REQUEST FOR ADDITIONAL APPROPRIATIONS
Consolidated Book for Procurement
The estimated cost for this report for the Department of the Navy
(DON) is $452,686.
The estimated total cost for supporting the DON budget
justification material is approximately $1,834,000. This includes
$75,200 in supplies and $1,758,800 in labor.
UNCLASSIFIED
UNCLASSIFIED
Department of Defense Fiscal Year (FY) 2017 Request for Additional
Appropriations
March 2017
Aircraft Procurement, Navy
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
Introduction and Explanation of
Contents................................................................................................................Volume
1 - v
Master Line Item Table of Contents (by Appropriation then Line
Number).....................................................Volume
1 - xxxv
Master Line Item Table of Contents (Alphabetically by Line Item
Title)..........................................................Volume
1 - xxxix
Line Item Table of Contents (by Appropriation then Line
Number).....................................................................
Volume 1 - xli
Line Item Table of Contents (Alphabetically by Line Item
Title)..........................................................................Volume
1 - xlv
Exhibit
P-40s................................................................................................................................................................
Volume 1 - 1
UNCLASSIFIED
Aircraft Procurement, Navy For construction, procurement,
production, modification, and modernization of aircraft, equipment,
including ordnance, spare parts, and accessories therefore;
specialized equipment; expansion of public and private plants,
including the land necessary therefore, and such lands and
interests therein, may be acquired, and construction prosecuted
thereon prior to approval of title; and procurement and
installation of equipment, appliances, and machine tools in public
and private plants; reserve plant and Government and
contractor-owned equipment layaway, $18,594,574,000, to remain
available for obligation until September 30, 2019.
Volume 1 - v
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
Appropriation Base Base Base OCO
------------- ------------- ------------- -------------
-------------
Total Department of the Navy 14,109,148 4,006,977 18,116,125
393,030
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254
Appropriation OCO OCO Request OCO
------------- ------------- ------------- -------------
-------------
Total Department of the Navy 85,419 478,449
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining
Appropriation OCO Base+OCO Base+OCO Base+OCO
------------- ------------- ------------- -------------
-------------
Total Department of the Navy 478,449 14,502,178 4,092,396
18,594,574
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
Budget Activity Base Base Base OCO
--------------- ------------- ------------- -------------
-------------
02. Airlift Aircraft 207,500 207,500
03. Trainer Aircraft 5,849 5,849
04. Other Aircraft 690,810 59,200 750,010 70,000
05. Modification of Aircraft 2,565,436 24,884 2,590,320
136,094
06. Aircraft Spares and Repair Parts 1,407,626 301,641 1,709,267
1,500
07. Aircraft Support Equip & Facilities 492,575 492,575
524
Total Aircraft Procurement, Navy 14,109,148 4,006,977 18,116,125
393,030
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254
Budget Activity OCO OCO Request OCO
--------------- ------------- ------------- -------------
-------------
02. Airlift Aircraft
03. Trainer Aircraft
06. Aircraft Spares and Repair Parts 1,500
07. Aircraft Support Equip & Facilities 524
Total Aircraft Procurement, Navy 85,419 478,449
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining
Budget Activity OCO Base+OCO Base+OCO Base+OCO
--------------- ------------- ------------- -------------
-------------
02. Airlift Aircraft 207,500 207,500
03. Trainer Aircraft 5,849 5,849
04. Other Aircraft 70,000 760,810 59,200 820,010
05. Modification of Aircraft 136,094 2,701,530 24,884
2,726,414
06. Aircraft Spares and Repair Parts 1,500 1,409,126 301,641
1,710,767
07. Aircraft Support Equip & Facilities 524 493,099
493,099
Total Aircraft Procurement, Navy 478,449 14,502,178 4,092,396
18,594,574
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017 FY 2017
PB Request Request PB Request PB Request S
Line Ident Base Base Base OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
Combat Aircraft
1 F/A-18E/F (Fighter) Hornet A 24 2,267,026 24 2,267,026 2 184,912
U
2 F/A-18E/F (Fighter) Hornet
C (FY 2017 for FY 2018) (M) (52,974) (52,974)
3 Joint Strike Fighter CV A 4 (939,280) 4 (939,280) U
Less: Advance Procurement (PY) (-48,630) (-48,630) U
---------- ---------- ---------- ----------
Advance Procurement (CY) 80,908 80,908 U
C (FY 2017 for FY 2018) (M) (80,908) (80,908)
5 JSF STOVL 16 (2,240,828) (2,913) 16 (2,243,741) U
Less: Advance Procurement (PY) (-203,060) (-203,060) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (233,648) (233,648)
7 CH-53K (Heavy Lift) A 2 (389,915) 2 (389,915) U
Less: Advance Procurement (PY) (-41,300) (-41,300) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (88,365) (88,365)
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254 S
Line Ident OCO OCO Request OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
2 F/A-18E/F (Fighter) Hornet
Advance Procurement (CY) U
Less: Advance Procurement (PY) U
---------- ---------- ---------- ----------
Advance Procurement (CY) U
5 JSF STOVL U
---------- ---------- ---------- ----------
7 CH-53K (Heavy Lift) A U
Less: Advance Procurement (PY) U
---------- ---------- ---------- ----------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
PB Request
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining S
Line Ident OCO Base+OCO Base+OCO Base+OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
Combat Aircraft
1 F/A-18E/F (Fighter) Hornet A 2 184,912 2 184,912 24 2,267,026 26
2,451,938 U
2 F/A-18E/F (Fighter) Hornet
C (FY 2017 for FY 2018) (M) (52,974) (52,974)
3 Joint Strike Fighter CV A 4 (939,280) 4 (939,280) U
Less: Advance Procurement (PY) (-48,630) (-48,630) U
---------- ---------- ---------- ----------
Advance Procurement (CY) 80,908 80,908 U
C (FY 2017 for FY 2018) (M) (80,908) (80,908)
5 JSF STOVL 16 (2,240,828) (2,913) 16 (2,243,741) U
Less: Advance Procurement (PY) (-203,060) (-203,060) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (233,648) (233,648)
7 CH-53K (Heavy Lift) A 2 (389,915) 2 (389,915) U
Less: Advance Procurement (PY) (-41,300) (-41,300) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (88,365) (88,365)
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017 FY 2017
PB Request Request PB Request PB Request S
Line Ident Base Base Base OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
9 V-22 (Medium Lift) 16 (1,322,857) 2 (170,839) 18 (1,493,696)
U
Less: Advance Procurement (PY) (-58,723) (-58,723) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (19,674) (19,674)
11 H-1 Upgrades (UH-1Y/AH-1Z) A 24 (815,946) 24 (815,946) U
Less: Advance Procurement (PY) (-56,168) (-56,168) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (57,232) (57,232)
13 MH-60R (MYP) A 61,177 61,177 U
14 P-8A Poseidon A 11 (2,183,245) 6 (920,000) 17 (3,103,245)
U
Less: Advance Procurement (PY) (-243,007) (-243,007) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (123,140) (123,140)
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254 S
Line Ident OCO OCO Request OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
Less: Advance Procurement (PY) U
---------- ---------- ---------- ----------
11 H-1 Upgrades (UH-1Y/AH-1Z) A U
Less: Advance Procurement (PY) U
---------- ---------- ---------- ----------
13 MH-60R (MYP) A U
14 P-8A Poseidon A U
Less: Advance Procurement (PY) U
---------- ---------- ---------- ----------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
PB Request
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining S
Line Ident OCO Base+OCO Base+OCO Base+OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
9 V-22 (Medium Lift) 1 (85,419) 16 (1,322,857) 3 (256,258) 19
(1,579,115) U
Less: Advance Procurement (PY) (-58,723) (-58,723) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (19,674) (19,674)
11 H-1 Upgrades (UH-1Y/AH-1Z) A 24 (815,946) 24 (815,946) U
Less: Advance Procurement (PY) (-56,168) (-56,168) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (57,232) (57,232)
13 MH-60R (MYP) A 61,177 61,177 U
14 P-8A Poseidon A 11 (2,183,245) 6 (920,000) 17 (3,103,245)
U
Less: Advance Procurement (PY) (-243,007) (-243,007) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (123,140) (123,140)
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017 FY 2017
PB Request Request PB Request PB Request S
Line Ident Base Base Base OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
16 E-2D Adv Hawkeye A 6 (1,154,569) 6 (1,154,569) U
Less: Advance Procurement (PY) (-238,086) (-238,086) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (125,042) (125,042)
---------- ---------- ---------- ----------
Budget Activity 02: Airlift Aircraft
-------------------
---------- ---------- ---------- ----------
-------------------
---------- ---------- ---------- ----------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254 S
Line Ident OCO OCO Request OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
Less: Advance Procurement (PY) U
---------- ---------- ---------- ----------
---------- ---------- ---------- ----------
-------------------
-------------------
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
PB Request
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining S
Line Ident OCO Base+OCO Base+OCO Base+OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
16 E-2D Adv Hawkeye A 6 (1,154,569) 6 (1,154,569) U
Less: Advance Procurement (PY) (-238,086) (-238,086) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (125,042) (125,042)
---------- ---------- ---------- ----------
Budget Activity 02: Airlift Aircraft
-------------------
---------- ---------- ---------- ----------
-------------------
---------- ---------- ---------- ----------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017 FY 2017
PB Request Request PB Request PB Request S
Line Ident Base Base Base OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
Less: Advance Procurement (PY) (-32,451) (-32,451) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (24,848) (24,848)
22 MQ-4 Triton A 2 (463,582) 2 (463,582) U
Less: Advance Procurement (PY) (-54,577) (-54,577) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (55,652) (55,652)
24 MQ-8 UAV B 1 72,435 1 72,435 U
25 STUASL0 UAV 4 70,000 U
26 Other Support Aircraft 4 59,200 4 59,200 U
---------- ---------- ---------- ----------
Budget Activity 05: Modification of Aircraft
-------------------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254 S
Line Ident OCO OCO Request OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
---------- ---------- ---------- ----------
22 MQ-4 Triton A U
Less: Advance Procurement (PY) U
---------- ---------- ---------- ----------
24 MQ-8 UAV B U
25 STUASL0 UAV 4 70,000 U
26 Other Support Aircraft U
---------- ---------- ---------- ----------
-------------------
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
PB Request
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining S
Line Ident OCO Base+OCO Base+OCO Base+OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
Less: Advance Procurement (PY) (-32,451) (-32,451) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (24,848) (24,848)
22 MQ-4 Triton A 2 (463,582) 2 (463,582) U
Less: Advance Procurement (PY) (-54,577) (-54,577) U
---------- ---------- ---------- ----------
C (FY 2017 for FY 2018) (M) (55,652) (55,652)
24 MQ-8 UAV B 1 72,435 1 72,435 U
25 STUASL0 UAV 4 70,000 4 70,000 4 70,000 U
26 Other Support Aircraft 4 59,200 4 59,200 U
---------- ---------- ---------- ----------
Budget Activity 05: Modification of Aircraft
-------------------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017 FY 2017
PB Request Request PB Request PB Request S
Line Ident Base Base Base OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
29 Adversary A 5,191 5,191 U
30 F-18 Series A 1,023,492 -105,600 917,892 U
31 H-53 Series A 46,095 13,000 59,095 U
32 SH-60 Series A 108,328 108,328 3,000 U
33 H-1 Series A 46,333 46,333 3,740 U
34 EP-3 Series A 14,681 14,681 7,505 U
35 P-3 Series A 2,781 2,781 U
36 E-2 Series A 32,949 32,949 U
37 Trainer A/C Series A 13,199 13,199 U
38 C-2A A 19,066 19,066 U
39 C-130 Series A 61,788 700 62,488 U
40 FEWSG A 618 618 U
41 Cargo/Transport A/C Series A 9,822 9,822 U
42 E-6 Series A 222,077 222,077 U
43 Executive Helicopters Series A 66,835 66,835 U
44 Special Project Aircraft A 16,497 16,497 14,869 U
45 T-45 Series A 114,887 114,887 U
46 Power Plant Changes A 16,893 16,893 U
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority 06 Mar 2017
(Dollars in Thousands)
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254 S
Line Ident OCO OCO Request OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
29 Adversary A U
32 SH-60 Series A 3,000 U
33 H-1 Series A 3,740 U
34 EP-3 Series A 7,505 U
35 P-3 Series A U
36 E-2 Series A U
37 Trainer A/C Series A U
38 C-2A A U
40 FEWSG A U
42 E-6 Series A U
43 Executive Helicopters Series A U
44 Special Project Aircraft A 14,869 U
45 T-45 Series A U
46 Power Plant Changes A U
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
PB Request
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining S
Line Ident OCO Base+OCO Base+OCO Base+OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
29 Adversary A 5,191 5,191 U
30 F-18 Series A 1,023,492 -105,600 917,892 U
31 H-53 Series A 46,095 13,000 59,095 U
32 SH-60 Series A 3,000 111,328 111,328 U
33 H-1 Series A 3,740 50,073 50,073 U
34 EP-3 Series A 7,505 22,186 22,186 U
35 P-3 Series A 2,781 2,781 U
36 E-2 Series A 32,949 32,949 U
37 Trainer A/C Series A 13,199 13,199 U
38 C-2A A 19,066 19,066 U
39 C-130 Series A 61,788 700 62,488 U
40 FEWSG A 618 618 U
41 Cargo/Transport A/C Series A 9,822 9,822 U
42 E-6 Series A 222,077 222,077 U
43 Executive Helicopters Series A 66,835 66,835 U
44 Special Project Aircraft A 14,869 31,366 31,366 U
45 T-45 Series A 114,887 114,887 U
46 Power Plant Changes A 16,893 16,893 U
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017 FY 2017
PB Request Request PB Request PB Request S
Line Ident Base Base Base OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
48 Common ECM Equipment A 143,773 143,773 98,240 U
49 Common Avionics Changes A 164,839 164,839 U
50 Common Defensive Weapon System A 4,403 4,403 U
51 ID Systems A 45,768 45,768 U
52 P-8 Series 18,836 18,836 U
53 MAGTF EW for Aviation A 5,676 16,300 21,976 U
54 MQ-8 Series 19,003 19,003 U
55 RQ-7 Series 3,534 3,534 U
56 V-22 (Tilt/Rotor ACFT) Osprey B 141,545 99,000 240,545 8,740
U
57 F-35 STOVL Series A 34,928 34,928 U
58 F-35 CV Series A 26,004 26,004 U
59 QRC A 5,476 5,476 U
---------- ---------- ---------- ----------
-------------------
Aircraft Spares and Repair Parts
---------- ---------- ---------- ----------
Total Aircraft Spares and Repair Parts 1,407,626 301,641 1,709,267
1,500
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254 S
Line Ident OCO OCO Request OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
48 Common ECM Equipment A 98,240 U
49 Common Avionics Changes A U
50 Common Defensive Weapon System A U
51 ID Systems A U
52 P-8 Series U
54 MQ-8 Series U
55 RQ-7 Series U
57 F-35 STOVL Series A U
58 F-35 CV Series A U
59 QRC A U
Budget Activity 06: Aircraft Spares and Repair Parts
-------------------
60 Spares and Repair Parts A 1,500 U
---------- ---------- ---------- ----------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
PB Request
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining S
Line Ident OCO Base+OCO Base+OCO Base+OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
48 Common ECM Equipment A 98,240 242,013 242,013 U
49 Common Avionics Changes A 164,839 164,839 U
50 Common Defensive Weapon System A 4,403 4,403 U
51 ID Systems A 45,768 45,768 U
52 P-8 Series 18,836 18,836 U
53 MAGTF EW for Aviation A 5,676 16,300 21,976 U
54 MQ-8 Series 19,003 19,003 U
55 RQ-7 Series 3,534 3,534 U
56 V-22 (Tilt/Rotor ACFT) Osprey B 8,740 150,285 99,000 249,285
U
57 F-35 STOVL Series A 34,928 34,928 U
58 F-35 CV Series A 26,004 26,004 U
59 QRC A 5,476 5,476 U
---------- ---------- ---------- ----------
-------------------
Aircraft Spares and Repair Parts
---------- ---------- ---------- ----------
Total Aircraft Spares and Repair Parts 1,500 1,409,126 301,641
1,710,767
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017 FY 2017
PB Request Request PB Request PB Request S
Line Ident Base Base Base OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
62 Aircraft Industrial Facilities A 23,194 23,194 524 U
63 War Consumables A 40,613 40,613 U
64 Other Production Charges A 860 860 U
65 Special Support Equipment A 36,282 36,282 U
66 First Destination Transportation A 1,523 1,523 U
---------- ---------- ---------- ----------
---------- ---------- ---------- ----------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
Nov Amended Mar Amended FY 2017 Div.B,P.L.
Request Request Total OCO 114-254 S
Line Ident OCO OCO Request OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
62 Aircraft Industrial Facilities A 524 U
63 War Consumables A U
64 Other Production Charges A U
65 Special Support Equipment A U
66 First Destination Transportation A U
---------- ---------- ---------- ----------
---------- ---------- ---------- ----------
UNCLASSIFIED
Department of the Navy
March Budget Amendment to the FY 2017 President's Budget Request
for BASE + Overseas Contingency Operations (OCO)
Exhibit P-1 March Budget Amendment to the FY 2017 President's
Budget Request for BASE + Overseas Contingency Operations
(OCO)
Total Obligational Authority
(Dollars in Thousands)
FY 2017
PB Request
Remaining Less Enacted Mar Amended FY 2017
PB Request PL 114-254 Request PB Remaining S
Line Ident OCO Base+OCO Base+OCO Base+OCO e
---- ----------------- ----- -------- ---- -------- ---- --------
---- -------- ---- -
-------------------
62 Aircraft Industrial Facilities A 524 23,718 23,718 U
63 War Consumables A 40,613 40,613 U
64 Other Production Charges A 860 860 U
65 Special Support Equipment A 36,282 36,282 U
66 First Destination Transportation A 1,523 1,523 U
---------- ---------- ---------- ----------
---------- ---------- ---------- ----------
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
Master Line Item Table of Contents (by Appropriation then Line
Number)
Appropriation 1506N: Aircraft Procurement, Navy
Line # BA BSA Line Item Number Line Item Title Page
1 01 01 0145
FA-18E/F................................................................................................................................................
Volume 1 - 1
5 01 01 0152 JSF
STOVL............................................................................................................................................Volume
1 - 3
9 01 01 0164 V-22 (Medium
Lift).................................................................................................................................
Volume 1 - 5
14 01 01 0193 P-8A
Poseidon.......................................................................................................................................
Volume 1 - 7
Appropriation 1506N: Aircraft Procurement, Navy
Line # BA BSA Line Item Number Line Item Title Page
18 02 01 0246
C-40A.....................................................................................................................................................
Volume 1 - 9
UNCLASSIFIED
Line # BA BSA Line Item Number Line Item Title Page
26 04 01 0465 Other Support
Aircraft..........................................................................................................................Volume
1 - 11
Line # BA BSA Line Item Number Line Item Title Page
28 05 01 0514 AV-8
Series..........................................................................................................................................Volume
1 - 13
30 05 01 0525 F-18
Series..........................................................................................................................................
Volume 1 - 15
31 05 01 0528 H-53
Series..........................................................................................................................................
Volume 1 - 17
39 05 01 0560 C-130
Series........................................................................................................................................
Volume 1 - 19
UNCLASSIFIED
Line # BA BSA Line Item Number Line Item Title Page
60 06 01 0605 Spares and Repair
Parts.....................................................................................................................
Volume 1 - 27
UNCLASSIFIED
UNCLASSIFIED
Master Line Item Table of Contents (Alphabetically by Line Item
Title)
Line Item Title Line Item Number Line # BA BSA Page
AV-8 Series 0514 28 05 01..................... Volume 1 - 13
C-130 Series 0560 39 05 01..................... Volume 1 - 19
C-40A 0246 18 02 01.......................Volume 1 - 9
F-18 Series 0525 30 05 01..................... Volume 1 - 15
FA-18E/F 0145 1 01 01.......................Volume 1 - 1
FA-18E/F, Advance Procurement 0145 2 01
01............................................
H-53 Series 0528 31 05 01..................... Volume 1 - 17
JSF STOVL 0152 5 01 01.......................Volume 1 - 3
JSF STOVL, Advance Procurement 0152 6 01
01............................................
MAGTF EW for Aviation 0587 53 05 01..................... Volume 1 -
21
Other Support Aircraft 0465 26 04 01..................... Volume 1
- 11
P-8A Poseidon 0193 14 01 01.......................Volume 1 -
7
P-8A Poseidon, Advance Procurement 0193 15 01
01............................................
Spares and Repair Parts 0605 60 06 01..................... Volume 1
- 27
V-22 (Medium Lift) 0164 9 01 01.......................Volume 1 -
5
V-22 (Medium Lift), Advance Procurement 0164 10 01
01............................................
V-22 (Tilt/Rotor Acft) Osprey 0590 56 05 01.....................
Volume 1 - 23
Volume 1 - xxxix
UNCLASSIFIED
UNCLASSIFIED
Line Item Table of Contents (by Appropriation then Line
Number)
Appropriation 1506N: Aircraft Procurement, Navy
Line # BA BSA Line Item Number Line Item Title Page
1 01 01 0145
FA-18E/F................................................................................................................................................
Volume 1 - 1
5 01 01 0152 JSF
STOVL............................................................................................................................................Volume
1 - 3
9 01 01 0164 V-22 (Medium
Lift).................................................................................................................................
Volume 1 - 5
14 01 01 0193 P-8A
Poseidon.......................................................................................................................................
Volume 1 - 7
Appropriation 1506N: Aircraft Procurement, Navy
Line # BA BSA Line Item Number Line Item Title Page
18 02 01 0246
C-40A.....................................................................................................................................................
Volume 1 - 9
UNCLASSIFIED
Line # BA BSA Line Item Number Line Item Title Page
26 04 01 0465 Other Support
Aircraft..........................................................................................................................Volume
1 - 11
Line # BA BSA Line Item Number Line Item Title Page
28 05 01 0514 AV-8
Series..........................................................................................................................................Volume
1 - 13
30 05 01 0525 F-18
Series..........................................................................................................................................
Volume 1 - 15
31 05 01 0528 H-53
Series..........................................................................................................................................
Volume 1 - 17
39 05 01 0560 C-130
Series........................................................................................................................................
Volume 1 - 19
UNCLASSIFIED
Line # BA BSA Line Item Number Line Item Title Page
60 06 01 0605 Spares and Repair
Parts.....................................................................................................................
Volume 1 - 27
UNCLASSIFIED
UNCLASSIFIED
Line Item Table of Contents (Alphabetically by Line Item
Title)
Line Item Title Line Item Number Line # BA BSA Page
AV-8 Series 0514 28 05 01..................... Volume 1 - 13
C-130 Series 0560 39 05 01..................... Volume 1 - 19
C-40A 0246 18 02 01.......................Volume 1 - 9
F-18 Series 0525 30 05 01..................... Volume 1 - 15
FA-18E/F 0145 1 01 01.......................Volume 1 - 1
FA-18E/F, Advance Procurement 0145 2 01
01............................................
H-53 Series 0528 31 05 01..................... Volume 1 - 17
JSF STOVL 0152 5 01 01.......................Volume 1 - 3
JSF STOVL, Advance Procurement 0152 6 01
01............................................
MAGTF EW for Aviation 0587 53 05 01..................... Volume 1 -
21
Other Support Aircraft 0465 26 04 01..................... Volume 1
- 11
P-8A Poseidon 0193 14 01 01.......................Volume 1 -
7
P-8A Poseidon, Advance Procurement 0193 15 01
01............................................
Spares and Repair Parts 0605 60 06 01..................... Volume 1
- 27
V-22 (Medium Lift) 0164 9 01 01.......................Volume 1 -
5
V-22 (Medium Lift), Advance Procurement 0164 10 01
01............................................
V-22 (Tilt/Rotor Acft) Osprey 0590 56 05 01.....................
Volume 1 - 23
Volume 1 - xlv
UNCLASSIFIED
UNCLASSIFIED
LI 0145 - FA-18E/F UNCLASSIFIED Navy Page 1 of 2 P-1 Line #1
Exhibit P-40, Budget Line Item Justification: Request for
Additional Appropriations 2017 Navy Date: March 2017 Appropriation
/ Budget Activity / Budget Sub Activity: 1506N: Aircraft
Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat
Aircraft
P-1 Line Item Number / Title: 0145 / FA-18E/F
ID Code (A=Service Ready, B=Not Service Ready): A Program Elements
for Code B Items: 0204136N Other Related Program Elements:
0604269N, 0305207N, 0604270N, 0204154N
Line Item MDAP/MAIS Code: 000
Resource Summary Prior Years FY 2015 FY 2016
FY 2017 Base
FY 2017 OCO
FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021
To Complete Total
Procurement Quantity (Units in Each) 563
- 5 24 2 26 14
- -
- - 608
Gross/Weapon System Cost ($ in Millions) 64,333.482 0.000 350.000
2,267.026 184.912 2,451.938 1,361.974 0.000 0.000 0.000
- 68,497.394 Less PY Advance
Procurement ($ in Millions) -
- -
- -
- 52.974
- -
- -
52.974 Net Procurement (P-1) ($ in Millions) 64,333.482 0.000
350.000 2,267.026 184.912 2,451.938 1,309.000 0.000 0.000 0.000
- 68,444.420 Plus CY Advance
Procurement ($ in Millions) -
- -
52.974 - 52.974
- -
- -
- 52.974 Total Obligation Authority
($ in Millions) 64,333.482 0.000 350.000 2,320.000 184.912
2,504.912 1,309.000 0.000 0.000 0.000 - 68,497.394
(The following Resource Summary rows are for informational purposes
only. The corresponding budget requests are documented
elsewhere.)
Initial Spares ($ in Millions) -
- -
- -
- -
- -
- -
- Flyaway Unit Cost ($ in Thousands)
102,317.297 - 69,453.000 73,825.500
69,551.000 73,496.692 81,805.929 -
- -
- 100,342.270 Gross/Weapon System
Unit Cost ($ in Thousands) 114,269.062
- 70,000.000 94,459.417 92,456.000
94,305.308 97,283.857 -
- -
- 112,660.188
Description: AMENDED BUDGET REQUEST JUSTIFICATION: $2,267.026
Million is required to support approved increases for 24 additional
F/A-18E/F aircraft and $52.974 Million of advance procurement for
24 additional FY 2018 aircraft.
The F/A-18E/F Naval Strike Fighter is a twin-engine, mid-wing,
multi-mission tactical aircraft. F/A-18E/F can be missionized
through selected use of external equipment to accomplish specific
fighter or attack missions. This capability allows the Operational
Commander more flexibility in employing his tactical aircraft in a
dynamic scenario. The primary design mission for the F/A-18E/F is a
strike fighter which includes the traditional applications, such as
fighter escort and fleet air defense, combined with the attack
applications, such as interdiction and close air support. Since the
same airframe systems are used on attack missions as well as
fighter missions, excellent fighter and self defense capability is
retained.
PY Advance Procurement should reflect PB16 Budget. PY quantity
should read 563 aircraft and Total quantity should read 608
aircraft.
FY16 Congressional Addition of 5 FA-18E/F for $350 Million.
FY17 F/A-18E/F aircraft quantity of 24 Baseline aircraft to include
one squadron stand-up. FY17 F/A-18F aircraft quantity of 2 adds
aircraft to the program to account for Overseas Contingency
Operation combat losses.
Justification: FY17 Baseline funding request for 24 aircraft to
include one squadron stand-up. This reflects an increase of 10
aircraft over Department of the Navy's February 2016 Unfunded
Priority List (UPL) request for 14 F/A-18E/F Super Hornets. Strike
Fighter Inventory Management continues to be challenged with
end-of-life planning for F/A-18A-D legacy aircraft, delays in
development, procurement and integration of operational F-35C
aircraft, overutilization of current aircraft due to high
operational tempo,
Volume 1 - 1
UNCLASSIFIED
LI 0145 - FA-18E/F UNCLASSIFIED Navy Page 2 of 2 P-1 Line #1
Exhibit P-40, Budget Line Item Justification: Request for
Additional Appropriations 2017 Navy Date: March 2017 Appropriation
/ Budget Activity / Budget Sub Activity: 1506N: Aircraft
Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat
Aircraft
P-1 Line Item Number / Title: 0145 / FA-18E/F
ID Code (A=Service Ready, B=Not Service Ready): A Program Elements
for Code B Items: 0204136N Other Related Program Elements:
0604269N, 0305207N, 0604270N, 0204154N
Line Item MDAP/MAIS Code: 000 and aviation depot maintenance
backlogs. Procurement of additional F/A-18E/F strike-fighter
aircraft in FY 2017 will reduce near-term Strike Fighter
shortfalls, accelerate divestiture of legacy F/A-18 A-D series
Hornets, and begin to address long-term strike-fighter capacity
shortfalls by maintaining an open F/A-18 E/F/G production line and
procuring aircraft with useful life into the 2030s.
OCO: The FY2017 Overseas Contingency Operation (OCO) requirement of
2 FA-18E/F for $185 million Aircraft Reset in support of OCO
operations.
Volume 1 - 2
UNCLASSIFIED
LI 0145 - FA-18E/F UNCLASSIFIED Navy Page 1 of 1 P-1 Line #2
Exhibit P-40, Advance Procurement Budget Line Item Justification:
Request for Additional Appropriations 2017 Navy Date: March 2017
Appropriation / Budget Activity / Budget Sub Activity: 1506N:
Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat
Aircraft
P-1 Line Item Number / Title: 0145 / FA-18E/F
Program Elements for Code B Items: 0204136N Other Related Program
Elements: 0604269N, 0305207N, 0604270N, 0204154N Line Item
MDAP/MAIS Code: 000
Resource Summary Prior Years FY 2015 FY 2016
FY 2017 Base
FY 2017 OCO
FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021
To Complete Total
Gross/Weapon System Cost ($ in Millions)
- -
- 52.974
- 52.974
- -
- -
- 52.974 Net Procurement (P-1) ($ in
Millions) -
- -
52.974 - 52.974
- -
- -
- 52.974 Total Obligation Authority
($ in Millions) - - - 52.974 - 52.974 - - - - - 52.974
Description: AMENDED BUDGET REQUEST JUSTIFICATION: $2,267.026
Million is required to support approved increases for 24 additional
F/A-18E/F aircraft and $52.974 Million of advance procurement for
24 additional FY 2018 aircraft.
The F/A-18E/F Naval Strike Fighter is a twin-engine, mid-wing,
multi-mission tactical aircraft. F/A-18E/F can be missionized
through selected use of external equipment to accomplish specific
fighter or attack missions. This capability allows the Operational
Commander more flexibility in employing his tactical aircraft in a
dynamic scenario. The primary design mission for the F/A-18E/F is a
strike fighter which includes the traditional applications, such as
fighter escort and fleet air defense, combined with the attack
applications, such as interdiction and close air support. Since the
same airframe systems are used on attack missions as well as
fighter missions, excellent fighter and self defense capability is
retained.
PY Advance Procurement should reflect PB16 Budget. PY quantity
should read 563 aircraft and Total quantity should read 608
aircraft.
Justification: Funding is requested to procure long lead items for
24 F/A-18E/F planned for procurement in FY2018.
Volume 1 - 3
UNCLASSIFIED
UNCLASSIFIED
LI 0152 - JSF STOVL UNCLASSIFIED Navy Page 1 of 2 P-1 Line #5
Exhibit P-40, Budget Line Item Justification: Request for
Additional Appropriations 2017 Navy Date: March 2017 Appropriation
/ Budget Activity / Budget Sub Activity: 1506N: Aircraft
Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat
Aircraft
P-1 Line Item Number / Title: 0152 / JSF STOVL
ID Code (A=Service Ready, B=Not Service Ready): B Program Elements
for Code B Items: 0204146M Other Related Program Elements:
0204146N, 0207142F Line Item MDAP/MAIS Code: 198
Resource Summary Prior Years FY 2015 FY 2016
FY 2017 Base
FY 2017 OCO
FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021
To Complete Total
Procurement Quantity (Units in Each) 21 6 15 16
- 16 20 20 20 21 172 311 Gross/Weapon
System Cost ($ in Millions) 4,801.532 1,287.605 2,291.599 2,243.741
0.000 2,243.741 2,853.972 2,758.152 2,787.591 2,868.001 22,845.941
44,738.134 Less PY Advance Procurement ($ in Millions) 839.436
103.195 143.885 203.060 - 203.060
233.648 276.374 273.464 279.199 2,672.774 5,025.035 Net Procurement
(P-1) ($ in Millions) 3,962.096 1,184.410 2,147.714 2,040.681 0.000
2,040.681 2,620.324 2,481.778 2,514.127 2,588.802 20,173.167
39,713.099 Plus CY Advance Procurement ($ in Millions) 942.631
143.885 203.060 233.648 - 233.648
370.472 227.562 231.003 220.000 2,452.774 5,025.035 Total
Obligation Authority ($ in Millions) 4,904.727 1,328.295 2,350.774
2,274.329 0.000 2,274.329 2,990.796 2,709.340 2,745.130 2,808.802
22,625.941 44,738.134
(The following Resource Summary rows are for informational purposes
only. The corresponding budget requests are documented
elsewhere.)
Initial Spares ($ in Millions) -
64.194 111.569 214.252 - 214.252
26.159 88.434 160.150 140.989 Continuing Continuing Flyaway Unit
Cost ($ in Thousands) 178,108.476 183,410.667 129,988.400
155,087.500 - 155,087.500 126,419.400
124,838.000 123,557.450 124,278.905 129,599.517 133,984.691
Gross/Weapon System Unit Cost ($ in Thousands) 228,644.381
214,600.833 152,773.267 140,233.813 -
140,233.813 142,698.600 137,907.600 139,379.550 136,571.476
132,825.238 143,852.521
Description: AMENDED BUDGET REQUEST JUSTIFICATION: $2.913 Million
is required to support unique Amphibious Assault Ships (LHA/LHD)
airframe requirements and engine Peculiar Ground Support Equipment
(PGSE).
Joint Strike Fighter (JSF) program will develop and field a family
of aircraft that meets the needs of DoD and allies with the F-35A
Conventional Take Off and Landing (CTOL) variant, the F-35B Short
Take-Off and Vertical Landing (STOVL) variant, and the F-35C
Carrier Variant (CV) with optimum commonality among the three
variants to minimize life cycle costs. This is a joint program with
no executive service. Service Acquisition Executive (SAE) authority
alternates between the Department of the Navy (DoN) and the
Department of the Air Force (DAF) and currently resides with the
Navy. The F-35s are the next generation of strike fighters which
has increased aero-performance, stealth signature and
countermeasures. Its advanced avionics, data links and adverse
weather precision targeting incorporates the latest technology
available. The F-35 has increased range with internal fuel and
includes superior weaponry over existing aircraft. The highly
supportable, affordable, state of the art aircraft commands and
maintains global air superiority. The production cost and
quantities are interdependent due to one manufacturer for the
program. USAF regular procurement commenced in FY07, DON regular
procurement commenced in FY08.
Notes: (1) FY10 and prior quantity and funding for F-35B STOVL and
F-35C CV were reported under same BLI (0147). Result is 29 F-35B
STOVL aircraft (6 - FY08; 7 - FY09; and 16 - FY10) are included in
the BLI 0147 Prior Year Column. The F-35C CV budget continues to
report under BLI 0147. CY Advance Procurement for FY10 F-35B STOVL
aircraft was included in the FY10 F-35C CV budget. The Advance
Procurement Credit for FY10 F-35B STOVL aircraft was included in
FY11 F-35B STOVL budget.
(2)Cost to complete should be: Gross Weapon System Cost-
$23,692.975 Prior Year AP- $3,121.464 Net Procurement- $20,571.511
CY Advanced Procurement- $2,054.430
(3)Amended Budget Request includes the following: -Procures (2)
modular T-SAPF units for MCAS Iwakuni ($1.070M).
Volume 1 - 5
UNCLASSIFIED
LI 0152 - JSF STOVL UNCLASSIFIED Navy Page 2 of 2 P-1 Line #5
Exhibit P-40, Budget Line Item Justification: Request for
Additional Appropriations 2017 Navy Date: March 2017 Appropriation
/ Budget Activity / Budget Sub Activity: 1506N: Aircraft
Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat
Aircraft
P-1 Line Item Number / Title: 0152 / JSF STOVL
ID Code (A=Service Ready, B=Not Service Ready): B Program Elements
for Code B Items: 0204146M Other Related Program Elements:
0204146N, 0207142F Line Item MDAP/MAIS Code: 198 Units are
expandable rigid-walled expeditionary facilities to support F-35
operations at the SAP/SAR level (mission planning, briefing,
debriefing, low observable management) and house mission-critical
classified ALIS servers and peripherals in an environmentally
protected and controlled secure space.
-Procures (110) Mobility Storage Rack Units required for F-35B
Alternate Mission Equipment (AME)($1.100M). Required storage for
the increasing JSF AME footprint.
-F-35B F-135 Power Module Shipboard Movement Trailer ($0.743M).
Procures F-35 Power Module Shipboard Movement Trailers to enable
F-35B Engines to fit inside MV-22 aircraft for transport.
[P5 / Airframe/CFE]: PB017 Amended: Procures (+3) F-35B Aircraft in
FY17 plus Advanced Procurement.
[P5 / Non- Recur Cost]: Non-recurring costs increased in FY17 due
to additional funding needed for Special Tooling/ Test Capacity
Equipment to support the JSF STOVL.
Justification: BASIS FOR FY17 BUDGET REQUEST: The FY17 budget
provides funding for 16 Short Take-Off, Vertical Landing (STOVL)
F-35B aircraft for the Marine Corps, with associated support for
DoN requirements, and Advance Procurement for 20 STOVL F-35B
aircraft in FY18.
Volume 1 - 6
UNCLASSIFIED
LI 0152 - JSF STOVL UNCLASSIFIED Navy Page 1 of 1 P-1 Line #6
Exhibit P-40, Advance Procurement Budget Line Item Justification:
Request for Additional Appropriations 2017 Navy Date: March 2017
Appropriation / Budget Activity / Budget Sub Activity: 1506N:
Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat
Aircraft
P-1 Line Item Number / Title: 0152 / JSF STOVL
Program Elements for Code B Items: 0204146M Other Related Program
Elements: 0204146N, 0207142F Line Item MDAP/MAIS Code: 198
Resource Summary Prior Years FY 2015 FY 2016
FY 2017 Base
FY 2017 OCO
FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021
To Complete Total
Gross/Weapon System Cost ($ in Millions) 942.631 143.885 203.060
233.648 - 233.648 370.472 227.562
231.003 220.000 2,452.774 5,025.035 Net Procurement (P-1) ($ in
Millions) 942.631 143.885 203.060 233.648
- 233.648 370.472 227.562 231.003
220.000 2,452.774 5,025.035 Total Obligation Authority ($ in
Millions) 942.631 143.885 203.060 233.648 - 233.648 370.472 227.562
231.003 220.000 2,452.774 5,025.035
Description: Joint Strike Fighter (JSF) program is developing and
fielding a family of aircraft that meets the needs of DoD and
allies, with the F-35A Conventional Take Off and Landing (CTOL)
variant, F-35B Short Take-Off and Vertical Landing (STOVL) variant
and F-35C Carrier Variant (CV). The aircraft will have optimum
commonality among three variants to minimize life cycle costs. This
is a joint program with no executive service. Service Acquisition
Executive (SAE) authority alternates between Department of Navy
(DoN) and Department of Air Force and currently resides with the
DAF. The F-35 is next generation of strike fighters to command and
maintain global air superiority. Advance procurement funding will
support Airframe and Engine Termination Liability, and long-lead
parts and materials necessary to protect delivery schedule of FY18
JSF aircraft.
Note: (1) F-35B USMC variant Budget Line Item 0152 was created in
FY11, prior years budgets were reported under Budget Line Item
0147. The F-35C USN variant continues to report under Budget Line
Item 0147. CY Advance Procurement for FY10 F-35B STOVL aircraft was
included in the FY10 F-35C CV budget. The Advance Procurement
Credit for FY10 F-35B STOVL aircraft was included in the FY11 F-35B
STOVL budget.
Justification: BASIS FOR FY17 BUDGET REQUEST:
FY17 Advance Procurement funding is requested for long-lead
requirements necessary to support procurement of 20 STOVL JSF
aircraft in FY18.
Volume 1 - 7
UNCLASSIFIED
UNCLASSIFIED
LI 0164 - V-22 (Medium Lift) UNCLASSIFIED Navy Page 1 of 2 P-1 Line
#9
Exhibit P-40, Budget Line Item Justification: Request for
Additional Appropriations 2017 Navy Date: March 2017 Appropriation
/ Budget Activity / Budget Sub Activity: 1506N: Aircraft
Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat
Aircraft
P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift)
ID Code (A=Service Ready, B=Not Service Ready): A Program Elements
for Code B Items: N/A Other Related Program Elements: N/A Line Item
MDAP/MAIS Code: 212
Resource Summary Prior Years FY 2015 FY 2016
FY 2017 Base
FY 2017 OCO
FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021
To Complete Total
Procurement Quantity (Units in Each) 282 19 19 18 1 19 6 6 6 14 40
411 Gross/Weapon System Cost ($ in Millions) 24,192.579 1,554.588
1,463.609 1,493.696 85.419 1,579.115 660.795 731.674 639.209
1,493.035 4,788.815 37,103.419 Less PY Advance Procurement ($ in
Millions) 1,391.729 59.269 67.254 58.723
- 58.723 19.674 22.511 21.801 46.593
149.158 1,836.712 Net Procurement (P-1) ($ in Millions) 22,800.850
1,495.319 1,396.355 1,434.973 85.419 1,520.392 641.121 709.163
617.408 1,446.442 4,639.657 35,266.707 Plus CY Advance Procurement
($ in Millions) 1,481.558 51.564 43.853 19.674
- 19.674 22.511 21.801 46.593 48.442
100.716 1,836.712 Total Obligation Authority ($ in Millions)
24,282.408 1,546.883 1,440.208 1,454.647 85.419 1,540.066 663.632
730.964 664.001 1,494.884 4,740.373 37,103.419
(The following Resource Summary rows are for informational purposes
only. The corresponding budget requests are documented
elsewhere.)
Initial Spares ($ in Millions) -
0.858 0.479 0.033 - 0.033
- -
- 37.569 Continuing Continuing
Flyaway Unit Cost ($ in Thousands) 74,107.174 71,603.000 71,920.947
74,797.444 84,008.000 75,282.211 94,784.500 98,853.500 99,289.667
95,697.071 108,537.475 79,061.713 Gross/Weapon System Unit Cost ($
in Thousands) -
- -
- -
- -
- -
- -
-
Description: AMENDED BUDGET REQUEST JUSTIFICATION: $170.839 Million
is required to support approved increases for 2 additional MV-22
aircraft in the base request and $85.419 Million for 1 additional
MV-22 in the OCO request.
The V-22 is a tilt-rotor vertical takeoff and landing aircraft
currently being produced for joint service application. The program
provides an aircraft to meet the amphibious/vertical assault needs
of the Marine Corps, the Carrier Onboard Delivery needs of the
Navy, and supplements USSOCOM special mission aircraft. The
aircraft is capable of flying 2,100 miles with one refueling, and
gives the Services the advantage of a Vertical/Short Takeoff and
Landing (V/STOL) aircraft that can rapidly self-deploy to any
location in the world.
The current procurement objective is 461: 360 MV-22 Marine Corps
aircraft, 48 Navy aircraft, and 53 CV-22 aircraft for USSOCOM
(funded by USSOCOM and the Air Force). The program successfully
completed Milestone III in the 1st Quarter of 2006, and IOC in
March of 2007.
Funding for the Navy variant will begin in FY2017 for long-lead
requirements associated with the procurement of six aircraft. The
configuration of this variant is a modification of the MV-22 and
will perform the Carrier Onboard Delivery (COD) mission and
include: (1) external conformal fuel tanks to