SharePoint 2010 Migration
Thank you for joining us as we explore the
7 Fatal Mistakes Made When Migrating
From SP 2007 to SP 2010
Welcome Everyone!
Question & Answer Session
• Webinar content will last for 50 minutes followed by
Q&A session which will last until all questions have
been answered or 11:30 AM, whichever comes first.
• If you have a question or an issue:
– Type your question in the question window of the
GoToWebinar control panel on the right side of your
desktop
– I will sort through the questions and
present those most frequently asked
to our panel at the end of the presentation
– If you an issue, click on the hand
• If you have a question that does not get
addressed, we will provide contact information
so you can reach out to the experts at
Netwoven after the webinar.
Sandy Gledhill
Slide # Enabling Intelligent Enterprises
Netwoven
Founded in 2001 by former Microsoft executives
Top talent from industry
Leadership comprised of Microsoft, Accenture, Oracle and Intel talent
Former senior executive of Wipro, Infosys, McKinsey on our board
US headquartered company with development center in India
Save the Children
Slide # Enabling Intelligent Enterprises
Service Description
Migration Intranet, Extranet migrations from 2007
Out-Tasking Managed Services including Level 1, 2 and 3
support
Social Networking Communities
Document Management Taxonomy, FAST Search, Migration
Business Intelligence Reports, Scorecards and Dashboards
Portal and Collaboration Intranet, Collaboration
Web Content Management Public Websites
Custom Development Line of Business Custom Applications
Netwoven
SharePoint Services
Microsoft Best
Practices award
Winner
Slide # Enabling Intelligent Enterprises
Early Registration Prize Winner!!
Apple iPod nano!
All attendees
who registered before February
28, 2011 are eligible!
And the Winner is….
Slide # Enabling Intelligent Enterprises
Migrate Successfully!
Do you know the
7 Fatal Mistakes made when Migrating from SharePoint 2007 to SP 2010?
YOU SHOULD! And this is why…
Slide # Enabling Intelligent Enterprises
Current Business Environment
*Since the start of the recession, 8.5
million jobs have been lost ~ BLS
*50% of businesses fail in the first 5
years ~ SBA
*Over the lifetime of a business:
• 39% are profitable
• 30% break even
• 30% lose money ~ NFIB Study
Slide # Enabling Intelligent Enterprises
Project Statistics
Overall project failure rates vary
• From 33% to 67%
• Even a 1 in 3 failure rate is totally unacceptable
ACM Article (1)
– 25% of projects fail along multiple axes
– Any more than one change in project management leads to 50% risk of under performance
– Risk of under-performance is closely correlated to effort (person-months).
(1) http://blog.jackvinson.com/archives/2007/11/12/how_many_of_your_it_projects_fail_too_many.html
Slide # Enabling Intelligent Enterprises
Niraj Tenany
• President and CEO, co-founder of Netwoven
• Enterprise Content Management Expert
• Worked for clients like eBay, Chevron, Microsoft, Applied
Materials
• Served both Fortune 1000 and mid market clients as an IT
strategist
• Frequent speaker in Microsoft and Industry events
• Has worked with several ECM products such as Opentext
Livelink, eRoom, Lotus Notes, Documentum, Interwoven and
SharePoint
Slide # Enabling Intelligent Enterprises
Special Offer ~ today only
Architecture Design Session (ADS)
A Netwoven expert will consult with your company
• This is a 1 day consultation on any area of concern
• Can be held on site at your facility, at Netwoven in
Milpitas, at the Microsoft facility in Mountain View, or
conducted remotely via web meeting.
Slide # Enabling Intelligent Enterprises
Fatal Mistake #1
Not defining a complete roadmap for your
SharePoint environment
• SharePoint 2010 is a disrupting technology and will have a
major impact on your overall IT strategy. Ignoring a well
defined roadmap will result into a bad IT strategy.
- Fastest growing product in
Microsoft’s history to reach $1B
in sales
- ERP for unstructured data
- Touches all aspects of your IT
strategy
Slide # Enabling Intelligent Enterprises
Fatal Mistake #1
Not defining a complete roadmap for your
SharePoint environment
• Not leveraging the features of SharePoint to the fullest will
result into high maintenance costs, duplicate technologies
for end users, and lower productivity for end users
- Web Content Management
- Document Management
- Custom Applications
- Social Networking
- Extranet
- Enterprise search
- Business Intelligence
Slide # Enabling Intelligent Enterprises
Fatal Mistake #1
Not defining a complete roadmap for your
SharePoint environment
For instance:
• Not considering the Business Intelligence capabilities of
SharePoint could result into multiple systems and having a
disintegrated system for end users
•Not considering the new FAST search
would mean not providing advanced
findability capabilities and missing out
on Search apps
Slide # Enabling Intelligent Enterprises
Fatal Mistake #2
Failing to completely analyze your current
environment and prepare a migration plan
• Risky migration approach with vendors and internal staff
providing migration estimates that do not accurately scope
the project. Can result into a failed migration.
Risky Migration
- Technical Analysis
- Usage Analysis
- Governance
- Requirements Queue
- Search and Retrieval
Slide # Enabling Intelligent Enterprises
Fatal Mistake #2
Failing to completely analyze your current
environment and prepare a migration plan
• Unable to determine the timeline and budget for migration
resulting into missed expectations with your end users
- Site Collection Sizes
- Security Policies
- Taxonomy / Meta data Management
- Search
- Customizations
- Operations
Slide # Enabling Intelligent Enterprises
Fatal Mistake #2
Failing to completely analyze your current environment and prepare a migration plan
For instance:
• Performance issues and data restore issues with your large site collections
• Third Party web parts deployed on some WFEs and not on all WFEs (Surprise!)
Do this, so you don’t end up
here
Slide # Enabling Intelligent Enterprises
Fatal Mistake #3
Relying completely on the results of the Sharepoint pre-
upgrade checker
• Utility provided by Microsoft to assess your environment and
its readiness for migration
- Hardware readiness
- Database readiness
- List of customizations
For Instance:
•Require SharePoint 2007 SP2 service pack
•Need to upgrade to 64 bit machines
Slide # Enabling Intelligent Enterprises
Fatal Mistake #3
Relying completely on the results of the SharePoint pre-
upgrade checker
• Excellent starting point but should not be the only thing in
your bag of tricks
• Could lead to a non-functional SharePoint environment
leading to lost productivity, wasted money, time and human
resources by the business.
- Known and unknown
customizations
- Undocumented things done by
administrators and end users
Slide # Enabling Intelligent Enterprises
Fatal Mistake #3
Relying completely on the results of the SharePoint pre-
upgrade checker
• Could lead to critical data being lost after migration is
performed.
• Unable to migrate a site
collection due to a missing
custom feature
• Partial migration of the
Mysites due to missing third
party web parts
Slide # Enabling Intelligent Enterprises
Fatal Mistake #4
Failing to re-architect prior to migration
• Involves looking at your overall SharePoint environment
and ensuring that the roadmap that is defined fits with the
overall architecture and using the new features of
SharePoint to implement them
- Farm Architecture
- Information Architecture
- Taxonomy Architecture
- Search Architecture
- Operations Architecture
- Governance Architecture
Slide # Enabling Intelligent Enterprises
Fatal Mistake #4
Failing to re-architect prior to migration
Can cause your team to:
- Miss Technical improvements
- Miss Operational improvements
- Miss Process improvements
- Replace custom features with
OOTB features
- Plan and enable new features that
come with SharePoint 2010
- Develop new customizations to
meet business requirements
Slide # Enabling Intelligent Enterprises
Fatal Mistake #4
Failing to re-architect prior to migration
Common questions regarding re-architecture:
• Deep Site Collections vs. Wide Site Collections
• Having Extranet and Intranet in the same farm
• Working with large digital content (Video)
- Intranet and Extranet
- Separate Active Directory to manage
users
- Leveraging the use of the DMZ
- Better administrative functions
- Deep vs. Wide - Few site collections hosting intranet,
collaboration, and document
management
- Use of SharePoint groups and AD
groups
- Search Scopes
- Small or large Taxonomy
Slide # Enabling Intelligent Enterprises
Fatal Mistake #5
Not analyzing the customizations in detail
- Custom Templates
- Custom Workflows
- Custom Applications
- Custom Search
- Custom Web Parts
- Custom Features
Slide # Enabling Intelligent Enterprises
Fatal Mistake #5
Not analyzing the customizations in detail
• Root cause of delays in migration. Not having a complete
handle on the customizations can result into costly delays
and an unstable environment.
• Prepare a list of customizations, analyze and test the
customizations and perform appropriate changes
• Site Definitions
• Third Party Web Parts
• Workflows
• Line Of Business Applications
• Custom Features
Slide # Enabling Intelligent Enterprises
Fatal Mistake #5
Not analyzing the customizations in detail
• Multiple file delete function in a document library
• Taxonomy Management application
- Multiple file delete is an OOTB
feature. Remove the
customization
- Replace components of the
taxonomy management
application with OOTB features
Slide # Enabling Intelligent Enterprises
Fatal Mistake #6
Trying to cut corners by using an inexpensive third
party migration tool
• Assist with content migration
• Assist with customization migration
- Date / Time stamps preserved
- Created By / Modified By
preserved
- Deleted users cleaned
- Merge and split of site collections
and sites
- Merge and split of libraries
- Customization migration
Slide # Enabling Intelligent Enterprises
Fatal Mistake #6
Trying to cut corners by using an inexpensive third party migration tool
• Often ignore the learning curve required for the third party tool
• Migration Tools themselves require customizations at time to support specific needs
Don’t be this guy
- Ability to take folder names and
turn them into site columns
Slide # Enabling Intelligent Enterprises
Fatal Mistake #6
Trying to cut corners by using an inexpensive third
party migration tool
- Several HR Site collections
exist that are spread across
the farm. Need to combine
them into a single site
collection
- Customer Site collection too
big, need to break it into
multiple site collections
Slide # Enabling Intelligent Enterprises
Fatal Mistake #7
Failing to Conduct a Test Migration
• Most important step prior to preparing your final migration plan. Without this, the project plans will not be final
• The credibility of your business hangs in the balance here! The incorrect scoping that can result will likely mean costly project delays.
- Untested migration scripts
- Non functional content
migration tool
- Time it takes to migrate
Slide # Enabling Intelligent Enterprises
Fatal Mistake #7
Failing to Conduct a Test Migration
• Verify your plan
• Verify your assumptions
• Validate your tools
• Ensure you have the right team with the required skills
- Incomplete test scripts
- Lack of co-ordination with the
server group for hardware
- Availability of end users for testing
of the migrated content
Slide # Enabling Intelligent Enterprises
Special Offer ~ today only
Architecture Design Session (ADS)
A Netwoven expert will consult with your company • This is a 1 day consultation on any area of concern
• Can be held on site at your facility, at Netwoven in Milpitas, at the
Microsoft facility in Mountain View, or conducted remotely via web
meeting.
1. Netwoven will provide an AS-IS assessment
2. A TO-BE Definition will be identified
3. Netwoven will provide a GAP Analysis
4. Recommendations will be provided
Slide # Enabling Intelligent Enterprises
Special Offer ~ today only
Architecture Design Session
(ADS)
• Define the Roadmap
• Establish Priorities
• Propose Next Steps
Slide # Enabling Intelligent Enterprises
Special Offer ~ today only
Architecture Design Session
(ADS)
The ADS Project with Netwoven is a $2,000.00 value.
Today only, as a “Thank You” for your participation, we
are offering you a one time opportunity to schedule a
complete ADS for…
ONLY $500.00!
Slide # Enabling Intelligent Enterprises
Special Offer ~ today only
Architecture Design Session
(ADS)
Special Offer registration procedure
1. Send an email to [email protected]
2. Enter “SPADS0329” in the subject line
3. In the body of your email include your name and
contact information ~ make sure to include a telephone
number
4. A Netwoven team member will contact you to
set up an appointment time and will forward a
Statement of Work for signature
Slide # Enabling Intelligent Enterprises
Webinar Prize Winner!!
Microsoft Office 2010
Professional Plus!
All attendees who registered and
are attending the webinar
today!
And the Winner is….
Slide # Enabling Intelligent Enterprises
Expert Panel
Niraj Tenany
CEO & Co-Founder
Netwoven
Matt Maher
Solutions Architect
Netwoven
Viraj Bais
CTO & Co-Founder
Netwoven
Walt De Petris
VP, Service Delivery
Netwoven