PROJECT : BLAST FURNACE PROJECT (PT. KRAKATAU STEEL) Doc. No. 3703-96A1-21-01-E7-BQ-005A Page
PACKAGE : Windows in Air Compression Station in GF Rev 0
SUB PACKAGE : ARCHITECTURE NAME DATE SIGN
CLIENT : PT. KRAKATAU STEEL Prep'd By LUCKY 16 - 04 - 2015
LOCATION : CILEGON, BANTEN Chec'd By LUCKY 16 - 04 - 2015
JOB NO. : 3703 App' By WENDRY N 16 - 04 - 2015
BILL OF QUANTITY Windows in Air Compression Station GFITEM
DESCRIPTION SPECIFICATION QTY UNIT UNIT PRICE TOTAL TOTAL
REMARKNO. MATERIAL LABOUR EQUIPMENT UNIT PRICE PRICE
A. PREPARE 1.00 ls
1 ARCHITECTURAL WORK
1.3 Windows Work
a C-4 Aluminium Windows (6000 mm x 1200 mm) 2.00 Unit
b C-4a Aluminium Windows Windows (6000 mm x 1200 mm) 2.00 Unit
c C-4b Aluminium Windows Windows (6000 mm x 1200 mm) 2.00 Unit
Total Windows Work -
TOTAL BILL OF QUANTITY Windows in Air Compression Station GF -
Leaf = Transparent Polycarbonat Frame = Aluminium 3"
Leaf = Transparent Polycarbonat Frame = Aluminium 3"
Leaf = Transparent Polycarbonat Frame = Aluminium 3"
ENGINEERING & CONSTRUCTIONP T K R A K A T A U E N G I N E E R I N G
WALL WORKNO. DESCRIPTION
1 Brick WallLantai 1 / 1st Floor
No. Ruangan/ Room Panjang Tinggi Unit
1 Axis 1 15 4 1
2 Axis 2 15 4 1
3 Axis 3 15 4 1
4 Axis 8 15 4 1
5 Axis A 35 4 1
6 Axis B 4.5 4 1
7 Axis C 35 4 1
8
Jumlah Lantai 1 / 1st Floor
Lantai 2 / 2nd Floor
No. Ruangan/ Room Panjang Tinggi Unit
1 Axis 1 1
2 Axis 2 1
3 Axis 3 15 4.5 1
4 Axis 8 15 4.5 1
5 Axis A 35 4.5 1
6 Axis B 4.5 1
7 Axis C 35 4.5 1
8
Jumlah Lantai 2 / 2nd Floor
Pengurangan lubang jendela n pintu
No. Ruangan/ Room Panjang Lebar Unit
1 M-1 1 2.4 1
2 M-2 1 2.4 1
3 M-3 1.5 2.7 2
4 M-4 4.5 4 1
5 M-1 1 2.4 1
6 C-1 1.5 1.5 19
7 C-2 1.5 1.5 20
8 C-3 1.5 0.9 4
9 C-4 6 1.2 2
10 C-4a 6 1.2 2
11 C-4b 6 1.2 2
12 FC-1 2.4 1.5 1
13
Jumlah Pengurangan lubang jendela n pintu
Total Jumlah Brick Wall
2 Plester & Rendering
ExteriorLantai 1 / 1st Floor
No. Ruangan/ Room Panjang Lebar Unit
1 Axis 1 15 4 1
2 Axis 2 15 4 1
3 Axis 3 15 4 1
4 Axis 8 15 4 1
5 Axis A 35 4 1
6 Axis B 4.5 4 1
7 Axis C 35 4 1
8
9 Balok & KolomAxis 1 16 0.5 1
10 Balok & KolomAxis 2
11 Balok & KolomAxis 3
12 Balok & KolomAxis 8 16 0.5 1
13 Balok & KolomAxis A 36 0.5 1
14 Balok & KolomAxis B 5.5 0.5 1
15 Balok & KolomAxis C 36 0.5 1
16
Jumlah Lantai 1 / 1st Floor
Lantai 2 / 2nd Floor
No. Ruangan/ Room Panjang Lebar Unit
1 Axis 1 0 0 1
2 Axis 2 0 0 1
3 Axis 3 15 4.5 1
4 Axis 8 15 4.5 1
5 Axis A 35 4.5 1
6 Axis B 0 4.5 1
7 Axis C 35 4.5 1
8
9 Balok & KolomAxis 1 0 1
10 Balok & KolomAxis 2 0 0 1
11 Balok & KolomAxis 3 15 1 1
12 Balok & KolomAxis 8 15 1 1
13 Balok & KolomAxis A 35 1 1
14 Balok & KolomAxis B 0 1
15 Balok & KolomAxis C 35 1 1
16
Jumlah Lantai 2 / 2nd Floor
InteriorLantai 1 / 1st Floor
No. Ruangan/ Room Panjang Lebar Unit
1 Axis 1 15 4 1
2 Axis 2 15 4 1
3 Axis 3 15 4 1
4 Axis 8 15 4 1
5 Axis A 35 4 1
6 Axis B 4.5 4 1
7 Axis C 35 4 1
8 0 0 0 0
9 Balok & KolomAxis 1 16 0.5 1
10 Balok & KolomAxis 2 0 0 0
11 Balok & KolomAxis 3 0 0 0
12 Balok & KolomAxis 8 16 0.5 1
13 Balok & KolomAxis A 36 0.5 1
14 Balok & KolomAxis B 5.5 0.5 2
15 Balok & KolomAxis C 36 0.5 1
16 0 0 0 0
Jumlah Lantai 1 / 1st Floor
Lantai 2 / 2nd Floor
No. Ruangan/ Room Panjang Lebar Unit
1 Axis 1 0 0 1
2 Axis 2 0 0 1
3 Axis 3 15 4.5 1
4 Axis 8 15 4.5 1
5 Axis A 35 4.5 1
6 Axis B 0 4.5 1
7 Axis C 35 4.5 1
8 0 0 0 0
9 Balok & KolomAxis 1 0 0 1
10 Balok & KolomAxis 2 0 0 1
11 Balok & KolomAxis 3 15 1 1
12 Balok & KolomAxis 8 15 1 1
13 Balok & KolomAxis A 35 1 1
14 Balok & KolomAxis B 0 0 1
15 Balok & KolomAxis C 35 1 1
16 0 0 0 0
Jumlah Lantai 2 / 2nd Floor
Pengurangan lubang jendela n pintu
No. Ruangan/ Room Panjang Lebar Unit
1 M-1 1 2.4 1
2 M-2 1 2.4 1
3 M-3 1.5 2.7 2
4 M-4 4.5 4 1
5 M-1 1 2.4 1
6 C-1 1.5 1.5 19
7 C-2 1.5 1.5 20
8 C-3 1.5 0.9 4
9 C-4 6 1.2 2
10 C-4a 6 1.2 2
11 C-4b 6 1.2 2
12 FC-1 2.4 1.5 1
13
Jumlah Pengurangan lubang jendela n pintu
Total Jumlah Plester & Rendering
3 Exterior Painting
Lantai 1 / 1st Floor
No. Ruangan/ Room Panjang Lebar Unit
1 Axis 1 15 4 1
2 Axis 2 15 4 1
3 Axis 3 15 4 1
4 Axis 8 15 4 1
5 Axis A 35 4 1
6 Axis B 4.5 4 1
7 Axis C 35 4 1
8 0 0 0 0
9 Balok & KolomAxis 1 16 0.5 1
10 Balok & KolomAxis 2 0 0 0
11 Balok & KolomAxis 3 0 0 0
12 Balok & KolomAxis 8 16 0.5 1
13 Balok & KolomAxis A 36 0.5 1
14 Balok & KolomAxis B 5.5 0.5 1
15 Balok & KolomAxis C 36 0.5 1
16 0 0 0 0
Jumlah Lantai 1 / 1st Floor
Lantai 2 / 2nd Floor
No. Ruangan/ Room Panjang Lebar Unit
1 Axis 1 0 0 1
2 Axis 2 0 0 1
3 Axis 3 15 4.5 1
4 Axis 8 15 4.5 1
5 Axis A 35 4.5 1
6 Axis B 0 4.5 1
7 Axis C 35 4.5 1
8 0 0 0 0
9 Balok & KolomAxis 1 0 0 1
10 Balok & KolomAxis 2 0 0 1
11 Balok & KolomAxis 3 15 1 1
12 Balok & KolomAxis 8 15 1 1
13 Balok & KolomAxis A 35 1 1
14 Balok & KolomAxis B 0 0 1
15 Balok & KolomAxis C 35 1 1
16 0 0 0 0
Jumlah Lantai 2 / 2nd Floor
Pengurangan lubang jendela n pintu
No. Ruangan/ Room Panjang Lebar Unit
1 M-1 1 2.4 1
2 M-2 1 2.4 1
3 M-3 1.5 2.7 2
4 M-4 4.5 4 1
5 M-1 1 2.4 1
6 C-1 1.5 1.5 19
7 C-2 1.5 1.5 20
8 C-3 1.5 0.9 4
9 C-4 6 1.2 2
10 C-4a 6 1.2 2
11 C-4b 6 1.2 2
12 FC-1 2.4 1.5 1
13 0 0 0 0
Jumlah Pengurangan lubang jendela n pintu
Total Jumlah Exterior Painting
4 Interior Painting
Lantai 1 / 1st Floor
No. Ruangan/ Room Panjang Lebar Unit
1 Axis 1 15 4 1
2 Axis 2 15 4 1
3 Axis 3 15 4 1
4 Axis 8 15 4 1
5 Axis A 35 4 1
6 Axis B 4.5 4 1
7 Axis C 35 4 1
8 0 0 0 0
9 Balok & KolomAxis 1 16 0.75 1
10 Balok & KolomAxis 2 16 0.75 1
11 Balok & KolomAxis 3 16 0.5 1
12 Balok & KolomAxis 8 16 0.5 1
13 Balok & KolomAxis A 36 0.75 1
14 Balok & KolomAxis B 5.5 0.5 2
15 Balok & KolomAxis C 36 0.75 1
16 0 0 0 0
17 Concrate Slab Electrical 7.5 4.5 1
18 0 0 0 0
Jumlah Lantai 1 / 1st Floor
Lantai 2 / 2nd Floor
No. Ruangan/ Room Panjang Lebar Unit
1 Axis 1 0 0 1
2 Axis 2 0 0 1
3 Axis 3 15 4.5 1
4 Axis 8 15 4.5 1
5 Axis A 35 4.5 1
6 Axis B 0 4.5 1
7 Axis C 35 4.5 1
8 0 0 0 0
9 Balok & KolomAxis 1 0 0 1
10 Balok & KolomAxis 2 0 0 1
11 Balok & KolomAxis 3 15 1 1
12 Balok & KolomAxis 8 15 1 1
13 Balok & KolomAxis A 35 1 1
14 Balok & KolomAxis B 0 0 1
15 Balok & KolomAxis C 35 1 1
16 0 0 0 0
Jumlah Lantai 2 / 2nd Floor
Pengurangan lubang jendela n pintu
No. Ruangan/ Room Panjang Lebar Unit
1 M-1 1 2.4 1
2 M-2 1 2.4 1
3 M-3 1.5 2.7 2
4 M-4 4.5 4 1
5 M-1 1 2.4 1
6 C-1 1.5 1.5 19
7 C-2 1.5 1.5 20
8 C-3 1.5 0.9 4
9 C-4 6 1.2 2
10 C-4a 6 1.2 2
11 C-4b 6 1.2 2
12 FC-1 2.4 1.5 1
13 0 0 0 0
14
Jumlah Pengurangan lubang jendela n pintu
Total Jumlah Interior Painting
5 Metal Cladding
Skylight wall
No. Ruangan/ Room Panjang Lebar Unit
1 3 2.6 2
2
3
Jumlah Skylight wall
Lantai 2 / 2nd Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
3
Jumlah Lantai 2 / 2nd Floor
Pengurangan lubang jendela n pintu
No. Ruangan/ Room Panjang Lebar Unit
1
2
3
Jumlah Pengurangan lubang jendela n pintu
Total Jumlah Metal Cladding
6 Flashing for skylightSkylight wall
No. Ruangan/ Room Panjang Lebar Unit
1 19 1.2 2
2
3
Jumlah Skylight wall
Lantai 2 / 2nd Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
3
Jumlah Lantai 2 / 2nd Floor
Pengurangan lubang jendela n pintu
No. Ruangan/ Room Panjang Lebar Unit
1
2
3
Jumlah Pengurangan lubang jendela n pintu
Total Jumlah Flashing for skylight
7 Embeded PlateSkylight wall
No. Ruangan/ Room Panjang Lebar Unit
1 5
2
3
Jumlah Skylight wall
Total Jumlah Embeded Plate
8 Embeded PlateSkylight wall
No. Ruangan/ Room Panjang Lebar Unit
1 6
2
3
Jumlah Skylight wall
Total Jumlah Embeded Plate
9 Embeded PlateSkylight wall
No. Ruangan/ Room Panjang Lebar Unit
1 9
2
3
Jumlah Skylight wall
Total Jumlah Embeded Plate
10 Embeded PlateSkylight wall
No. Ruangan/ Room Panjang Lebar Unit
1 6
2
3
Jumlah Skylight wall
WALL WORKDESCRIPTION SPECIFICATION
Hebel 200x600x200 mm
Jumlah
60
60
60
60
140
18
140
0
538
Jumlah
0
0
67.5
67.5
157.5
0
157.5
450
Jumlah
2.4
2.4
8.1
18
2.4
42.75
45
5.4
14.4
14.4
14.4
3.6
0
173.25
814.75
Cement-Lime Mortar
Jumlah
60
60
60
60
140
18
140
8
8
18
2.75
18
592.75
Jumlah
0
0
67.5
67.5
157.5
0
157.5
0
0
15
15
35
0
35
0
550
Jumlah
60
60
60
60
140
18
140
0
8
0
0
8
18
5.5
18
0
595.5
Jumlah
0
0
67.5
67.5
157.5
0
157.5
0
0
0
15
15
35
0
35
0
550
Jumlah
2.4
2.4
8.1
18
2.4
42.75
45
5.4
14.4
14.4
14.4
3.6
0
173.25
4230
Jumlah
60
60
60
60
140
18
140
0
8
0
0
8
18
2.75
18
0
546
Jumlah
0
0
67.5
67.5
157.5
0
157.5
0
Weathershield Paint, Primer 1 ply & paint 2 plyPearl Green (RAL6035) Ex. Nipponpaint
0
0
15
15
35
0
35
0
465
Jumlah
2.4
2.4
8.1
18
2.4
42.75
45
5.4
14.4
14.4
14.4
3.6
0
173.25
837.75
Jumlah
60
60
60
60
140
18
140
0
12
12
8
8
Primer 1 ply & paint 2 plyWhite Ex. Vinilex
27
5.5
27
0
33.75
0
538
Jumlah
0
0
67.5
67.5
157.5
0
157.5
0
0
0
15
15
35
0
35
0
550
Jumlah
2.4
2.4
8.1
18
2.4
42.75
45
5.4
14.4
14.4
14.4
3.6
0
0
173.25
914.75
Jumlah
15.6
0
0
15.6
Jumlah
0
0
0
0
Jumlah
0
15.6
Colorful plate with thickness of 1.0 mm
Jumlah
45.6
0
0
45.6
Jumlah
0
0
0
0
Jumlah
Colorful press-forming plate with base plate in a thickness of 0.6mm, Min. 28mm wave height
0
0
Jumlah
0
45.6
plate 300x600x10, Ø10
Jumlah
5
0
0
5
5
plate 300x300x10, Ø10
Jumlah
6
0
0
6
6
plate 150x500x10, Ø10
Jumlah
9
0
0
9
9
plate 100x100x8, Ø10
Jumlah
6
0
0
6
DOOR WORKNO. DESCRIPTION
1 M1 - Steel Door (1000 mm x 2400 mm)
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Air Compression Station 1 1
2 0
Jumlah Lantai 1 / 1st Floor 1
Total Jumlah M1 - Steel Door (1000 mm x 2400 mm) 1
2 M2 - Steel Door (1000 mm x 2400 mm)
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Control Room 1 1
2 0
Jumlah Lantai 1 / 1st Floor 1
Total Jumlah M2 - Steel Door (1000 mm x 2400 mm) 1
3 M3 - Steel Door (1500 mm x 2700 mm)
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Control Room & Eletrical Room 2 2
2 0
Jumlah Lantai 1 / 1st Floor 2
Total Jumlah M3 - Steel Door (1500 mm x 2700 mm) 2
4 M4 - Steel Door (4500 mm x 4000 mm)
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Air Compression Station 1 1
2 0
Jumlah Lantai 1 / 1st Floor 1
Total Jumlah M4 - Steel Door (4500 mm x 4000 mm) 1
5 FM -1 Fire Door (1000 mm x 2400 mm)
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Eletrical Room 1 1
2 0
Jumlah Lantai 1 / 1st Floor 1
Total Jumlah FM -1 Fire Door (1000 mm x 2400 mm) 1
DOOR WORKSPECIFICATION
Leaf = Steel Plate Finish Paint + Glass Minimum 5 mm Frame = Steel Frame
(Include Accessories : Hinges, Lever Handle, Lock Set)
Leaf = Steel Plate Finish Paint + Glass Minimum 5 mm Frame = Steel Frame
(Include Accessories : Hinges, Lever Handle, Lock Set)
Leaf = Steel Plate Finish Paint + Glass Minimum 5 mm Frame = Steel Frame
(Include Accessories : Hinges, Lever Handle, Lock Set)
Leaf = Steel Plate Finish Paint + Glass Minimum 5 mm Frame = Steel Frame
(Include Accessories : Hinges, Lever Handle, Lock Set)
Leaf = Fireproofing 1.2h, sound insulation 35 dB + Glass Minimum 5 mm Frame = Steel Frame
(Include Accessories : Hinges, Lever Handle, Lock Set)
WINDOWS WORKNO. DESCRIPTION
1 C-1 Aluminium Windows (1500 mm x 1500 mm)
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Air Compression Station 19 19
2 0
Jumlah Lantai 1 / 1st Floor 19
Total Jumlah C-1 Aluminium Windows (1500 mm x 1500 mm) 19
2 C-2 Aluminium Windows (1500 mm x 1500 mm)
Lantai 2 / 2nd Floor
No. Ruangan/ Room Unit Jumlah
1 Air Compression Station 20 20
2 0
Jumlah Lantai 2 / 2nd Floor 20
Total Jumlah C-2 Aluminium Windows (1500 mm x 1500 mm) 20
3 C-3 Aluminium Windows (1500 mm x 900 mm)
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Control Room & Eletrical Room 4 4
2 0
Jumlah Lantai 1 / 1st Floor 4
Total Jumlah C-3 Aluminium Windows (1500 mm x 900 mm) 4
4 C-4 Aluminium Windows (6000 mm x 1200 mm)
Atap / Roof
No. Ruangan/ Room Unit Jumlah
1 Air Compression Station 2 2
2 0
Jumlah Atap / Roof 2
Total Jumlah C-4 Aluminium Windows (6000 mm x 1200 mm) 2
5 C-4a Aluminium Windows Windows (6000 mm x 1200 mm)
Atap / Roof
No. Ruangan/ Room Unit Jumlah
1 Air Compression Station 2 2
2 0
Jumlah Atap / Roof 2
Total Jumlah C-4a Aluminium Windows Windows (6000 mm x 1200 mm) 2
6 C-4b Aluminium Windows Windows (6000 mm x 1200 mm)
Atap / Roof
No. Ruangan/ Room Unit Jumlah
1 Air Compression Station 2 2
2 0
Jumlah Atap / Roof 2
Total Jumlah C-4b Aluminium Windows Windows (6000 mm x 1200 mm) 2
7 FC-1 Fire Window (2400 mm x 1500 mm)
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Control Room 1 1
2 0
Jumlah Lantai 1 / 1st Floor 1
Total Jumlah FC-1 Fire Window (2400 mm x 1500 mm) 1
8Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Control Room 3 3
2 0
Jumlah Lantai 1 / 1st Floor 3
Total Jumlah Opening concrete hop Ø800 3
9 Opening Steel Frame 200mmx400mmLantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 Control Room 1 1
2 0
Opening concrete hop Ø800
WINDOWS WORKSPECIFICATION
Leaf = Aluminium 3" + Glass Minimum 5 mm Frame = Aluminium
(Include Accessories : Hinges, Lever Handle, Lock Set)
Leaf = Aluminium 3" + Glass Minimum 5 mm Frame = Aluminium
(Include Accessories : Hinges, Lever Handle, Lock Set)
Leaf = Aluminium 3" + Glass Minimum 5 mm Frame = Aluminium
(Include Accessories : Hinges, Lever Handle, Lock Set)
Leaf = Transparent Polycarbonat Frame = Aluminium 3"
Leaf = Transparent Polycarbonat Frame = Aluminium 3"
Leaf = Transparent Polycarbonat Frame = Aluminium 3"
Leaf = Fireproofing 1.2h, sound insulation 35 dB + Glass Minimum 5 mm Frame = Aluminium
Concrete c20, Reinforcement 2Ø12, Stirrup Ø6@200
L50x5, Ø6@200
CEILING WORKNO. DESCRIPTION
1 Interior Paint
Lantai 1 / 1st Floor
No. Ruangan/ Room Panajang Lebar Unit
1 Control Rooom 8 5 1
2 Electrical Room 8 5 1
Jumlah Lantai 1 / 1st Floor
Total Jumlah Interior Paint
2 Ceiling 2 GRC
Lantai 1 / 1st Floor
No. Ruangan/ Room Panajang Lebar Unit
1 Control Rooom 8 5 1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Ceiling 2 GRC
CEILING WORKDESCRIPTION SPECIFICATION
Jumlah
40
40
80
80
Jumlah
40
0
40
40
Primer 1 ply & paint 2 plyWhite Ex. Vinilex
GRC Board 6mm Thk, Include Metal Furing Galvanized, Include White Paint
ex. GRC BOARD
FLOOR WORKNO. DESCRIPTION
1Lantai 1
No. Ruangan/ Room Panjang
1
2
Jumlah Lantai 1
Total Jumlah
2Lantai 1
No. Ruangan/ Room Panjang
1
2
3
Jumlah Lantai 1
Total Jumlah
3Lantai 1
No. Ruangan/ Room Panjang
1
Jumlah Lantai 1
Total Jumlah
4 Cement FloorLantai 1
No. Ruangan/ Room Panjang
1 Air compression Station 33
2 Control Room 2
3 Air Compression Station 2
4 Control Room 2.7
5 Electrical Room] 2.7
6 Air Compression Station 2.4
7 Concrete water discharging board 104
8
9
10
11
Jumlah Lantai 1
Total Jumlah Cement Floor
5 Ceramic Tile 2
Lantai 1 / 1st Floor
No. Ruangan/ Room Panjang
1 Elctrical Room 7.5
2 Control Room 7.5
3
Jumlah Lantai 1 / 1st Floor
Total Jumlah Ceramic Tile 2
6 Cement SkirtingLantai 1 / 1st Floor
No. Ruangan/ Room Panjang
1 Air Compression Station 45
Jumlah Lantai 1 / 1st Floor
Total Jumlah Cement Skirting
7 Ceramic Skirting
Lantai 1 / 1st Floor
No. Ruangan/ Room Panjang
1 Electrical Room
2 Control Room
3 Axis 1 15
4 Axis 2 15
5 Axis A 4.5
6
7
8
Jumlah Lantai 1 / 1st Floor
Total Jumlah Ceramic Skirting
8Lantai 1 / 1st Floor
No. Ruangan/ Room Panjang
1
2
3
4
5
Jumlah Lantai 1 / 1st Floor
Total Jumlah
9 Water Proofing Lantai 1 / 1st Floor
No. Ruangan/ Room Panjang
1 Air Compression Station 30
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Water Proofing
10 Crushed stonesLantai 1 / 1st Floor
No. Ruangan/ Room Panjang
1 all room 35
2 0 0
3
4
5
6
7
8
9
Jumlah Lantai 1 / 1st Floor
Total Jumlah Crushed stones
FLOOR WORKDESCRIPTION SPECIFICATION
Lebar Tinggi Jumlah
0
0
Jumlah Lantai 1 0
Total Jumlah 0
Lebar Tinggi Jumlah
0
0
0
Jumlah Lantai 1 0
Total Jumlah 0
Lebar Tinggi Jumlah
0
0
Jumlah Lantai 1 0
Total Jumlah 0
Concrete K125, finish mortar thk:20mm
Lebar Tinggi Jumlah
15 0.15 74.25
1.6 0.54 1.728
1.6 0.54 1.728
2.5 0.15 1.0125
2.5 0.15 1.0125
5.5 0.15 1.98
1 0.1 10.4
0
0
0
0
Jumlah Lantai 1 92.111
Total Jumlah Cement Floor 92.111
Lebar Unit Jumlah
4.5 1 33.75
4.5 1 33.75
0
Jumlah Lantai 1 / 1st Floor 67.5
67.5
Mortar finish, Height:120mm, Finish Paint
Lebar Tinggi Jumlah
1 1 45
0
Jumlah Lantai 1 / 1st Floor 45
Total Jumlah Cement Skirting 45
Lebar Unit Jumlah
0
0
1 1 15
1 1 15
1 4 18
0
0
0
Jumlah Lantai 1 / 1st Floor 48
Total Jumlah Ceramic Skirting 48
Lebar Tinggi Jumlah
0
0
Ex. Roman, Ceramic tile 600 x 600 mm, color: light sea gray (polished)
Ex. Roman, Ceramic tile 600 x 120 mm, color: light sea gray (polished)
0
0
Jumlah Lantai 1 / 1st Floor 0
Total Jumlah 0
DAMDEX
Lebar Tinggi Jumlah
15 1 450
0
Jumlah Lantai 1 / 1st Floor 450
Total Jumlah Water Proofing 450
Crushed stones of 3:7 (Thickness:150)
Lebar Tinggi Jumlah
15 0.15 78.75
0 0.15 0
0
0
0
0
0
0
0
Jumlah Lantai 1 / 1st Floor 78.75
Total Jumlah Crushed stones 78.75
ROOF WORKNO. DESCRIPTION
1 Metal Roof
Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 compresor 30 8.6 2
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Panajang Lebar Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Metal Roof
2 Standard Flashing (Ridge Capping)Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 bubungan 30 1 1
2 longitudinal 8.6 1 4
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Standard Flashing (Ridge Capping)
3 Roof DrainLantai Dasar / Ground Floor
No. Ruangan/ Room Unit
1 6
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Roof Drain
4 Down Spot PipeLantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 9.5 1 4
2 5.5 1 2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Down Spot Pipe
5 Metal Gutter
Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 30 1 2
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Metal Gutter
6 Rain gutter spout
Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 6
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Rain gutter spout
7 Water ProofingLantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 electrical,controm 15 4.5 1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Water Proofing
8 Screed (Slope 2%)Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 tebal 20mm 15 4.5 1
2
3
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Screed (Slope 2%)
9 Screed
Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 electrical,control 15 4.5 1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Screed
10 Cover Plate
Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 31.2 1.2 2
2 16.7 1.2 2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Cover Plate
11 Aluminium Plate thk :1.5 mmLantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1 15.6 0.5 2
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Aluminium Plate thk :1.5 mm
ROOF WORKDESCRIPTION SPECIFICATION
Jumlah
516
0
516
Jumlah
0
0
0
516
Colorful plate with thickness of 1.0 mm
Jumlah
30
34.4
64.4
Jumlah
0
0
0
64.4
Cast Iron Ø 100mm
Jumlah
6
0
6
Jumlah
0
0
0
Colorful press-forming plate with base plate in a thickness of 0.8mm, Min. 76mm wave height
6
PVC D Pipe Ø 100mm Include Accessories
Jumlah
38
11
49
Jumlah
0
0
0
49
Jumlah
60
0
60
Jumlah
0
0
0
60
Jumlah
6
0
6
Jumlah
0
Colorful plate with thickness of 1.0 mm(width: 500mm, height: 680mm)
Colorful plate with thickness of 1.0 mm(500x300x300mm)
0
0
6
DAMDEX WARNA + Serat Fiber
Jumlah
67.5
0
67.5
Jumlah
0
0
0
67.5
1 PC: 3 Sand, thk:20mm at the lowest point
Jumlah
67.5
0
0
67.5
Jumlah
0
0
0
67.5
Jumlah
67.5
0
67.5
1 PC: 3 Sand: 2% DAMDEX multifungsi from PC, thk:20mm
Jumlah
0
0
0
67.5
Jumlah
74.88
40.08
114.96
Jumlah
0
0
0
114.96
for expansion joint
Jumlah
15.6
0
15.6
Jumlah
0
0
0
15.6
Colorful plate (Resada Green RAL 6011) with thickness of 1.0 mm
SANITARY WORKNO. DESCRIPTION
Lantai Dasar / Ground Floor
No. Item
1 Closet (WC)
2 Jet Shower/Shower Spray
3 Lavatory at Toilet
4 Lavatory Faucet at Toilet
5 Liquid Soap Dispenser
6 Urinal
7 Urinal Partition
8 Sink
9 Sink Faucet
10 Floor drain
11
12
13
14
14
15
16
No. Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
14
15
16
SANITARY WORKDESCRIPTION
Spec Unit Jumlah
Ex. TOTO CW421J/SW420 JP (Complete Accessories) 5
Ex. TOTO TX423SV1N 5
Ex. TOTO L521V1A (Complete Accessories) 2
Ex. TOTO TX111LRYR 2
Ex. TOTO TS126AR 2
Ex. TOTO U57M 2
Ex. TOTO A100 1
Concrete K 225 finish with ceramic (500x500x420mm) 4
Ex. TOTO T23B13 4
Ex. TOTO TX1BN 13
0
0
0
0
0
Spec Unit Jumlah
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
WINDOWS WORKNO. DESCRIPTION
1 Repairing Leader
Lantai Dasar / Ground Floor
No. Ruangan/ Room Unit Jumlah
1 2 2
2 0
Jumlah Lantai Dasar / Ground Floor 2
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Jumlah
1 0
2 0
Jumlah Lantai 1 / 1st Floor 0
Total Jumlah Repairing Leader 2
2 HandrailLantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Unit Jumlah
1 Ø 60x3,5 10.1 2 20.2
Ø 48x3,5 12 2 24
Ø 21,25x2,75 24.8 2 49.6
Jumlah Lantai Dasar / Ground Floor 93.8
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit Unit Jumlah
1 0
2 0
Jumlah Lantai 1 / 1st Floor 0
Total Jumlah Handrail 93.8
WINDOWS WORKSPECIFICATION
Stainless Steel Pipe + Accessories
Steel frame, column L50x5,vertical distance L63x6,steping Ø26.75x2.75,Savety holder Ø20,Finish
Paint
ROOF WORKNO. DESCRIPTION
1 Column 200mmx240mmLantai Dasar / Ground Floor
No. Ruangan/ Room L.pen tinggi Unit
1 all room 0.048 5.4 2
2 0.048 9.5 16
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Panajang Lebar Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Column 200mmx240mm
2 Lintel Beam 200mmx120mm
Lantai Dasar / Ground Floor
No. Ruangan/ Room L.pen Lebar Unit
1 0.024 2.5 44
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah Lintel Beam 200mmx120mm
3Lantai Dasar / Ground Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
4Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
5Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
6Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
7Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
8Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
3
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
9Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
10Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
11Lantai Dasar / Ground Floor
No. Ruangan/ Room Panjang Lebar Unit
1
2
Jumlah Lantai Dasar / Ground Floor
Lantai 1 / 1st Floor
No. Ruangan/ Room Unit
1
2
Jumlah Lantai 1 / 1st Floor
Total Jumlah
ROOF WORKDESCRIPTION SPECIFICATION
Jumlah
0.5184
7.296
7.8144
Jumlah
0
0
0
7.8144
Jumlah
2.64
0
2.64
Jumlah
0
0
0
2.64
Jumlah
0
0
0
Jumlah
0
0
0
Concrete K250 + Reinforcement (4Ø13, Ø6@150)
Concrete K250 + Reinforcement (2Ø8, 2Ø13, Ø6@150)