    TABLE OF CONTENTS

    ZBA - Application

    Narrative in Support of the Application and Development Plan Review

    Exhibit A – Scoping Letter

    Exhibit B – Site Permitting Plans

    Exhibit C – Stormwater Management Report

    Exhibit D – Logistics Plan

    Exhibit E – Site Renderings

    Exhibit F – Lot Coverage Calculations

  • 8/20/2019 Williams College Science Quad Proposal

    3/509

  • 8/20/2019 Williams College Science Quad Proposal

    4/509

  • 8/20/2019 Williams College Science Quad Proposal

    5/509

     

    2

    The President and Trustees of Williams College

    Narrative in Support of:

    Administrative Appeal to the Zoning Board of Appeals,

    Application for Special Permits,

    And Development Plan Review related to its

    Science Center Renewal Project

    The President and Trustees of Williams College (“Williams College” or the

    “College”) applies to the Zoning Board of Appeals (“ZBA”) for relief and development

     plan review related to its Science Center project.

    I. Project Overview. 

    Williams College proposes to renovate and expand its science center facilities to

    create needed labs, workshops, and classrooms, to modernize out-dated facilities, and to

     bring them into compliance with modern academic standards. With more than half ofWilliams’ students majoring in a science, and significant numbers of those conducting

    research alongside faculty, the college lacks sufficient academic space for the sciences.

    Moreover, a significant portion of the existing space is substandard. A facilities condition

    assessment not only revealed that the college lacks the space it needs to support scientific

    research by faculty and students, it also showed that Bronfman Science Center leaks

    significant amounts of heat and is structurally incapable of renovation. This project will

    not only solve the need for more academic space, it will also improve the college’s

    energy profile: even though the floor area of the science center will increase, energy

    consumption will decrease.

    This two-phased project will build a center designed for generations of futureWilliams’ students and faculty. In the first phase, a new 77,500 GSF addition (the South

    Addition) comprised primarily of workshops, research labs, teaching labs, and offices for

    the departments of physics, chemistry, and biology will be constructed south of the

    existing Morley Scientific Laboratory building. This will integrate the new spaces

    directly with the existing science facilities. To create space for these facilities on the

     parcel, Williams moved Miller House, removed Siskind house, will relocate one barn,

    and will tear down another.

    In the second phase, Bronfman Science Center will be removed and replaced with

    similarly sized addition (the North Addition) that will house 99,500 GSF of more flexiblespace, including classrooms, labs, offices, and collaborative spaces for mathematics,

    statistics, psychology, and geosciences. On the inside, this modern, more adaptable

    space should sustain science education at Williams for the foreseeable future. A multi-

    story entry space accessed from both the quad and street levels links the departmental

    offices on the upper floors with the classrooms and 200-person auditorium on the lower

    levels. From the outside, the North Addition redefines the west end of the Science Quad

    and creates a more welcoming threshold to the campus. The historic and attractive Clark

    Hall will remain available for another academic use in the future.

  • 8/20/2019 Williams College Science Quad Proposal

    6/509

     

    3

    The first phase of construction will in the spring of 2016, and the second phase

    should finish in 2020.

    II. Permitting Overview.

    On July 28, 2015, the Community Development Department conducted a scoping

    session for this project. The scoping letter is included as Exhibit A with this application.

    Williams College submits this narrative in support of its application to the Zoning Board

    of Appeals for the following:

    1. An administrative appeal from the decision of the Town Planner / Director

    of Community Development as set forth in the enclosed Scoping Letter. The

    college seeks relief from building height restrictions under the Williamstown

    Zoning Bylaw § 70-4.1 and from building coverage limits under Bylaw § 70-4.3.

    2. A special permit under Section 70-1.4.(c) of the Williamstown ZoningBylaw (the “Bylaw”) to allow the extension of an existing nonconforming

    structure. In one location a portion of the pre-existing Biology building is twelve

    feet from the neighboring property, rather than the required fifteen feet.

    3. A special permit under Section 5.1.B. for relief from the development

    standard for existing grades to allow more than six feet of cut in the area of the

     proposed loading dock. And

    4. Development Plan Review under § 70-8.2.

    The college will also seek a parking determination from the Planning Board. Asdocumented by the scoping letter, this project does not require prior approval from the

    Conservation Commission.

    III. Appeal From Administrative Decision.

    As the scoping letter shows, the Director of the Community Development

    Department / Town Planner determined that the proposed North and South Additions

    cannot be built in compliance with the zoning bylaw. They require relief from its

     building height and coverage limits. As the Scoping Letter explains, the ZBA can grant

    this relief administratively under the “Tufts – Campbell” analysis that the Massachusetts

    Supreme Judicial Court developed in the cases of Trustees of Tufts College v. Medford ,415 Mass 753, 616 N.E.2d 433 (1993) and Campbell v. City Council of Lynn, 415 Mass.

    772, 778; 616 N.E.2d 445, 449 (1993). For the reasons fully described below, Williams

    College respectfully requests that the Williamstown Zoning Board of Appeals grant this

    relief.

    A. Massachusetts Law Prevents Zoning Bylaws from Imposing

    Unreasonable Regulations on Educational Uses.

  • 8/20/2019 Williams College Science Quad Proposal

    7/509

     

    4

    In Massachusetts, educational uses cannot be required to obtain special use

     permits, and site development standards cannot be enforced against an educational use if

    they would be unreasonable as applied to the project. No zoning ordinance or bylaw

    “shall prohibit, regulate or restrict the use of land or structures for . . . educational

     purposes on land owned . . . by a nonprofit educational corporation.” M.G.L. c. 40A, § 3.The land or structures put to educational uses, however, “may be subject to reasonable

    regulation concerning the bulk and height of structures and determining yard sizes, lot

    area, setbacks, open space, parking, and building coverage requirements.” M.G.L. c.

    40A, § 3. 

    Well-settled criteria determine when the application of a facially neutral zoning

    regulation is unreasonable under Massachusetts law. In Trustees of Tufts College v.

     Medford , 415 Mass 753, 616 N.E.2d 433 (1993), the Supreme Judicial Court considered

    whether Medford’s dimensional and parking requirements could be applied to a library

    addition and parking structure proposed by Tufts. That Court recognized that “where the

    requirements to be applied do not take into account the special characteristics of theeducational use (such as . . . the need for large classroom and library buildings) . . .

    application of the requirements to the property of an educational institution may be

    inappropriately restrictive.” 415 Mass. at 758 n.6; 616 N.E.2d at 438 n.6. It then

    explained “that the question of reasonableness of a local zoning requirement as applied to

    a proposed educational use will depend on the particular facts of each case,” and that the

    educational institution bears the burden of showing “that the local requirements are

    unreasonable as applied to its proposed project.” 415 Mass. at 759; 616 N.E.2d at 438-

    39.

    Williams College has several ways to discharge its burden. It can prove

    unreasonableness by “demonstrating that compliance would substantially diminish ordetract from the usefulness of the proposed structure, or impair the character of the

    institution’s campus, without appreciably advancing the municipality’s legitimate

    concerns.”  Id.  Or, the College might demonstrate an “excessive cost of compliance”

    with the regulation that is “without significant gain in terms of municipal concerns.” 415

    Mass. at 759-60; 616 N.E.2d at 439. Or, Williams might show that the “facially

    reasonable zoning requirements” would “nullify” or “significantly impede an educational

    use . . . without appreciably advancing municipal goals.” Campbell v. City Council of

     Lynn, 415 Mass. 772, 778; 616 N.E.2d 445, 449 (1993); accord   Martin v. Corporation of

    the Presiding Bishop of the Church of Jesus Christ of Latter-Day Saints , 434 Mass 141,

    150; 747 N.E.2d 131 (2001); Rogers v. Town of Norfolk , 432 Mass. 374, 385; 734 N.E.2d

    1143, 1150 (2000).

    As the Cambpell Court explained, “the central question is whether the application

    of the [zoning] requirements to a specific project in particular setting furthers legitimate

    municipal concerns to a sufficient extent to warrant requiring an educational institution . .

    . to alter its development plans.” 415 Mass. at 764.

    B. Two Requirements in the Bylaw would be Unreasonable if Applied to

  • 8/20/2019 Williams College Science Quad Proposal

    8/509

     

    5

    This Project.

    As the Scoping Letter explained, “the proposed facilities are an integral piece of

    the education[al] mission of the institution” and a “by right use under local zoning and

    Ch. 40A MGL.” The College, however, respectfully requests relief from the building

    height and coverage standards in the Bylaw, because they would be unreasonable asapplied to this project.

    1. It would be unreasonable to apply the Bylaw’s building height

    limit to the proposed building additions.

    The Bylaw restricts building heights in the General Residence district to a

    maximum elevation of 35 feet as of right, or up to 45 feet by special permit. Bylaw,

    § 70-4.1.A, 4.1.B(4). In the abstract, this restriction serves legitimate municipal concerns

     by promoting safety and preserving the access of adjoining premises to light and air.

    Applied to the proposed new additions to the science center building, however, this

    standard is unreasonable.

    With the site’s sloping topography, the South Addition measure approximately

    76’10” above grade, and the North Addition measures approximately 58’8” above grade.

    These buildings are taller than the bylaw would otherwise allow because they must be

    large enough to house the needed academic program spaces, they cannot be built

    underground economically, and they should be built to the same architectural scale as the

    surrounding buildings. Nor can these uses be located off site. Locating all the science

     programs together in the same quadrangle is essential because scientific inquiry and

    education is increasingly interdisciplinary. More and more areas of study and research--

    including neuroscience, biochemistry and molecular biology, astrophysics, biophysics,

    and biostatistics--span the boundaries of traditional academic departments.

    The proposed design locates all the required academic spaces within a building

    that is scaled to reflect its surroundings. If it were forced to comply with the height

    requirements, it would sprawl and cover too much ground. Reducing the height of this

     building would not only “substantially diminish or detract” from its usefulness, it would

    also exacerbate impervious coverage within the parcel. This project charts a middle

    course, creating the needed spaces within additions that match the scale of the existing

    science center and preserve a historic quadrangle that opens to the town green.

    Moreover, the proposed project will will mitigate or improve several existing

    municipal concerns. The existing stormwater management system will be significantlyimproved including two (2) new underground detention system, new water quality

    treatment structures, and includes rainwater reuse. The rainwater harvesting system will

    collect rainwater from existing and proposed roof tops in an underground cistern and then

     pump it to cooling towers, where it will be used for evaporative cooling of the building.

    The proposed stormwater management system will help mitigate the rate and volume of

    runoff and improve the water quality of runoff discharging to the municipal drainage

    system. Additionally, reducing the footprints of the buildings allows the creation of

  • 8/20/2019 Williams College Science Quad Proposal

    9/509

     

    6

    additional parking in the Spring Street neighborhood, which was one of the most

    commonly raised concerns throughout the course of the town’s recent economic

    development review and planning process.

    In short, making the building any shorter or smaller would significantly

    compromise the college’s ability to carry out its educational mission, either by imposingexcessive costs or by prohibiting core educational facilities. As applied to this building

    in this specific location, the height limit would “substantially diminish or detract from the

    usefulness of the proposed structure. . . . without appreciably advancing municipal

    goals.” Tufts, 415 Mass. at 759. For these reasons, it would be unreasonable to enforce

    the Bylaw’s height limits against this building.

    2. It would be unreasonable to apply the Bylaw’s building coverage

    limits to the proposed building additions.

    In 1997, when it permitted an earlier expansion of the science center, the ZBA’s

    decision allowed 30.8% of the building lot (commonly owned contiguous property) to becovered by buildings, more than the bylaw’s nominal limit of 20%. The new North

    Addition’s footprint is slightly smaller than Bronfman’s and Miller House and Siskind

    House have been removed, but the overall building coverage within this lot remains

    above 20%, at 26.04%. As the lot coverage calculations in Exhibit F detail, the proposed

     project will result in 130,088 square feet of coverage on a 499,633 square foot lot. While

    more than the bylaw allows, this actually is less coverage than the ZBA permitted in

    1996, when it approved of 154,451 square feet of building coverage. As is described

    above, this project is sized to provide essential academic uses, and has been designed to

     balance to trade off between building height and building footprint.  At the same time, the

     proposed plans preserve the open, airy feel of the Science quadrangle, enhance pedestrian

    connections, provide additional parking, and reduce offsite stormwater impacts from theScience Center. Accordingly, continued relief from the building coverage requirements

    is warranted because they would “substantially diminish or detract from the usefulness of

    the proposed structure. . . . without appreciably advancing municipal goals.” Tufts, 415

    Mass. at 759.

    IV. Williams College Respectfully Requests a Special Permit under Section

    1.4.C. to Permit Alteration and Additions to a Preexisting Non-conforming

    Structure.

    At one corner, an original portion of the Science Center building is located 12 feetfrom the rear boundary line of a neighboring property.

    The plans include the following measures to mitigate the negative impacts of the

     proposed project on the neighborhood:

      The North Building has a pitched roof to mitigate the height and blend

    with the character and context of the neighboring structures on Hoxsey

  • 8/20/2019 Williams College Science Quad Proposal

    10/509

     

    7

    Street as well as the adjacent campus buildings.

      The façade of the North Building is broken down in scale by wings of the

     building that face Hoxsey Street, reducing the apparent volume as it

    addresses the neighborhood.

      The loading dock south of the existing Bronfman building will be

    removed and replaced with a more pedestrian friendly and landscapedcirculation path.

      Stormwater runoff at both North and South building locations will be

    reduced from current conditions by capturing and reusing captured rain

    water on-site for mechanical use and toilet flushing.

       New plantings along Hoxsey Street will soften the street edge; replenish

    the pedestrian experience and transition to the building.

      Loading dock services for the South Building will be consolidated by the

    existing Morley loading dock and screened by the building and plantings.

      A new parking area comprised of 22 spaces will be located off Walden

    Street and screened with plantings.

    With these measures of mitigation, the alterations and additions will not be

    substantially more detrimental to the neighborhood, and relief is warranted.

    V. This Project Requires a Special Permit under Section 5.1.B. for relief from

    the development standard for existing grades.

    As the Scoping Letter explains, this project may be subject to special permits

    granting relief from the some of the site development standards of § 5. Under Section

    70-5.4.A.4 of the Bylaw, “[e]xisting grade should be changed minimally, typically

    departing from existing grade by no more than six feet, and resulting in a balance on site between cut and fill, except for basement and cellar elevations.” To adjust the location of

    the loading dock on the site and to replace a currently failing retaining wall, requires a

    small area of cut that exceeds six feet. This small area of cut poses no risks, and no

     better design is reasonably feasible.

    VI. DEVELOPMENT PLAN REVIEW

    Except for those issues where the College has asked the ZBA to grant relief, this

     project complies with the applicable portions of Article V, Development Standards and

    Section 70-6.1, Off-Street Parking. The following demonstrates compliance with the

    applicable development standards identified by the Scoping Letter.

    Section 70-5.2 Service Adequacy Requirements

    Section 70-5.2.A. (1) Access

    The project maintains and improves existing access to the science center from

    Hoxsey and Walden Streets, which provide adequate access as defined by the

  • 8/20/2019 Williams College Science Quad Proposal

    11/509

     

    8

    Subdivision Rules and Regulations.

    During the construction period, deliveries and other construction traffic will be

    handled in accordance with the Phase 1 logistics plan submitted herewith as Exhibit D.

    The purpose of the logistics plan is to minimize the construction phase traffic, parking

    and delivery impacts on the surrounding neighborhood, including Spring Street, WaldenStreet, Hoxsey Street, and the municipal parking lot.

    The key details of the logistics plan are as follows:

      Contractors will be required to park in offsite locations as shown on the plan.

      Construction generally will run from 7AM to 3:30 PM, Monday to Friday during

    Phase 1 construction of the South Addition.

      Construction generally will run from 8AM to 4:30 PM, Monday to Friday during

    the Phase 2 construction of the North Addition.

      Chandler House will be used for construction offices.

     

    Deliveries to the site will be routed primarily down Stetson Court to a new accessdrive adjacent to the Health Center that will connect Stetson Drive to the Walden

    Street, which, with approval from the Board of Selectmen, will return to two-way

    traffic.

      While occasional construction traffic may travel via Walden and Latham Street,

    traffic will diverted from Spring Street (north of Walden), the Knolls, and Hoxsey

    Street.

      The Town Manager has convened a working group to pursue a permanent

    extension of Walden Street to South Street. The college is an active participant in

    these conversations and will support the Town’s efforts with this project. If this

    road is constructed before the completion of this project, construction traffic may

     be re-routed from Stetson Court to South Street.

    (As Phase 2 approaches, the college will submit a Phase 2 logistics plan from review and

    approval.)

    Section 70-5.2.A. (2) Access

     Not applicable per scoping letter.

    Sections 70-5.2.B. Water supply & C. Sewage disposal.

    The project will continue to use public water and sewer, with no anticipated

    adverse impacts.

    Section 70-5.3 Environmental Protection Requirements

    Section 70-5.3.A Water Quality

  • 8/20/2019 Williams College Science Quad Proposal

    12/509

     

    9

    The science center will continue to be served by Williamstown’s public water

    supply, which is adequate.

    (1) On-site sewage disposal systems.

     Not applicable.

    (2) Drainage facilities.

    The proposed improvements include the installation of stormwater treatment

    devices for the removal of suspended solids and protection of water quality.

    Treatment devices will include: catch basins with deep sediment sumps and oil

    and gas traps to maintain the quality of surface and ground waters.

    Section 70-5.3.B Stormwater Management

    As demonstrated by the stormwater management report included as Exhibit C this

     project complies with all applicable stormwater management standards and Best

    Management Practices.

    The project includes a stormwater management system that has been designed in

    compliance with the MassDEP Stormwater Management Standards. Best

    Management Practices (BMPs) will be used to mitigate potential changes in peak

    runoff rate, runoff volume, and provide water quality treatment.

    Two stormwater detention systems, one for the South Addition and one for the

     North Addition, will mitigate the increase in impervious area and maintain peakrunoff rates below pre-development levels. Both systems have been designed to

     provide groundwater recharge by providing dead storage below the outlet pipe

    that meets the required recharge volume.

    The South Addition includes two rainwater harvesting tanks totaling 20,000

    gallons of storage. These tanks collect roof runoff from the South Addition and

    the Unified Science Center and reuse this water for mechanical equipment

    makeup water in the Unified Science Center. The North Addition includes one

    10,000 gallon rainwater harvesting tank. This tank collects roof runoff from the

     North Addition and reuses this water inside the building for flush fixtures. These

    rainwater harvesting tanks and reuse systems help to mitigate the increase inimpervious area and maintain runoff volumes below pre-development levels.

    Through the implementation of the two underground detention systems and three

    rainwater harvesting tanks, the proposed stormwater management system will

    reduce the post-development peak runoff rates and runoff volumes to below pre-

    development levels for Design Points 1 (Hoxsey Street municipal drainage

    system) and 2 (Walden Street municipal drainage system). Tables 1 and 2

  • 8/20/2019 Williams College Science Quad Proposal

    13/509

     

    10

    summarize the pre- and post-development peak runoff rates and runoff volumes

    for both design points.

    Table 1 – Peak Runoff Rates (in cfs) at Design Points

    Storm Event2-year 10-year 25-year 100-year

    DP1 – Hoxsey Street 

    Existing 2.68 4.74 5.96 7.64

    Proposed 2.55 4.56 5.75 7.29

    Change -0.13 -0.18 -0.21 -0.35

    DP2 – Walden Street 

    Existing 6.26 10.91 13.61 17.34

    Proposed 5.95 10.42 13.13 16.66

    Change -0.31 -0.49 -0.48 -0.68

    Table 2 – Runoff Volumes (in acre-feet) at Design Points

    Storm Event

    2-year 10-year 25-year 100-year

    DP1 – Hoxsey Street 

    Existing 0.201 0.354 0.445 0.574

    Proposed 0.185 0.343 0.437 0.568

    Change -0.016 -0.011 -0.008 -0.006

    DP2 – Walden Street 

    Existing 0.462 0.807 1.012 1.298

    Proposed 0.421 0.769 0.975 1.263Change -0.041 -0.038 -0.037 -0.035

    During construction the contractor will provide adequate stormwater controls and

    erosion control to prevent erosion on site and sediment from leaving the site. The

    minimum erosion control systems are indicated on the Erosion Control plan

    including a sedimentation basin near Walden Street that will also mitigate and

    slow the rate of runoff leaving the site during construction prior to the proposed

    stormwater management system being completed and functioning. The

    stormwater controls shall be adjusted as construction progresses and additional

    stormwater controls shall be added as needed.

    In addition, the college and the town’s departments of community development

    and public works are working together in a broader review of stormwater

    management throughout the watershed bounded by South Street, Main Street,

    Spring Street, and Christmas Book. This review will help ensure that the

    college’s projects within the watershed will handle stormwater in a compatible

    manner and will help improve stormwater and lessen flooding conditions.

  • 8/20/2019 Williams College Science Quad Proposal

    14/509

     

    11

    Section 70-5.3.C Erosion Control

    Since the project will disturb more than one acre of land, the contractor will file a

    notice of intent with the U.S. EPA and the project will be subject to coverage

    under the National Pollution Discharge Elimination System and the its

    Construction General Permit. Accordingly the contractors and engineers willneed to prepare and submit a stormwater pollution prevention plan (SWPP) and

    implement its protective measures, including erosion control barriers (i.e. silt

    fence, straw wattles, straw bales, and crushed stone), inlet protection at catch

     basins, stabilized construction entrance, sedimentation basin(s), surface and slope

    stabilization (erosion control blanket, mulch, seeding, etc.)

    (1) Stabilizing.

    All earth exposed from the project construction will be stabilized where not

    covered by vegetation or paved areas. Proposed vegetated areas will be topsoiled,

    seeded and mulched.

    (2) Erosion control plan.

    An erosion control plan is incorporated into the separately bound permitting plan

    set. During construction, erosion control barriers will be installed at the limit of

    work as defined on the plan.

    (3) Requirements.

    Wherever possible, existing trees and vegetation will remain. Any topsoil

    stripped for reuse shall be stockpiled with siltation fencing at the toe of the piles.

    Temporary vegetation (erosion control seed mixes), erosion control blankets,wood chips, crushed stone , diversion swales or sediment basins shall be used

    where soils will be exposed for more than 14 days and further construction

    activity is not planned in the near future unless the area is used for a staging area.

    All areas disturbed due to project construction will be seeded and loamed as

    noted on the design plans once construction activities are complete. 

    (4) Impervious Coverage.

    Impervious coverage calculations have been made for each phase of the project.

    For the south building extension, the “limit of work”area as shown on the plans isapproximately 3.30 acres (or 143,530 square feet). The proposed impervious area

    within this limit of work is approximately 1.90 acres, for an impervious coverage

    of 62% of the total limit of work. The average site slope (of landscape areas,

    excluding retaining walls) is less than 8 percent grade, giving a maximum

    allowable impervious coverage of 80 percent.

  • 8/20/2019 Williams College Science Quad Proposal

    15/509

     

    12

    For the north building extension, the “limit of work” is 1.5 acres (or 143,530

    square feet)The impervious area within the limit of work is approximately 0.8

    acres, for an impervious coverage of 62% of the total limit of work. The average

    site slope (of landscaped areas, excluding retaining walls) is less than 7 percent,

    giving a maximum allowable impervious coverage of 80 percent.

    Table 3 – Summary of Existing and Proposed Site Areas

    Land UseExisting

    (Acres)

    Proposed

    (Acres)

    Change

    (Acres)

    North Building Site

    Buildings 0.43 0.40 -0.03

    Pavement

    (Roads, parking, walkways, plazas)0.37 0.50 +0.13

    Landscape Areas 0.70 0.60 -0.10

    Total 1.50 1.50 -

    South Building Site

    Buildings 0.75 0.96 +0.21

    Pavement

    (Roads, parking, walkways, plazas)1.15 1.10 -0.05

    Landscape Areas 1.40 1.24 -0.16

    Total 3.30 3.30 -

    (5) Erosion Control Report.

    We have submitted the enclosed control plan, which adequately protects against

    the potential for erosion related to this project.

    Section 70-5.3.D Air Quality

    This project is not a major new stationary source of air pollution as defined by the

    EPA, nor is the project required to apply to DEP under the Clean Air Act. The project does not represent any new uses or processes that are not currently present

    at the site.

    Section 70-5.3.E Odors

    This project will not cause any emission of odors detectable beyond the boundary

    of the site. There are no new uses or processes that would result in odors.

  • 8/20/2019 Williams College Science Quad Proposal

    16/509

     

    13

    Section 70-5.3.F Plants and Animals

    The project will have no significant impact on wildlife habitats or corridors, or to

    any plant species listed as endangered, threatened, or of special concern.

    Damage to existing trees has been avoided to the greatest extent possible, but theremoval of trees along Hoxsey Street, including one greater than 24 inches in

    diameter, is necessary and unavoidable to allow the installation of new utilities.

    Williams College will use its best efforts to compensate for the tree removal

    though attractive, inviting landscaping along Hoxsey Street that will replace the

    lost trees with healthier, more site-appropriate specimens.

    Section 70-5.3.G Hazardous Materials

    There is no hazardous material manufacturing as part of the project. There will

    also be no storing of flammables in quantities exceeding four times that required

    for licensing under 527 CMR 14. No use that requires licensing under 310 CMR30.800 is part of this project.

    Section 70-5.4 Other Design Requirements

    Section 70-5.4.A Site Design

    (1) Visibility reduced.

    Under the proposed designs the parking spaces are located more than 15 feet from

    Hoxsey and Walden Streets, none are located within a required side yard, and less

    than one-third are located within the required 30-foot front yard.

    (2) Vegetation.

    As the site plans show, at least 50% of all required front yards will remain

    vegetated.

    (3) Building orientations.

    The extensions of the building will be perpendicular or parallel to the nearest

    town streets.

    (4) Existing grade.

    The loading dock and a retaining wall require a small area with more than six feet

    of cut. Williams College requests special permit relief from this developmentstandard, which requires that the existing grade be changed minimally, and

     proposed final grades will not vary from existing grade by six feet.

    (5) Site circulation.

    The primary access to the site will be pedestrian, through the existing campus

    sidewalks. In addition the existing Morley Drive from Walden Street will remain

    in place to provide access for pick ups and drop offs and to nearby parking

  • 8/20/2019 Williams College Science Quad Proposal

    17/509

     

    14

    spaces. Two spaces will be removed near Miller House, but the project will

    create a new 22-space parking area along the improved the loading dock access

    drive from Walden Street. A failing retaining wall in this location will be

    replaced.

    The existing access drive and small parking area on Hoxsey Street has beenretained and improved. The loading dock in that location will be removed and the

    number of parking spaces will be reduced from 6 to 5.

    Overall the project will create 19 new spaces.

    The site circulation plans will be reviewed with the Fire Chief to assure safe and

    adequate access for emergency vehicles.

    (6) Pedestrian access.

    The proposed building extensions will be well-served by the existing campus

    sidewalk system and the new side walk connections to Walden and HoxseyStreets.

    (7) Visibility minimized.

     Not applicable this project is not located within the Rural Residence zoning

    district.

    Section 70-5.4.B Landscaping requirements

    (1) Applicability.

    The college’s proposed project creates a new 22-space parking lot near Walden

    Street to help provide additional parking capacity in the area and will more thanmake up for the informal parking that has occurred as a matter of practice along

    the current access drive to the loading dock.

    (2) Plants.

    Except where relief is explicitly requested and granted, the college will plant the

    required number of trees and shrubs within the required planting areas.

    (3) Planting areas.

    (a) Street planting area; (b) Side-line planting area. Because this

     property abuts Route 7 (Main Street), a state-numbered highway, therequirements for street planting areas and side-line planting areas apply.

    However, given the landscaping of the town green and the way it relates to the

    landscaping of the college campus, technical compliance with these requirements

    will not yield attractive results. Accordingly, as an alternative measure of

    compliance, the college proposes that implement the landscaping plans as

    submitted, and provide sufficient funds for the town to plant or replace 4 trees of

    its choosing at locations it selects within the town green.

  • 8/20/2019 Williams College Science Quad Proposal

    18/509

     

    15

    (c) Parking area interior plantings. Not applicable.

    (d) District boundary planting area. Not applicable. 

    (e) Trail buffers.  Not applicable.

    (f) Screening. The proposed landscape plans provide the require

    screening.

    (4) Existing vegetation.

    The existing vegetation will be preserved wherever feasible

    (5) Exceptions.

     Not applicable.

    (6) Maintenance.All plant materials will be maintained in a healthful condition. Dead plantings

    will be replaced during the next planting season.

    Section 70-5.4.C Agricultural Protection

     Not applicable.

    Section 70-5.4.D Lighting

    As shown in the attached lighting plan, the college will comply with the required

    lighting limits.

    Section 70-5.4.E Noise

    The College will comply with the noise regulations set forth in Bylaw Section 70-

    5.4.E.

    Section 70-5.4.F Vibration

    Except for construction activities associated with construction, there will not be

    any sources of vibration associated with the project.

    Section 70-5.4.G Electrical Disturbances

    There will be no electrical disturbances adversely effecting off-site equipment

    associated with the completed project.

    Section 70-5.4.H Historical and Archaeological Sites

  • 8/20/2019 Williams College Science Quad Proposal

    19/509

     

    16

    The project is not located on a site recorded on the Massachusetts Register of

    Historic Places. The project is also not considered a “major development.” The

    College has complied with Williamstown’s Demolition Delay Bylaw prior to

    relocation and preservation of Miller House and the demolition of Siskind House.

    Section 70-5.4.I Solid Waste

    Construction debris and demolition waste will be disposed of at a site assigned

    solid waste facility by a commercial hauler. These arrangements will be made

    directly by the contractor with oversight by the College. The exact location will

     be submitted to the Building Inspector at the time of construction with the

     building permit application. The completed facility will have secured trash

    receptacles and the college will manage recycling and trash removal in

    accordance with its standard practices and standards.

    Section 70-6.1 Off-street parking and loading.

    Section 70-6.1(B) Number of Spaces. 

    The college will seek a determination from the Planning Board that the net

    addition of 19 new spaces as part of this project will provide sufficient off-street

     parking. This renewal project will modernize and expand academic facilities, but

    will not generate increased demand for parking. While there is no increase in

     parking expected for the project, the project creates 19 new spaces to respond to

    the perceived need for additional parking in the Spring Street neighborhood.

    Section 70-6.1(C) -- Compliance with Development Standards for Off-Street

    Parking

    As described below, this project will comply with the development standards for

    off-street parking spaces:

    (1) Space equivalents. The parking areas will provide the required 300 square

    feet of standing and maneuvering area.

    (2) Location. The new and reconfigured parking spaces are provided in two

    areas on the same lot as the project with access directly from Hoxsey Street, and

    from Walden Street. None of the parking spaces are located within 15 feet of any

    street right of way.

    (3) Access.  All parking spaces are provided with unobstructed access to and

    from a town street and will be properly maintained. The parking areas are

    designed so that vehicles will not be required nor permitted to back into a public

    way. The proposed Hoxsey Street driveway is 20 feet wide and the Walden Street

    driveway is 24 feet wide. Non-mountable curbs define both driveways, and their

    existing entrance centerlines are appropriately spaced.

  • 8/20/2019 Williams College Science Quad Proposal

    20/509

     

    17

    (4) Surfacing. All parking areas will be surfaced with at least 3 and one-half

    inches of bituminous concrete over compact subgrade.

    (5) Drainage. As described in the enclosed drainage plan which is included in

    the separately bound permitting Plan set, stormwater runoff in the proposed parking areas will be collected in catch basins with deep sumps, routed through

    water quality inlets and conveyed through properly sized pipes to municipal

    drainage systems, this system complies with stormwater management standards.

    (6) Lighting.  The parking areas will be lit in accordance with William & Mary

     pole mounted fixtures, which are Type 2 lights as defined in Section 70-5.4.D(1)

    of the Bylaw. These parking area lights will be mounted at 12 feet above finished

    grade.

    The proposed pedestrian walkways through the site will be lit with a combination

    of William & Mary pole fixtures and Type 3 bollard lights. The bollard lightswill be mounted at less than 3 feet above finished grade.

    These light fixtures are consistent with College standards and bylaw overspill

    requirements. They will comply with overspill limits while ensuring pedestrian

    safety. See Plan L-1, Proposed Site Lighting Analysis.

    Construction phase parking: Parking during the construction phase will be

     provided entirely off-street, in the locations described at the logistics plan.

    Construction contracts will require contractors to park in these off-street locations

    rather than in public parking areas. Shuttles will be provided between the remote

    construction parking areas and the project site.

    VIII. Conclusion.

    For the reasons described above, Williams College respectfully requests that the

    Williamstown Zoning Board of Appeals:

    (1) determine that it would be unreasonable, in violation of M.G.L., c. 40A, § 3,

    to apply the building height limit under Bylaw § 70-4.1 to this project, and grant

    Williams College permission to build the proposed North and South Additions;

    (2) determine that it would be unreasonable, in violation of M.G.L., c. 40A, § 3,to apply the building coverage limits under Bylaw § 70-4.3 to this project, and

    grant Williams College permission to build the proposed North and South

    Additions;

    (3) grant a special permit under § 70-1.4.(c) to allow the extension of a non-

    conforming building, finding that it will not be substantially more detrimental to

    the neighborhood than the existing structure;

  • 8/20/2019 Williams College Science Quad Proposal

    21/509

     

    18

    (4) grant a special permit under § 70-5.1.B to allow a small area of cut in excess

    of six feet related to the relocation of a retaining wall and loading dock.

    (5) conduct the development plan review and approve of the development plans;

    and

    (6) grant such other relief as the ZBA may determine is warranted.

  • 8/20/2019 Williams College Science Quad Proposal

    22/509

     

    19

    Exhibit A

  • 8/20/2019 Williams College Science Quad Proposal

    23/509

     

     Andrew Groff

    Director / Planner

    Phone/Fax: 413-458-9344 

    Town of Williamstown

    Community Development Department 31 North Street 

    Williamstown, Massachusetts 01267  

    Friday, August 14, 2015

    PROJECT: Unified Science Center, North and South Additions

    LOCATION: Williams Science Quad (bounded by: Main, Spring, Hoxsey, and Walden Streets)

    OWNER: Williams College

    ZONING DISTRICT: General Residence

    PRESENT: Andrew Groff, Jamie Art, Jason Miner, Rita Coppola Wallace, Project Design Team Representatives

    Scope of Work

    Based upon discussion and plans provided at the scoping session held on Tuesday July 28, 2015 it is the Community

    Development Department’s understanding that this proposed project will involve a major reconfiguration of the WilliamsCollege science complex. The following changes have been proposed;

    •  Two additions to the existing Morley Science Center are proposed.

    •  The south addition will sit atop the current location of Miller House and Siskind House. Miller House will be

    moved to South Street, Siskind House will be demolished.

    •  The new south addition will be constructed first in 2016 – 2018 and with a footprint of 18,000 s.f. and a height

    from average grade of 76 feet.

    •  The south addition will be constructed in place of the existing 1968 Bronfman Hall.

    •  Bronfman will be demolished in summer 2018.

    •  The north addition will be constructed in 2018 – 2020 and with a footprint of just under 18,000 s.f. and a height

    from average grade of 58 feet.

    Permitting ducational Uses

    The Zoning Enabling Act (MGL Ch. 40A) in Section 3 specifically states that no ordinance or bylaw shall: “prohibit,

    regulate or restrict the use of land for educational purposes…or by a religious sect…or by a nonprofit educational

    corporation; provided that such land or structures may be subject to reasonable regulations concerning the bulk and

    height of structures and determining lot sizes and setbacks, open space, parking and building coverage.” It is our office’s

    determination that the buildings proposed by Williams College constitute an educational use as Williams College, a not

    for profit educational corporation, is the owner and operator of the proposed facilities. Additionally, the proposed

    facilities are an integral piece of the education mission of the institution. These facts make the use of the land a by right

    use under local zoning and Ch. 40A MGL.

    Guidance on the extent to which the educational use exemption applies is found in case law. In The Bible Speaks v. Board

    of Appeals of Lenox (8 Mass Ap. Ct. 19) the court determined that; “The Legislature did not intend to impose special

    permit requirements designed under Massachusetts General Law Ch40A §9 … on legitimate educational uses.” The court

    also determined that the portions of Lenox’s bylaw concerning reasonable bulk, dimensional, and height requirements

    were valid and that an educational institution is subject to reasonable regulation as long as it does not nullify the

    educational use exemption.

    MGL Ch40A section 9 states that; “Zoning ordinances or by-laws shall provide for specific types of uses which shall only

    be permitted in specified districts upon the issuance of a special permit. Special permits may be issued only for uses

    which are in harmony with the general purpose and intent of the ordinance or by-law, and shall be subject to general or

    specific provisions set forth therein; and such permits may also impose conditions, safeguards and limitations on time or

    use.” The Bible Speaks case only instructs that local boards may not require use special permits, as defined by MGL

  • 8/20/2019 Williams College Science Quad Proposal

    24/509

      Williams College Science Quad Scoping Letter 2

    Ch.40A §9 for any educational use. Case law is silent on the relationship between educational uses and special permits

    for extension of non-conforming structures per MGL Ch.40A §6 as well as locally authorized special the permits intended

    to grant relief from specified development standards.

    Two other major cases further refined the legal test for determining how to apply “reasonable regulations”; Trustees of

    Tufts College vs. City of Medford (415 MA753) and Campbell v. City of Lynn (415 MA772). In the Tufts and Campbell

    cases, the court found that this power was not absolute. If the strict application of dimensional and parking standards

    resulted in the nullification of the educational use, the requirement may not be enforced. This would be determined bythe Board of Appeals as an administrative appeal from the Planning Administrator’s determination. The applicant carries

    the burden of demonstrating that there is a “practical prohibition” of the educational use due to the enforcement of the

    regulation in question.

    The Williamstown Zoning Bylaw specifically authorizes in Ch.70 §5, special permits, which can be used to obtain relief

    from the development standards of §5. Additionally the Bylaw authorizes special permits for extensions of non-

    conforming structures as authorized in MGL Ch.40A §6. These types of special permits are not use special permits as

    defined by MGL Ch.40A §9. They are special permits specifically authorized by the Williamstown Zoning Bylaw for relief

    from development or dimensional standards and therefore the ruling in Bible Speaks does not apply. If a development

    standard does not constitute a “practical prohibition” of the educational use as described by Tufts and Campbell, relief

    from development standards may be sought through the §5 Special Permit, or a Special Permit to extend a non-

    conforming structure.

    Permits Required and Required Submittals

    Conservation Commission

    •  The site is not located in an area subject to jurisdiction by the Conservation Commission, a filing with the

    Commission is not required. Please note there are extensive wetlands nearby and the project site is located in a

    sensitive watershed area. The project would become jurisdictional to the Commission if nearby jurisdictional

    area is negatively impacted by the project construction process.

    Historical Commission

    •  Historical Commission review for the demolition of Siskind House and the moving of Miller House was

    completed in mid-2015.

    Public Works Department Approvals

    •  The project will require the following permits from the Department of Public Works; sewer connection and

    water connection permits. It is the Community Development Department’s understanding that the Science

    Quad project is not the only project within the immediate Spring Street area proposed over the next several

    years. Due to the proximity of these projects to one another there is potential for serious impacts to the

    neighborhood’s public utility system. Advanced planning and coordination with the Public Works Department on

    this project and the remaining Spring Street area projects is necessary. Public Works Director Tim Kaiser should

    be engaged on this issue at the applicant’s earliest convenience.

    Planning Board Approvals

    • 

    Parking Determination: In keeping with a long standing interpretation of the Williamstown Zoning Bylaw, ouroffice finds that use (a not for profit educational use) is unlisted by section 6 of the Zoning Bylaw and will require

    a parking determination. This submittal shall include a narrative which details the parking needs of the site

    including a proposed number of permanent parking spaces.

    Zoning Board Approvals

    SpecialPermit

    •  The Zoning Board of Appeals found in its granting of Special Permit 1996-34 that the existing Thompson Biology

    Building is setback from the westerly property bound by 12 foot 4 inches. This section of the building does not

    comply with the 15 foot yard requirement. The building legally preexisted this zoning requirement and is

    therefore a legally preexisting non-conforming building. An extension of the building will have to receive a

  • 8/20/2019 Williams College Science Quad Proposal

    25/509

      Williams College Science Quad Scoping Letter 3

    special permit from the Zoning Board of Appeals that finds that such extension is not more detrimental to the

    neighborhood than the existing structure.

    •  Additional Special Permits might be necessary to seek relief or compliance alternatives from Development

    Standards if such relief is preferable but does not constitute a practical prohibition of an educational use.

    Tufts-CampbellFindings(AdministrativeAppeal)

    There are several conditions shown on the proposed plans which do not comply with the applicable requirements of the

    Bylaw, these include, but are not limited to the following:

    •  The height of the proposed north addition (76 feet), the height of the proposed south addition (58 feet),

    building coverage on site is limited to 20% of lot area. At present 30.8% of the lot is covered by buildings.

    It is our determination that these aspects of the project are not permitted. Therefore relief from these dimensional

    standards must be sought through the Tufts Campbell finding process. The applicant must appeal this decision that these

    standards apply to the project. Case law requires the application to show the Board that the imposition of the standards

    in the bylaw constitute a practical prohibition of the property’s educational use.

    The Zoning Board of Appeals will require the following information for the Special Permit and Appeal hearing.

    •  The submission shall require a completed Application for a Hearing before the Zoning Board of Appeals, and all

    plans and narrative as required for a Development Plan Review (detailed below) by the Board.

    •  The Appeal requires narrative detailing how enforcement of a particular development standard would result in a

    practical prohibition of the proposed educational use.

    •  The Special Permit requires narrative detailing how the project will meet the standard of not more detrimental

    to the neighborhood.

    DevelopmentPlanReview

    Development Plan Review will be required for this project as it involved construction of new nonresidential structures in

    excess of 2,500 square feet, clearance of more than 20,000 square feet of vegetative ground cover, and substantial

    alterations to parking areas for more than 10 vehicles.

    The following submittals are required by the Zoning Board of Appeals in addition to a completed Application for a

    Hearing.

    The standard Development Plan Review documentation shall be submitted with the application.

    •  A locus plan as defined by §70-8.2.C

    •  A site plan as defined by §70-8.2.C

    •  Building Plans defined by §70-8.2.C

    •  Documentation defined by §70-8.2.C

    The Development is not a Major Development, as defined by the bylaw. The additional submittals required for major

    developments in §70-5 are not applicable. In accordance with §70-8.2 the site plan required for development plan

    review must be prepared by a registered architect, landscape architect, professional engineer or other approved design

    professional.

    The following required submittals correspond to Section 5 of the Williamstown Zoning Bylaw, Development Standards, as

    well as Section 6 Parking Standards. Evidence of compliance with these standards should be prepared by the project

    design team and must be presented to the Zoning Board of Appeals for Development Plan Review.

    •  5.2: ServiceRequirements 

    o  5.2.A(1) Access: Special Permit 1996-34 details specific requirements for deliveries and for construction

    related traffic. These conditions must be addressed as part of this permitting process as traffic patterns

    in this area have changed.

    o  5.2.A(2) Traffic Study: Not applicable, the project is not a major development.

  • 8/20/2019 Williams College Science Quad Proposal

    26/509

      Williams College Science Quad Scoping Letter 4

      As previously noted, there are several different Spring Street area projects proposed over the

    next several years. While one particular project may not have traffic impacts, all projects

    together could. Future projects could also require a full study if considered major

    developments. It is our office’s recommendation that, while not a requirement, the applicant

    consider addressing traffic as an issue at this stage. Active communication with the Zoning

    Board on this topic could provide for a more straightforward permitting process for future

    projects. Further consultation with Community Development Department staff is encouraged

    on this issue.o  5.2.B(1-2) Water Supply&5.2.C(1-2) Wastewater Disposal: See previous note on Public Works

    Department permits.

    •  5.3: EnvironmentalStandards :

    o  5.3.A(1) Not applicable

    o  5.3.A(2) Oil and Gas Traps in Drainage: Demonstrate compliance

    o  5.3.B Storm Water Management: Demonstrate Compliance

      The project will require a complete stormwater plan in compliance with this section to be

    reviewed by the Zoning Board of Appeals. The plan will be evaluated using the most recent

    Massachusetts Stormwater Management Policy. The use of low impact development

    techniques are highly encouraged. Special attention should be paid to the downstream

    implications of new stormwater runoff as the entire watershed area does drain into the

    undersized Christmas Brook culvert.

    o  5.3.C(1) Stabilization of Exposed Earth: Demonstrate compliance

    o  5.3.C(2) An erosion control plan is required. Submission of the Stormwater Pollution Prevention Plan

    being prepared to meet EPA requirements will be sufficient to meet this bylaw requirement.

    o  5.3.C(3) Construction Requirements: Demonstrate compliance

    o  5.3.C(4) Impervious Coverage Restrictions: Demonstrate compliance

    o  5.3.C(5) Expert erosion report: An independently prepared erosion control plan may be required at the

    discretion of the Zoning Board.

    o  5.3.D: Air Quality: Demonstrate compliance

    o  5.3.E: Odor: Demonstrate compliance

    o  5.3.F: Plants & Animals: The project is not in an area subject to the Natural Heritage Program. Any tree

    over 24”dbh to be removed will require a finding from the Board that removal of the tree is

    unavoidable.

    o  5.3.G: Hazardous Materials: Demonstrate compliance

    •  5.4: DesignRequirements 

    o  5.4.A Site Design: The Zoning Board may grant a Special Permit for exemptions for these requirements if

    necessary.

      5.4.A(1)Visibility Reduced: Demonstrate Compliance.

      5.4.A(2)Vegetation: Demonstrate Compliance

      5.4.A(3)Building Orientation: Project Complies.

      5.4.A(4) Existing Grade: Existing grade may be changed by no more than 6 feet. A Special

    Permit is necessary for any change over 6 feet.

     

    5.4.A(5): Site Circulation: Demonstrate Compliance.

      5.4.A(6): Pedestrian Access: Demonstrate Compliance.

      5.4.A(7): Not applicable

    o  5.4.B Landscaping: Demonstrate compliance. The Zoning Board may authorize alternatives for

    landscaping requirements in the course of performing the Development Plan Review. Please note state

    highway plantings are required for the proposed north addition.

    o  5.4.C Agriculture: Not applicable

    o  5.4.D Lighting: Demonstrate compliance: Please submit a lighting plan.

    o  5.4.E Noise Standards: Demonstrate compliance

    o  5.4.F Vibration Standards: Demonstrate compliance

  • 8/20/2019 Williams College Science Quad Proposal

    27/509

      Williams College Science Quad Scoping Letter 5

    o  5.4.G Electrical Disturbances: Demonstrate compliance

    o  5.4.H Impact on Historical Sites: Demonstrate compliance.

    o  5.4.I Solid Waste Disposal: Demonstrate compliance

    •  6.1: ParkingRequirements 

    o  6.1.B Number of Spaces: The development will have to provide off street parking spaces as required by

    the Planning Board which will undertake a parking determination prior to the Zoning Board of Appeals

    hearing.o  6.1.C Parking Development Standards: Demonstrate compliance with access, drainage, surfacing, and

    lighting requirements for any proposed parking lot modifications. Please provide information regarding

    access and construction worker parking during the construction period.

    Project Phasing

    It is our office’s understanding that the project will be completed over a five year period, ending in 2020. A project of this

    length will require phasing of permitting. In keeping with the process used for other large scale projects the Zoning Board

    will discuss the overall project concept upon initial application. The first phase of the project is the South Addition. The

    initial permit application shall include full documentation for this first phase. Additionally a phasing plan shall be

    submitted detailing which site elements are specific to each phase. This plan will permit the Building Commissioner’s

    Office to clearly demarcate land use elements that are tied to each phase’s Certificate of Occupancy. Please highlight any

    proposed phases with incomplete design or site plan elements. In the event that the initial permits are approved with

    incomplete elements for future phases the applicant shall return to the Zoning Board for final approval of each additional

    phase.

    If you have any questions, or if I can be of further assistance, please feel free to contact us.

    Sincerely,

    Andrew Groff

    Director / Planner

  • 8/20/2019 Williams College Science Quad Proposal

    28/509

     

    20

    Exhibit B (Separately Bound)

  • 8/20/2019 Williams College Science Quad Proposal

    29/509

     

    21

    Exhibit C (Separately Bound)

  • 8/20/2019 Williams College Science Quad Proposal

    30/509

     

    22

    Exhibit D

  • 8/20/2019 Williams College Science Quad Proposal

    31/509

    Construction Fence with Scrimand Erosion Controls

    Storage and Laydown

    Structures to be Demolished or Relocated off-site

    Corners to be Kept Back and Stabilizedto Allow Trucks to Make Turns

    (Lamp Post to be Removed or Relocated)

    Primary Trucking and Delivery Route

    Main Construction Gate

    Loading Dock toRemain Accessible

        M   o   r    l   e

       y     D

       r .

       G  r  a  c  e   C   t .

       H  o  x  s  e  y   S   t .

       S   t  e   t  s  o  n   C   t .

    WILLIAMS COLLEGE SCIENCE CENTER RENESOUTH BUILDING SITE LOGISTICS - ACCESS AND PR

  • 8/20/2019 Williams College Science Quad Proposal

    32/509

    Barns on Den  - Material La  - Foreman P

    Parking Garage Off North St.

     Abandoned Structure L

    - Parking Only

    - Parking- Storage of Early Lon

    PROJECT SITE

    Mohawk Trail 2

    Mission Park Lot on Lynde Ln.- Parking Only

    WILLIAMS COLLEGE SCIENCE CENTER RENESOUTH BUILDING LOGISTICS - OFF SITE PARKING A

  • 8/20/2019 Williams College Science Quad Proposal

    33/509

     

    23

    Exhibit E

  • 8/20/2019 Williams College Science Quad Proposal

    34/509

     S O U T H  B U I L D I N G  –  E  a

      s  t  s  i  d  e  a  t  M  o  r  l  e  y  C  i  r  c  l  e

     

  • 8/20/2019 Williams College Science Quad Proposal

    35/509

     S O U T H  B U I L D I N G  –  S  o

      u  t  h  w  e  s  t  c  o  r  n  e  r  a  t  W  a  l  d  e

      n  S  t  r  e  e  t

     

  • 8/20/2019 Williams College Science Quad Proposal

    36/509

     N O R T H  B U I L D I N G  –  E  a  s  t  s  i  d  e  a  t  Q  u  a  d

     

  • 8/20/2019 Williams College Science Quad Proposal

    37/509

     N O R T H  B U I L D I N G  –  N  o  r  t  h  w  e  s  t  C  o  r  n  e  r  a  t  H  o  x  s  e  y  S  t  r  e  e  t

     

  • 8/20/2019 Williams College Science Quad Proposal

    38/509

     

    24

    Exhibit F

  • 8/20/2019 Williams College Science Quad Proposal

    39/509

    Williams College | Science Center Renewal

    Parcel No. 98, 93 & 10

    Williams College

    10.8 + .20 + .47 =  11.47 Acres

    499,633.00 sf  

    Current sf Proposed sf  

    Parcel No. 98

    Clark 4,327 Clark 4,327

    West College 763 West College 763

    Morley Science Center 66,674 Morley Science Center 66,674

    Lambert House 2,278 Lambert House 2,278

    Jenness House 2,378 Jenness House 2,378

    Hardy House 2,183 Hardy House 2,183

    Rice 2,891 Rice 2,891

    Jesup 6,609 Jesup 6,609

    Morgan 6,485 Morgan 6,485

    Bronfman 18,594 North Building 17,530

    Miller House 3,362 South Building 17,970

    Siskind House 2,438   ‐ ‐

    Red Barn 1,282   ‐ ‐

    Blue Barn 943   ‐ ‐

    Parcel No. 93

    ABC House 2,438 ABC House 2,438

    Parcel No. 10

    Chandler House 1,538 Chandler House 1,538

    125,183 130,088

    % Building Coverage   25.05% 26.04%

  • 8/20/2019 Williams College Science Quad Proposal

    40/509

  • 8/20/2019 Williams College Science Quad Proposal

    41/509

  • 8/20/2019 Williams College Science Quad Proposal

    42/509

  • 8/20/2019 Williams College Science Quad Proposal

    43/509

  • 8/20/2019 Williams College Science Quad Proposal

    44/509

  • 8/20/2019 Williams College Science Quad Proposal

    45/509

  • 8/20/2019 Williams College Science Quad Proposal

    46/509

  • 8/20/2019 Williams College Science Quad Proposal

    47/509

  • 8/20/2019 Williams College Science Quad Proposal

    48/509

  • 8/20/2019 Williams College Science Quad Proposal

    49/509

  • 8/20/2019 Williams College Science Quad Proposal

    50/509

  • 8/20/2019 Williams College Science Quad Proposal

    51/509

  • 8/20/2019 Williams College Science Quad Proposal

    52/509

  • 8/20/2019 Williams College Science Quad Proposal

    53/509

  • 8/20/2019 Williams College Science Quad Proposal

    54/509

  • 8/20/2019 Williams College Science Quad Proposal

    55/509

  • 8/20/2019 Williams College Science Quad Proposal

    56/509

  • 8/20/2019 Williams College Science Quad Proposal

    57/509

  • 8/20/2019 Williams College Science Quad Proposal

    58/509

  • 8/20/2019 Williams College Science Quad Proposal

    59/509

  • 8/20/2019 Williams College Science Quad Proposal

    60/509

  • 8/20/2019 Williams College Science Quad Proposal

    61/509

  • 8/20/2019 Williams College Science Quad Proposal

    62/509

  • 8/20/2019 Williams College Science Quad Proposal

    63/509

  • 8/20/2019 Williams College Science Quad Proposal

    64/509

  • 8/20/2019 Williams College Science Quad Proposal

    65/509

  • 8/20/2019 Williams College Science Quad Proposal

    66/509

  • 8/20/2019 Williams College Science Quad Proposal

    67/509

  • 8/20/2019 Williams College Science Quad Proposal

    68/509

  • 8/20/2019 Williams College Science Quad Proposal

    69/509

  • 8/20/2019 Williams College Science Quad Proposal

    70/509

  • 8/20/2019 Williams College Science Quad Proposal

    71/509

  • 8/20/2019 Williams College Science Quad Proposal

    72/509

     A3.N.01

    1

     A3.N.02 1

     A3.N.01

    2

    1 2 5 6 7 8

    D

    F

    B

    C

    E

    C.5

    8.71.2 32.5 4 5.5

     A3.N.02

    4.5

     A3.N.02

    6.5

    B.5

    8.1

    730SFCOMPUTERLAB

    470SF

    THINSECTIONROOM

    790SFCOMPUTERLAB

    870SFMAINELECTRICAL

    vending

       2   '  -   2   "

       1   0   '  -   3   "

       1   8   '  -   2   "

       3   '  -   4   "

       2   7   '  -   5   "

       1   0   '  -   0   "

       2   7   '  -   0   "

       2   '  -   2   "

    240SFFIELDSTORAGE

    F.D

    40SFJAN.CL.

    60EM.ELE

    220SFROCK STORAGE

     ACCESSIBLELIFT

    vending

    F.D.

    UP

    UP

    FOOTPRINTOFEXISTINGBRONFMANBUILDINGTOBEDEMOLISHED

    1060SFCLASSROOM

    960SFCLASSROOM

    600SFBUILDINGSTORAGE

    20'-1"1'-0"28'-0"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"20'-8"5'-4"

    3220SF

     AUDITORIUM200SEATS

    70SF Auditorium Prep.

    190SF

     AUDITORIUMSTORAGE

       1   0   0   '  -   6   "

    208'-8 1/2"

    34

      U  P

    U   P  

  • 8/20/2019 Williams College Science Quad Proposal

    73/509

     A3.N.01

    1

     A3.N.02 1

     A3.N.01

    2

    1 2 5 6 7 8

    D

    F

    B

    C

    E

    C.5

    8.71.2 32.5 4 5.5

     A3.N.02

    4.5

     A3.N.02

    6.5

    B.5

    8.1

    820SF

    TEACHINGLABOCEANOGRAP

    980SFCLASSROOM

    940SFCLASSROOM

    500SF

    GROUPDYNAMICSROOM

    100SFPSYCH.STORAGE

    290SFWORK ROOMTeachingLabB1

    320SFWORK ROOMTeachingLabB2

    120SFELECT.CLOSET

    80SFCONTROL ROOM

    70SFCONTROL ROOM

    70SF

    RESTROOM/SHOWER

    40SFRESTROOM

    40SFRESTROOM

    150SFSTAFFOFFICE

    150SFSTAFFOFFICE

    mechanicalshaft

    mechanicalshaft

    100SFMATHSTORAGE

    520SFCOMPUTERLAB

    DN

    50SFRESTROOM

    120SELECT.CL

    LIGHTWELLBELOW LIGHTWELLBELOW

    UP

    90SIT

    30SFJAN.CL.

       1   0   '  -   3   "

       1   8   '  -   2   "

       3   '  -   4   "

       2   7   '  -   5   "

       1   0   '  -   0   "

       2   7   '  -   0   "

       2   '  -   2   "

    1050SFSHELL SPACE

    640SFCLASSROOM

    140SF

    CLASSROOMSTORAGE

    350SFWORK ROOMTeachingLabA1

    40SFTESTROOM

    30SFTESTROOM

    30SFTESTROOM

    40SFTESTROOM

    30SFTESTROOM

    30SFTESTROOM

    30SFTESTROOM

    30SFTESTROOM

    360SFWORK ROOMTeachingLabA2

    30SFTESTROOM

    30SFTESTROOM

    30SFTESTROOM

    40SFTESTROOM

    30SFTESTROOM

    54

    54

    400SFSHELL SPACE

    20'-1"1'-0"28'-0"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"20'-8"5'-4"2'-2"

    214'- 0"

    2920SFCORRIDOR

       1   0   0   '  -   6   "

    34

  • 8/20/2019 Williams College Science Quad Proposal

    74/509

  • 8/20/2019 Williams College Science Quad Proposal

    75/509

     A3.N.01

    1

     A3.N.02 1

     A3.N.01

    2

    1 2 5 6 7 8

    D

    F

    B

    C

    E

    C.5

    8.71.2 32.5 4 5.5

     A3.N.02

    4.5

     A3.N.02

    6.5

    B.5

    8.1

    650SF

    TEACHINGLAB:SEDIMENTOLOGY

    420SF

    PSYCH.SEMINARROOM

    90SFELECT.CLOSET

    100SFCOPYROOM

    180SFSTAFFOFFICE

    180SFSTAFFOFFICE

    180SFFACULTYOFFICE

    180SFFACULTYOFFICE

    180SFFACULTYOFFICE

    180SFFACULTYOFFICE

    190SFFACULTYOFFICE

    190SFFACULTYOFFICE

    190SFFACULTYOFFICE

    180SFFACULTYOFFICE

    120SF

    FLEX/VISITOROFFICE

    30SFJAN.CL.

    40SFRESTROOM

    40SFRESTROOM

    560SF

    GEOSCIENCERESEARCHLAB

    180SFFACULTYOFFICE

    180SF ADMINOFFICE

    110SFKITCHENETTE

    1560SF

    PSYCH.LIBRARY

    50SFRESTROOM

    EquipmentZone

    480SF

    SCIENCECENTERSEMINARROOM

    180SF

    FLEX/VISITOROFFICE

    40SFSTORAGE

    mechanicalshaft360SF

    CLASSROOM

    180SFFACULTYOFFICE

    180SFFACULTYOFFICE

    180SFFACULTYOFFICE

    180SFFACULTYOFFICE

    190SFFACULTYOFFICE

    DN

    mechanicalshaft

    40SFSTORAGE

    90

    ELE70SF

    RESTROOM/SHOWER

    230SFLOUNGE

    930SFENTRY

    1060SFCORRIDOR

    470SFCORRIDOR

    340SF

    CORRIDOR

    UP

    mechanicalshaft

       2   '  -   2   "

       1   0   '  -   3   "

       1   8   '  -   2   "

       3   '  -   4   "

       2   7   '  -   5   "

       1   0   '  -   0   "

       2   7   '  -   0   "

       2   '  -   2   "

       1   0   0   '  -   6   "

    180SFFACULTYOFFICE

    170SFFACULTYOFFICE

    120SFPROJECTROOM

    20'-1"1'-0"28'-0"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"20'-8"5'-4"2'-2"

    214'- 0"

    180SFFACULTYOFFICE

    34

  • 8/20/2019 Williams College Science Quad Proposal

    76/509

         R     O     O     F

     A3.N.01

    1

     A3.N.02 1

     A3.N.01

    2

    1 2 5 6 7 8

    D

    F

    B

    C

    E

    C.5

    8.1.2 32.5 4 5.5

     A3.N.02

    4.5

     A3.N.02

    6.5

    B.5

    8.1

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    210SFFACULTYOFFICE

    210SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    210SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    200SFFACULTYOFFICE

    220SFFACULTYOFFICE

    200SF ADMINOFFICE

    150SFCOPYROOM

    480SF

    MATHSEMINARROOM

    110SFKITCHENETTE

    560SF

    GEOSCIENCERESEARCHLAB

    90SIT

    120SELECT.C

    30SFJAN.CL.

    40SFRESTROOM

    40SFRESTROOM

    70SF

    RESTROOM/SHOWER

    120SFFLEXOFFICE

    50SFRESTROOM

    590SF

    STATS/APPLIEDMATHLAB

    650SF

    TEACHINGLAB:STRUCTURAL

    GEOLOGY

    opentobelow

    mechanicalshaftmechanicalshaft

    40SFSTORAGE

    DN

    930SFENTRY

    360SFCORRIDOR

    260SF

    CORRIDOR

    mechanicalshaft790SFCORRIDOR

       2   '  -   2   "

       1   0   '  -   3   "

       1   8   '  -   2   "

       3   '  -   4   "

       2   7   '  -   5   "

       1   0   '  -   0   "

       2   7   '  -   0   "

       2   '  -   2   "

       1   0   0   '  -   6   "

    210SFFACULTYOFFICE

    200SFFACULTYOFFICE

    2050SF

    MATHLIBRARY

    90SF

    ELECTRICALCLOSET

    80SFPROJECTROOM

    80SFPROJECTROOM

    120SFFLEXOFFICE

    20'-1"1'-0"28'-0"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"20'-8"5'-4"2'-2"

    214'- 0"

    34

  • 8/20/2019 Williams College Science Quad Proposal

    77/509

  • 8/20/2019 Williams College Science Quad Proposal

    78/509

  • 8/20/2019 Williams College Science Quad Proposal

    79/509

    UP

    1

    2

    3

    4

    5

    7

    8

    9

    10

     A B C D E F G H ID.4 E.7

    6

    4.1

    2.9

     A.5 I.5

    4.6

    11

    4.8

     A.1

    11.1

    2.1

    10.2

    9.7

    8.7

    7.7

    6.4

    H.9

     A3.S.02

    1

     A3.S.01

    2

     A3.S.02 2

    21' -6" 21' -6" 10' -9" 21' -6" 21' -6" 21' -6" 10' -9" 21' -6" 21' -6"

    176'- 4"

    110SF

    IT

    60SF

    JAN

    420SF

    MAINELECTRICAL

    ROOM

    1480SF

    MECHANICAL

    460SF

    LOADING

    130SF

    SCIENCECENTER

    STAFFOFFICE

    260SF

    TEM

    260SF

    SEM

    130SF

    FACILITIESSTAFF

    OFFICE

    130SF

    IMAGINGSTAFF

    OFFICE

    60SF

    IMAGINGSUPPOR

     ANDSTORAGE

    110SF

    HIGHSPEED

    IMAGINGCAMERA

    2980SF

    MAIN/WOODSHOP250SF

    MATERIALSSUPPLY

    340SF

    ELECTRICSHOP

    120SF

    WELDINGAREA

    80SF

    PAINTBOOTH

    270SF

    OFFICE/SHOP

    CLASSROOM

    100SF

    WASTESTORAGE

    100SF

    RECYCLING

    80SF

    SPECIALTYEQUIP

    ROOM

    40SF

    BALANCERM

    50SF

    LN2STORAGE

    60SF

    EMER.ELEC

    200SF

    SHOPVESTIBULE

    250SF

    VESTIBULE

    480SF

    CORRIDOR

    370SF

    CORRIDOR

    200SF

    CORRIDOR

    200SF

    PLUMBING

    210SF

    CORRIDOR

    LINEOFBUILDINGABOVE

    CRAWLSPACEBENEATH

    LOADINGDOCKFOR

    ENTRANCEOFSITE

    UTILITIES

    GENERATOR

       6   '  -   0   "

       2   4   '  -   0   "

       1   1   '

      -   0   "

       3   0   '  -   0   "

       1   1   '  -   0   "

       1   0   '  -   6   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       1   0   '  -   6   "

       6   9   '  -   4   "

       4   1   '  -   2   "

  • 8/20/2019 Williams College Science Quad Proposal

    80/509

    UP

    UP

    UP

    1

    2

    3

    4

    5

    7

    8

    9

    10

     A B C D E F G H ID.4 E.7

    6

    4.1

    2.9

     A.5 I.5

    4.6

    11

    4.8

     A.1

    11.1

    2.1

    10.2

    9.7

    8.7

    7.7

    6.4

    H.9

     A3.S.02

    1

     A3.S.01

    2

     A3.S.02 2

    21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6"

    176'- 4"

       6   '  -   0   "

       2   4   '  -   0   "

       1   1   '

      -   0   "

       3   0   '  -   0   "

       1   1   '  -   0   "

       1   0   '  -   6   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       1   0   '  -   6   "

       7   5   '

      -   4   "

       9   5   '  -   0   "

    LINEOFLOADINGDOCKANDBASEMENTBELOW

    58'-7"

    150SF

    ELECTRICAL

    30SF

    JAN

    180SF

    PHYSICSOFFICE

    170SF

    CHEMISTRYOFFICE

    180SF

    PHYSICSOFFICE

    180SF

    PHYSICSOFFICE

    180SF

    PHYSICSOFFICE

    180SF

    PHYSICSOFFICE

    170SF

    PHYSICSOFFICE

    180SF

    PHYSICSOFFICE

    240SF

    MACHINESHOP

    SUPPORT

    590SF

    RESEARCHLAB

    640SF

    RESEARCHLAB 640SF

    RESEARCHLAB640SF

    SCIENCECENTER

    FLEXLAB 300SF

    SCIENCECENTER

    FLEXSUPPORTLAB

    620SF

    SCIENCECENTER

    FLEXLAB

    660SF

    SCIENCECENTER

    FLEXLAB

    600SF

    SCIENCECENTER

    FLEXLAB600SF

    RESEARCHLAB

    300SF

    SUPPORTLAB610SF

    RESEARCHLAB630SF

    RESEARCHLAB

    290SF

    SUPPORTLAB

    330SF

    RESEARCHLAB

    360SF

    RESEARCHLAB

    670SF

    STUDENTSTUDY

    170SF

    STUDENTSTU

    160SF

    STUDENTSTUDY

    130SF

    PROJECTROOM

    230SF

    STUDENTSTUDY

    90SF

    VESTIBULE

    90SF

    VESTIBULE

    30SF

    PUMPROOM

    64' - 3" 53' - 6"

  • 8/20/2019 Williams College Science Quad Proposal

    81/509

    UPDN

    UP

    1

    2

    3

    4

    5

    7

    8

    9

    10

     A B C D E F G H ID.4 E.7

    6

    4.1

    2.9

     A.5 I.5

    4.6

    11

    4.8

     A.1

    11.1

    2.1

    10.2

    10.2

    9.7 9.7

    8.7 8.7

    7.7 7.7

    6.4 6.4

    H.9

     A3.S.02

    1

     A3.S.01

    2

     A3.S.02 2

    58'-7"

       1   '  -   7   "

       6   '  -   0   "

       2   4   '  -   0   "

       1

       1   '  -   0   "

       3   0   '  -   0   "

       1   1   '  -   0   "

       1   0   '  -   6   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       1   0   '  -   6   "

    21' -6" 21' -6" 10' -9" 21' -6" 21' -6" 21' -6" 10' -9" 21' -6" 21' -6"

    176'- 4"

       7

       5   '  -   4   "

       9   5   '  -   0   "

    600SF

    RESEARCHLAB

    670SF

    RESEARCHLAB

    620SF

    RESEARCHLAB310SF

    TISSUECULTURE

    SHAREDLAB

    640SF

    RESEARCHLAB

    600SF

    RESEARCHLAB

    640SF

    RESEARCHLAB

    610SF

    RESEARCHLAB

    70SF

    IT

    150SF

    ELECTRICAL

    30SF

    JAN

    180SF

    CHEMISTRYOFFICE

    170SF

    CHEMISTRYOFFICE

    180SF

    CHEMISTRYOFFICE

    180SF

    CHEMISTRYOFFICE

    180SF

    CHEMISTRYOFFICE

    180SF

    BIOLOGYOFFICE

    180SF

    BIOLOGYOFFICE

    170SF

    BIOLOGYOFFICE

    130SF

    BIOCHEM

    MICROSCOPY

    100SF

    COLDROOM

    90SF

    EQUIPMENTROOM

    210SF

    CHEMISTRYOFFICE

    390SF

    EQUIPMENTROOM

    630SF

    RESEARCHLAB

    600SF

    RESEARCHLAB

    310SF

    EQUIPMENT/

    STORAGE

    CORRIDOR

    310SF

    ORGANICCHEM

    SUPPORTROOM

    300SF

    BIOCHEM

     ANALYTICAL LAB

    170SF

    STUDENTST

    170SF

    STUDENTSTUDY

    100SF

    SCIENCECENTER

    STAFFOFFICE

    90SF

    COPYROOM

    140SF

    PROJECTALCOVE

    150SF

    STUDENTSTUDY

    110SF

    STUDENTSTUDY

    140SF

    KITCHENETTE

    64' -3" 53' -6"

  • 8/20/2019 Williams College Science Quad Proposal

    82/509

    DN

    1

    2

    3

    4

    5

    7

    8

    9

    10

     A B C D E F

    G

    G H I

    D.4

    D.4

    E.7

    E.7

    6

    4.1

    2.9

     A.5 I.5

    4.6

    11

    4.8

     A.1

    11.1

    2.1

    10.2

    9.7

    8.7

    7.7

    6.4

    H.9

     A3.S.02

    1

     A3.S.01

    2

     A3.S.02 2

        6    '  -

        0    "

        2    4    '  -

        0    "

        1    1    '  -

        0    "

        3    0    '  -

        0    "

        1    1    '  -

        0    "

        1    0    '  -

        6    "

        2    1    '  -

        0    "

        2    1    '  -

        0    "

        2    1    '  -

        0    "

        1    0    '  -

        6    "

    21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6"

        7    5    '  -

        4    "

        9    5    '  -

        0    "

    176'-4"

    8 ' - 6"

    480SF

    RESEARCHLAB

    120SF

    FLYSUPPORTLAB

    460SF

    RESEARCHLAB

    660SF

    RESEARCHLAB

    590SF

    RESEARCHLAB

    70SF

    IT

    150SF

    ELECTRICAL

    30SF

    JAN

    180SF

    BIOLOGYOFFICE

    170SF

    BIOLOGYOFFICE

    180SF

    BIOLOGYOFFICE

    180SF

    BIOLOGYOFFICE

    180SF

    BIOLOGYOFFICE

    180SF

    SCIENCECENTER

    OFFICE

    180SF

    SCIENCECENTER

    OFFICE

    170SF

    SCIENCECENTER

    OFFICE

    620SF

    RESEARCHLAB

    640SF

    RESEARCHLAB

    600SF

    RESEARCHLAB

    490SF

    RESEARCHLAB

    120SF

    AUTOCLAVE

    390SF

    EQUIPMENTROOM

    220SF

    BIOLOGYOFFICE

    180SF

    CHEMTEACHING

    SUPPORTLAB

    1290SF

    BIOCHEM

    TEACHINGLAB

    530SF

    BIOLOGYSEMINAR

    180SF

    BIOSUPPORTLAB

    100SF

    SCIENCECENTER

    FLEXOFFICE

    170SF

    STUDENTSTUDY

    160SF

    STUDENTSTUD

    10SF

    EMER.ELEC

    90SF

    PROJECTROOM

    70SF

    FLYWETLAB

    130SF

    PROJECTROOM

    130SF

    PROJECTALCOVE

        9    5    '  -

        0    "

    64' - 3" 58' - 7" 53' - 6"

  • 8/20/2019 Williams College Science Quad Proposal

    83/509

    1

    2

    3

    4

    5

    7

    8

    9

    10

     A B C D E F G H ID.4 E.7

    6

    4.1

    2.9

     A.5 I.5

    4.6

    11

    4.8

     A.1

    11.1

    2.1

    10.2

    9.7

    8.7

    7.7

    6.4

    H.9

     A3.S.02

    1

     A3.S.01

    2

     A3.S.02 2

    4940SF

    MECHANICAL ROOM

    40SF

    ELEVATOR

    CONTROLLER

    ROOMCFMF

       6   '  -   0   "

       2   4   '  -   0   "

       1

       1   '  -   0   "

       3   0   '  -   0   "

       1   1   '  -   0   "

       1   0   '  -   6   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       1   0   '  -   6   "

    21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6"

    DN

       7

       5   '  -   4   "

       8   8   '  -   4   1   /   4   "

       6   '  -   7

       3   /   4   "

       9   5   '  -   0   "

       1   0   '  -   6   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       2   1   '  -   0   "

       1   0   '  -   6   "

       2   '  -   2   "

       2   '  -   4   "

    58'-7"

    77' - 5" 77' -5"

    176'- 4"

    1

    2

    3

    4

    5

     A B C

    6

    4.1

    2.9

     A.5

    4.6

    4.8

     A.1

    2.1

       7   5   '  -   4   "

    SCALE: 1/16"=1'-0"2

    PENTHOUSEROOF

  • 8/20/2019 Williams College Science Quad Proposal

    84/509

  • 8/20/2019 Williams College Science Quad Proposal

    85/509

  • 8/20/2019 Williams College Science Quad Proposal

    86/509

     

    STORMWATER REPORT

    For

    WILLIAMS COLLEGESCIENCE CENTER RENEWAL PROJECT

    Williamstown, Massachusetts

    Prepared for:

    PAYETTE290 Congress Street, 5th Floor

    Boston, MA 02210-1005 

    Prepared by:

    NITSCH ENGINEERING, INC.2 Center Plaza, Suite 430

    Boston, MA 02108-1928

    120 Front Street Suite 820Worcester, MA 01608

    Nitsch Project #10942

    December 18, 2015

  • 8/20/2019 Williams College Science Quad Proposal

    87/509

  • 8/20/2019 Williams College Science Quad Proposal

    88/509

    Williams College Science Center December 18, 2015Nitsch Project #10942 

    TABLE OF CONTENTS

    1.0  INTRODUCTION ............................................................................................................. 1 

    2.0  EXISTING CONDITIONS ................................................................................................. 1 

    2.1  Existing Drainage Infrastructure ....................................................................................... 1 

    2.2  NRSC Soil Designations .................................................................................................. 2 

    2.3  Onsite Soil Explorations ................................................................................................... 2 

    3.0  PROPOSED CONDITIONS ............................................................................................. 3 

    3.1  Project Description ....