16
Wireless Facility Engineering Review AT&T Application for Site (CNU 4216) 1861 Solano Avenue, Berkeley, CA Dieter J. Preiser, PMP 9/2/2012 RCC Consultants, Inc. Western Regional Office 266 E. 33 rd Street, San Bernardino, CA 92404 909.881.0250 Tel, 909.881.8979 Fax

Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

    

Wireless Facility Engineering Review 

AT&T Application for Site (CNU 4216) 1861 Solano Avenue, Berkeley, CA 

 

 

 

 

 

 

 

Dieter J. Preiser, PMP 9/2/2012 

   

       

   

 RCC Consultants, Inc. ‐ Western Regional Office 266 E. 33rd Street, San Bernardino, CA 92404 909.881.0250 Tel, 909.881.8979 Fax 

Page 2: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 2 

AT&T Application for Site (CNU4216) 1861 Solano Avenue, Berkeley, CA 

  RCC Consultants, Inc. has been engaged by the City of Berkeley to conduct a peer review, 

consistent with recognized industry standard practices, of the proposal from AT&T to construct 

and operate a new wireless base station facility at 1861 Solano Avenue, Berkeley, CA.  RCC has 

performed many similar peer reviews for municipal clients throughout the US, including several 

in the San Francisco Bay area. 

 

This report supersedes, RCC’s previous report for this location, dated December 12, 2012, as 

AT&T has modified the proposed antenna locations on the subject building. 

  

Surrounding Environment 

The proposed site is the Oaks Theater, located on the north side of Solano Avenue between The 

Alameda and Colusa Avenue in a commercial zone.  A residential neighborhood is located 

immediately to the north of the property.   

Durant Avenue 

Page 3: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 3 

 

Figure 1 ‐ Aerial View of the Vicinity 

 

Background 

AT&T is licensed by the Federal Communications Commission to operate in portions of the PCS 

(1950 MHz), Cellular (870 MHz), AWS (1730/2130 MHz) and LTE (700 MHz) frequency bands.  

ATT deploys three different technologies in its wireless infrastructure: GSM, UMTS and, most 

recently, LTE to deliver voice and data services.  This application is for the construction and 

operation of a new wireless facility to support services in these frequency bands using the 

technologies stated.  Details are provided below. 

 

Proposed Site Configuration 

The applicant has proposed to install antenna systems and equipment in the existing building. 

Specifically ATT is proposing to: 

1.  Install a total of twelve (12) antennas in three sectors and ancillary equipment for GSM, 

UMTS and LTE services: 

1861 Solano Avenue 

Page 4: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 4 

• Sector A – four (4) each antennas with orientation of 60° at a height above ground of 

47’‐1” to the center line.  

• Sector B – four (4) each antennas with orientation of 250° at a height above ground 

of 47’‐1” to the center line. 

• Sector C – four (4) each antennas with orientation of 160° at a height above ground 

of 47’‐1” to the center line. 

These antennas will be installed at or below parapet height within fiberglass 

reinforced panel screens painted to match the existing building color.   

2.  Each antenna is a Powerwave Model P65‐15‐XLH‐RR broadband antenna with 

dimensions of 51”H x 12”W x 6”D.  

3. Twelve equipment cabinets and smaller, miscellaneous equipment boxes will be located 

on a raised platform in a designated area of 8’‐2” x 36’‐0” within the stairwell of the 

building.   

 Figure 2 – Antenna Installation Locations 

 

Antenna Sector C at 160 degrees 

Antenna Sector B at 260 degrees 

Antenna Sector A at 60 degrees 

Page 5: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 5 

Methodology 

In conducting a peer review, RCC reviews and analyzes site application documents against 

wireless industry standards and best practices.   In this case, RCC considered the application 

and supplemental materials submitted by AT&T, including the plans by Steamline Engineering, 

dated January 16, 2012, the RF report by Hammett and Edison, Inc., dated May 2, 2012, and the 

coverage maps and field tests data, dated July 9, 2012.  The coverage maps depict the modeled 

coverage from adjacent sites, and the combined modeled area coverage including the new site 

(marked as Figures 3, and 4, respectively).    

 

 Figure 3 – Modeled Existing Coverage at 850 MHz from Adjacent Sites 

 

1861 Solano Avenue

Page 6: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 6 

 Figure 4 – Modeled Post‐Implementation Coverage at 850 MHz 

 

Justification for the Site Modification 

AT&T has stated that the design objective for this site is to eliminate a coverage gap that exists 

in the area surrounding Solano Avenue/Contra Costa Avenue, in particular as it relates to in‐

building coverage.  Although substantial outdoor coverage exists as indicated by the blue 

shaded area in Figure 3, the adjacent six existing sites are too far removed from the intended 

coverage area to provide reliable in‐transit and in‐building coverage.  AT&T also submitted 

actual drive test and call failure data that supports the contention of a network gap in the 

subject area.  It is RCC’s opinion that AT&T has demonstrated a coverage gap in its network in 

the area in terms of in‐transit and in‐building service, and that this gap will be substantially 

mitigated by the activation of service from the subject site. 

 

 

 

 

1861 Solano Avenue

Page 7: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 7 

Alternatives 

AT&T had previously provided an analysis of three alternative sites it has considered, including: 

• Alternative 1: 1760 Solano Avenue 

• Alternative 2: 1820 Solano Ave. 

• Alternative 3: 1850 Solano Ave. 

None of these were found to be suitable.  (See RCC’s previous report, dated December 12, 

2011.) 

 

Radio Frequency Emissions Safety 

RCC has reviewed the report prepared by Hammett and Edison, Inc. on behave of AT&T, dated 

May 2, 2012, and concurs with its conclusion that the proposed antenna installation will comply 

with the Federal Communications Commission’s guidelines for radio frequency emissions 

exposure as detailed in their Office of Engineering & Technology Bulletin No. 65, “Evaluating 

Compliance with FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic 

Fields,” August 1997 (“OET Bulletin 65”).  Based on the OET Bulletin 65, the Maximum 

Permissible Exposure (“MPE”) for the general population/uncontrolled exposure is 0.47 milli‐

Watt per square centimeter (mW/cm²) in the 700 MHz band (LTE), 0.58 milli‐Watt per square 

centimeter (mW/cm²) in the Cellular spectrum, and 1 mW/cm² in the PCS and AWS spectrum.   

Permissible levels for exposure under occupational conditions, such as may be encountered by 

maintenance personnel, are five times higher. 

             

Page 8: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Co

Summary

RCC Cons

• BAwp

• Tp

• Tco

• Tp

  Date:  Se  ________Dieter J. 

nsultants, Inc. 

y & Conclus

sultants, Inc

ased on theAT&T has demwhich would roposed sitehe proposedractices to fhe installatioontained withe proposedertaining to 

eptember 2, 

__________Preiser, PM

ion 

. is of the op

coverage prmonstrated be substante. d design is coill coverage on of the anthin antennad installationradio freque

2012 

___________P 

pinion that:

rediction maa gap in in‐ttially mitigat

onsidered regaps in areatennas shoua screens. n will meet Fency emissio

____ 

aps, drive daransit and ined by imple

easonable anas similar to uld have min

Federal Comons exposur

ata and netwn‐building comentation o

nd consistenthe subject nimal visual 

mmunicationsre to the gen

work incidenoverage in thof equipmen

nt with industarget area.impact as th

s Commissioneral public. 

P

nt data provihe subject ant at the 

stry best  hey will be 

on guidelines   

Page 8 

ded, rea 

Page 9: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

    

Wireless Facility Engineering Review 

AT&T Application for Site (CNU 4216) 1861 Solano Avenue, Berkeley, CA 

 

 

 

 

 

 

 

Dieter J. Preiser, PMP 12/12/2011 

   

       

   

 RCC Consultants, Inc. ‐ Western Regional Office 266 E. 33rd Street, San Bernardino, CA 92404 909.881.0250 Tel, 909.881.8979 Fax 

Page 10: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 2 

AT&T Application for Site (CNU4216) 1861 Solano Avenue, Berkeley, CA 

  RCC Consultants, Inc. has been engaged by the City of Berkeley to conduct a peer review, 

consistent with recognized industry standard practices, of the proposal from AT&T to construct 

and operate a new wireless base station facility at 1861 Solano Avenue, Berkeley, CA.  RCC has 

performed many similar peer reviews for municipal clients throughout the US, including several 

in the San Francisco Bay area. 

 

Surrounding Environment 

The proposed site is the Oaks Theater, located on the north side of Solano Avenue between The 

Alameda and Colusa Avenue in a commercial zone.  A residential neighborhood is located 

immediately to the north of the property.   

Durant Avenue 

 

Figure 1 ‐ Aerial View of the Vicinity 

 

1861 Solano Avenue 

Page 11: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 3 

Background 

AT&T is licensed by the Federal Communications Commission to operate in portions of the PCS 

(1950 MHz), Cellular (870 MHz), AWS (1730/2130 MHz) and LTE (700 MHz) frequency bands.  

ATT deploys three different technologies in its wireless infrastructure: GSM, UMTS and, most 

recently, LTE to deliver voice and data services.  This application is for the construction and 

operation of a new wireless facility to support services in these frequency bands using the 

technologies stated.  Details are provided below. 

 

Proposed Site Configuration 

The applicant has proposed to install antenna systems and equipment in the existing building. 

Specifically ATT is proposing to: 

1.  Install a total of twelve (12) antennas in three sectors and ancillary equipment for GSM, 

UMTS and LTE services: 

• Sector A – four (4) each antennas with orientation of 60° at a height above ground of 

43’‐4” to the center line.  

• Sector B – four (4) each antennas with orientation of 250° at a height above ground 

of 47’‐1” to the center line. 

• Sector C – four (4) each antennas with orientation of 160° at a height above ground 

of 43’‐4” to the center line. 

These antennas will be installed at or below parapet height within fiberglass 

reinforced panel screens painted to match the existing building color.   

2.  Each antenna is a Powerwave Model P65‐15‐XLH‐RR broadband antenna with 

dimensions of 51”H x 12”W x 6”D.  

3. Twelve equipment cabinets and smaller, miscellaneous equipment boxes will be located 

on a raised platform in a designated area of 8’‐2” x 36’‐0” within the stairwell of the 

building.   

Page 12: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 4 

 Figure 2 – Antenna Installation Locations 

Methodology 

In conducting a peer review, RCC reviews and analyzes site application documents against 

wireless industry standards and best practices.   In this case, RCC considered the application 

and supplemental materials submitted by AT&T, including the coverage maps provided that are 

reflecting the modeled area coverage from adjacent sites and the combined modeled area 

coverage including the new site (marked as Figures 3 and 4, respectively).    

 

Antenna Sector C at 160 degrees 

Antenna Sector B at 260 degrees 

Antenna Sector A at 60 degrees 

Page 13: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 5 

 Figure 3 – Modeled Existing Coverage at 850 MHz from Adjacent Sites 

1861 Solano Avenue 

Page 14: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 6 

 Figure 4 – Modeled Post‐Implementation Coverage at 850 MHz 

 

Justification for the Site Modification 

AT&T has stated that the design objective for this site is to eliminate a coverage gap that exists 

in the area surrounding Solano Avenue/Contra Costa Avenue, in particular as it relates to in‐

building coverage.  Although substantial outdoor coverage exists as indicated by the blue 

shaded area in Figure 3, the adjacent six existing sites are too far removed from the intended 

coverage area to provide reliable in‐transit and in‐building coverage.   It is RCC’s opinion that 

AT&T has demonstrated a coverage gap in its network in the area in terms of in‐transit and in‐

building service, and that this gap will be substantially mitigated by the activation of service 

from the subject site. 

 

 

Page 15: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Consultants, Inc.    Page 7 

Alternatives 

AT&T has provided an analysis of three alternative sites it has considered. 

 

Alternative 1: 1760 Solano Avenue 

This is an existing site for T‐Mobile, Verizon and Sprint and would have been a preferred site 

from a coverage standpoint.  However, AT&T indicated that the landlord was not interested in 

negotiating a lease. 

 

Alternative 2: 1820 Solano Ave. 

This two story building is 26’ to 28’ in height which would not offer sufficient antenna height to 

effectively meet the coverage objectives.   RCC has analyzed the coverage maps which are 

based on an effective antenna height of 30”.  The coverage achievable with this height 

limitation is substantially less that that available from the proposed site or from the Alternative 

1 site. 

 

Alternative 3: 1850 Solano Ave. 

This single story commercial building would also place a significant restriction on effective 

antenna height feasible without additional structural height increase.   RCC has analyzed the 

coverage maps based on a 28’antenna height and finds the coverage substantially less that that 

available from the proposed site or from the Alternative 1 site. 

 

Radio Frequency Emissions Safety 

RCC has reviewed the report prepared by Hammett and Edison, Inc.  on behave of AT&T and 

concurs with its conclusion that the proposed antenna installation will comply with the Federal 

Communications Commission’s guidelines for radio frequency emissions exposure as detailed in 

their Office of Engineering & Technology Bulletin No. 65, “Evaluating Compliance with FCC 

Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields,” August 1997 (“OET 

Bulletin 65”).  Based on the OET Bulletin 65, the Maximum Permissible Exposure (“MPE”) for 

the general population/uncontrolled exposure is 0.47 milli‐Watt per square centimeter 

Page 16: Wireless Facility Engineering Review - Berkeley, California...Wireless Facility Engineering Review ... recently, LTE to deliver voice and data services. This application is for the

 RCC      Co

(mW/cm

Cellular s

exposure

personne

  

Summary

RCC Cons

• Btrm

• Tp

• Tco

• Tp

  Date:  De  ________Dieter J. 

nsultants, Inc. 

m²) in the 700

spectrum, an

e under occu

el, are five ti

y & Conclus

sultants, Inc

ased on theransit and inmitigated by he proposedractices to fhe installatioontained withe proposedertaining to 

ecember 12,

__________Preiser, PM

0 MHz band 

nd 1 mW/cm

upational co

mes higher.

ion 

. is of the op

coverage prn‐building coimplementad design is coill coverage on of the anthin antennad installationradio freque

 2011 

___________P 

(LTE), 0.58 m

m² in the PCS

nditions, suc

 

pinion that:

rediction maoverage in thation of equionsidered regaps in areatennas shoua screens. n will meet Fency emissio

____ 

milli‐Watt pe

S and AWS s

ch as may be

aps providedhe subject aripment at theasonable anas similar to uld have min

Federal Comons exposur

er square ce

pectrum.   P

e encounter

d, AT&T has rea which wohe proposednd consistenthe subject nimal visual 

mmunicationsre to the gen

entimeter (m

Permissible l

red by maint

demonstratould be subs site. nt with industarget area.impact as th

s Commissioneral public. 

P

mW/cm²) in t

evels for 

tenance 

ted a gap in stantially 

stry best  hey will be 

on guidelines   

Page 8 

the 

in‐