WILLIAMS COLLEGEScience Center Renewal Project
Zoning Submission
12.18.2015
8/20/2019 Williams College Science Quad Proposal
2/509
1
TABLE OF CONTENTS
ZBA - Application
Narrative in Support of the Application and Development Plan Review
Exhibit A – Scoping Letter
Exhibit B – Site Permitting Plans
Exhibit C – Stormwater Management Report
Exhibit D – Logistics Plan
Exhibit E – Site Renderings
Exhibit F – Lot Coverage Calculations
8/20/2019 Williams College Science Quad Proposal
3/509
8/20/2019 Williams College Science Quad Proposal
4/509
8/20/2019 Williams College Science Quad Proposal
5/509
2
The President and Trustees of Williams College
Narrative in Support of:
Administrative Appeal to the Zoning Board of Appeals,
Application for Special Permits,
And Development Plan Review related to its
Science Center Renewal Project
The President and Trustees of Williams College (“Williams College” or the
“College”) applies to the Zoning Board of Appeals (“ZBA”) for relief and development
plan review related to its Science Center project.
I. Project Overview.
Williams College proposes to renovate and expand its science center facilities to
create needed labs, workshops, and classrooms, to modernize out-dated facilities, and to
bring them into compliance with modern academic standards. With more than half ofWilliams’ students majoring in a science, and significant numbers of those conducting
research alongside faculty, the college lacks sufficient academic space for the sciences.
Moreover, a significant portion of the existing space is substandard. A facilities condition
assessment not only revealed that the college lacks the space it needs to support scientific
research by faculty and students, it also showed that Bronfman Science Center leaks
significant amounts of heat and is structurally incapable of renovation. This project will
not only solve the need for more academic space, it will also improve the college’s
energy profile: even though the floor area of the science center will increase, energy
consumption will decrease.
This two-phased project will build a center designed for generations of futureWilliams’ students and faculty. In the first phase, a new 77,500 GSF addition (the South
Addition) comprised primarily of workshops, research labs, teaching labs, and offices for
the departments of physics, chemistry, and biology will be constructed south of the
existing Morley Scientific Laboratory building. This will integrate the new spaces
directly with the existing science facilities. To create space for these facilities on the
parcel, Williams moved Miller House, removed Siskind house, will relocate one barn,
and will tear down another.
In the second phase, Bronfman Science Center will be removed and replaced with
similarly sized addition (the North Addition) that will house 99,500 GSF of more flexiblespace, including classrooms, labs, offices, and collaborative spaces for mathematics,
statistics, psychology, and geosciences. On the inside, this modern, more adaptable
space should sustain science education at Williams for the foreseeable future. A multi-
story entry space accessed from both the quad and street levels links the departmental
offices on the upper floors with the classrooms and 200-person auditorium on the lower
levels. From the outside, the North Addition redefines the west end of the Science Quad
and creates a more welcoming threshold to the campus. The historic and attractive Clark
Hall will remain available for another academic use in the future.
8/20/2019 Williams College Science Quad Proposal
6/509
3
The first phase of construction will in the spring of 2016, and the second phase
should finish in 2020.
II. Permitting Overview.
On July 28, 2015, the Community Development Department conducted a scoping
session for this project. The scoping letter is included as Exhibit A with this application.
Williams College submits this narrative in support of its application to the Zoning Board
of Appeals for the following:
1. An administrative appeal from the decision of the Town Planner / Director
of Community Development as set forth in the enclosed Scoping Letter. The
college seeks relief from building height restrictions under the Williamstown
Zoning Bylaw § 70-4.1 and from building coverage limits under Bylaw § 70-4.3.
2. A special permit under Section 70-1.4.(c) of the Williamstown ZoningBylaw (the “Bylaw”) to allow the extension of an existing nonconforming
structure. In one location a portion of the pre-existing Biology building is twelve
feet from the neighboring property, rather than the required fifteen feet.
3. A special permit under Section 5.1.B. for relief from the development
standard for existing grades to allow more than six feet of cut in the area of the
proposed loading dock. And
4. Development Plan Review under § 70-8.2.
The college will also seek a parking determination from the Planning Board. Asdocumented by the scoping letter, this project does not require prior approval from the
Conservation Commission.
III. Appeal From Administrative Decision.
As the scoping letter shows, the Director of the Community Development
Department / Town Planner determined that the proposed North and South Additions
cannot be built in compliance with the zoning bylaw. They require relief from its
building height and coverage limits. As the Scoping Letter explains, the ZBA can grant
this relief administratively under the “Tufts – Campbell” analysis that the Massachusetts
Supreme Judicial Court developed in the cases of Trustees of Tufts College v. Medford ,415 Mass 753, 616 N.E.2d 433 (1993) and Campbell v. City Council of Lynn, 415 Mass.
772, 778; 616 N.E.2d 445, 449 (1993). For the reasons fully described below, Williams
College respectfully requests that the Williamstown Zoning Board of Appeals grant this
relief.
A. Massachusetts Law Prevents Zoning Bylaws from Imposing
Unreasonable Regulations on Educational Uses.
8/20/2019 Williams College Science Quad Proposal
7/509
4
In Massachusetts, educational uses cannot be required to obtain special use
permits, and site development standards cannot be enforced against an educational use if
they would be unreasonable as applied to the project. No zoning ordinance or bylaw
“shall prohibit, regulate or restrict the use of land or structures for . . . educational
purposes on land owned . . . by a nonprofit educational corporation.” M.G.L. c. 40A, § 3.The land or structures put to educational uses, however, “may be subject to reasonable
regulation concerning the bulk and height of structures and determining yard sizes, lot
area, setbacks, open space, parking, and building coverage requirements.” M.G.L. c.
40A, § 3.
Well-settled criteria determine when the application of a facially neutral zoning
regulation is unreasonable under Massachusetts law. In Trustees of Tufts College v.
Medford , 415 Mass 753, 616 N.E.2d 433 (1993), the Supreme Judicial Court considered
whether Medford’s dimensional and parking requirements could be applied to a library
addition and parking structure proposed by Tufts. That Court recognized that “where the
requirements to be applied do not take into account the special characteristics of theeducational use (such as . . . the need for large classroom and library buildings) . . .
application of the requirements to the property of an educational institution may be
inappropriately restrictive.” 415 Mass. at 758 n.6; 616 N.E.2d at 438 n.6. It then
explained “that the question of reasonableness of a local zoning requirement as applied to
a proposed educational use will depend on the particular facts of each case,” and that the
educational institution bears the burden of showing “that the local requirements are
unreasonable as applied to its proposed project.” 415 Mass. at 759; 616 N.E.2d at 438-
39.
Williams College has several ways to discharge its burden. It can prove
unreasonableness by “demonstrating that compliance would substantially diminish ordetract from the usefulness of the proposed structure, or impair the character of the
institution’s campus, without appreciably advancing the municipality’s legitimate
concerns.” Id. Or, the College might demonstrate an “excessive cost of compliance”
with the regulation that is “without significant gain in terms of municipal concerns.” 415
Mass. at 759-60; 616 N.E.2d at 439. Or, Williams might show that the “facially
reasonable zoning requirements” would “nullify” or “significantly impede an educational
use . . . without appreciably advancing municipal goals.” Campbell v. City Council of
Lynn, 415 Mass. 772, 778; 616 N.E.2d 445, 449 (1993); accord Martin v. Corporation of
the Presiding Bishop of the Church of Jesus Christ of Latter-Day Saints , 434 Mass 141,
150; 747 N.E.2d 131 (2001); Rogers v. Town of Norfolk , 432 Mass. 374, 385; 734 N.E.2d
1143, 1150 (2000).
As the Cambpell Court explained, “the central question is whether the application
of the [zoning] requirements to a specific project in particular setting furthers legitimate
municipal concerns to a sufficient extent to warrant requiring an educational institution . .
. to alter its development plans.” 415 Mass. at 764.
B. Two Requirements in the Bylaw would be Unreasonable if Applied to
8/20/2019 Williams College Science Quad Proposal
8/509
5
This Project.
As the Scoping Letter explained, “the proposed facilities are an integral piece of
the education[al] mission of the institution” and a “by right use under local zoning and
Ch. 40A MGL.” The College, however, respectfully requests relief from the building
height and coverage standards in the Bylaw, because they would be unreasonable asapplied to this project.
1. It would be unreasonable to apply the Bylaw’s building height
limit to the proposed building additions.
The Bylaw restricts building heights in the General Residence district to a
maximum elevation of 35 feet as of right, or up to 45 feet by special permit. Bylaw,
§ 70-4.1.A, 4.1.B(4). In the abstract, this restriction serves legitimate municipal concerns
by promoting safety and preserving the access of adjoining premises to light and air.
Applied to the proposed new additions to the science center building, however, this
standard is unreasonable.
With the site’s sloping topography, the South Addition measure approximately
76’10” above grade, and the North Addition measures approximately 58’8” above grade.
These buildings are taller than the bylaw would otherwise allow because they must be
large enough to house the needed academic program spaces, they cannot be built
underground economically, and they should be built to the same architectural scale as the
surrounding buildings. Nor can these uses be located off site. Locating all the science
programs together in the same quadrangle is essential because scientific inquiry and
education is increasingly interdisciplinary. More and more areas of study and research--
including neuroscience, biochemistry and molecular biology, astrophysics, biophysics,
and biostatistics--span the boundaries of traditional academic departments.
The proposed design locates all the required academic spaces within a building
that is scaled to reflect its surroundings. If it were forced to comply with the height
requirements, it would sprawl and cover too much ground. Reducing the height of this
building would not only “substantially diminish or detract” from its usefulness, it would
also exacerbate impervious coverage within the parcel. This project charts a middle
course, creating the needed spaces within additions that match the scale of the existing
science center and preserve a historic quadrangle that opens to the town green.
Moreover, the proposed project will will mitigate or improve several existing
municipal concerns. The existing stormwater management system will be significantlyimproved including two (2) new underground detention system, new water quality
treatment structures, and includes rainwater reuse. The rainwater harvesting system will
collect rainwater from existing and proposed roof tops in an underground cistern and then
pump it to cooling towers, where it will be used for evaporative cooling of the building.
The proposed stormwater management system will help mitigate the rate and volume of
runoff and improve the water quality of runoff discharging to the municipal drainage
system. Additionally, reducing the footprints of the buildings allows the creation of
8/20/2019 Williams College Science Quad Proposal
9/509
6
additional parking in the Spring Street neighborhood, which was one of the most
commonly raised concerns throughout the course of the town’s recent economic
development review and planning process.
In short, making the building any shorter or smaller would significantly
compromise the college’s ability to carry out its educational mission, either by imposingexcessive costs or by prohibiting core educational facilities. As applied to this building
in this specific location, the height limit would “substantially diminish or detract from the
usefulness of the proposed structure. . . . without appreciably advancing municipal
goals.” Tufts, 415 Mass. at 759. For these reasons, it would be unreasonable to enforce
the Bylaw’s height limits against this building.
2. It would be unreasonable to apply the Bylaw’s building coverage
limits to the proposed building additions.
In 1997, when it permitted an earlier expansion of the science center, the ZBA’s
decision allowed 30.8% of the building lot (commonly owned contiguous property) to becovered by buildings, more than the bylaw’s nominal limit of 20%. The new North
Addition’s footprint is slightly smaller than Bronfman’s and Miller House and Siskind
House have been removed, but the overall building coverage within this lot remains
above 20%, at 26.04%. As the lot coverage calculations in Exhibit F detail, the proposed
project will result in 130,088 square feet of coverage on a 499,633 square foot lot. While
more than the bylaw allows, this actually is less coverage than the ZBA permitted in
1996, when it approved of 154,451 square feet of building coverage. As is described
above, this project is sized to provide essential academic uses, and has been designed to
balance to trade off between building height and building footprint. At the same time, the
proposed plans preserve the open, airy feel of the Science quadrangle, enhance pedestrian
connections, provide additional parking, and reduce offsite stormwater impacts from theScience Center. Accordingly, continued relief from the building coverage requirements
is warranted because they would “substantially diminish or detract from the usefulness of
the proposed structure. . . . without appreciably advancing municipal goals.” Tufts, 415
Mass. at 759.
IV. Williams College Respectfully Requests a Special Permit under Section
1.4.C. to Permit Alteration and Additions to a Preexisting Non-conforming
Structure.
At one corner, an original portion of the Science Center building is located 12 feetfrom the rear boundary line of a neighboring property.
The plans include the following measures to mitigate the negative impacts of the
proposed project on the neighborhood:
The North Building has a pitched roof to mitigate the height and blend
with the character and context of the neighboring structures on Hoxsey
8/20/2019 Williams College Science Quad Proposal
10/509
7
Street as well as the adjacent campus buildings.
The façade of the North Building is broken down in scale by wings of the
building that face Hoxsey Street, reducing the apparent volume as it
addresses the neighborhood.
The loading dock south of the existing Bronfman building will be
removed and replaced with a more pedestrian friendly and landscapedcirculation path.
Stormwater runoff at both North and South building locations will be
reduced from current conditions by capturing and reusing captured rain
water on-site for mechanical use and toilet flushing.
New plantings along Hoxsey Street will soften the street edge; replenish
the pedestrian experience and transition to the building.
Loading dock services for the South Building will be consolidated by the
existing Morley loading dock and screened by the building and plantings.
A new parking area comprised of 22 spaces will be located off Walden
Street and screened with plantings.
With these measures of mitigation, the alterations and additions will not be
substantially more detrimental to the neighborhood, and relief is warranted.
V. This Project Requires a Special Permit under Section 5.1.B. for relief from
the development standard for existing grades.
As the Scoping Letter explains, this project may be subject to special permits
granting relief from the some of the site development standards of § 5. Under Section
70-5.4.A.4 of the Bylaw, “[e]xisting grade should be changed minimally, typically
departing from existing grade by no more than six feet, and resulting in a balance on site between cut and fill, except for basement and cellar elevations.” To adjust the location of
the loading dock on the site and to replace a currently failing retaining wall, requires a
small area of cut that exceeds six feet. This small area of cut poses no risks, and no
better design is reasonably feasible.
VI. DEVELOPMENT PLAN REVIEW
Except for those issues where the College has asked the ZBA to grant relief, this
project complies with the applicable portions of Article V, Development Standards and
Section 70-6.1, Off-Street Parking. The following demonstrates compliance with the
applicable development standards identified by the Scoping Letter.
Section 70-5.2 Service Adequacy Requirements
Section 70-5.2.A. (1) Access
The project maintains and improves existing access to the science center from
Hoxsey and Walden Streets, which provide adequate access as defined by the
8/20/2019 Williams College Science Quad Proposal
11/509
8
Subdivision Rules and Regulations.
During the construction period, deliveries and other construction traffic will be
handled in accordance with the Phase 1 logistics plan submitted herewith as Exhibit D.
The purpose of the logistics plan is to minimize the construction phase traffic, parking
and delivery impacts on the surrounding neighborhood, including Spring Street, WaldenStreet, Hoxsey Street, and the municipal parking lot.
The key details of the logistics plan are as follows:
Contractors will be required to park in offsite locations as shown on the plan.
Construction generally will run from 7AM to 3:30 PM, Monday to Friday during
Phase 1 construction of the South Addition.
Construction generally will run from 8AM to 4:30 PM, Monday to Friday during
the Phase 2 construction of the North Addition.
Chandler House will be used for construction offices.
Deliveries to the site will be routed primarily down Stetson Court to a new accessdrive adjacent to the Health Center that will connect Stetson Drive to the Walden
Street, which, with approval from the Board of Selectmen, will return to two-way
traffic.
While occasional construction traffic may travel via Walden and Latham Street,
traffic will diverted from Spring Street (north of Walden), the Knolls, and Hoxsey
Street.
The Town Manager has convened a working group to pursue a permanent
extension of Walden Street to South Street. The college is an active participant in
these conversations and will support the Town’s efforts with this project. If this
road is constructed before the completion of this project, construction traffic may
be re-routed from Stetson Court to South Street.
(As Phase 2 approaches, the college will submit a Phase 2 logistics plan from review and
approval.)
Section 70-5.2.A. (2) Access
Not applicable per scoping letter.
Sections 70-5.2.B. Water supply & C. Sewage disposal.
The project will continue to use public water and sewer, with no anticipated
adverse impacts.
Section 70-5.3 Environmental Protection Requirements
Section 70-5.3.A Water Quality
8/20/2019 Williams College Science Quad Proposal
12/509
9
The science center will continue to be served by Williamstown’s public water
supply, which is adequate.
(1) On-site sewage disposal systems.
Not applicable.
(2) Drainage facilities.
The proposed improvements include the installation of stormwater treatment
devices for the removal of suspended solids and protection of water quality.
Treatment devices will include: catch basins with deep sediment sumps and oil
and gas traps to maintain the quality of surface and ground waters.
Section 70-5.3.B Stormwater Management
As demonstrated by the stormwater management report included as Exhibit C this
project complies with all applicable stormwater management standards and Best
Management Practices.
The project includes a stormwater management system that has been designed in
compliance with the MassDEP Stormwater Management Standards. Best
Management Practices (BMPs) will be used to mitigate potential changes in peak
runoff rate, runoff volume, and provide water quality treatment.
Two stormwater detention systems, one for the South Addition and one for the
North Addition, will mitigate the increase in impervious area and maintain peakrunoff rates below pre-development levels. Both systems have been designed to
provide groundwater recharge by providing dead storage below the outlet pipe
that meets the required recharge volume.
The South Addition includes two rainwater harvesting tanks totaling 20,000
gallons of storage. These tanks collect roof runoff from the South Addition and
the Unified Science Center and reuse this water for mechanical equipment
makeup water in the Unified Science Center. The North Addition includes one
10,000 gallon rainwater harvesting tank. This tank collects roof runoff from the
North Addition and reuses this water inside the building for flush fixtures. These
rainwater harvesting tanks and reuse systems help to mitigate the increase inimpervious area and maintain runoff volumes below pre-development levels.
Through the implementation of the two underground detention systems and three
rainwater harvesting tanks, the proposed stormwater management system will
reduce the post-development peak runoff rates and runoff volumes to below pre-
development levels for Design Points 1 (Hoxsey Street municipal drainage
system) and 2 (Walden Street municipal drainage system). Tables 1 and 2
8/20/2019 Williams College Science Quad Proposal
13/509
10
summarize the pre- and post-development peak runoff rates and runoff volumes
for both design points.
Table 1 – Peak Runoff Rates (in cfs) at Design Points
Storm Event2-year 10-year 25-year 100-year
DP1 – Hoxsey Street
Existing 2.68 4.74 5.96 7.64
Proposed 2.55 4.56 5.75 7.29
Change -0.13 -0.18 -0.21 -0.35
DP2 – Walden Street
Existing 6.26 10.91 13.61 17.34
Proposed 5.95 10.42 13.13 16.66
Change -0.31 -0.49 -0.48 -0.68
Table 2 – Runoff Volumes (in acre-feet) at Design Points
Storm Event
2-year 10-year 25-year 100-year
DP1 – Hoxsey Street
Existing 0.201 0.354 0.445 0.574
Proposed 0.185 0.343 0.437 0.568
Change -0.016 -0.011 -0.008 -0.006
DP2 – Walden Street
Existing 0.462 0.807 1.012 1.298
Proposed 0.421 0.769 0.975 1.263Change -0.041 -0.038 -0.037 -0.035
During construction the contractor will provide adequate stormwater controls and
erosion control to prevent erosion on site and sediment from leaving the site. The
minimum erosion control systems are indicated on the Erosion Control plan
including a sedimentation basin near Walden Street that will also mitigate and
slow the rate of runoff leaving the site during construction prior to the proposed
stormwater management system being completed and functioning. The
stormwater controls shall be adjusted as construction progresses and additional
stormwater controls shall be added as needed.
In addition, the college and the town’s departments of community development
and public works are working together in a broader review of stormwater
management throughout the watershed bounded by South Street, Main Street,
Spring Street, and Christmas Book. This review will help ensure that the
college’s projects within the watershed will handle stormwater in a compatible
manner and will help improve stormwater and lessen flooding conditions.
8/20/2019 Williams College Science Quad Proposal
14/509
11
Section 70-5.3.C Erosion Control
Since the project will disturb more than one acre of land, the contractor will file a
notice of intent with the U.S. EPA and the project will be subject to coverage
under the National Pollution Discharge Elimination System and the its
Construction General Permit. Accordingly the contractors and engineers willneed to prepare and submit a stormwater pollution prevention plan (SWPP) and
implement its protective measures, including erosion control barriers (i.e. silt
fence, straw wattles, straw bales, and crushed stone), inlet protection at catch
basins, stabilized construction entrance, sedimentation basin(s), surface and slope
stabilization (erosion control blanket, mulch, seeding, etc.)
(1) Stabilizing.
All earth exposed from the project construction will be stabilized where not
covered by vegetation or paved areas. Proposed vegetated areas will be topsoiled,
seeded and mulched.
(2) Erosion control plan.
An erosion control plan is incorporated into the separately bound permitting plan
set. During construction, erosion control barriers will be installed at the limit of
work as defined on the plan.
(3) Requirements.
Wherever possible, existing trees and vegetation will remain. Any topsoil
stripped for reuse shall be stockpiled with siltation fencing at the toe of the piles.
Temporary vegetation (erosion control seed mixes), erosion control blankets,wood chips, crushed stone , diversion swales or sediment basins shall be used
where soils will be exposed for more than 14 days and further construction
activity is not planned in the near future unless the area is used for a staging area.
All areas disturbed due to project construction will be seeded and loamed as
noted on the design plans once construction activities are complete.
(4) Impervious Coverage.
Impervious coverage calculations have been made for each phase of the project.
For the south building extension, the “limit of work”area as shown on the plans isapproximately 3.30 acres (or 143,530 square feet). The proposed impervious area
within this limit of work is approximately 1.90 acres, for an impervious coverage
of 62% of the total limit of work. The average site slope (of landscape areas,
excluding retaining walls) is less than 8 percent grade, giving a maximum
allowable impervious coverage of 80 percent.
8/20/2019 Williams College Science Quad Proposal
15/509
12
For the north building extension, the “limit of work” is 1.5 acres (or 143,530
square feet)The impervious area within the limit of work is approximately 0.8
acres, for an impervious coverage of 62% of the total limit of work. The average
site slope (of landscaped areas, excluding retaining walls) is less than 7 percent,
giving a maximum allowable impervious coverage of 80 percent.
Table 3 – Summary of Existing and Proposed Site Areas
Land UseExisting
(Acres)
Proposed
(Acres)
Change
(Acres)
North Building Site
Buildings 0.43 0.40 -0.03
Pavement
(Roads, parking, walkways, plazas)0.37 0.50 +0.13
Landscape Areas 0.70 0.60 -0.10
Total 1.50 1.50 -
South Building Site
Buildings 0.75 0.96 +0.21
Pavement
(Roads, parking, walkways, plazas)1.15 1.10 -0.05
Landscape Areas 1.40 1.24 -0.16
Total 3.30 3.30 -
(5) Erosion Control Report.
We have submitted the enclosed control plan, which adequately protects against
the potential for erosion related to this project.
Section 70-5.3.D Air Quality
This project is not a major new stationary source of air pollution as defined by the
EPA, nor is the project required to apply to DEP under the Clean Air Act. The project does not represent any new uses or processes that are not currently present
at the site.
Section 70-5.3.E Odors
This project will not cause any emission of odors detectable beyond the boundary
of the site. There are no new uses or processes that would result in odors.
8/20/2019 Williams College Science Quad Proposal
16/509
13
Section 70-5.3.F Plants and Animals
The project will have no significant impact on wildlife habitats or corridors, or to
any plant species listed as endangered, threatened, or of special concern.
Damage to existing trees has been avoided to the greatest extent possible, but theremoval of trees along Hoxsey Street, including one greater than 24 inches in
diameter, is necessary and unavoidable to allow the installation of new utilities.
Williams College will use its best efforts to compensate for the tree removal
though attractive, inviting landscaping along Hoxsey Street that will replace the
lost trees with healthier, more site-appropriate specimens.
Section 70-5.3.G Hazardous Materials
There is no hazardous material manufacturing as part of the project. There will
also be no storing of flammables in quantities exceeding four times that required
for licensing under 527 CMR 14. No use that requires licensing under 310 CMR30.800 is part of this project.
Section 70-5.4 Other Design Requirements
Section 70-5.4.A Site Design
(1) Visibility reduced.
Under the proposed designs the parking spaces are located more than 15 feet from
Hoxsey and Walden Streets, none are located within a required side yard, and less
than one-third are located within the required 30-foot front yard.
(2) Vegetation.
As the site plans show, at least 50% of all required front yards will remain
vegetated.
(3) Building orientations.
The extensions of the building will be perpendicular or parallel to the nearest
town streets.
(4) Existing grade.
The loading dock and a retaining wall require a small area with more than six feet
of cut. Williams College requests special permit relief from this developmentstandard, which requires that the existing grade be changed minimally, and
proposed final grades will not vary from existing grade by six feet.
(5) Site circulation.
The primary access to the site will be pedestrian, through the existing campus
sidewalks. In addition the existing Morley Drive from Walden Street will remain
in place to provide access for pick ups and drop offs and to nearby parking
8/20/2019 Williams College Science Quad Proposal
17/509
14
spaces. Two spaces will be removed near Miller House, but the project will
create a new 22-space parking area along the improved the loading dock access
drive from Walden Street. A failing retaining wall in this location will be
replaced.
The existing access drive and small parking area on Hoxsey Street has beenretained and improved. The loading dock in that location will be removed and the
number of parking spaces will be reduced from 6 to 5.
Overall the project will create 19 new spaces.
The site circulation plans will be reviewed with the Fire Chief to assure safe and
adequate access for emergency vehicles.
(6) Pedestrian access.
The proposed building extensions will be well-served by the existing campus
sidewalk system and the new side walk connections to Walden and HoxseyStreets.
(7) Visibility minimized.
Not applicable this project is not located within the Rural Residence zoning
district.
Section 70-5.4.B Landscaping requirements
(1) Applicability.
The college’s proposed project creates a new 22-space parking lot near Walden
Street to help provide additional parking capacity in the area and will more thanmake up for the informal parking that has occurred as a matter of practice along
the current access drive to the loading dock.
(2) Plants.
Except where relief is explicitly requested and granted, the college will plant the
required number of trees and shrubs within the required planting areas.
(3) Planting areas.
(a) Street planting area; (b) Side-line planting area. Because this
property abuts Route 7 (Main Street), a state-numbered highway, therequirements for street planting areas and side-line planting areas apply.
However, given the landscaping of the town green and the way it relates to the
landscaping of the college campus, technical compliance with these requirements
will not yield attractive results. Accordingly, as an alternative measure of
compliance, the college proposes that implement the landscaping plans as
submitted, and provide sufficient funds for the town to plant or replace 4 trees of
its choosing at locations it selects within the town green.
8/20/2019 Williams College Science Quad Proposal
18/509
15
(c) Parking area interior plantings. Not applicable.
(d) District boundary planting area. Not applicable.
(e) Trail buffers. Not applicable.
(f) Screening. The proposed landscape plans provide the require
screening.
(4) Existing vegetation.
The existing vegetation will be preserved wherever feasible
(5) Exceptions.
Not applicable.
(6) Maintenance.All plant materials will be maintained in a healthful condition. Dead plantings
will be replaced during the next planting season.
Section 70-5.4.C Agricultural Protection
Not applicable.
Section 70-5.4.D Lighting
As shown in the attached lighting plan, the college will comply with the required
lighting limits.
Section 70-5.4.E Noise
The College will comply with the noise regulations set forth in Bylaw Section 70-
5.4.E.
Section 70-5.4.F Vibration
Except for construction activities associated with construction, there will not be
any sources of vibration associated with the project.
Section 70-5.4.G Electrical Disturbances
There will be no electrical disturbances adversely effecting off-site equipment
associated with the completed project.
Section 70-5.4.H Historical and Archaeological Sites
8/20/2019 Williams College Science Quad Proposal
19/509
16
The project is not located on a site recorded on the Massachusetts Register of
Historic Places. The project is also not considered a “major development.” The
College has complied with Williamstown’s Demolition Delay Bylaw prior to
relocation and preservation of Miller House and the demolition of Siskind House.
Section 70-5.4.I Solid Waste
Construction debris and demolition waste will be disposed of at a site assigned
solid waste facility by a commercial hauler. These arrangements will be made
directly by the contractor with oversight by the College. The exact location will
be submitted to the Building Inspector at the time of construction with the
building permit application. The completed facility will have secured trash
receptacles and the college will manage recycling and trash removal in
accordance with its standard practices and standards.
Section 70-6.1 Off-street parking and loading.
Section 70-6.1(B) Number of Spaces.
The college will seek a determination from the Planning Board that the net
addition of 19 new spaces as part of this project will provide sufficient off-street
parking. This renewal project will modernize and expand academic facilities, but
will not generate increased demand for parking. While there is no increase in
parking expected for the project, the project creates 19 new spaces to respond to
the perceived need for additional parking in the Spring Street neighborhood.
Section 70-6.1(C) -- Compliance with Development Standards for Off-Street
Parking
As described below, this project will comply with the development standards for
off-street parking spaces:
(1) Space equivalents. The parking areas will provide the required 300 square
feet of standing and maneuvering area.
(2) Location. The new and reconfigured parking spaces are provided in two
areas on the same lot as the project with access directly from Hoxsey Street, and
from Walden Street. None of the parking spaces are located within 15 feet of any
street right of way.
(3) Access. All parking spaces are provided with unobstructed access to and
from a town street and will be properly maintained. The parking areas are
designed so that vehicles will not be required nor permitted to back into a public
way. The proposed Hoxsey Street driveway is 20 feet wide and the Walden Street
driveway is 24 feet wide. Non-mountable curbs define both driveways, and their
existing entrance centerlines are appropriately spaced.
8/20/2019 Williams College Science Quad Proposal
20/509
17
(4) Surfacing. All parking areas will be surfaced with at least 3 and one-half
inches of bituminous concrete over compact subgrade.
(5) Drainage. As described in the enclosed drainage plan which is included in
the separately bound permitting Plan set, stormwater runoff in the proposed parking areas will be collected in catch basins with deep sumps, routed through
water quality inlets and conveyed through properly sized pipes to municipal
drainage systems, this system complies with stormwater management standards.
(6) Lighting. The parking areas will be lit in accordance with William & Mary
pole mounted fixtures, which are Type 2 lights as defined in Section 70-5.4.D(1)
of the Bylaw. These parking area lights will be mounted at 12 feet above finished
grade.
The proposed pedestrian walkways through the site will be lit with a combination
of William & Mary pole fixtures and Type 3 bollard lights. The bollard lightswill be mounted at less than 3 feet above finished grade.
These light fixtures are consistent with College standards and bylaw overspill
requirements. They will comply with overspill limits while ensuring pedestrian
safety. See Plan L-1, Proposed Site Lighting Analysis.
Construction phase parking: Parking during the construction phase will be
provided entirely off-street, in the locations described at the logistics plan.
Construction contracts will require contractors to park in these off-street locations
rather than in public parking areas. Shuttles will be provided between the remote
construction parking areas and the project site.
VIII. Conclusion.
For the reasons described above, Williams College respectfully requests that the
Williamstown Zoning Board of Appeals:
(1) determine that it would be unreasonable, in violation of M.G.L., c. 40A, § 3,
to apply the building height limit under Bylaw § 70-4.1 to this project, and grant
Williams College permission to build the proposed North and South Additions;
(2) determine that it would be unreasonable, in violation of M.G.L., c. 40A, § 3,to apply the building coverage limits under Bylaw § 70-4.3 to this project, and
grant Williams College permission to build the proposed North and South
Additions;
(3) grant a special permit under § 70-1.4.(c) to allow the extension of a non-
conforming building, finding that it will not be substantially more detrimental to
the neighborhood than the existing structure;
8/20/2019 Williams College Science Quad Proposal
21/509
18
(4) grant a special permit under § 70-5.1.B to allow a small area of cut in excess
of six feet related to the relocation of a retaining wall and loading dock.
(5) conduct the development plan review and approve of the development plans;
and
(6) grant such other relief as the ZBA may determine is warranted.
8/20/2019 Williams College Science Quad Proposal
22/509
19
Exhibit A
8/20/2019 Williams College Science Quad Proposal
23/509
Andrew Groff
Director / Planner
Phone/Fax: 413-458-9344
Town of Williamstown
Community Development Department 31 North Street
Williamstown, Massachusetts 01267
Friday, August 14, 2015
PROJECT: Unified Science Center, North and South Additions
LOCATION: Williams Science Quad (bounded by: Main, Spring, Hoxsey, and Walden Streets)
OWNER: Williams College
ZONING DISTRICT: General Residence
PRESENT: Andrew Groff, Jamie Art, Jason Miner, Rita Coppola Wallace, Project Design Team Representatives
Scope of Work
Based upon discussion and plans provided at the scoping session held on Tuesday July 28, 2015 it is the Community
Development Department’s understanding that this proposed project will involve a major reconfiguration of the WilliamsCollege science complex. The following changes have been proposed;
• Two additions to the existing Morley Science Center are proposed.
• The south addition will sit atop the current location of Miller House and Siskind House. Miller House will be
moved to South Street, Siskind House will be demolished.
• The new south addition will be constructed first in 2016 – 2018 and with a footprint of 18,000 s.f. and a height
from average grade of 76 feet.
• The south addition will be constructed in place of the existing 1968 Bronfman Hall.
• Bronfman will be demolished in summer 2018.
• The north addition will be constructed in 2018 – 2020 and with a footprint of just under 18,000 s.f. and a height
from average grade of 58 feet.
Permitting ducational Uses
The Zoning Enabling Act (MGL Ch. 40A) in Section 3 specifically states that no ordinance or bylaw shall: “prohibit,
regulate or restrict the use of land for educational purposes…or by a religious sect…or by a nonprofit educational
corporation; provided that such land or structures may be subject to reasonable regulations concerning the bulk and
height of structures and determining lot sizes and setbacks, open space, parking and building coverage.” It is our office’s
determination that the buildings proposed by Williams College constitute an educational use as Williams College, a not
for profit educational corporation, is the owner and operator of the proposed facilities. Additionally, the proposed
facilities are an integral piece of the education mission of the institution. These facts make the use of the land a by right
use under local zoning and Ch. 40A MGL.
Guidance on the extent to which the educational use exemption applies is found in case law. In The Bible Speaks v. Board
of Appeals of Lenox (8 Mass Ap. Ct. 19) the court determined that; “The Legislature did not intend to impose special
permit requirements designed under Massachusetts General Law Ch40A §9 … on legitimate educational uses.” The court
also determined that the portions of Lenox’s bylaw concerning reasonable bulk, dimensional, and height requirements
were valid and that an educational institution is subject to reasonable regulation as long as it does not nullify the
educational use exemption.
MGL Ch40A section 9 states that; “Zoning ordinances or by-laws shall provide for specific types of uses which shall only
be permitted in specified districts upon the issuance of a special permit. Special permits may be issued only for uses
which are in harmony with the general purpose and intent of the ordinance or by-law, and shall be subject to general or
specific provisions set forth therein; and such permits may also impose conditions, safeguards and limitations on time or
use.” The Bible Speaks case only instructs that local boards may not require use special permits, as defined by MGL
8/20/2019 Williams College Science Quad Proposal
24/509
Williams College Science Quad Scoping Letter 2
Ch.40A §9 for any educational use. Case law is silent on the relationship between educational uses and special permits
for extension of non-conforming structures per MGL Ch.40A §6 as well as locally authorized special the permits intended
to grant relief from specified development standards.
Two other major cases further refined the legal test for determining how to apply “reasonable regulations”; Trustees of
Tufts College vs. City of Medford (415 MA753) and Campbell v. City of Lynn (415 MA772). In the Tufts and Campbell
cases, the court found that this power was not absolute. If the strict application of dimensional and parking standards
resulted in the nullification of the educational use, the requirement may not be enforced. This would be determined bythe Board of Appeals as an administrative appeal from the Planning Administrator’s determination. The applicant carries
the burden of demonstrating that there is a “practical prohibition” of the educational use due to the enforcement of the
regulation in question.
The Williamstown Zoning Bylaw specifically authorizes in Ch.70 §5, special permits, which can be used to obtain relief
from the development standards of §5. Additionally the Bylaw authorizes special permits for extensions of non-
conforming structures as authorized in MGL Ch.40A §6. These types of special permits are not use special permits as
defined by MGL Ch.40A §9. They are special permits specifically authorized by the Williamstown Zoning Bylaw for relief
from development or dimensional standards and therefore the ruling in Bible Speaks does not apply. If a development
standard does not constitute a “practical prohibition” of the educational use as described by Tufts and Campbell, relief
from development standards may be sought through the §5 Special Permit, or a Special Permit to extend a non-
conforming structure.
Permits Required and Required Submittals
Conservation Commission
• The site is not located in an area subject to jurisdiction by the Conservation Commission, a filing with the
Commission is not required. Please note there are extensive wetlands nearby and the project site is located in a
sensitive watershed area. The project would become jurisdictional to the Commission if nearby jurisdictional
area is negatively impacted by the project construction process.
Historical Commission
• Historical Commission review for the demolition of Siskind House and the moving of Miller House was
completed in mid-2015.
Public Works Department Approvals
• The project will require the following permits from the Department of Public Works; sewer connection and
water connection permits. It is the Community Development Department’s understanding that the Science
Quad project is not the only project within the immediate Spring Street area proposed over the next several
years. Due to the proximity of these projects to one another there is potential for serious impacts to the
neighborhood’s public utility system. Advanced planning and coordination with the Public Works Department on
this project and the remaining Spring Street area projects is necessary. Public Works Director Tim Kaiser should
be engaged on this issue at the applicant’s earliest convenience.
Planning Board Approvals
•
Parking Determination: In keeping with a long standing interpretation of the Williamstown Zoning Bylaw, ouroffice finds that use (a not for profit educational use) is unlisted by section 6 of the Zoning Bylaw and will require
a parking determination. This submittal shall include a narrative which details the parking needs of the site
including a proposed number of permanent parking spaces.
Zoning Board Approvals
SpecialPermit
• The Zoning Board of Appeals found in its granting of Special Permit 1996-34 that the existing Thompson Biology
Building is setback from the westerly property bound by 12 foot 4 inches. This section of the building does not
comply with the 15 foot yard requirement. The building legally preexisted this zoning requirement and is
therefore a legally preexisting non-conforming building. An extension of the building will have to receive a
8/20/2019 Williams College Science Quad Proposal
25/509
Williams College Science Quad Scoping Letter 3
special permit from the Zoning Board of Appeals that finds that such extension is not more detrimental to the
neighborhood than the existing structure.
• Additional Special Permits might be necessary to seek relief or compliance alternatives from Development
Standards if such relief is preferable but does not constitute a practical prohibition of an educational use.
Tufts-CampbellFindings(AdministrativeAppeal)
There are several conditions shown on the proposed plans which do not comply with the applicable requirements of the
Bylaw, these include, but are not limited to the following:
• The height of the proposed north addition (76 feet), the height of the proposed south addition (58 feet),
building coverage on site is limited to 20% of lot area. At present 30.8% of the lot is covered by buildings.
It is our determination that these aspects of the project are not permitted. Therefore relief from these dimensional
standards must be sought through the Tufts Campbell finding process. The applicant must appeal this decision that these
standards apply to the project. Case law requires the application to show the Board that the imposition of the standards
in the bylaw constitute a practical prohibition of the property’s educational use.
The Zoning Board of Appeals will require the following information for the Special Permit and Appeal hearing.
• The submission shall require a completed Application for a Hearing before the Zoning Board of Appeals, and all
plans and narrative as required for a Development Plan Review (detailed below) by the Board.
• The Appeal requires narrative detailing how enforcement of a particular development standard would result in a
practical prohibition of the proposed educational use.
• The Special Permit requires narrative detailing how the project will meet the standard of not more detrimental
to the neighborhood.
DevelopmentPlanReview
Development Plan Review will be required for this project as it involved construction of new nonresidential structures in
excess of 2,500 square feet, clearance of more than 20,000 square feet of vegetative ground cover, and substantial
alterations to parking areas for more than 10 vehicles.
The following submittals are required by the Zoning Board of Appeals in addition to a completed Application for a
Hearing.
The standard Development Plan Review documentation shall be submitted with the application.
• A locus plan as defined by §70-8.2.C
• A site plan as defined by §70-8.2.C
• Building Plans defined by §70-8.2.C
• Documentation defined by §70-8.2.C
The Development is not a Major Development, as defined by the bylaw. The additional submittals required for major
developments in §70-5 are not applicable. In accordance with §70-8.2 the site plan required for development plan
review must be prepared by a registered architect, landscape architect, professional engineer or other approved design
professional.
The following required submittals correspond to Section 5 of the Williamstown Zoning Bylaw, Development Standards, as
well as Section 6 Parking Standards. Evidence of compliance with these standards should be prepared by the project
design team and must be presented to the Zoning Board of Appeals for Development Plan Review.
• 5.2: ServiceRequirements
o 5.2.A(1) Access: Special Permit 1996-34 details specific requirements for deliveries and for construction
related traffic. These conditions must be addressed as part of this permitting process as traffic patterns
in this area have changed.
o 5.2.A(2) Traffic Study: Not applicable, the project is not a major development.
8/20/2019 Williams College Science Quad Proposal
26/509
Williams College Science Quad Scoping Letter 4
As previously noted, there are several different Spring Street area projects proposed over the
next several years. While one particular project may not have traffic impacts, all projects
together could. Future projects could also require a full study if considered major
developments. It is our office’s recommendation that, while not a requirement, the applicant
consider addressing traffic as an issue at this stage. Active communication with the Zoning
Board on this topic could provide for a more straightforward permitting process for future
projects. Further consultation with Community Development Department staff is encouraged
on this issue.o 5.2.B(1-2) Water Supply&5.2.C(1-2) Wastewater Disposal: See previous note on Public Works
Department permits.
• 5.3: EnvironmentalStandards :
o 5.3.A(1) Not applicable
o 5.3.A(2) Oil and Gas Traps in Drainage: Demonstrate compliance
o 5.3.B Storm Water Management: Demonstrate Compliance
The project will require a complete stormwater plan in compliance with this section to be
reviewed by the Zoning Board of Appeals. The plan will be evaluated using the most recent
Massachusetts Stormwater Management Policy. The use of low impact development
techniques are highly encouraged. Special attention should be paid to the downstream
implications of new stormwater runoff as the entire watershed area does drain into the
undersized Christmas Brook culvert.
o 5.3.C(1) Stabilization of Exposed Earth: Demonstrate compliance
o 5.3.C(2) An erosion control plan is required. Submission of the Stormwater Pollution Prevention Plan
being prepared to meet EPA requirements will be sufficient to meet this bylaw requirement.
o 5.3.C(3) Construction Requirements: Demonstrate compliance
o 5.3.C(4) Impervious Coverage Restrictions: Demonstrate compliance
o 5.3.C(5) Expert erosion report: An independently prepared erosion control plan may be required at the
discretion of the Zoning Board.
o 5.3.D: Air Quality: Demonstrate compliance
o 5.3.E: Odor: Demonstrate compliance
o 5.3.F: Plants & Animals: The project is not in an area subject to the Natural Heritage Program. Any tree
over 24”dbh to be removed will require a finding from the Board that removal of the tree is
unavoidable.
o 5.3.G: Hazardous Materials: Demonstrate compliance
• 5.4: DesignRequirements
o 5.4.A Site Design: The Zoning Board may grant a Special Permit for exemptions for these requirements if
necessary.
5.4.A(1)Visibility Reduced: Demonstrate Compliance.
5.4.A(2)Vegetation: Demonstrate Compliance
5.4.A(3)Building Orientation: Project Complies.
5.4.A(4) Existing Grade: Existing grade may be changed by no more than 6 feet. A Special
Permit is necessary for any change over 6 feet.
5.4.A(5): Site Circulation: Demonstrate Compliance.
5.4.A(6): Pedestrian Access: Demonstrate Compliance.
5.4.A(7): Not applicable
o 5.4.B Landscaping: Demonstrate compliance. The Zoning Board may authorize alternatives for
landscaping requirements in the course of performing the Development Plan Review. Please note state
highway plantings are required for the proposed north addition.
o 5.4.C Agriculture: Not applicable
o 5.4.D Lighting: Demonstrate compliance: Please submit a lighting plan.
o 5.4.E Noise Standards: Demonstrate compliance
o 5.4.F Vibration Standards: Demonstrate compliance
8/20/2019 Williams College Science Quad Proposal
27/509
Williams College Science Quad Scoping Letter 5
o 5.4.G Electrical Disturbances: Demonstrate compliance
o 5.4.H Impact on Historical Sites: Demonstrate compliance.
o 5.4.I Solid Waste Disposal: Demonstrate compliance
• 6.1: ParkingRequirements
o 6.1.B Number of Spaces: The development will have to provide off street parking spaces as required by
the Planning Board which will undertake a parking determination prior to the Zoning Board of Appeals
hearing.o 6.1.C Parking Development Standards: Demonstrate compliance with access, drainage, surfacing, and
lighting requirements for any proposed parking lot modifications. Please provide information regarding
access and construction worker parking during the construction period.
Project Phasing
It is our office’s understanding that the project will be completed over a five year period, ending in 2020. A project of this
length will require phasing of permitting. In keeping with the process used for other large scale projects the Zoning Board
will discuss the overall project concept upon initial application. The first phase of the project is the South Addition. The
initial permit application shall include full documentation for this first phase. Additionally a phasing plan shall be
submitted detailing which site elements are specific to each phase. This plan will permit the Building Commissioner’s
Office to clearly demarcate land use elements that are tied to each phase’s Certificate of Occupancy. Please highlight any
proposed phases with incomplete design or site plan elements. In the event that the initial permits are approved with
incomplete elements for future phases the applicant shall return to the Zoning Board for final approval of each additional
phase.
If you have any questions, or if I can be of further assistance, please feel free to contact us.
Sincerely,
Andrew Groff
Director / Planner
8/20/2019 Williams College Science Quad Proposal
28/509
20
Exhibit B (Separately Bound)
8/20/2019 Williams College Science Quad Proposal
29/509
21
Exhibit C (Separately Bound)
8/20/2019 Williams College Science Quad Proposal
30/509
22
Exhibit D
8/20/2019 Williams College Science Quad Proposal
31/509
Construction Fence with Scrimand Erosion Controls
Storage and Laydown
Structures to be Demolished or Relocated off-site
Corners to be Kept Back and Stabilizedto Allow Trucks to Make Turns
(Lamp Post to be Removed or Relocated)
Primary Trucking and Delivery Route
Main Construction Gate
Loading Dock toRemain Accessible
M o r l e
y D
r .
G r a c e C t .
H o x s e y S t .
S t e t s o n C t .
WILLIAMS COLLEGE SCIENCE CENTER RENESOUTH BUILDING SITE LOGISTICS - ACCESS AND PR
8/20/2019 Williams College Science Quad Proposal
32/509
Barns on Den - Material La - Foreman P
Parking Garage Off North St.
Abandoned Structure L
- Parking Only
- Parking- Storage of Early Lon
PROJECT SITE
Mohawk Trail 2
Mission Park Lot on Lynde Ln.- Parking Only
WILLIAMS COLLEGE SCIENCE CENTER RENESOUTH BUILDING LOGISTICS - OFF SITE PARKING A
8/20/2019 Williams College Science Quad Proposal
33/509
23
Exhibit E
8/20/2019 Williams College Science Quad Proposal
34/509
S O U T H B U I L D I N G – E a
s t s i d e a t M o r l e y C i r c l e
8/20/2019 Williams College Science Quad Proposal
35/509
S O U T H B U I L D I N G – S o
u t h w e s t c o r n e r a t W a l d e
n S t r e e t
8/20/2019 Williams College Science Quad Proposal
36/509
N O R T H B U I L D I N G – E a s t s i d e a t Q u a d
8/20/2019 Williams College Science Quad Proposal
37/509
N O R T H B U I L D I N G – N o r t h w e s t C o r n e r a t H o x s e y S t r e e t
8/20/2019 Williams College Science Quad Proposal
38/509
24
Exhibit F
8/20/2019 Williams College Science Quad Proposal
39/509
Williams College | Science Center Renewal
Parcel No. 98, 93 & 10
Williams College
10.8 + .20 + .47 = 11.47 Acres
499,633.00 sf
Current sf Proposed sf
Parcel No. 98
Clark 4,327 Clark 4,327
West College 763 West College 763
Morley Science Center 66,674 Morley Science Center 66,674
Lambert House 2,278 Lambert House 2,278
Jenness House 2,378 Jenness House 2,378
Hardy House 2,183 Hardy House 2,183
Rice 2,891 Rice 2,891
Jesup 6,609 Jesup 6,609
Morgan 6,485 Morgan 6,485
Bronfman 18,594 North Building 17,530
Miller House 3,362 South Building 17,970
Siskind House 2,438 ‐ ‐
Red Barn 1,282 ‐ ‐
Blue Barn 943 ‐ ‐
Parcel No. 93
ABC House 2,438 ABC House 2,438
Parcel No. 10
Chandler House 1,538 Chandler House 1,538
125,183 130,088
% Building Coverage 25.05% 26.04%
8/20/2019 Williams College Science Quad Proposal
40/509
8/20/2019 Williams College Science Quad Proposal
41/509
8/20/2019 Williams College Science Quad Proposal
42/509
8/20/2019 Williams College Science Quad Proposal
43/509
8/20/2019 Williams College Science Quad Proposal
44/509
8/20/2019 Williams College Science Quad Proposal
45/509
8/20/2019 Williams College Science Quad Proposal
46/509
8/20/2019 Williams College Science Quad Proposal
47/509
8/20/2019 Williams College Science Quad Proposal
48/509
8/20/2019 Williams College Science Quad Proposal
49/509
8/20/2019 Williams College Science Quad Proposal
50/509
8/20/2019 Williams College Science Quad Proposal
51/509
8/20/2019 Williams College Science Quad Proposal
52/509
8/20/2019 Williams College Science Quad Proposal
53/509
8/20/2019 Williams College Science Quad Proposal
54/509
8/20/2019 Williams College Science Quad Proposal
55/509
8/20/2019 Williams College Science Quad Proposal
56/509
8/20/2019 Williams College Science Quad Proposal
57/509
8/20/2019 Williams College Science Quad Proposal
58/509
8/20/2019 Williams College Science Quad Proposal
59/509
8/20/2019 Williams College Science Quad Proposal
60/509
8/20/2019 Williams College Science Quad Proposal
61/509
8/20/2019 Williams College Science Quad Proposal
62/509
8/20/2019 Williams College Science Quad Proposal
63/509
8/20/2019 Williams College Science Quad Proposal
64/509
8/20/2019 Williams College Science Quad Proposal
65/509
8/20/2019 Williams College Science Quad Proposal
66/509
8/20/2019 Williams College Science Quad Proposal
67/509
8/20/2019 Williams College Science Quad Proposal
68/509
8/20/2019 Williams College Science Quad Proposal
69/509
8/20/2019 Williams College Science Quad Proposal
70/509
8/20/2019 Williams College Science Quad Proposal
71/509
8/20/2019 Williams College Science Quad Proposal
72/509
A3.N.01
1
A3.N.02 1
A3.N.01
2
1 2 5 6 7 8
D
F
B
C
E
C.5
8.71.2 32.5 4 5.5
A3.N.02
4.5
A3.N.02
6.5
B.5
8.1
730SFCOMPUTERLAB
470SF
THINSECTIONROOM
790SFCOMPUTERLAB
870SFMAINELECTRICAL
vending
2 ' - 2 "
1 0 ' - 3 "
1 8 ' - 2 "
3 ' - 4 "
2 7 ' - 5 "
1 0 ' - 0 "
2 7 ' - 0 "
2 ' - 2 "
240SFFIELDSTORAGE
F.D
40SFJAN.CL.
60EM.ELE
220SFROCK STORAGE
ACCESSIBLELIFT
vending
F.D.
UP
UP
FOOTPRINTOFEXISTINGBRONFMANBUILDINGTOBEDEMOLISHED
1060SFCLASSROOM
960SFCLASSROOM
600SFBUILDINGSTORAGE
20'-1"1'-0"28'-0"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"20'-8"5'-4"
3220SF
AUDITORIUM200SEATS
70SF Auditorium Prep.
190SF
AUDITORIUMSTORAGE
1 0 0 ' - 6 "
208'-8 1/2"
34
U P
U P
8/20/2019 Williams College Science Quad Proposal
73/509
A3.N.01
1
A3.N.02 1
A3.N.01
2
1 2 5 6 7 8
D
F
B
C
E
C.5
8.71.2 32.5 4 5.5
A3.N.02
4.5
A3.N.02
6.5
B.5
8.1
820SF
TEACHINGLABOCEANOGRAP
980SFCLASSROOM
940SFCLASSROOM
500SF
GROUPDYNAMICSROOM
100SFPSYCH.STORAGE
290SFWORK ROOMTeachingLabB1
320SFWORK ROOMTeachingLabB2
120SFELECT.CLOSET
80SFCONTROL ROOM
70SFCONTROL ROOM
70SF
RESTROOM/SHOWER
40SFRESTROOM
40SFRESTROOM
150SFSTAFFOFFICE
150SFSTAFFOFFICE
mechanicalshaft
mechanicalshaft
100SFMATHSTORAGE
520SFCOMPUTERLAB
DN
50SFRESTROOM
120SELECT.CL
LIGHTWELLBELOW LIGHTWELLBELOW
UP
90SIT
30SFJAN.CL.
1 0 ' - 3 "
1 8 ' - 2 "
3 ' - 4 "
2 7 ' - 5 "
1 0 ' - 0 "
2 7 ' - 0 "
2 ' - 2 "
1050SFSHELL SPACE
640SFCLASSROOM
140SF
CLASSROOMSTORAGE
350SFWORK ROOMTeachingLabA1
40SFTESTROOM
30SFTESTROOM
30SFTESTROOM
40SFTESTROOM
30SFTESTROOM
30SFTESTROOM
30SFTESTROOM
30SFTESTROOM
360SFWORK ROOMTeachingLabA2
30SFTESTROOM
30SFTESTROOM
30SFTESTROOM
40SFTESTROOM
30SFTESTROOM
54
54
400SFSHELL SPACE
20'-1"1'-0"28'-0"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"20'-8"5'-4"2'-2"
214'- 0"
2920SFCORRIDOR
1 0 0 ' - 6 "
34
8/20/2019 Williams College Science Quad Proposal
74/509
8/20/2019 Williams College Science Quad Proposal
75/509
A3.N.01
1
A3.N.02 1
A3.N.01
2
1 2 5 6 7 8
D
F
B
C
E
C.5
8.71.2 32.5 4 5.5
A3.N.02
4.5
A3.N.02
6.5
B.5
8.1
650SF
TEACHINGLAB:SEDIMENTOLOGY
420SF
PSYCH.SEMINARROOM
90SFELECT.CLOSET
100SFCOPYROOM
180SFSTAFFOFFICE
180SFSTAFFOFFICE
180SFFACULTYOFFICE
180SFFACULTYOFFICE
180SFFACULTYOFFICE
180SFFACULTYOFFICE
190SFFACULTYOFFICE
190SFFACULTYOFFICE
190SFFACULTYOFFICE
180SFFACULTYOFFICE
120SF
FLEX/VISITOROFFICE
30SFJAN.CL.
40SFRESTROOM
40SFRESTROOM
560SF
GEOSCIENCERESEARCHLAB
180SFFACULTYOFFICE
180SF ADMINOFFICE
110SFKITCHENETTE
1560SF
PSYCH.LIBRARY
50SFRESTROOM
EquipmentZone
480SF
SCIENCECENTERSEMINARROOM
180SF
FLEX/VISITOROFFICE
40SFSTORAGE
mechanicalshaft360SF
CLASSROOM
180SFFACULTYOFFICE
180SFFACULTYOFFICE
180SFFACULTYOFFICE
180SFFACULTYOFFICE
190SFFACULTYOFFICE
DN
mechanicalshaft
40SFSTORAGE
90
ELE70SF
RESTROOM/SHOWER
230SFLOUNGE
930SFENTRY
1060SFCORRIDOR
470SFCORRIDOR
340SF
CORRIDOR
UP
mechanicalshaft
2 ' - 2 "
1 0 ' - 3 "
1 8 ' - 2 "
3 ' - 4 "
2 7 ' - 5 "
1 0 ' - 0 "
2 7 ' - 0 "
2 ' - 2 "
1 0 0 ' - 6 "
180SFFACULTYOFFICE
170SFFACULTYOFFICE
120SFPROJECTROOM
20'-1"1'-0"28'-0"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"20'-8"5'-4"2'-2"
214'- 0"
180SFFACULTYOFFICE
34
8/20/2019 Williams College Science Quad Proposal
76/509
R O O F
A3.N.01
1
A3.N.02 1
A3.N.01
2
1 2 5 6 7 8
D
F
B
C
E
C.5
8.1.2 32.5 4 5.5
A3.N.02
4.5
A3.N.02
6.5
B.5
8.1
200SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
210SFFACULTYOFFICE
210SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
210SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
200SFFACULTYOFFICE
220SFFACULTYOFFICE
200SF ADMINOFFICE
150SFCOPYROOM
480SF
MATHSEMINARROOM
110SFKITCHENETTE
560SF
GEOSCIENCERESEARCHLAB
90SIT
120SELECT.C
30SFJAN.CL.
40SFRESTROOM
40SFRESTROOM
70SF
RESTROOM/SHOWER
120SFFLEXOFFICE
50SFRESTROOM
590SF
STATS/APPLIEDMATHLAB
650SF
TEACHINGLAB:STRUCTURAL
GEOLOGY
opentobelow
mechanicalshaftmechanicalshaft
40SFSTORAGE
DN
930SFENTRY
360SFCORRIDOR
260SF
CORRIDOR
mechanicalshaft790SFCORRIDOR
2 ' - 2 "
1 0 ' - 3 "
1 8 ' - 2 "
3 ' - 4 "
2 7 ' - 5 "
1 0 ' - 0 "
2 7 ' - 0 "
2 ' - 2 "
1 0 0 ' - 6 "
210SFFACULTYOFFICE
200SFFACULTYOFFICE
2050SF
MATHLIBRARY
90SF
ELECTRICALCLOSET
80SFPROJECTROOM
80SFPROJECTROOM
120SFFLEXOFFICE
20'-1"1'-0"28'-0"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"10'-6"20'-8"5'-4"2'-2"
214'- 0"
34
8/20/2019 Williams College Science Quad Proposal
77/509
8/20/2019 Williams College Science Quad Proposal
78/509
8/20/2019 Williams College Science Quad Proposal
79/509
UP
1
2
3
4
5
7
8
9
10
A B C D E F G H ID.4 E.7
6
4.1
2.9
A.5 I.5
4.6
11
4.8
A.1
11.1
2.1
10.2
9.7
8.7
7.7
6.4
H.9
A3.S.02
1
A3.S.01
2
A3.S.02 2
21' -6" 21' -6" 10' -9" 21' -6" 21' -6" 21' -6" 10' -9" 21' -6" 21' -6"
176'- 4"
110SF
IT
60SF
JAN
420SF
MAINELECTRICAL
ROOM
1480SF
MECHANICAL
460SF
LOADING
130SF
SCIENCECENTER
STAFFOFFICE
260SF
TEM
260SF
SEM
130SF
FACILITIESSTAFF
OFFICE
130SF
IMAGINGSTAFF
OFFICE
60SF
IMAGINGSUPPOR
ANDSTORAGE
110SF
HIGHSPEED
IMAGINGCAMERA
2980SF
MAIN/WOODSHOP250SF
MATERIALSSUPPLY
340SF
ELECTRICSHOP
120SF
WELDINGAREA
80SF
PAINTBOOTH
270SF
OFFICE/SHOP
CLASSROOM
100SF
WASTESTORAGE
100SF
RECYCLING
80SF
SPECIALTYEQUIP
ROOM
40SF
BALANCERM
50SF
LN2STORAGE
60SF
EMER.ELEC
200SF
SHOPVESTIBULE
250SF
VESTIBULE
480SF
CORRIDOR
370SF
CORRIDOR
200SF
CORRIDOR
200SF
PLUMBING
210SF
CORRIDOR
LINEOFBUILDINGABOVE
CRAWLSPACEBENEATH
LOADINGDOCKFOR
ENTRANCEOFSITE
UTILITIES
GENERATOR
6 ' - 0 "
2 4 ' - 0 "
1 1 '
- 0 "
3 0 ' - 0 "
1 1 ' - 0 "
1 0 ' - 6 "
2 1 ' - 0 "
2 1 ' - 0 "
2 1 ' - 0 "
1 0 ' - 6 "
6 9 ' - 4 "
4 1 ' - 2 "
8/20/2019 Williams College Science Quad Proposal
80/509
UP
UP
UP
1
2
3
4
5
7
8
9
10
A B C D E F G H ID.4 E.7
6
4.1
2.9
A.5 I.5
4.6
11
4.8
A.1
11.1
2.1
10.2
9.7
8.7
7.7
6.4
H.9
A3.S.02
1
A3.S.01
2
A3.S.02 2
21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6"
176'- 4"
6 ' - 0 "
2 4 ' - 0 "
1 1 '
- 0 "
3 0 ' - 0 "
1 1 ' - 0 "
1 0 ' - 6 "
2 1 ' - 0 "
2 1 ' - 0 "
2 1 ' - 0 "
1 0 ' - 6 "
7 5 '
- 4 "
9 5 ' - 0 "
LINEOFLOADINGDOCKANDBASEMENTBELOW
58'-7"
150SF
ELECTRICAL
30SF
JAN
180SF
PHYSICSOFFICE
170SF
CHEMISTRYOFFICE
180SF
PHYSICSOFFICE
180SF
PHYSICSOFFICE
180SF
PHYSICSOFFICE
180SF
PHYSICSOFFICE
170SF
PHYSICSOFFICE
180SF
PHYSICSOFFICE
240SF
MACHINESHOP
SUPPORT
590SF
RESEARCHLAB
640SF
RESEARCHLAB 640SF
RESEARCHLAB640SF
SCIENCECENTER
FLEXLAB 300SF
SCIENCECENTER
FLEXSUPPORTLAB
620SF
SCIENCECENTER
FLEXLAB
660SF
SCIENCECENTER
FLEXLAB
600SF
SCIENCECENTER
FLEXLAB600SF
RESEARCHLAB
300SF
SUPPORTLAB610SF
RESEARCHLAB630SF
RESEARCHLAB
290SF
SUPPORTLAB
330SF
RESEARCHLAB
360SF
RESEARCHLAB
670SF
STUDENTSTUDY
170SF
STUDENTSTU
160SF
STUDENTSTUDY
130SF
PROJECTROOM
230SF
STUDENTSTUDY
90SF
VESTIBULE
90SF
VESTIBULE
30SF
PUMPROOM
64' - 3" 53' - 6"
8/20/2019 Williams College Science Quad Proposal
81/509
UPDN
UP
1
2
3
4
5
7
8
9
10
A B C D E F G H ID.4 E.7
6
4.1
2.9
A.5 I.5
4.6
11
4.8
A.1
11.1
2.1
10.2
10.2
9.7 9.7
8.7 8.7
7.7 7.7
6.4 6.4
H.9
A3.S.02
1
A3.S.01
2
A3.S.02 2
58'-7"
1 ' - 7 "
6 ' - 0 "
2 4 ' - 0 "
1
1 ' - 0 "
3 0 ' - 0 "
1 1 ' - 0 "
1 0 ' - 6 "
2 1 ' - 0 "
2 1 ' - 0 "
2 1 ' - 0 "
1 0 ' - 6 "
21' -6" 21' -6" 10' -9" 21' -6" 21' -6" 21' -6" 10' -9" 21' -6" 21' -6"
176'- 4"
7
5 ' - 4 "
9 5 ' - 0 "
600SF
RESEARCHLAB
670SF
RESEARCHLAB
620SF
RESEARCHLAB310SF
TISSUECULTURE
SHAREDLAB
640SF
RESEARCHLAB
600SF
RESEARCHLAB
640SF
RESEARCHLAB
610SF
RESEARCHLAB
70SF
IT
150SF
ELECTRICAL
30SF
JAN
180SF
CHEMISTRYOFFICE
170SF
CHEMISTRYOFFICE
180SF
CHEMISTRYOFFICE
180SF
CHEMISTRYOFFICE
180SF
CHEMISTRYOFFICE
180SF
BIOLOGYOFFICE
180SF
BIOLOGYOFFICE
170SF
BIOLOGYOFFICE
130SF
BIOCHEM
MICROSCOPY
100SF
COLDROOM
90SF
EQUIPMENTROOM
210SF
CHEMISTRYOFFICE
390SF
EQUIPMENTROOM
630SF
RESEARCHLAB
600SF
RESEARCHLAB
310SF
EQUIPMENT/
STORAGE
CORRIDOR
310SF
ORGANICCHEM
SUPPORTROOM
300SF
BIOCHEM
ANALYTICAL LAB
170SF
STUDENTST
170SF
STUDENTSTUDY
100SF
SCIENCECENTER
STAFFOFFICE
90SF
COPYROOM
140SF
PROJECTALCOVE
150SF
STUDENTSTUDY
110SF
STUDENTSTUDY
140SF
KITCHENETTE
64' -3" 53' -6"
8/20/2019 Williams College Science Quad Proposal
82/509
DN
1
2
3
4
5
7
8
9
10
A B C D E F
G
G H I
D.4
D.4
E.7
E.7
6
4.1
2.9
A.5 I.5
4.6
11
4.8
A.1
11.1
2.1
10.2
9.7
8.7
7.7
6.4
H.9
A3.S.02
1
A3.S.01
2
A3.S.02 2
6 ' -
0 "
2 4 ' -
0 "
1 1 ' -
0 "
3 0 ' -
0 "
1 1 ' -
0 "
1 0 ' -
6 "
2 1 ' -
0 "
2 1 ' -
0 "
2 1 ' -
0 "
1 0 ' -
6 "
21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6"
7 5 ' -
4 "
9 5 ' -
0 "
176'-4"
8 ' - 6"
480SF
RESEARCHLAB
120SF
FLYSUPPORTLAB
460SF
RESEARCHLAB
660SF
RESEARCHLAB
590SF
RESEARCHLAB
70SF
IT
150SF
ELECTRICAL
30SF
JAN
180SF
BIOLOGYOFFICE
170SF
BIOLOGYOFFICE
180SF
BIOLOGYOFFICE
180SF
BIOLOGYOFFICE
180SF
BIOLOGYOFFICE
180SF
SCIENCECENTER
OFFICE
180SF
SCIENCECENTER
OFFICE
170SF
SCIENCECENTER
OFFICE
620SF
RESEARCHLAB
640SF
RESEARCHLAB
600SF
RESEARCHLAB
490SF
RESEARCHLAB
120SF
AUTOCLAVE
390SF
EQUIPMENTROOM
220SF
BIOLOGYOFFICE
180SF
CHEMTEACHING
SUPPORTLAB
1290SF
BIOCHEM
TEACHINGLAB
530SF
BIOLOGYSEMINAR
180SF
BIOSUPPORTLAB
100SF
SCIENCECENTER
FLEXOFFICE
170SF
STUDENTSTUDY
160SF
STUDENTSTUD
10SF
EMER.ELEC
90SF
PROJECTROOM
70SF
FLYWETLAB
130SF
PROJECTROOM
130SF
PROJECTALCOVE
9 5 ' -
0 "
64' - 3" 58' - 7" 53' - 6"
8/20/2019 Williams College Science Quad Proposal
83/509
1
2
3
4
5
7
8
9
10
A B C D E F G H ID.4 E.7
6
4.1
2.9
A.5 I.5
4.6
11
4.8
A.1
11.1
2.1
10.2
9.7
8.7
7.7
6.4
H.9
A3.S.02
1
A3.S.01
2
A3.S.02 2
4940SF
MECHANICAL ROOM
40SF
ELEVATOR
CONTROLLER
ROOMCFMF
6 ' - 0 "
2 4 ' - 0 "
1
1 ' - 0 "
3 0 ' - 0 "
1 1 ' - 0 "
1 0 ' - 6 "
2 1 ' - 0 "
2 1 ' - 0 "
2 1 ' - 0 "
1 0 ' - 6 "
21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6" 21' - 6" 10' - 9" 21' - 6" 21' - 6"
DN
7
5 ' - 4 "
8 8 ' - 4 1 / 4 "
6 ' - 7
3 / 4 "
9 5 ' - 0 "
1 0 ' - 6 "
2 1 ' - 0 "
2 1 ' - 0 "
2 1 ' - 0 "
1 0 ' - 6 "
2 ' - 2 "
2 ' - 4 "
58'-7"
77' - 5" 77' -5"
176'- 4"
1
2
3
4
5
A B C
6
4.1
2.9
A.5
4.6
4.8
A.1
2.1
7 5 ' - 4 "
SCALE: 1/16"=1'-0"2
PENTHOUSEROOF
8/20/2019 Williams College Science Quad Proposal
84/509
8/20/2019 Williams College Science Quad Proposal
85/509
8/20/2019 Williams College Science Quad Proposal
86/509
STORMWATER REPORT
For
WILLIAMS COLLEGESCIENCE CENTER RENEWAL PROJECT
Williamstown, Massachusetts
Prepared for:
PAYETTE290 Congress Street, 5th Floor
Boston, MA 02210-1005
Prepared by:
NITSCH ENGINEERING, INC.2 Center Plaza, Suite 430
Boston, MA 02108-1928
120 Front Street Suite 820Worcester, MA 01608
Nitsch Project #10942
December 18, 2015
8/20/2019 Williams College Science Quad Proposal
87/509
8/20/2019 Williams College Science Quad Proposal
88/509
Williams College Science Center December 18, 2015Nitsch Project #10942
TABLE OF CONTENTS
1.0 INTRODUCTION ............................................................................................................. 1
2.0 EXISTING CONDITIONS ................................................................................................. 1
2.1 Existing Drainage Infrastructure ....................................................................................... 1
2.2 NRSC Soil Designations .................................................................................................. 2
2.3 Onsite Soil Explorations ................................................................................................... 2
3.0 PROPOSED CONDITIONS ............................................................................................. 3
3.1 Project Description ....