www.t4.com.pk
Introduction
Registered Since May 2007Started with 16 employeesStarting Project NSN-Telenor ProjectNow More then 170 employees
www.t4.com.pk
Current Projects
www.t4.com.pk
Top Management
Chief Executive Officer ABDUL KHALIQ
Director Administration SAJJAD AHMAD
Senior Executive Human Resource
MUHAMMAD USMAN
Executive Finance MUHAMMAD IRFAN
Manager Operation(South) ABDUL SAMAD MEMON
Manager Operation(North) KHALID KHAN
Manager Operation(Center-I) RIZWAN RIAZ
Manager Operation(Center-II) KAMRAN ANWAR
Deputy Manager OperationsMUDASSAR AHMAD KHAN
Quality Manager ZAMIR AHMAD
www.t4.com.pk
Abdul Khaliq25 years experience in Pakistan Air force Represented PAF in Siemens Pakistan for UHF Analogue
telecom Project and worked in Carrier Telephone industries for Installation and Commissioning of country-wide network.
3 years work experience with German based company datacon Al-Saudia for Saudi telecom KSA.
5 years working experience with Nortel Network Asia for PTML Project and Complete installation and Commissioning of initial 4 Phases of PTML in Center and North region.
Also took part in Nortel-Huawei Swap for approx. 400 sites in North and Center regions
On May 2007 established TIER4(SMC-Pvt)Ltd and now working as CEO ---till date
www.t4.com.pk
Strategy
Sincerity towards responsibilities No Compromise on “Quality”Customer relationshipQuick response Co-ordination between Management and
Field Engineers Dedicated servicesPositive attitudeWillingness for Post Services demands
www.t4.com.pk
Work flow Process Nok ok
Project Coordinator
DN
Receiving
Huawei Coordination
TE Implementation
M.O
Quality Work
Media + Test Call
Pre-ATP + DT Support
D.M.O
Q.M
D.M.O
Commercial Launch
Site Documentation
RFI
ATP + Snags Verification
www.t4.com.pk
How it Works…DN Processing and Collection Follow up transportationHardware receiving, Verification and RFITeam MovementsFollow up Complete workflow chart SOP implementation Quality checklist Media Patching and call testPre-ATP and DT supportATPSnags VerificationCommercial Launch
www.t4.com.pk
Key EventsOnly highly trained receivers capable of
complete RFICombination of team depends upon site
configuration and link budgetDiscuss on-ground realities with site EngineerDuring installation link alignment is kept on
priorityMedia patching as soon as possibleCall testTake time before leaving the site(Finishing)
www.t4.com.pk
www.t4.com.pk
www.t4.com.pk
www.t4.com.pk
Maintaining QualityCompany policy regarding Quality “No
Compromise”Quality ChecklistData collection MethodsSQRPicturesInternal Training ProgramsIf any snag Is found during ATP, site Engineer
is held responsible and inquiredAfter inquiry corrective actions are taken to
avoid it in future.www.t4.com.pk
Site ID______________
Quality Check List Huawei – Ufone Project
1. BTS, Rectifier and microwave Rack are installed according to floor plan i.e.
A) BTS Back Side 250mm & From R/L Side 200mm.
B) Rectifier Back Side 100mm.
C) M.W Back Side Closed with Rectifier. 2. Ladder is installed properly i.e. At proper height, Should be leveled and
Properly tight. 3. Ladder piece is used between DDF and Ladder edge for alarm cables.
4. BTS rectifier, and M.W rack anchor / bolts are properly fixed and tightened.
5. BTS Caballing is according to the BTS configuration.
6. Battery Banks installed properly i.e. dimensions / connectivity / numbering.
7. Layout plan is accurately implemented.
8. A.C Power cable is routed on cable tray at the back side and fall at 90' to
Rectifier. 4 Core is properly terminated into breaker.
9. All the power cables are routed the front edge of the ladder and are falling
Vertically at BTS, rectifier and M.W rack. (90').
10. All PCM and Alarm cables are routed on the back side (edge) of the ladder
And fall vertically at BTS.
11. All the grounding cables are routed at the mid of cable tray.
12. Distance between power, grounding and alarm cables is not less then 4mm
On cable tray.
13. Main grounding bus bar (inner) is installed properly with insulators.
14. Inner and other bus bar (shelter) are inter-connected properly.
15. BTS, Rectifier and M.W rack are grounded properly on main grounding bar.
16. BTS PCM cables all four PCM are labeled in DDF.
17. External & Internal Alarms cables pairs are labeled with ties with self
Printed labeled.
18. All the PCM and alarm cables should be properly tied up in DDF and
No extra mass up should be seen.
19. All White ties are used inside the shelter and black ties out side the shelter.
OK N.OK
www.t4.com.pk
1. All ties should be trimmed properly with small cutter near to tie knob.
2. All tie knots should be at casual distance and at same angle.
3. All feeder connectors and jumper connectors are made by Rigger team lead
Checked by Quality Supervisor. Rigger Name______________________.
4. RF and IF Feeder Grounding are properly terminated at grounding bus bar,
Tighten and labeled properly.
5. No cross found between jumpers, Power cable and I.F cables.
6. Alarm cable and PCM cable coming from BTS are patched at left side and
From bottom to top of the Krone Module.
7. All jumpers and feeder connector are covered with proper neat shrink tube.
8. In look, DDF is clean tidy all extra wires are trimmed off.
Site ID Name________________________________________________________
Site Address ________________________________________________________
Quality Supervisor Name__________________ Signature__________________
Senior Rigger Name__________________ Signature__________________
Site Engineer Name__________________ Signature__________________
Date _________________
NOTE :- If any error or snag found during ATP for above mentioned check points, site
Engineer will be held responsible.
www.t4.com.pk
Pictures Detail (U-Fone) Take Full Tower Pictures
RF View (0 )
RF View (45 )
RF View (90 )
RF View (135 )
RF View (180 )
RF View (225 )
RF View (270 )
RF View (315 )
1st Sector =
1) 1st Antenna Facing Area
2) 1st Antenna Tilts (Electrical & Mechanical Tilt)
3) 2nd Antenna Facing Area
4) 2nd Antenna Tilt
Note: Same as Upper sequence All Sectors Pictures will be
take.
And pictures of all expended Hardware.
Engineer / Quality Supervisor
Name:__________________
Signature_________________ www.t4.com.pk
Pictures List For MW QC 1. RSL Screen Shot 2. NODE ID Screen Shot 3. NE ID Screen Shot 4. TX/RX Frequency Channels Screen Shot 5. TX Power Screen Shot 6. Grounding Cable of IDU 7. Grounding Cable of ODU 8. Grounding of IF Cable on All Bus Bar (3 Pic) 9. Antenna Fastness 10. IF Cable Loop 11. Antenna water proof 12. IF Cable water proof 13. Label of E1 Cable 14. Label of DDF rack 15. Label of signal cable 16. Routing in the rack 17. Routing on the ladder 18. Routing in the tower 19. MW Rack (Full View) 20. RTN Rack Grounding
Engineer / Quality Supervisor
Name:__________________
Signature_________________ www.t4.com.pk
Definition Serial No
BTS CABINET
DTMU
DTMU
DTRU
DTRU
DTRU
DTRU
DTRU
DTRU
DTRU
DTRU
DTRU
DDPU
DDPU
DDPU
DDPU
DDPU
DDPU
ANTENNA
ANTENNA
ANTENNA
ANTENNA
ANTENNA
ANTENNA
Rectifier Cabinet
Power module
Power module
Power module
Power module
Power module
Power module
Power module
Monitor Module
Monitor Module
Monitor Module
Monitor Module
DMLC
Site ID =
BTS Serial #
Item Qty Serial Number
Dish 1
Dish 2
ODU 1
ODU 2
RTN / IDU
PXC Card
SCC Card
PO1 Card
PH1 Card
SL1 Card
SLE Card
IF Card
Hybird Coupler
IF Cabel MtrMW Rack
DDF
Item Qty Serial Number
Dish 1
Dish 2
ODU 1
ODU 2
RTN 620 Sub Rack
PXC Card
SCC Card
PO1 Card
PH1 Card
SL1 Card
SLE Card
IF System Card
Hybird Coupler
IF Cabel (Mtr)Installation Rack
DDF
Site A ID=
MW Serial #
Site B ID=
www.t4.com.pk
• Before leaving the Site
• Please make sure • Before giving the power to the BTS please
ensure once that all the connections and cabling is done accurately
• All the extra alarms are looped in DDF box • All the required snaps are taken according to
requirement • All the bar codes are taken • Check the swapping of feeder cables • Explain any issues left back at site to higher
management before leaving • Please fill the check list and submit it back to
office
www.t4.com.pk
Thanks…!!!