3030thth Engineer Battalion Engineer Battalion (Topographic)(Topographic)
Ongoing Support to OEF/OIFOngoing Support to OEF/OIF
AgendaAgenda
OIF MissionOIF Mission OIF StatisticsOIF Statistics OIF Locations OIF Locations Support to CPASupport to CPA Thanks…Thanks… IssuesIssues
MissionMission
The 30The 30thth EN BN (-) deploys to Kuwait EN BN (-) deploys to Kuwait with an LAD of 4 April 2003, conducts with an LAD of 4 April 2003, conducts RSOI with the 416RSOI with the 416thth ENCOM in theatre, ENCOM in theatre, and resumes geospatial support to the and resumes geospatial support to the CFLCC in order to support current and CFLCC in order to support current and future military operations in the Middle future military operations in the Middle East.East.
Summary of Missions ExecutedSummary of Missions Executed
4423100th Survey
70000818100th Press
66103218100th HVMP
500032025100th TA
3264639175th HVMP
33011935175th TA
Production
Complete
Missions
(since 11 APR)
PAXElement
E
1 100
E
2 100
E
175E
2 100
E
1 100
E
HHCI
E
100
TALILTALIL
KIRKUKKIRKUK
BIAPBIAP
AL KUTAL KUT
CPACPA
DOHADOHA
E
1 100
Returning from CPA missionReturning from CPA mission Remainder of BN reconstituted & ready to Remainder of BN reconstituted & ready to
deploydeploy 5026/50275026/5027 OIF 2.5OIF 2.5 OIF 3OIF 3
Ongoing Geospatial OperationsOngoing Geospatial Operations
Topographic Support Topographic Support ToTo
Coalition Provisional Coalition Provisional AuthorityAuthority
(CPA)(CPA)
AgendaAgenda
MissionMission RequirementsRequirements Statistics Statistics Facts Facts Current OrganizationCurrent Organization Proposed OrganizationProposed Organization Future Support to CPAFuture Support to CPA
MissionMission
The Coalition Provisional Authority provides The Coalition Provisional Authority provides continuous support to the people of Iraq to continuous support to the people of Iraq to ensure effective and complete ensure effective and complete reconstruction of the country’s critical reconstruction of the country’s critical infrastructure and stabilization of the infrastructure and stabilization of the government until such time as the Iraqi government until such time as the Iraqi people can provide for and govern people can provide for and govern themselves as a democratic nationthemselves as a democratic nation
RequirementsRequirements
Special map products which support:Special map products which support: Route planningRoute planning Infrastructure reconstruction and planningInfrastructure reconstruction and planning Civil developmentCivil development Governmental representationGovernmental representation
Image products which support:Image products which support: Force protection planning Force protection planning Operational planningOperational planning
ScanningScanning Disaster reliefDisaster relief ReconstructionReconstruction
ReproductionReproduction Large quantity reproductionLarge quantity reproduction
StatisticsStatistics
Statistics (as of 15 May 2004)Statistics (as of 15 May 2004)Product Type QuantityImage Maps 1,876Raster Maps 1,765Vector Maps 1,076Scans 745Reproduction 76,367
FactsFacts All products produced were created for the CPA staff and ministries, Combined
Joint Task force-7 (CJTF-7), its subordinate units, and the United States Army Corps of Engineers (USACE)
The topographic team is playing a key role in the ongoing Mass Grave site assessment through change detection utilizing archival and current commercial satellite imagery
Provided image based products to assist in the search for weapons of mass destruction
Very little of Iraq’s map data survived combat operations and post war looting. In the effort to recover or reproduce this critical data, the Topographic Team has scanned in several hard copy maps and created vector data crucial in the rebuilding of the Iraqi infrastructure
The USACE has a Division size element flowing into Iraq and the Topographic Team will be a valuable asset fulfilling their mapping needs
Facts (con’t)Facts (con’t) Products are also being utilized to support the following military plans and Products are also being utilized to support the following military plans and
operations:operations: Operation Desert ScorpionOperation Desert Scorpion Operation Peninsula StrikeOperation Peninsula Strike Operation Long StreetOperation Long Street Operation Iron AnvilOperation Iron Anvil Green Zone Security (CPA)Green Zone Security (CPA) Force protection plans for maneuver units throughout IraqForce protection plans for maneuver units throughout Iraq Regional CPA Headquarter security plansRegional CPA Headquarter security plans
The following are key products used to support the CPA regional The following are key products used to support the CPA regional headquarters:headquarters: Baldiyah (cities, municipalities), Hayy (neighborhoods), and Mahalah Baldiyah (cities, municipalities), Hayy (neighborhoods), and Mahalah
zones (postal zones) boundarieszones (postal zones) boundaries Province (state) Quaida (county), and Nadiya (district) zone boundariesProvince (state) Quaida (county), and Nadiya (district) zone boundaries
Government districts boundariesGovernment districts boundaries
Facts (con’t)Facts (con’t)These products continue to be instrumental in successful accomplishments of the following critical tasks:
Reconstruction of the Iraqi oil infrastructure
Reconstruction of the Iraqi electrical infrastructure
Reconstruction of the Iraqi transportation network
Reconstruction of the Iraqi irrigation system
Reconstruction of key Iraqi government facilities infrastructure
Reconstruction of the Iraqi civil infrastructure to include schools, hospitals, police stations, fire stations, prisons and court houses
Bottom line:Bottom line: The Topographic Team is a critical asset within CPA and The Topographic Team is a critical asset within CPA and must continue supporting this organizationmust continue supporting this organization
CurrentCurrentOverall OrganizationOverall Organization
DCOS/ HSG
PERSONNAL INTELLIGENCE RCO RSCO Logistics
Director, Administration & Logistics / Chief of Staff Amb Steve Smith
DCMA
HCA
CHAPLAIN
DS
KBR
CommunicationsFACILITIES MGT
DCIS
SJA
ComptrollerFPO
DVB
Transition Support Team
Convention Center
CID
Blackwater
OSI
3/2 CAVMRCO
SPECIAL STAFFPRINCIPAL STAFF
CPA SUPPORT
Geo-Spatial SpaceSupport Cell
HQ SUPPORT GROUP
IndicatesTransition to Principle Staff
Current Geo-Spatial Space Current Geo-Spatial Space Support Cell OrganizationSupport Cell Organization
Chief GSSC(0-5, FA 40)
TopographicTeam (7)
Spectral Analysts(2)
Space SupportTeam (6)
Proposed OrganizationProposed Organization
LTC, FA 40Space Plans Off
Topographic Tech(CW2/3)
Eagle Vision IITeam
CJTF7 SpaceSupport Team
Topographic TeamNCOIC (SFC)
Topographic AnalystSquad (1xNCO, 5xEM)
Lithography Squad(1xNCO, 3xEM)
Database/SystemAdministrator (1xNCO, 2xEM)
-Military ranks used, can also be civilian equivalent-Pre-assigned positions from Space and Missile Defense Command
Future Geo-Spatial Support
-Geo-Spatial support not included in OIF-2 support-Geo-Spatial support to new CPA organization will be included in OIF-3 support-Team will be civilian contracted or military-Team will continue to support the same organizations -Team size will be approximate 10 to 15 man size element-Equipment package will be the same or civilian equivalent to
-2 DTSS-L and HVMP (ARC and ERDAS software)-Software will be ERDAS and ARC-View or equivalent -At least one 36” scanner, two 60” plotters and three 36” plotters
-Products and data will be posted on the net
Thanks…Thanks…
ILEX / MANTECH (deployment critical)ILEX / MANTECH (deployment critical) TPIO-Terrain, DCD, FLWTPIO-Terrain, DCD, FLW DGSDGS 2929thth, 320, 320thth, 555, 555thth, 1203, 1203rdrd, & 132, & 132ndnd LTC Kuh/LTC DayLTC Kuh/LTC Day
IssuesIssues
HVMP FieldingHVMP Fielding UA / UE Terrain Teams (pax & equip)UA / UE Terrain Teams (pax & equip) Future of 21L & 21SFuture of 21L & 21S TGD TGD Geospatial OversightGeospatial Oversight