Upload
nguyencong
View
217
Download
2
Embed Size (px)
Citation preview
, [ ] a100% Bumiputera owned company, commenced business late 2001 focusing on niche products in the field of safety & innovation and providing best-in-class services for the Oil & Gas/Petrochemical and Construc-tion industry.
With qualified and technically experienced staff, the company has matured into a dynamic organization. Continuing to strive for excellence, is now recognized as a major fabrication and trading company with unmatched records in all of fields the Company is specialized in.
The Company policies are: To strive for excellence and be recognized as THE
leading company in its field of business,
To establish and maintain a good working and mutually beneficial relationship with all clients,
To sustain the highest Safety and Health stan-dards and to ensure the Safety and Health of its employees are given the highest priority,
To ensure highest standards in ethics and integrity are complied with,
To be very competitive in pricing, yet uncom-promising in the quality and professionalism of work completed, and
To be sensitive to the environment and conserve the state of the environment.
About Us
is proud to be credited as a total system, service & solution provider with a focus in providing innovative safety solutions. As all industries by defini-tion are safety orientated (and in particular the Oil & Gas industry), our packages are tailored to provide the most technically advanced system, product, and service solution that meets the budgetary constraints of our Clients.
Through an extensive knowledge of the oil & gas indus-try from the inside as a Client and from the outside as a EPIC Contractor, has developed a com-plex and yet highly effective and sophisticated global network of suppliers and partners. Whilst the term smart-partnering is used indiscriminately, we truly believe that have mastered the disci-pline of smart-partnering.
In the area of product offer, has success-fully collaborated with distinguished and leading Inter-national companies in representing their presence in Malaysia. Several leading International companies have shown their absolute confidence in the Company by appointing the Company to be their EXCLUSIVE Agent/Partner in Malaysia.
has achieved many major milestones since its conception and it has succeeded in being recognized to be a key player in supporting the fabrica-tion yards in large scale fabrication works especially, but not limited to, the following services:
1. Major Structural Fabrication and Welding,2. Piping Fabrication and Welding,3. Minor and Major Construction,4. Field Joint Coating (FJC) Services, 5. Blasting and Painting Works6. Passive Fire Protection (PFP),7. Electrical and Instrumentation (E&I),8. Water, Energy and Waste Solution,9. VSAT - End-to-End Communication,10. FRP - Grating, Handrails and Structures,11. Fire & Blast Walls, Radient Heatsheets,12. VIV Suppression System,13. Architectural works,14. Insulation works, and15. Mechanical Maintenance.
Business Activities
The health, safety and well-being of our employees is of utmost importance and as a company, we continu-ally work to ensure all employees place the same emphasis towards health and safety during the course of conducting our business. We also firmly believe that the co-operation and commitment of all employees is essential in achieving the highest standard in Health, Safety and Environment management.
Health Safely & Environmental Policy strives to uphold the health safety & environmental aspects in its manufacturing and business operations by:
Complying to ISO 14001 & OHSAS 18001 standard requirements, applicable legal requirements, as well as client requirements with regards to HSE and shall make available all documents, services and facilities related to HSE issues so as to enable proper performance of HSE related activities
Preventing pollution, injury and ill-health protect its employees, the environment and all third parties including their equipments from any hazard that may arise as a result of the WORK
Continuosly improving the HSEMS and ensuring its effective implementation for continual improvement
Conserving natural resources from extinction.
Drugs & Alcohol Policy
will and does not tolerate or accept activities which collaborate with the illegal use, selling, possession, distribution, consumption, abusing, trans-fer or sales of any form of alcohol and drugs in the workplace.
’s position on the consequences of its employee with regards to the violation of this is imme-diate removal of the employee from the workplace and following disciplinary measures e.g. dismissal, suspen-sion, demotion, transfers and for repetitive, chronic offences or cases – reference will be made to the Enforcing Government Agencies.
Health, Safety &Environement
1. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR
CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT –
SAPURA ACERGY SDN BHD - TNK VIETNAM BV - May 17, 2012
2. PROVISION OF FIELD JOINT COATING SERVICES FOR MOC
TRANSPORTATION AND INSTALLATION OF OFFSHORE
PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE
SDN BHD - MURPHY OIL - May 9, 2012
3. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT
PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT -
NEWFIELD - April 9, 2012
4. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND
SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL
LTS3000 L & T SAPURA - April 1, 2012
5. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR
TELOK A & B PROJECT – MMHE SDN BHD - SHELL -
March 23, 2012
6. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN
ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS -
March 14, 2012
7. PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI
CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN
DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA -
KPOC - March 13, 2012
8. SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD
AND RISER CLAMP FOR PROVISION OF HOOK-UP AND
COMMISSIONING FOR PCSB SKO PIPELINE REJUVENATION
PROJECT. – CARIMIN ENGINEERING SERVICES - PETRONAS -
March 12, 2012
9. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT –
ALAM SWIBER - PETRONAS - February 27, 2012
10. PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS
(RAYCHEM WPC100M) FOR EMEMPI�S TAPIS EOR REJUVENA-
TION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE
SDN BHD - EMEMPI - February 24, 2012
11. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS &
THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE
- PETRONAS -February 22, 2012
12. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMER-
SIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH –
DIAMOND OFFSHORE - MURPHY OIL - February 14, 2012
13. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL
SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA -
GLOBAL OFFSHORE - February 09, 2012
14. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR
LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA
ACERGY SDN BHD - TNK VIETNAM BV - January 20, 2012
15. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT
M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL - SHELL
December 21, 2011
16. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR
PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD -
NEWFIELD December 1, 2011
17. E & I FABRICATION, INSTALLATION, TESTING, PRE- COMMIS-
SIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND
PACKAGE C) – MMHE SDN BHD - EMEMPI - December, 2011
18. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING
QUARTERS – MMHE SDN BHD - EMEMPI - November, 2011
19. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN
TOPSIDES – SIME DARBY ENGINEERING SDN BHD - KPOC -
November 25, 2011
20. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT –
ALAM SWIBER - PETRONAS - October 10, 2011
21. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF
PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA
RAYA-B – APEX ENERGY SDN. BHD. - TALISMAN - September
27, 2011
22. PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES
FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI
PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD -
NEWFIELD - September 15, 2011
23. PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI
CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24”
EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR
KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV
GROUP SDN BHD - PETRONAS CARIGALI SDN BHD -
September 15, 2011
24. PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/
EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP &
APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER
WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD. -
SHELL - September 15, 2011
25. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF
PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES
(E-9550 & E-9650) – MONT TRINITY - NIPPON OIL -
September 12, 2011
26. PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI
CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED
TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES
(TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN
BHD - NEWFIELD - August 17, 2011
* Please email to [email protected] for a full and detail track record
SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION ATA
Track Records
* Please email to [email protected] for a full and detail track record, if required.
Ou
r G
row
th P
ath
Sin
ce C
omm
ence
men
t of
Bu
sin
ess
in 2
00
1 ti
ll 2
012
Ou
r G
row
th P
ath
Sin
ce C
omm
ence
men
t of
Bu
sin
ess
in 2
00
1 ti
ll 2
012
Gallery of Recently Completed Project & Our Yard/Facilities
Structural, Piping & Mechanical, Electrical & Instrumentation, Firewall & Blastwall Works for
KUMANG CLUSTER Development Project
CPOC Eight Legged MDPP Jacket Project
ANGEL Gas Project -Passive Fire Protection Works
MODEC RJS 409 ESPADARTE FPSA MODULE - STRUCTURAL WORKS
YOHO Development Project EPC2 Production - PFP Works
Sumandak Phase II SUPG-BDevelopment - Structure Works
5-Acre Fabrication Facilities in Pasir Gudang consists of Covered
Fabrication Workshop, Blasting Chamber and Blasting & Painting
Equipment & Facilities, under one roof.
PC4 (Multidiscipline) Gas Development Project
E11 P-B Topsides - Passive Fire Protection Works And
Supply of Blastwall
w w w. j u r u n a t u r e . c o m