    Project Name / ID NH No. Length Stretch State PIU

    Scheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Date & Time of

    recording /

    reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time ofcompletion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    11 12 13 14 15 16 17 18 19

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    20 21 22 23 24 25 26 27 28

    Damages

    Remarks (if any)

    Roughness

    17.2, Schedule-K (a)(ii) Damages to be paid by Concessionaire

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    17.2, Schedule-K (a)(i) Damages to be paid by Concessionaire

    Breach / Blockade Damages

    Remarks (if any)

  • 8/12/2019 Work Flow Tag

    2/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording/ reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion ofrepair /

    rectification

    Status / Remarks Amount Paid Unpaid

    29 30 31 32 33 34 35 36 37

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    38 39 40 41 42 43 44 45 46

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    Rutting exceeding 10 mm in more than 2% of road surface in a stretch of 1 km Damages

    17.2, Schedule-K (a)(v) Damages to be paid by Concessionaire Remarks (if any)

    Damages

    Remarks (if any)

    Cracking in more than 5% of road surface in a stretch of 1 km Damages

    Pot Holes

    17.2, Schedule-K (a)(iii) Damages to be paid by Concessionaire

    17.2, Schedule-K (a)(iv) Damages to be paid by Concessionaire Remarks (if any)

  • 8/12/2019 Work Flow Tag

    3/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    47 48 49 50 51 52 53 54 55

  • 8/12/2019 Work Flow Tag

    4/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording/ reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion ofrepair /

    rectification

    Status / Remarks Amount Paid Unpaid

    56 57 58 59 60 61 62 63 64

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    65 66 67 68 69 70 71 72 73

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    17.2, Schedule-K (a)(vii) Damages to be paid by Concessionaire Remarks (if any)

    Damage to pavement edges exceeding 10 cm Damages

    17.2, Schedule-K (a)(viii) Damages to be paid by Concessionaire Remarks (if any)

    Bleeding / Skidding Damages

    17.2, Schedule-K (a)(vi) Damages to be paid by Concessionaire Remarks (if any)

    Ravelling / Stripping of bitumen surface exceeding 10 sq.m Damages

  • 8/12/2019 Work Flow Tag

    5/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    74 75 76 77 78 79 80 81 82

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    83 84 85 86 87 88 89 90 91

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    91 92 93 94 95 96 97 98 99

    17.2, Schedule-K (b)(i) Damages to be paid by Concessionaire Remarks (if any)

    Hard / Earth shoulders, side slopes, drains and culverts

    Removal of Debris / Dust Damages

    17.2, Schedule-K (a)(ix) Damages to be paid by Concessionaire Remarks (if any)

    Variation by more than 2% in the prescribed slope of camber / cross fall Damages

  • 8/12/2019 Work Flow Tag

    6/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording/ reporting

    Exact Location

    (LHS/RHS) withChainage

    Time Allowed

    forrectification

    Date & Time of

    completion ofrepair /

    rectification

    Status / Remarks Amount Paid Unpaid

    100 101 102 103 104 105 106 107 108

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    100 101 102 103 104 105 106 107 108

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    Variation by more than 15% in the prescribed side (embankment) slopes Damages

    17.2, Schedule-K (b)(iii) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K (b)(ii) Damages to be paid by Concessionaire Remarks (if any)

    Edge drop at shoulders exceeding 40 mm Damages17.2, Schedule-K (b)(ii) Damages to be paid by Concessionaire Remarks (if any)

    Edge drop at shoulders exceeding 40 mm Damages

  • 8/12/2019 Work Flow Tag

    7/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    109 110 111 112 113 114 115 116 117

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    118 119 120 121 122 123 124 125 126

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time ofcompletion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    127 128 129 130 131 132 133 134 135

    17.2, Schedule-K (b)(iv) Damages to be paid by Concessionaire Remarks (if any)

    Damage to or silting of culverts and side drains during and immediately preceding the rainy

    seasonDamages

    17.2, Schedule-K (b)(v) Damages to be paid by Concessionaire Remarks (if any)

    Rain cuts/gullies in slope Damages

  • 8/12/2019 Work Flow Tag

    8/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording/ reporting

    Exact Location

    (LHS/RHS) withChainage

    Time Allowed

    forrectification

    Date & Time of

    completion ofrepair /

    rectification

    Status / Remarks Amount Paid Unpaid

    136 137 138 139 140 141 142 143 144

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    145 146 147 148 149 150 151 152 153

    17.2, Schedule-K (d)(i) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K (c)(i) Damages to be paid by Concessionaire Remarks (if any)

    Road side furniture including road signs and pavement marking

    Street Lighting and telecom (ATMS)

    Any Major failure of the system Damages

    De silting of drains in urban/semi-urban areas Damages

    17.2, Schedule-K (b)(vi) Damages to be paid by Concessionaire Remarks (if any)

    Damage to shape or position; poor visibility or loss of retro-reflectivity Damages

  • 8/12/2019 Work Flow Tag

    9/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    154 155 156 157 158 159 160 161 162

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    163 164 165 166 167 168 169 170 171

    17.2, Schedule-K (e)(i) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K (d)(ii) Damages to be paid by Concessionaire Remarks (if any)

    Trees and plantation

    Obstruction in a minimum head-room of 5 m above carriageway or obstruction in visibility of

    road signsDamages

    Street Lighting and telecom (ATMS)

    Faults and minor failures Damages

  • 8/12/2019 Work Flow Tag

    10/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    172 173 174 175 176 177 178 179 180

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    181 182 183 184 185 186 187 188 189

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    17.2, Schedule-K (e)(iii) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K (e)(ii) Damages to be paid by Concessionaire Remarks (if any)

    Trees and plantation

    Replacement of trees and bushes Damages

    Trees and plantation

    Deterioration in health of trees and bushes Damages

  • 8/12/2019 Work Flow Tag

    11/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    190 191 192 193 194 195 196 197 198

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    199 200 201 202 203 204 205 206 207

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    208 209 210 211 212 213 214 215 216

    17.2, Schedule-K (f)(i) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K (e)(iv) Damages to be paid by Concessionaire Remarks (if any)

    Rest areas

    Cleaning of toilets Damages

    Trees and plantation

    Removal of vegetation affecting sight line and road structures Damages

  • 8/12/2019 Work Flow Tag

    12/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    217 218 219 220 221 222 223 224 225

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    226 227 228 229 230 231 232 233 234

    17.2, Schedule-K (g)(ii) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K (g)(i) Damages to be paid by Concessionaire Remarks (if any)

    Toll plazas

    Damage to toll plaza Damages

    17.2, Schedule-K (f)(ii) Damages to be paid by Concessionaire Remarks (if any)

    Toll plazas

    Failure of Toll collection equipment or lighting Damages

    Rest areas

    Defects in electrical, water and sanitary installations Damages

  • 8/12/2019 Work Flow Tag

    13/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    235 236 237 238 239 240 241 242 243

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    244 245 246 247 248 249 250 251 252

    17.2, Schedule-K, Bridges (a)(i) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K (h)(i) Damages to be paid by Concessionaire Remarks (if any)

    Superstructure of bridges

    Cracks - Temporary measures Damages

    Other Project Facilities and Approach roads

    Damage or deterioration in Approach Roads, pedestrian facilities, truck lay-bys, bus-bays,

    bus- shelters, cattle crossings, Traffic Aid Posts, Medical Aid Posts and other works Damages

  • 8/12/2019 Work Flow Tag

    14/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    253 254 255 256 257 258 259 260 261

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    262 263 264 265 266 267 268 269 270

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    17.2, Schedule-K, Bridges (a)(ii) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K, Bridges (a)(i) Damages to be paid by Concessionaire Remarks (if any)

    Superstructure of bridges

    Spalling/scaling Damages

    Superstructure of bridges

    Cracks - Permanent measures Damages

  • 8/12/2019 Work Flow Tag

    15/30

    Project Name / ID NH No. Length Stretch State PIUScheduled Start

    Date

    Scheduled End

    date

    Name of

    Concessionaire

    1 2 3 4 5 6 7 8 9

    Operation & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)

    Fixed Fields

    271 272 273 274 275 276 277 278 279

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    280 281 282 283 284 285 286 287 288

    Date of recording

    / reporting

    Exact Location

    (LHS/RHS) with

    Chainage

    Time Allowed

    for

    rectification

    Date & Time of

    completion of

    repair /

    rectification

    Status / Remarks Amount Paid Unpaid

    289 290 291 292 293 294 295 296 297

    17.2, Schedule-K, Bridges (c)(i) Damages to be paid by Concessionaire Remarks (if any)

    17.2, Schedule-K, Bridges (b)(i) Damages to be paid by Concessionaire Remarks (if any)

    Piers, abutments, return walls and wing walls of bridges

    Cracks and damages including settlement and tilting Damages

    Foundation of bridges

    Scouring and / or cavitation Damages

  • 8/12/2019 Work Flow Tag

    16/30

    Date of

    Agreement10

  • 8/12/2019 Work Flow Tag

    17/30

    Date of

    Agreement10

  • 8/12/2019 Work Flow Tag

    18/30

    Date of

    Agreement10

  • 8/12/2019 Work Flow Tag

    19/30

    Date of

    Agreement10

  • 8/12/2019 Work Flow Tag

    20/30

    Date of

    Agreement10

  • 8/12/2019 Work Flow Tag

    21/30

    Date of

    Agreement10

  • 8/12/2019 Work Flow Tag

    22/30

    Date of

    Agreement10

  • 8/12/2019 Work Flow Tag

    23/30

    Date of

    Agreement

    10

  • 8/12/2019 Work Flow Tag

    24/30

    Date of

    Agreement

    10

  • 8/12/2019 Work Flow Tag

    25/30

    Date of

    Agreement

    10

  • 8/12/2019 Work Flow Tag

    26/30

    Date of

    Agreement

    10

  • 8/12/2019 Work Flow Tag

    27/30

    Date of

    Agreement

    10

  • 8/12/2019 Work Flow Tag

    28/30

    Date of

    Agreement

    10

  • 8/12/2019 Work Flow Tag

    29/30

    Date of

    Agreement

    10

  • 8/12/2019 Work Flow Tag

    30/30

    Date of

    Agreement

    10