WIMES 2.02 Page 52
APPENDIX C1 - DATA SHEETS
GRIT REMOVAL, TRANSFER AND TREATMENT EQUIPMENT
PROJECT TITLE (P) DOCUMENT REFERENCE (P)PROJECT NUMBER (P) REVISION (P)PROJECT LOCATION (P) DATE (P)EQUIPMENT SUPPLIER (P/S)
REFERENCE DRAWINGS INCLUDED (Y/N) (P)
TAG NO/ASSET CODE (P)
* - Indicates Purchaser’s default requirement
2.0 GENERAL
2.3 General
1 Type of Equipment Selected (P/S)Grit Removal Equipment ()Cross-flow separatorVortex separator (VS)Non-powered VSGrit Transfer Equipment ()Solids handling pump unitAir lift pumpRam pump unitGrit Treatment Equipment ()Screw classifierReciprocating rake classifierWasher/ de-waterer (vortex type)Package Grit Plant ()
3.0 OPERATING ENVIRONMENT(S) AND SITE DETAILS
1 Operating Environment(s) (P)Site/Equipment Location ()InlandCoastalInsideOutsideOther (specify)Hazardous Area ClassificationZone (1 or 2 or N/A)Gas GroupTemperature class
EMC Environment ()1st environment – C11st environment – C22nd environment – C3
2 Special Environmental Hazards (P)
3 References For Further Information (P)
4.0 PROCESS INFORMATION
1 Influent Source and Feed Arrangements () (P)Rural/urbanIndustrial/domestic split % %Pumped/gravity flow % %
2 Influent Screening (P)Screened influent (Y/N)Aperture type/dimensions (e.g. hole/6 mm in 2D)
3 Waste Water Flow Rates (l/s) (P)MinimumDesignMaximum
3 Frequency (per Year) and Duration (hrs) of Maximum Flow Events (P)
4 Unusual Influent Properties (P)
5 Influent Grit/Silt Levels (P)High grit levels (Y/N)High silt levels (Y/N)
ISSUE 5 JULY 2017
WIMES 2.02 Page 53
5.0 PERFORMANCE SPECIFICATION
5.1 General
1 Service Life (years) (P)2 Mode of Operation () (P)
DutyDuty/assistDuty/standby
2 Utilisation (% or hrs/day) (P)
3 Ambient Air Temp/RH (-10 to 40°C/< 95%*) (P)
5.2 Process Performance
5.2.1 Grit Removal Equipment
5.2.1.1 Cross Flow Separators and Vortex Separators (If Required/Provided)
1 Flow Capacity (l/s) (P/S)2 Separation Efficiency (P)
Minimum (95 %*)Flow rate (l/s)
2 Grit Characteristics (P)Minimum size (0.2 mm*)Specific gravity (2.65”)
2 Flow Range over which Specified Efficiency can be Maintained (l/s) (S)
2 Expected Efficiencies at Minimum/Maximum Flows for Treatment (%) (S)
Min Max
5.2.2 Grit Transfer Equipment
5.2.2.1 Solids Handling Pump Units (If Required/Provided)
1 Pump Capacity, Head, Efficiency and Power Input at the GP (S)Capacity (l/s)Total generated head (m)Efficiency (%)Power input (kW)
3 Maximum Diameter of Solid Sphere Required/Able to be Passed by the Pump (mm)Required (P)Able (S)
4 Maximum Pump Unit Vibration (4.5 mm/s*) (P)
5.2.2.2 Air Lift Pumps (If Required/Provided)
1 Blower Volumetric Performance at Duty Point (S)Differential pressure (bar)Flow rate (l/s)
1 Blower Power Input at Duty Point (kW) (S)
2 Air Lift Pump Dip Ratio at Duty Point (kW) (S)
3 Maximum Diameter of Solid Sphere Required/Able to be Passed by the Air Lift Pump Delivery Pipe (mm)Required (P)Able (S)
4 Maximum Air Blower Vibration (4.5 mm/s*) (P)
5.2.3 Grit Treatment Equipment
5.2.3.1 All Equipment
1 Flow Capacity (l/s) (P/S)
5.2.3.2 Washer/De-waterers (If Required/ Provided)
1 Maximum Water Content of Grit (%)Allowable (P)Expected (S)
1 Maximum Faecal Organic Content of Grit (%)Allowable (P)Expected (S)
5.3 Noise
1 Maximum Noise Levels (dB (A) at 1 m)Allowable (< 80*) (P)Expected (S)
2 Acoustic Hoods/Cladding Required (Y/N) (S)
3 Additional Noise Requirements (P)
5.4 Life Cycle Costs
5.4.1 Energy Consumption
1 Energy Consumption(kWh/hr) (S)
ISSUE 5 JULY 2017
WIMES 2.02 Page 54
5.4.2 Washwater Consumption
1 Washwater Consumption (l/hour) (S)
5.4.3 Service Lives and Costs of Components
1 Expected Service Lives (P/S)Component (Specify) Life (x103 hrs)
2 Costs of Components (£)/Time Required to Replace Components (hrs) (S)Component (specify) Cost Time
6.0 DESIGN SPECIFICATION
6.1 General
6.1.2 Weights and Lifting Arrangements
1 Equipment Weight (wet and dry) (kg) (S)
1 Heaviest maintenance lift (kg) (S)
1 Heaviest erection lift (kg) (S)
6.1.5 Support Structures
2 Materials (P/S)
6.1.6 Drive Systems
6.1.6.2 Motors/Gearboxes (If Required/Provided)
Refer to Appendix C2.
6.1.6.3 Hydraulic Drive Systems (If Required/Provided)
1 Hydraulic Drive to Operate (P/S)
2 Rating (S)Motor rating (kW)Maximum operating pressure (bar)
3 Hydraulic Power Pack (P/S)b Control panel spec.
(WIMES 3.04*)c Motor specification
(WIMES 3.03*)d Coating specification
(WIMES 4.01*)5 Hydraulic System (P/S)a Oil reservoir capacity (l)b Maximum oil pump
delivery (l/min)7 Further Measures Required to Reduce
Impacts of Oil Spillage (P)
8 Rigid Pipework Type () (P/S)SeamlessFully welded
8 Rigid Pipework Material () (P/S)Stainless steelCarbon steel
10 Type of Hydraulic Oil (P/S)
6.1.7 Bearings and Lubrication
6.1.7.2 Rolling Element Bearings
3 Requirements for Split Type Bearings (P)
6.1.7.3 Lubrication
1 Bearing Lubrication Philosophy () (P/S)Sealed for lifeManual re-greasingAutomatic re-greasing
5 Minimum Capacity/Life of Auto Grease Dispensers (cc/mths) (P/S)
ISSUE 5 JULY 2017
WIMES 2.02 Page 55
6.1.9 Information Plate
1 Additional Information Reqd on Plate (P)
2 Duplicate Plate Required (Y/N) (P)
2 Location of Duplicate Plate (P)
6.1.11 Lagging and Trace Heating (If Required)
2 Frost Protection Afforded Down to: (-10°C*) (P)
3 Reference for Particular Specification (P)
6.1.12 Control Panel and Associated Electrical Installation
1 Control Panel Required/ Provided (Y/N) (P/S)
2 Control Panel Specification () (P)WIMES 3.04*Supplier’s standardPurchaser’s standard
6.1.14 Theft Prevention
1 Painting of Stainless Steel Components Required (Y/N) (P)
6.1.15 O & M Manuals
1 Reference for Particular Specification (P)
6.2 Grit Removal Equipment
6.2.1 Cross Flow Grit Separators (If Required/Provided)
6.2.1.1 General
2 Equipment Designation or Model No. (S)
6.2.1.2 Influent Guide Vanes
1 Influent Guide Vane Material (P/S)
5 Max. Head Loss Across Guide Vanes (mm) (P)
6.2.1.3 Outlet Weir
2 Adjustable Weir Plate Required/Provided (Y/N) (P/S)
6.2.1.4 Grit Scraper Assembly
2b Number of Scraper Arms (P/S)
2b Adjustable Tie Rods Required/Provided (Y/N) (P/S)
2c Plastic Wear Plates Required/Provided (Y/N) (P/S)
3 Speed (at Tank Periphery) (m/min) (S)
6.2.1.5 Drive System
1 Configuration of Drive System () (P/S)Option a) reqd./providedOption b) reqd./provided
2 Mechanical Overload Protection System Reqd./ Provided (Y/N) (P/S)
6.2.1.7 Metal Support Bridge
General
1 Bridge Material () (P/S)Mild steel*(specify grade)Stainless steel(specify grade)Other (specify)
1 Method of Corrosion Protection () (P/S)Galvanising*Paint/polymeric coatings
3 Bridge Loads (P)a Via walkway flooring
(kN/m2)
ISSUE 5 JULY 2017
WIMES 2.02 Page 56
Walkway
2 Minimum Width Between Guard-Rails (P)750 mm*Other (specify)
3 Type of Walkway Flooring () (P)a Steel open bar gratingb GRP open bar flooring9 Method(s) of Edge Protection () (P)
Toe-platesInfill panels (1/2 height)Infill panels (full height)
Guard-Rails
2 Reference for Purchaser’s Particular Specification (P)
Access onto the Bridge
1 Party Responsible for Providing Means of Access onto Bridge () (P)Bridge SupplierOther (specify)
6.2.1.8 Grit Transfer
General
1 Method of Grit Transfer () (P/S)Solids handling pump unitAir lift pumpRam pump unit
6.2.2 Powered Vortex Separators (If Required/Provided)
6.2.2.1 General
1e Grit Backwashing System Required/Provided (Y/N) (P/S)
2 Equipment Designation or Model No. (S)
6.2.2.2 Grit Separation Tank
2 Tank Material (P/S)
6.2.2.3 Grit Separation Device
1b Method of Attaching Impeller/Paddle to Drive Tube () (P/S)KeyConical taperOther (specify)
2 Impeller/Paddle Material (P/S)
6 Impeller/Paddle Speed (rpm) (S)
6.2.2.6 Metal Support Bridge
General
1 Bridge Material () (P/S)Mild steel*(specify grade)Stainless steel(specify grade)Other (specify)
1 Method of Corrosion Protection () (P/S)Galvanising*Paint/polymeric coatings
3 Bridge Loads (P)a Via walkway flooring
(kN/m2)
Walkway
1 Minimum Width Between Guard-Rails (P)750 mm*Other (specify)
3 Type of Walkway Flooring () (P)a Steel open bar gratingc GRP open bar flooring
9 Method(s) of Edge Protection () (P)Toe-platesInfill panels (1/2 height)Infill panels (full height)
Guard-Rails
1 Reference for Purchaser’s Particular Specification (P)
ISSUE 5 JULY 2017
WIMES 2.02 Page 57
Access onto the Bridge
1 Party Responsible for Providing Means of Access onto Bridge () (P)Bridge SupplierOther (specify)
6.2.2.7 Grit Backwashing System (If Required/Provided)
1 Type of Backwashing System Required/Provided (P)Water/Air
Water Backwashing Systems (If Required/Provided)
1 Washwater Availability/ Requirements (P/S)Pressure and Flow RateSupply Pressure (bar)Flow rate (l/min)Type ()Final effluentScreened effluentPotable waterFiltration Level (Microns)
2 Valve Type () (P/S)Full bore, ¼ turn, actuated*Solenoid
6.2.2.8 Grit Transfer
General
1 Method of Grit Transfer () (P/S)Solids handling pump unitAir lift pumpRam pump unit
6.2.3 Non-Powered Vortex Separators (If Required/Provided)
6.2.3.1 General
1b Grit Backwashing System Required/Provided (Y/N) (P/S)
2 Equipment Designation or Model No. (S)
3 Separator Configuration () (P/S)Free-standingInstalled in a wet well
6.2.3.2 Grit Separator
1 Separator Material(s) (P/S)
6.2.3.3 Grit Backwashing System (If Required/Provided)
1 Type of Backwashing System Required/Provided (P)Water/Air
Water Backwashing Systems (If Required/Provided)
1 Washwater Availability/ Requirements (P/S)Pressure and Flow RateSupply Pressure (bar)Flow rate (l/min)Type ()Final effluentScreened effluentPotable waterFiltration Level (Microns)
2 Valve Type () (P/S)Full bore, ¼ turn, actuated*Solenoid
6.2.3.4 Grit Transfer
General
1 Method of Grit Transfer () (P/S)Solids handling pump unitAir lift pumpRam pump unit
ISSUE 5 JULY 2017
WIMES 2.02 Page 58
6.3 Grit Transfer Equipment
6.3.1 Solids Handling Pump Units (If Required/Provided)
6.3.1.1 General
1 Equipment Designation or Model No. (S)
2 Maximum Operating Speed (rpm)Allowable (1500*) (P)Design (S)
6.3.1.2 Orientation and Support Structure
1 Orientation () (P/S)HorizontalVertical
2 Support Structure Material (S)
6.3.1.3 Casing
2 Casing Material (P/S)
5 Flange Type (PN 16*) (P/S)
6 Casing Wear Rings (P/S)Required/Provided (Y/N)
6 Fixing Method (P/S)
6 Material(s) (P/S)
6.3.1.4 Impeller
1 Impeller Type () (P/S)ClosedSemi-openOpenVortexSpiral vaneOther (specify)
2 Impeller Dimensions (mm) (S)Diameter fittedMin. diameterMax. diameter
3 Impeller Material (P/S)
4 Method of Securing Impeller to Pump Shaft () (P/S)KeyBoltConical taperOther (specify)
6 Impeller Wear Rings (P/S)Required/Provided (Y/N)
6 Fixing Method (P/S)
6 Material(s) (P/S)
6.3.1.5 Shaft
1 Shaft Material (S)
6.3.1.6 Seals
1 Seal Type (P/S)
1 Seal Manufacturer (P/S)
2 Seal Flushing/Cooling Required/Provided (Y/N) (P/S)
2 Flushing Water Availability/ Requirements (P/S)Pressure and Flow RateSupply Pressure (bar)Flow rate (l/min)Type ()Final effluentScreened effluentPotable waterFiltration Level (Microns)
6.3.1.7 Shaft Coupling (If Required/Provided)
1 Coupling Type (Spacer for Mechanical Seals*) (S)
1 Coupling Manufacturer (S)
2 Component Materials (S)HubSpacerFlexible componentGuard
ISSUE 5 JULY 2017
WIMES 2.02 Page 59
6.3.2 Air-Lift Pumps (If Required/Provided)
6.3.2.1 General
1 Equipment Designation or Model No. (S)
6.3.2.3 Air Wash/Air Lift Pipework
1 Type of Valve () (P/S)Full Bore, actuatedSolenoid
1 Mode of Operation of Valve () (P/S)ManualAuto
6.4 Grit Treatment Equipment
6.4.1 Screw Classifiers (If Required/Provided)
6.4.1.1 General
1 Configuration (Standalone with Pumped Feed*) (P)
2 Material(s) (P/S)
3 Equipment Designation or Model No. (S)
6.4.1.2 Grit Settlement Tank
1 Flange Type (PN 16*) (P/S)
4 Odour Control Connection Required (Y/N) (P)
6.4.1.3 Screw Conveyor
2 Type of Conveyor () (P/S)Shafted screwShaftless spiral
3 Screw/Spiral Material (P/S)
3 Trough/Tube Material (P/S)
4 Wear Plates/Liner (Shaftless Spirals)Required/Provided (Y/N) (P/S)
4 Material (P/S)
5 Method of Facilitating Bearing Maintenance () (P/S)Pivot mechanism for screwMaintenance possible without disturbing screw
6.4.1.5 External Washwater Systems (If Required/Provided)
1 Washwater Availability/ Requirements (P/S)Pressure and Flow RateSupply Pressure (bar)Flow rate (l/min)Type ()Final effluentScreened effluentPotable waterFiltration Level (Microns)
2 Spray Bar/Nozzle Material(s) (P/S)
4 Valve Type () (P/S)Full bore, ¼ turn, actuated*Solenoid
6.4.1.6 ‘Mini’ Vortex Separators/Hydrocyclones (If Required/Provided)
1 Required/Provided (Y/N) (P/S)
2 Separator Material(s) (P/S)
6.4.2 Reciprocating Rake Classifiers (If Required/Provided)
6.4.2.1 General
1 Equipment Designation or Model No. (S)
6.4.2.3 Rake Assembly
1 Angle of Inclination of Channel (S)
ISSUE 5 JULY 2017
WIMES 2.02 Page 60
6.4.2.4 Drive System
General
1 Type of Drive System () (P/S)GearmotorHydraulic cylinder
Gearmotor Driven Rake Assemblies
3 Proximity Switch for ‘Parking’ Required (Y/N) (P)
6.4.2.6 Organics Return System (If Required/Provided)
1 Required/Provided (Y/N) (P/S)
3 Type of System () (P/S)
6.4.3 Washer/De-waterers (Vortex Type) (If Required/Provided)
6.4.3.1 General
1 Configuration (Standalone with Pumped Feed*) (P)
3 Material(s) (P/S)
4 Equipment Designation or Model No. (S)
6.4.3.3 Grit Stirrer
2 Stirrer Material (P/S)
3 Stirrer Speed (rpm) (S)
6.4.3.4 Organics Return System
2 Washwater Availability/ Requirements (P/S)Pressure and Flow RateSupply Pressure (bar)Flow rate (l/min)Type ()Final effluentScreened effluentPotable waterFiltration Level (Microns)
3 Valve Type () (P/S)Full bore, ¼ turn, actuated*Solenoid
6.4.3.5 Screw Conveyor
2 Type of Conveyor () (P/S)Shafted screwShaftless spiral
3 Screw/Spiral Material (P/S)
3 Trough/Tube Material (P/S)
4 Wear Plates/Liner (Shaftless Spirals)Required/Provided (Y/N) (P/S)
4 Material (P/S)
5 Method of Facilitating Bearing Maintenance () (P/S)Pivot mechanism for screwMaintenance possible without disturbing screw
6.5 Package Grit Plant
6.5.1 General
1d Grit Pump Required/ Provided (P/S)
6.5.2 Tank
1 Tank Material () (P/S)Stainless steel number 1.4307* (AISI 304L)Stainless steel number 1.4404 (AISI 316L)Other (specify)
4 Flange Type (PN 16*) (P/S)
ISSUE 5 JULY 2017
WIMES 2.02 Page 61
6.5.3 Horizontal Screw Conveyor
2 Type of Conveyor () (P/S)Shafted screwShaftless spiral
3 Screw/Spiral Material (P/S)
3 Trough/Tube Material (P/S)
4 Wear Plates/Liner (Shaftless Spirals)Required/Provided (Y/N) (P/S)
4 Material (P/S)
6.5.4 Air Sparge System
3 Type of Valve () (P/S)Full Bore, actuatedSolenoid
3 Mode of Operation of Valve () (P/S)ManualAuto
6.5.5 Inclined Screw Conveyor
6.5.5.1 General
2 Type of Conveyor () (P/S)Shafted screwShaftless spiral
3 Screw/Spiral Material (P/S)
3 Trough/Tube Material (P/S)
4 Wear Plates/Liner (Shaftless Spirals)Required/Provided (Y/N) (P/S)
4 Material (P/S)
6.5.5.2 Organics Return System (If Specified/Supplied)
2 Washwater Availability/ Requirements (P/S)Pressure and Flow RateSupply Pressure (bar)Flow rate (l/min)Type ()Final effluentScreened effluentPotable waterFiltration Level (Microns)
3 Spray Bar/Nozzle Material(s) (P/S)
5 Valve Type () (P/S)Full bore, ¼ turn, actuated*Solenoid
7.0 INSPECTION AND TESTING
7.1 Factory Acceptance Testing
7.1.1 General
1 Reference for Particular Specification (P)
7.2 Site Acceptance Testing
1 Reference for Particular Specification (P)
ISSUE 5 JULY 2017
APPENDIX C2 – DRIVE SYSTEM DATA SHEET
(TO BE COMPLETED FOR EACH MOTOR/GEARBOX ASSEMBLY)
Drive No.:
3 Driven Equipment (P/S)
4 Type of Drive () (P/S)FixedDual speedVariable
5 Method of Power Transmission from Drive System to Driven Assembly () (P/S)Close coupledChainBeltOther (specify)
6 Method of Mechanical Overload Protection for Drive System () (P/S)Current monitoringTorque limiting couplingOther (specify)
7 Local Inching Facility () (P)Required (Y/N)ForwardReverse
9f IEC Input Design Required (Y/N) (P)
10 Gearbox Specification (S)ManufacturerType (e.g. helical)Number of stagesFinal Drive ratioService factorEfficiency (%)IP rating
Drive No.:
3 Driven Equipment (P/S)
4 Type of Drive () (P/S)FixedDual speedVariable
5 Method of Power Transmission from Drive System to Driven Assembly () (P/S)Close coupledChainBeltOther (specify)
6 Method of Mechanical Overload Protection for Drive System () (P/S)Current monitoringTorque limiting couplingOther (specify)
7 Local Inching Facility () (P)Required (Y/N)ForwardReverse
9f IEC Input Design Required (Y/N) (P)
10 Gearbox Specification (S)ManufacturerType (e.g. helical)Number of stagesFinal Drive ratioService factorEfficiency (%)IP rating
WIMES 2.02 Page 63
Drive No.:
3 Driven Equipment (P/S)
4 Type of Drive () (P/S)FixedDual speedVariable
5 Method of Power Transmission from Drive System to Driven Assembly () (P/S)Close coupledChainBeltOther (specify)
6 Method of Mechanical Overload Protection for Drive System () (P/S)Current monitoringTorque limiting couplingOther (specify)
7 Local Inching Facility () (P)Required (Y/N)ForwardReverse
9f IEC Input Design Required (Y/N) (P)
10 Gearbox Specification (S)ManufacturerType (e.g. helical)Number of stagesFinal Drive ratioService factorEfficiency (%)IP rating
Drive No.:
3 Driven Equipment (P/S)
4 Type of Drive () (P/S)FixedDual speedVariable
5 Method of Power Transmission from Drive System to Driven Assembly () (P/S)Close coupledChainBeltOther (specify)
6 Method of Mechanical Overload Protection for Drive System () (P/S)Current monitoringTorque limiting couplingOther (specify)
7 Local Inching Facility () (P)Required (Y/N)ForwardReverse
9f IEC Input Design Required (Y/N) (P)
10 Gearbox Specification (S)
ISSUE 5 JULY 2017
WIMES 2.02 Page 64
ManufacturerType (e.g. helical)Number of stagesFinal Drive ratioService factorEfficiency (%)IP rating
ISSUE 5 JULY 2017
WIMES 2.02 Page 65
APPENDIX D – SUPPLIER’S SUPPLEMENTARY DATA SHEET INFORMATION
Clause Supplementary Information
ISSUE 5 JULY 2017