13
Yokogawa’s VigilantPlant delivers visibility, predictability and agility for power generation – throughout the plant life cycle. Yokogawa in the Power Industry Bulletin 53T01A01-01E

Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

Embed Size (px)

Citation preview

Page 1: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

Yokogawa’s VigilantPlant delivers visibility, predictability and agility for power generation – throughout the plant life cycle.

Yokogawa in thePower Industry

Bulletin 53T01A01-01E

Page 2: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

1 2

ACT WITH AGILITY Fewer surprises KNOW IN ADVANCE

Minimize reactive measures, unexpected downtime, quality variations

Reduce delays, lost opportunities, knowledge silos

Free of bottlenecks

SEE CLEARLY

Avoid guesswork, instability, sub-optimization

Less blind spots

The clear path to operational excellenceEnvision a plant where people are watchful and attentive while your businessresponds to change quickly and efficiently. Now picture an operation that delivers non-stop power generation while confidently expanding your capabilities into the future. Imagine no further. This is the vision and promise behind VigilantPlant, the clearpath to operational excellence.

Making critical plant information fully visible is just the beginning of the vigilant cycle.

Seeing clearly gives you the knowledge necessary to anticipate the changes required in your process. Knowing in advance brings you

the speed and flexibility to optimize your plant in real time. And by acting with agility, you are able to adapt to the ups and downs of

your business environment.

VigilantPlant excels at bringing out the best in your plant and your people – keeping them fully aware, well informed, and ready to

face the next challenge.

Page 3: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

The plant’s alert approach to operations, maintenance, and information is obvious. Operators are calm and in control. Managers are well informed, but never overwhelmed with data. All facilities are under control, ready to unleash their full potential for occasional peak load. At the same time, potential problems are anticipated before they happen. All this in the life of a vigilant operation.

You know a well run plantthe moment you walk in

A New PlantComes On-streamThe control room is quiet, with arrays of computer

screens displaying trends and messages on the walls

and operating desks. Gone are the chart recorders,

printers, meters and push buttons of yesterday. Operat-

ing staff remain calm, monitoring operations, preparing

the plant for routine testing and maintenance.

Other operating staff take time out from the control room

for refresher training on the plant’s full replica training

simulator. Here, the atmosphere is not quite as calm as

operating staff get put through their paces responding to

emergency conditions, and undergo training for less

common tasks such as plant start-up.

Being trained for a wide variety of emergencies, the

operators are ready to handle unexpected events with

confidence. Unscheduled shut-downs are minimized

and rapid recoveries from unforeseen incidents are

assured.

To a casual observer, this calm & efficient setting may seem rather boring. But this is the way a plant should run –allowing you to See Clearly, Know in Advance, andAct with Agility. It should run like a VigilantPlant.

3 4

Daily Operations & MaintenanceDuring the night, while most of the community sleeps,

the power plant remains in operation, ticking over at

minimum output, meeting society’s needs for an uninter-

rupted electricity supply. The plant is prepared for the

surge in electricity demand as the community awakes

and commercial activities resume.

The CENTUM VP system coordinates operations

throughout the plant, ensuring that boilers, steam

turbines, and balance of plant (BOP) facilities function

stress-free and at optimum efficiency while staying within

safe operating limits.

The advanced alarm and monitoring system monitors all

control system traffic, alerting operating staff to

problems, while blocking out unnecessary messages.

Most alarm messages relate to routine issues, such as

the failure of an aging field instrument or a problem with

the operation of a valve or damper.

As morning approaches, operating staff check the

plant’s daily schedule and begin placing additional coal

grinding mills into operation to increase the plant’s output

and meet the morning demand.

During the day, the control system continually adjusts the

plant output up and down to meet shifts in power

demand. A sudden cold weather snap a hundred km

away – or a failure in a plant elsewhere – may call for

more power. In the competitive electricity market, a plant

must be agile to quickly respond to market needs and

capitalize on opportunities to increase profitability.

Recent heavy rain may result in deliveries of wet coal

from the local mines. Operating staff respond by placing

an extra milling plant in reserve, and then relax knowing

that the Yokogawa control equipment includes fuel control

strategies to cope with changes in fuel conditions.

Meanwhile, in the maintenance workshop, plant techni-

cians responsible for 24/7 maintenance of all plant

instruments and control systems use the PRM asset

management software to monitor the performance of

field devices such as transmitters, analysers and

actuators.

The control system provides high-level operational and

maintenance diagnostics, enabling immediate identifica-

tion of plant faults, greatly accelerating response to

problems.

Plant managers keep an eye on plant performance via

secure remote access. Plant experts check and evaluate

plant performance from the comfort of their office

environment.

Plant Revamp & ExpansionWith today's power plants remaining in operation for sev-

eral decades, there comes a time when instrumentation

and control systems must be renewed to maintain a

competitive edge.

At the start of a replacement project, Yokogawa's experi-

enced engineering team carries out a plant and control

system audit. The sustainable and flexible architecture of

Yokogawa’s control system means that only the obsolete

control units need to be changed over, allowing existing

equipment to be retained to the maximum extent. Strate-

gies for increasing plant safety, avoiding project cost over-

runs, and increasing plant availability are put into place.

While the design and fabrication proceed, other process

application specialists review the plant control strategies

and incorporate new control concepts. This is thoroughly

tested by simulation, almost always with a full replica

simulator. Testing proceeds separately from the manu-

facture of control equipment, providing low risk engineer-

ing processes for projects with short outage times.

Once the plant outage begins, existing control equipment

is quickly removed, without disturbing existing cabinets

and cables. The new factory-assembled and tested control

equipment is installed, and connections made to existing

terminals and cables. Commissioning and testing of the

new control equipment commences almost immediately.

As the outage concludes, operating staff "run up" the

plant with the confidence that comes from having under-

gone extensive training on the plant simulator.

With the new control system, the power plant is set for many

more years of safe, reliable and competitive operation.

Page 4: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

SEECLEARLY

5 6

The effectiveness and efficiency of power plant operations depend on the availability of key performance information about the plant and the process. Yokogawa delivers a single-architecture monitoring and control system that integrates information from all facets of a power plant and keeps the plant personnel well informed. The industry-leading availability, reliability, and long-term stability of the Yokogawa automation platforms ensure an operating environment where your people can have 20:20 vision of your entire operation.

Improving visibility of all plant informationwith a single unified architecture Key Enablers:

--

---

CENTUM VP total power plant control system for turbine, boiler and balance of plant (BOP) controls

TÜV SIL3 certified ProSafe-RS integrated safety controller for the burner management system (BMS) and

protection system

FOUNDATION™ fieldbus and HART interface for field instruments, analyzers, and valve positioners

PROFIBUS interface for electrical equipment and motor valves

IEC 60870-5 interface for substation equipment

Single architecture covering the entire plant

-

-

Field-proven controller with seven 9s (99.99999%) availability in unique pair-and-spare redundant

architecture

Pair & spare fail-safe architecture is also available for the ProSafe-RS safety controller

High availability

--

±0.04% accuracy of the DPharp EJX digital transmitter even in the most critical applications (drum level, etc)

±0.1% of upper range limit (URL) for 10 years with EJA/EJX transmitters

Long term stability

Digital sensing & control

Error (%@max.span)

0.10

0.05

0.00

-0.05

-0.101 2 3 4 5 6 7 8

Year

9 10 11 12 13 14 15

Page 5: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

7 8

Optimizing operation & maintenance forunprecedented plant management efficiency

KNOWIN ADVANCE

Advanced plant management

Key Enablers:

-

-

-

Intelligent alarm management automatically displays alarms requiring operator attention, informing

operators whether alarm points are improving while suppressing irrelevant alarm messages.

Exaplog event analysis package analyzes the frequency of alarms and operator actions, visualizing

statistical data and helping to find the root causes of alarm occurrence and areas for improvement.

Event sequence analysis with built-in Sequence of Events Manager (SEM) allows 1msec time resolution

and 1msec accurate time synchronization system across all controllers.

Alarm Management

- Integrated asset management with PRM Plant Resource Manager enables effective maintenance of plant

assets in a single unified database system across different protocols and multiple suppliers.

Plant Asset Management

-

-

Full-replica simulator performs highly accurate modeling of actual plant behavior under any scenario for

optimized operation and control.

Performance calculation is fully integrated with the Yokogawa DCS and uses predefined formulae to monitor

and optimize performance.

Plant Modeling & Simulation

- Long-term data archiving and data transformation with Exaquantum ensures enhanced, seamless

information flow within and between plant systems and business applications.

Plant Information ManagementOnce into commercial operation, competitive power plants pursue operational excellence by continually improving efficiency and preventing/minimizing abnormal situations. Yokogawa enables optimization solutions that empower plant personnel under both normal and abnormal conditions. Knowledge-based tools and consulting services enable continual productivity improvement, advanced alarm management, and integrated plant asset management. No longer just reacting to problems, your people and your assets are focused on meeting tomorrow’s challenges.

Page 6: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

9 10

During the relatively long life cycle of a power plant, there comes a time when the instrumentation and control systems must be renewed to maintain a competitive edge. Yokogawa supports power plants with expert services that maximize efficiency and minimize cost over the entire life cycle. From initial design, construction, and daily operation to revamp and reinstrumentation, Yokogawa stands by your power plant. This long-term partnership ensures bottleneck-free performance and ongoing optimization that bring speed and flexibility to your business.

Enabling agility of business with plantservices throughout the plant life cycle

- Our philosophy of continuous evolution, demonstrated over a 30 year period with CENTUM, ensures a

smooth migration path and keeps your investment for I&C refurbishment to a minimum.

Sustainable control system architecture

- Certified professional trainers deliver competency-based training using a plant simulator to create training

scenarios that flexibly replicate normal, abnormal, and emergency operating conditions.

Custom-made operator training

- 24/7/365 remote monitoring combined with real-time diagnostic tools and services ensures system

maintenance can be condition-based, not time-based, reducing maintenance spending.

Condition-based system maintenance

- Plant-wide audits examine human resources, fuel, asset management, environment, production, plant

operation, and information systems, identifying opportunities for improvement and cost reduction.

Plant auditing and consulting

-

-

Automated operation procedures created with Exapilot enable the know-how of experienced operators to

be shared with less experienced staff.

Documentation of standard procedures for operation, maintenance, training, commissioning, audit, and

reporting.

Standard knowledge base

- Offline commissioning on a high-fidelity simulator allows thorough validation of the DCS configuration

before the software is loaded at the actual plant, keeping to a minimum the final tuning that must be done

during plant commissioning.

Efficient plant commissioning with plant simulator

ACTWITH AGILITY

Plant life cycle services

Key Enablers:

Page 7: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

11 12

- Pressure, temperature, flow, and level measurement

- Valve positioners and converters

- TÜV SIL3 certified integrated safety systems for burner management and

emergency shutdown

- Analog/digital meters, clamp-on power meters, power monitors,

insulation testers, handy calibrators

- Performance analysis, operational efficiency improvement, and alarm management

- Asset management

Field Instruments

Safety Management Systems

- Liquid analysis (pH/ORP, conductivity, dissolved oxygen)

- Gas analysis (NOx, SO2, CO, CO2, O2, hydrogen purity)

Analytical Instruments Meters and Test Instruments

Plant Optimization Software

- Commissioning, operator training, operation, maintenance,

and simulation services

Power Plant Services- Distributed control systems

- SCADA and network-based control systems

Unit Control Systems

Yokogawa in the power industry

- Paperless videographic recorders

- PC-based and stand-alone data acquisition equipment

- Single loop and highly scalable programmable logic controllers

Data Acquisition and Control

SEE CLEARLY KNOW IN ADVANCE ACT WITH AGILITY

Page 8: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

- Geothermal

- Biomass

- Waste to energy

Renewablepower plants

- Flue gas desulphurization (FGD)

- Circulating fluidized bed (CFB) boilers

Environmentprotection

Wide application experience in the power industry

- Coal/oil/gas fired

- Combined cycle

- Simple cycle

- Co-generation

- Industrial boilers

- Independent water and power

producers (IWPPs)

Fossil fuel firedpower plants

Coal fired power plant

Industrial boiler plant/co-generation plant

Combined cycle power plant

Waste to energy plant

CFB boiler plant

FGD plant

Geothermal power plant

Yokogawa supports a wide range of applications, from conventionalpower to renewable energy.

13 14

Page 9: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

Boiler & BOPControls

Plant SafetySystem

Plant informationmanagement

Plant resource management integrates and manages maintenance information from field instruments and monitors online conditions.

Plant resourcemanagement

Human interface station/engineering station

The ProSafe-RS SCS is a TÜV SIL3 certified safety system that incorporates Yokogawa’s own pair-and-spare technology.

Safety Control Station (SCS)

20000 600

500

400

300

200

100

010 20 30 40 50 60

Time ( Min. )

18000

16000

14000

12000

10000

8000

6000

4000

2000

0

10

9

8

7

6

5

4

3

2

1

0

MW

,leve

l,tem

pera

ture

Stea

m p

ress

ure

Flue

gas

oxy

gen

Boiler & BOP

Coal yard

Fuel

Ash pond

Boiler

EP

FGD

Waste water

TurbomachineryControl & Protection

Typical coal fired power plant

Turbomachinery

Water treatment

Steam turbine

The FCS provides powerful control functions with a highly reliable dual redundant configuration that incorporates Yokogawa’s own pair-and-spare technology.

Field Control Station (FCS)

- Boiler control- Burner management- Turbomachinery control

Typical control scope ofa coal fired power plant

- Balance of plant (BOP) Coal handling Water treatment Ash handling Flue gas desulphurization (FGD), etc.

All types of plant information including process data, alarms, events and sequence of events (SOE) are handled by plant information management, enabling the analysis of plant operational performance.

The human interface station (HIS) provides a unified and intuitive operating environment. Screens are ergonomically designed and arranged toreduce operator fatigue and discomfort. The engineering station provides powerful configuration tools and a virtual test function.

Total power plant control system

CENTUM VP provides an excellent platform for the comprehensiveand coordinated control of power plants.

15 16

Page 10: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

In this revamping project, one important

issue to be considered was the improve-

ment of system maintainability. The

customer wished to centrally manage

through the DCS architecture many

hundred HART-enabled and analogue

devices from multiple venders.

Yokogawa’s PRM Plant Resource

Manager integrates all field device

information and device diagnostic

information into a single database,

allowing real-time, remote maintenance

via DCS networks. When a plant

problem occurs, associated instruments

can be remotely checked and verified in

just a few minutes, which minimizes

routine maintenance work.

Efficient field asset management

The highly accurate simulation

environment (>99% steady state; >95%

dynamic state) enabled thorough

validation of the control configuration on

the simulator prior to the control system’s

actual commissioning at the plant. A

significant number of potential plant trips

and incidents were identified and

resolved before the initial plant startup.

The simulator also aided in the

initial/refresher operator training. In

parallel with the plant commissioning,

the plant operators were well trained

under a wide variety of normal,

abnormal, and emergency operating

conditions.

This ensures a safe and smooth plant

commissioning process.

Faster commissioning with plant simulator

Unified operation of turbine, process, and electrical controls

Real stories in the power industry

SEE CLEARLY800 MW combined-cyclewith LNG terminal

KNOW IN ADVANCE4 x 660 MW coal-firedrevamping

Eraring Power Station, Australia’s largest power station, maximized plant availability for a further 20 years, supported by Yokogawa’s highly integrated control and monitoring systems solutions.

This coal-fired plant has been operated reliably since 1981 and has a generating capacity of 2,640 MW. To ensure market competitiveness for the next few decades and to improve plant operation and efficiency while maintaining reliability, the customer decided to replace the original hard-wired control equipment.

Yokogawa provided an integrated control

solution comprised of a DCS, plant

ACT WITH AGILITY2 x 800 MW supercriticalfull-replica training simulator

Korea South East Power Co., Ltd. (KOSEP) has built and successfully brought online a greenfield supercritical power plant in Yonghung. With its two 800 MW coal-fired units, this plant will help meet the Korean market’s need for clean and efficient power.

To ensure that the commissioning process for its new plant went smoothly, KOSEP turned to Yokogawa and its TechComm Simulation subsidiary for a full-replica simulator solution.

The simulator was used for thorough off-line control system validation prior to DCS commissioning and for operator training in parallel with the plant commissioning.

17 18

Spain's BBE combined cycle power plant and BBG LNG regasification plant are using Yokogawa's field-proven control solutions to provide a stable energy supply.

The construction of these two plants has been a significant undertaking and has been necessitated by the country’s increased demand for electricity and imported natural gas.

Both facilities aim to have high availability. The Yokogawa CENTUM CS 3000 DCS supports reliable plant operation with its field-provenpair-and-spare non-stop controller technology.

At the BBE power plant, the CS 3000 with Unified Operator Interface (UOI) enables the seamless operation of multi-vendor control systems for turbine, Heat Recovery Steam Generator (HRSG), Balance of Plant (BOP), and electrical equipment through a single operator interface.

At the BBE power plant, turbine,

HRSG/BOP process, and electrical are

controlled by different vendors’ systems.

The CENTUM CS 3000/UOI enables

unified operation of multi-vendor control

systems from a single operator

interface, eliminating the need for the

duplication of human machine interfaces

(HMIs) and requiring no engineering for

cross-system communications.

The turbine, process, and electrical

control systems embrace the same HMI

environment as the turbine system HMI.

This enables unified operation of the

entire plant with a common look & feel,

integrated data displays, and integrated

alarm with original time stamp.

information management system, plant asset management system, full-replica training simulator, and field instruments together with strong local support.

The units have been returned to service ahead of schedule and have been operating very stably and efficiently.

Page 11: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

Asset OptimizationLife Cycle Solutions

Operation & Maintenance ServicesStandard Knowledge Base

The 4th Thermal Power Plant (Phase One)4 x 420 t/hr, coal fired, plant revamping

A more stable and robust power supplyThe re-instrumented boilers realized both higher stability and

increased throughput, assuring a stable energy supply.

Reduction of malfunctions and accidentsSince the renovation, equipment malfunctions have dropped

dramatically, eliminating costly plant downtimes.

“Seeing is believing. Whatever beautiful things sales people say, I will not believe until

I see them at work. When we experienced the plant trip, I learned what makes

Yokogawa different from others. I admire their sincerity and devotion toward

customers.”

Complex revamp/expansion projects test the alertness, care, and skill of both

the user and the supplier of automation. Yokogawa delivers practical

engineering solutions with professional care, modernizing and expanding your

plant with minimum disturbance to your business.

Ongoing adaptation and optimization requires continued collaboration.

Yokogawa keeps in close touch with your plant through 24/7 operation support

and expert consultation services.

Good coordination between multiple suppliers and engineering teams is the

key success factor in commissioning. Yokogawa ensures both human

collaboration and technical integration throughout the project life cycle.

Early involvement and collaborative project execution lowers the overall risk of the

project. Yokogawa strives to understand the goals of each project upfront and to

secure a firm ground for ongoing teamwork. Throughout execution, Yokogawa

secures strict quality gates based on proven procedures.

Design & Engineering

Installation & Commissioning

Operation & Optimization

Revamp and Expansion

“Seeing is believing”Front-End Engineering & Design (FEED)Main Instrumentation Vendor (MIV) Services

Site EngineeringIntegration Testing

Turn-Key ServicesCommissioning Services

Optimization Consulting24/7 Operation Support

Online Diagnosis SupportOperator Training

Services for a lifetime of plant efficiency

19 20

Ts. Bayarbaatar, Head of the 4th Thermal Power Plant, Mongolia

Be it diagnosis, root cause analysis, or predictive maintenance, practical

solutions are in short supply. Yokogawa brings you the tools and services that

help you take concrete actions to improve the effectiveness of your plant assets.

Maintenance and Upgrade

12001995

19961997

19981999

20002001

2002

1500

1400

1300

1600

1250

1550

1450

1350

1650

Unit: MWh

After the 1998 revamping,power output showed adefinite increase

1315

14111385 1387

1470

15261553

1604

Page 12: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

20000 600

500

400

300

200

100

010 20 30 40 50 60

Time ( Min. )

18000

16000

14000

12000

10000

8000

6000

4000

2000

0

10

9

8

7

6

5

4

3

2

1

0

MW

,leve

l,tem

pera

ture

Stea

m p

ress

ure

Flue

gas

oxy

gen

21

An industry leader on a clear pathIn 2002, Eraring Energy began a revamp process to replace the original 1970s design hard-wired electronic control equipment and computer equipment at its Eraring Power Station, one of Australia’s largest. Inviting and evaluating proposals for the latest equipment from the major control systems suppliers, Eraring Energy chose Yokogawa.

“The ability to operate flexibly gives us a competitive advantage”

“Yokogawa took advantage of the flexibility of its equipment to suit the existing installation. Where possible, the new equipment slot-ted into existing cabinets, reusing existing field cables, termina-tions, cabinets, and connectors. New equipment was wired and tested in the factory. This avoided disturbing most existing cabling and greatly sped up installation and commissioning times.”

“The new control equipment makes fault finding a breeze, while the new graphic displays show us all the details we need.”

“The asset management system allows us to directly monitor and manage all smart field devices from our workshop.”

“The renovated units are now more flexible and responsive than before, giving the station additional advantages in a highly com-petitive electricity market. The refitted control room is state-of-the art and provides a quiet and stress free operating environment for our staff.”

Jeff Hogan, Instrument and Control Team Manager of Eraring Energy

New control room ( CAD drawing )

Test result of control performance(Load change 66 MW/minute, fixed pressure)

“Expectations exceeded, our plant was backin operation ahead of schedule”

Choose Yokogawa as your partner for operational excellence.Let us be vigilant about your business!

“Yokogawa has exceeded our expectations, bringing each revamped unit back into reliable service ahead of schedule. Utilizing a full replica simulator, our engineering team and Yok-ogawa fully tested the new logic and control configurations before they were loaded on the actual plant. This significantly reduced the time needed for site commissioning, and avoided plant trips during commissioning. Being thoroughly trained on the new screen-based control system training simulator, our operators were well prepared for the new control scheme in time for plant commissioning. This assisted in ensuring an uneventful, smooth return to service.”

Power plant simulator

Eraring Power Station, Australia ( 4 x 660 MW, coal fired )

22

Michael Mortiss, Project Manager of Eraring Energy

“For flexibility, experience and commitment, we selected Yokogawa”

“Our decision to carry out the revamping project was based on the need to maintain a competitive advantage in the Australian deregulated electricity market. Maximizing plant availability for at least another 20 years, timely returns to service of each unit, and efficiency gains were also significant project drivers.”

“While there are several very capable control systems vendors, Yokogawa provided the most completely integrated solution of plant control system, training simulator, plant asset manage-ment system, and plant information and management systems.

Yokogawa’s flexible approach to design and implementation of large power plant revamp projects, team of experienced power plant engineers, and commitment to meeting all-important project outage schedules were further reasons for selecting Yokogawa.”

“We had already purchased other Yokogawa equipment such as transmitters and paperless chart recorders for our plant, and had received excellent service and on-going support.”

Michael Mortiss, Project Manager of Eraring Energy“Supported by the high-level operational and maintenance diag-nostics, together with strong local support from Yokogawa, we are sure that Eraring Power Station will secure high plant availability for a further 20 years.”

Faster load change, whilesecuring stable operation!

O2 Control(%O2)

Drum Level(mm)

Super Heater Temp.(degC)

Hot ReheatAverage Temp.(degC)

Main Steam Pressure(kPa)

Unit Demand(MW)

Output(MW)

Page 13: Yokogawa in the Power Industry€¦ · Yokogawa in the Power Industry ... At the start of a replacement project, ... - Integrated asset management with PRM Plant Resource Manager

[Ed:05/b] Printed in Japan,010(KP)

Subject to change without noticeAll Rights Reserved. Copyright © 2005, Yokogawa Electric Corporation

Fossil fired power plants

Gas turbine power plants

Renewable energy power plants

Plant services and/or plant simulators

Yokogawa service offices

Italy 400 MWcombined cycle

Romania180 MWcombined cycle

Turkey130 MWcombined cycle

China2 x 300 MWcoal fired

China 6 x 300 MW coal fired

India 2 x 600 MW 2 x 500 MW coal fired

India3 x 660 MWsupercriticalcoal fired

Algeria369 MWIWPP

Nigeria 530 MW & 2 x 450 MW simple cycle

Taiwan2 x 550 MWcoal fired

Korea9 x 100 MWcoal fired

Brazil 2 x 75 MW, oil & gas fired

Peru 650 MWcombined cycle

Venezuela 460 MW combined cycle

Bulgaria8 x 200 t/hflue gas desulphurization

Korea800 MW supercriticaltraining simulator

Japan2 x 1,050 MWflue gas desulfurization

U.S480 MW, combined cycle

U.S100 MW, combined cycle

Canada120 MW, cogeneration

U.S3 x 70 MW, gas & oil fired

Brazil 460 MW, combined cycle

Vietnam2 x 300 MW, coal firedsimulator & training

Japan 375 MW & 350 MW gas fired

Brunei110 MWcombined cycleThailand

2 x 110 MWcombined cycleSaudi Arabia

360 MWIWPP Australia

4 x 500 MWcoal fired revamping

Indonesia110 MW & 95 MWgeo-thermal

Singapore2 x 600 MWoil firedsimulator & training

Australia4 x 660 MWcoal fired revampingsimulator & training

Australia 4 x 550 MW brown coal fired revamping simulator & training

Mongolia8 x 420 t/hcoal firedrevamping & simulator

Spain800 MWcombined cyclew/ LNG terminal

UK37 MWWaste to energy

TrademarksCENTUM, Vnet/IP, vigilance and vigilantplant are either trademarks or registered trademarks of Yokogawa Electric Corporation.All other company brand or product names in this bulletin are trademarks or registered trademarks of their respective holders.

Represented by:

URL:www.yokogawa.com/pwr

Yokogawa Vigilance at your service worldwide - representative projects