center Project Update August 26, 2013
Major Topics at the Steering CommitteeMajor Topics at the Steering Committee
Other Energy Saving OptionsOther Energy Saving Options
Due to the current lack of rebates and grants solar power and windpower are not viable options.
Daylight harvesting and motion detectors will be used for lightingcontrol.
All lights will be either LED or fluorescent.
Use of sophisticated HVAC control systems.
7/30/2019 August 26 2013 Montgomery Township community center Update
12/12
Community and Recreation Center Project Update August 26, 2013
Moving ForwardMoving Forward
The bulk of the drawings will start to be created as we move intothe Construction Document Phase.
Ongoing coordination between all the consultants.
Proposed interior finishes, materials and colors will likely bepresented at the next progress meeting.
Begin to review options for the Cardio and Weight RoomEquipment.