1 Safe Work Procedure: 30
Bordertown Pumps and Refrigeration 22 Milne St
BORDERTOWN SA 5268 Phone 08 8752 1959 Fax 08 8752 1181 Email: [email protected]
Safe Work Method Statement
Job Task: angle grinder RISK IDENTIFICATION & CONTROLS
SWMS Created: 01/11/2013 Date of Last Review: June 2015
Authorised By : Daniel Staude Date for Next Review: June 2016
Personal Protective Equipment (where applicable):
Procedural step(s) Possible
Hazard(s) Safety Control(s)
Check equipment Electrocution Cuts and other injuries from blade / cutting wheel
All electrical leads should be intact with no damage to insulation
All outside sheathing properly secured by retaining rings on plugs, no internal wires showing
All adjusting screws should be tight
Prepare the work Slips, trips, sprains and strains
Check work is properly supported and wont slide or move
Check cut will be clear of supports
Check cut off will fall safely or will be supported
Check electric cord will reach along the cut
Check floor is clear of obstructions and debris
2 Safe Work Procedure: 30
Prepare yourself Noise dust inhalation or in eyes falling off‐cuts
PPE as required; eye wear, safety shoes, hearing protection, gloves
Pick up grinder Electrocution Cuts and other injuries from clade / cutting wheel
Lead to be plugged in and power on
Locate electric cord away from work, over right shoulder and away from area to be cut
Position the grinder Slips, trips Place grinder on loose work
Check cut can be completed without repositioning mid work
Make the cut Slips, trips Press trigger – be prepared to counter any kick
Place both hands on designated areas of tool to ensure maximum grip and control
Complete cut Slips, trips, cuts Take finger off trigger as soon as grinder is no longer cutting
Ensure the blade has stopped before resting the grinder
Switch off power to tool, when not in use
Overall risk rating: Significant RISK RATING GUIDE Consequence
Death Catastrophic Illness/Injury
Major Extensive Injuries
Moderate Medical treatment
required
Minor No injuries
Lik
elih
oo
d
Almost certain Occurred before/expected
H H S S
Likely Probably will occur
H S S S
Moderate May occur at some time
H S L L
Unlikely Unusual or rare situation
S L L L
High (H) – cease exposure immediately until protection, approved at senior management level, implemented.
Significant (S) – procedures alone may not be enough, senior management attention required.
Low (L) – may be managed by routine procedures, some risks in this category may be acceptable.
3 Safe Work Procedure: 30
SPECIFIC TASK REQUIREMENTS Qualifications or experience n/a
Training Angle grinder SWMS
Engineering details, certificates, WorkCover approvals n/a
Relevant codes of practice, legislation or standards Safe Work SA Code of Practice: Managing Electrical Risks in the Workplace Safe Work SA Code of Practice: Managing the risks of plant in the workplace Work Health and Safety Act 2012 (SA) Work Health and Safety Regulations 2012 (SA)
Plant/equipment n/a
Maintenance checks, site/workplace inspections n/a