7/25/2019 9 4 Indonesia Jupiter&Dewi
1/25
PLANNING FOR LOCAL INDUSTRIALINVOLVEMENT FOR NEW NPP
DEVELOPMENT IN INDONESIA
Jupiter Sitorus Pane, Dharu Dewi, YariantoNational Nuclear Energy Agency of indonesia
Presented at
Technical Meeting on Industrial Involvement and Localization for New NuclearPower Plant Construction.Crowne Plaza Hotel, Qingdao, China,
26 to 29 August 2014
7/25/2019 9 4 Indonesia Jupiter&Dewi
2/25
Outline Introduction
Localization/National Participation
Criteria for Selecting National Participation
Assessment of Quality and local content
Supply chain of Civil Construction Industires
Estimation of National IndustrialParticipation
Conclusion
7/25/2019 9 4 Indonesia Jupiter&Dewi
3/25
Introduction Indonesia has experienced constructing three
research reactors and performing various Pre-Feasibility Studies for the preparation of firstnuclear power plant.
One of the benefit for constructing NuclearPower Plant in developing countries likeIndonesia include local industrial participationor involvement that could provide positive
social impact to industry and public. This presentation provide information
regarding Indonesian experiences inestimating local industrial participation and
supply chains.
7/25/2019 9 4 Indonesia Jupiter&Dewi
4/25
Manufacturing using foreign engineering inthe local area.
Manufacturing through technologytransferring in the local areas
Manufacturing through technical
collaboration in the local areas
Localization /National Participation
7/25/2019 9 4 Indonesia Jupiter&Dewi
5/25
Manufacturing through joint venture withco brand in the local areas
Manufacturing using by imported parts orraw material in the local areas
National labor participation to services andconstruction
Localization/National Participation
7/25/2019 9 4 Indonesia Jupiter&Dewi
6/25
Criteria for Selecting Local
Industrial Participation
Are their profiles relevant to NPPsconstruction?
Are there potential investment capabilityto participate in a NPP Project?
Are there relevant experiences of thenational industries in high technology
project? Are there national industries experiences
in the large conventional power plants?
7/25/2019 9 4 Indonesia Jupiter&Dewi
7/25
Assessment of Quality and
local contentLocal Industries shall fulfill:
SNI (Indonesia National Standard )requirement: for safety.
ISO with other certified specialrequirements such as SNI, ASME NQA-1,OHSAS 18000, ISO14000 and NBBI forcivil works.
Portland V for building material
7/25/2019 9 4 Indonesia Jupiter&Dewi
8/25
Assessment of Quality and
Local Content Architecture: ISO 9001:2002, OHSAS
18001:1999, ASME NQA-1 (qualitycontrol)
Manufacturing industries: ISO 9001, ISO14001 ASMe Stamp (U, U2,S,R,NB, PP)and BS 5500
7/25/2019 9 4 Indonesia Jupiter&Dewi
9/25
Supply Chain of Civil
Construction Industries
NPP Construction
Civil Construction
Civil ConstructionIndustries
Steel StructureIndustries
Cement IndustrySupporting
Material IndustriesSteel Industries
7/25/2019 9 4 Indonesia Jupiter&Dewi
10/25
Civil Construction Industries PT. Adhi Karya
PT. Waskita Karya
PT. Hutama Karya
PT. Wijaya Karya PT. Nindya Karya
PT. Pembangunan Perumahan
PT. Krakatau Engineering
PT. Bangun Total Persada
7/25/2019 9 4 Indonesia Jupiter&Dewi
11/25
Civil Construction
Industries Supply Chain
NPP Construction
Civil ConstructionIndustries
PT. Adhi Karya
Experiences : Port of Inalum Bride of
Suramadu Tn. Abang
Market Istiqlal Mousque etc
PT. Waskita Karya PT. Hutama KaryaPT. Pembangunan
PerumahanPT. KrakatauEngineering
PT. Total BangunPersada
Experiences :LahendongGeothermal PPMuara KarangCPPPortResearch ReactorSerpongPort and dam
Experiences : Segara Mini
Hydro Cirompang Mini
Hidro Kendari CPP Ampana CPP Port Building
Experiences : KDL CCPP 3x40 GPP 90MW Talang Duku
GPP 65 MW Port and Dum Building
Experiences EPO GPP 2x40
Gunung MegangSumatra Selatan
WHRG PowerPlant 2 x 14 MWPT. Meratus jaya
Urea danAmonia Plant
Experiences : Building Hotel & Office Apartment Etc.
7/25/2019 9 4 Indonesia Jupiter&Dewi
12/25
Steel And Steel Structure
Industries PT. Krakatau Steel
PT. Gunung Garuda (PT. Gunung Steel Group)
PT. Cilegon Fabricators
PT. Ometraco Arya Samantha PT. Amarta Karya
PT. Arkon Prima Indonesia
PT. Gunawan Dian Jaya Steel
7/25/2019 9 4 Indonesia Jupiter&Dewi
13/25
Civil Construction
Industries Supply Chain
NPP Construction
Steel and Steel Structure
PT. Krakatau SteelPT. Gunung Steel
GroupPT. CilegonFabrication
PT. OmetracoArya Samanta
Experiences : Build PT
Krakatau DayaListrik (PowerPlant)
Experiences : Supply the
project of PT.KrakatauEngineering
Supply theproject of PT.Krakatau Posco
Experiences : Suralaya CPP Bukit Asam CPP Belawan CPP PLTGU Cilegon,
Muara Karangdan Tg. Periok
Experiences CCPP Tambal
Lorok project ,Semarang.
Paison-BesukiCPP
Gresik CPP Petero Kimia
Gresik
Kamojang , Jabar
7/25/2019 9 4 Indonesia Jupiter&Dewi
14/25
7/25/2019 9 4 Indonesia Jupiter&Dewi
15/25
Cement Industries PT. Semen Padang
PT. Semen Gresik
PT. Semen Tonasa
PT. Semen Baturaja
PT. Semen Holchim Indonesia
PT. Indocement Tunggal Perkasa TBk PT. Semen Andalas
PT. Semen Bosowa
PT. Semen Kupang
7/25/2019 9 4 Indonesia Jupiter&Dewi
16/25
Civil Construction
Industries Supply Chain
NPP Construction
Cement
PT. Semen PadangPT. SemenBaturaja
Palembang
PT. SemenHolchim
IndonesiaPT.. Semen Gresik
Experiences : Waste heat
recovery powergeneration atIndarung
CPPconstruction atteluk sirih
Experiences : No information
to buildelectricalgeneration plant
Experiences : Cilacap
CPP(2006) Paiton CPP Labuan CPP Indramayu CPP Muara Tawar
CPP
Experiences Sudimoro CPP
Pacitan Paiton CPP
Probolinggo Sluke CPP
Rembang
7/25/2019 9 4 Indonesia Jupiter&Dewi
17/25
Civil Construction
Industries Supply Chain
NPP Construction
Cement
PT. Semen PadangPT. Semen Baturaja
PalembangPT. Semen Holchiim
IndonesiaPT.. Semen Gresik
Product type and capacity Type I Portland Cement
(ordinary Portlant Ceme Nt Type II Portland Cement Type III Portland
Cement Type V Portland Cement Oil Weld Cement
Product type and capacity Type I Portland Cement
(about 375000 ton/year Portland Cement
Composite 875000ton/year
Product type and capacity Portland Ceomposite
Cement (about 3169.97ton/year)
Ordinary PortlandCement1.328.312 ton
Concrete Ready Mix 45million m
Product type andcapacity Ordinary Portland
Cement (about2.876.3000 box
Portland Cement8.763.700 Cement
Special BlendedCement (with order)
7/25/2019 9 4 Indonesia Jupiter&Dewi
18/25
7/25/2019 9 4 Indonesia Jupiter&Dewi
19/25
Oil
Oil
Oil
Oil
Coal
Coal
Coal
Coal
19
Estimation of LocalIndustrial Involvement
7/25/2019 9 4 Indonesia Jupiter&Dewi
20/25
Energy Projection with High Scenario(without limited unit of NPP*)
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
2032
2034
2036
2038
2040
2042
2044
2046
2048
2050
MW
Capacity of NPP (MW)
* PLTN dibebaskan muncul kapan dan dengan jumlah berapa saja
E h h S
7/25/2019 9 4 Indonesia Jupiter&Dewi
21/25
Energy Projection with High Scenario
(with limit 2 unit of NPP per year**)
0
2000
4000
6000
8000
10000
12000
14000
2010 2017 2024 2031 2038 2045
MW
Capacity of NPP (MW)
** PLTN ditasi waktu (mulai 2027) dan jumlah kemunculan (2 unit/tahun)
7/25/2019 9 4 Indonesia Jupiter&Dewi
22/25
Estimation of Local
Industrial InvolvementRoad map of construction:
NPP (unit#) #1,#2 #3,#4 #5,#6 #7,#8 #9,#10
Year ofconstruction
2027 2034 2037 2040 2043
Contract type Turn-key Turn-key Splitpackage
Splitpackage
Splitpackage
Local content 30 35 40 60 80
7/25/2019 9 4 Indonesia Jupiter&Dewi
23/25
Conclusion Indonesia has already identify industries that
fulfill criteria to participate on civil
construction of new nuclear Power Plant
since they have experiences to buildconventional power plant and
implemented national and international
code and standard.
Depend on the national nuclear energypolicy, the participation of local industries
could increase with the increase of number
of NPP construction.
7/25/2019 9 4 Indonesia Jupiter&Dewi
24/25
Thank You for Your Kind Attention
7/25/2019 9 4 Indonesia Jupiter&Dewi
25/25
Thank you