Bord Gáis Éireann Whitegate Independent Power Plant Environmental Impact Statement Black
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Bord Gáis Éireann Whitegate Independent Power Plant Environmental Impact Statement August 2006
This report takes into account the
particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party
Arup Consulting Engineers 15 Oliver Plunkett Street, Cork Tel +353 21 4277670 Fax +353 21 4272345 www.arup.ie Job number C1662.40
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Bord Gáis Éireann Whitegate Independent Power PlantEnvironmental Impact Statement
J:\C1600-C1699\C1662\3) DOCUMENTS\40\REPORTS\EIS_C1662.40_ISSUE1.DOC Arup Consulting EngineersIssue 1 8 August 2006
APPENDICES
APPENDIX 7 .1
GLOSSARY OF IMPACTS
APPENDIX 8 .1
ACOUSTIC TERMINOLOGY
APPENDIX 9 .1
AIR QUALITY ASSESSMENT
APPENDIX 10 .1
SPECIES LIST
APPENDIX 10.2
SITE EVALUATION SCHEME
APPENDIX 12 .1
ARCHAEOLOGICAL INVENTORY
APPENDIX 12 .2
ARTEFACT AT TRABOLGAN
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Bord Gáis Éireann Whitegate Independent Power PlantEnvironmental Impact Statement
J:\C1600-C1699\C1662\3) DOCUMENTS\40\REPORTS\EIS_C1662.40_ISSUE1.DOC Arup Consulting EngineersIssue 1 8 August 2006
LIST OF FIGURES
NTS1 Site Location NTS2 Site Layout – Proposed NTS3 Landscape Plan NTS4 Photomontage View from Whitegate NTS5 Photomontage View from Entrance to Trabolgan 1.1 Site Location 1.2 Site Context 1.3 Cork Harbour Context 3.1 Site Location 3.2 Site Context 3.3 Site Layout – Proposed 4.1 County Development Zoning Map 5.1 Visual Envelope/ Photo Location Points 5.2 Landscape Treatment 5.3a, b Existing and Proposed Views from Roches Point 5.4a, b Existing and Proposed Views from Whitegate (North) 5.5a, b Existing and Proposed Views from Whitegate (South) 5.6a, b Existing and Proposed Views from Cobh Cathedral 5.7a, b Existing and Proposed Views from Gobby Strand, Ringaskiddy 5.8a, b Existing and Proposed Views from Weavers Point, Crosshaven 5.9a, b Existing and Proposed Views from the Entrance to Trabolgan 5.10a, b Existing and Proposed Views from Northern End of Whitegate Bay 5.11a, b Existing and Proposed Views from Marloag Point 8.1 Noise Sensitive Locations and Noise Survey Locations 8.2 Plot of Measured Noise Levels at Fort Davis 8.3 Plot of Measured Noise Levels at South West Boundary of Site 8.4 Plot of Night Time Industrial Noise Levels 2000 – 2005 8.5 Calculated Operational Noise Levels 8.6 Calculated Construction Noise Levels 9.1 99.8%ile of Hourly Average NO2 baseline – oil firing 9.2 99.8%ile of Hourly Average NO2 baseline plus Phase I and Phase II – oil firing 9.3 Predicted Annual Average NO2 baseline – oil firing 9.4 Predicted Annual Average NO2 baseline plus Phase I and Phase II – oil firing 10.1 Habitat Map 11.1 Geology Map 11.2 Radon Map 11.3 Drawing Showing Stream 11.4 Groundwater Flow 11.5 Plan of Waste Areas 11.6 Location of Effluent Outfall 12.1 Extract from RMP Maps 12.2 Extract from First Edition OS Map 12.3 Extract from Second Edition OS Map
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Bord Gáis Éireann Whitegate Independent Power PlantEnvironmental Impact Statement
J:\C1600-C1699\C1662\3) DOCUMENTS\40\REPORTS\EIS_C1662.40_ISSUE1.DOC Arup Consulting EngineersIssue 1 8 August 2006
12.4 Extract from RMP Map Showing Site Location 12.5 Plates 1 and 2 12.6 Plates 3 and 4 12.7 Plates 5 and 6
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Bord Gáis Éireann Whitegate Independent Power PlantEnvironmental Impact Statement
J:\C1600-C1699\C1662\3) DOCUMENTS\40\REPORTS\EIS_C1662.40_ISSUE1.DOC Arup Consulting EngineersIssue 1 8 August 2006
GLOSSARY OF TERMS AND INITIALISATIONS This glossary is not exhaustive and the definitions are solely as an aid to the non-technical reader.
ACC air cooled condenser, cooling plant used in power stations AGI above ground [gas] installation alluvium sediment deposited by flowing water anticline a fold in rocks with strata sloping downward on both sides from a common crest aquifer a geological unit that stores and transmits significant quantities of groundwater under
normal hydraulic conditions barg a unit used for the measurement of pressure (referred to as gauge pressure) BGE Bord Gáis Éireann, the Irish gas board Carboniferous the geological Period between 355 and 290 million years ago CCGT combined cycle gas turbine EIA Environmental Impact Assessment EIS Environmental Impact Statement EPA Environmental Protection Agency excavation for archaeology, excavation means the manual and mechanical excavation by an
archaeologist-led team with specific objectives as regards information, preservation, recording, etc. of archaeological information. Its purpose is to fully investigate archaeological deposits and features
GHG greenhouse gases groundwater water that occupies pores and crevices in rock and soil, below the surface and above a
layer of impermeable material GSI Geological Survey of Ireland GTG gas turbine generator habitat the dwelling place of a species or community which provides a particular set of
environmental conditions HCV heavy commercial vehicles - this includes buses and coaches HGV heavy goods vehicles HRSG heat recovery steam generator in-situ in its original place, for archaeology it refers to the preservation of archaeological
sites/features without disturbance limit value specified in European Union air quality Directives as a concentration of a pollutant which
must not be exceeded in order to protect health methodology the specific approach or techniques use to analyse impacts or describe environments Mtoe Million tonnes of oil equivalent MW megawatts, one million watts MWe megawatts of electricity generated orogeny the process of mountain formation pcSAC proposed candidate Special Area of Conservation pNHA proposed Natural Heritage Area pollution the direct or indirect alteration of the physical, chemical, thermal, biological, or
radioactive properties of any part of the environment in such a way as to create a hazard or potential hazard to the health, safety or welfare of living species
Quaternary the most recent Period of geological time (the last two million years) ROG refinery off gas, a gas generated at the ConocoPhillips oil refinery run-off the gravity-flow of water in open channels SEI Sustainable Energy Ireland STG steam turbine generator test trenching a form of archaeological excavation where the purpose is to establish the nature and
extend of archaeological deposits and features present in a location that is proposed for development. Its purpose is not to fully investigate those deposits or features
visual envelope the extent of potential visibility of the proposed development to or from a specific area or feature in the landscape - defined by topography and vegetation
WIPP Whitegate Independent Power Plant
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Bord Gáis Éireann Whitegate Independent Power PlantEnvironmental Impact Statement
J:\C1600-C1699\C1662\3) DOCUMENTS\40\REPORTS\EIS_C1662.40_ISSUE1.DOC Arup Consulting EngineersIssue 1 8 August 2006
LIST OF CONTRIBUTORS This Environmental Impact Statement (EIS) is based on an assessment of the environmental effects of the proposed Whitegate Independent Power Plant undertaken by Arup Consulting Engineers and its subconsultants. The Arup study team drew on in-house resources including environmental and earth sciences, traffic engineering and graphics. The following subconsultants, working in accordance with specifications prepared by Arup Consulting Engineers, supplemented these resources: • ANV Technology – Noise and Vibration Study
• Brady Shipman Martin – Landscape and Visual Study, including the preparation of photomontages
• Dixon Brosnan – Flora and Fauna Study
• Mott MacDonald Ltd – Air Quality and Climate Study
• Sheila Lane and Associates – Archaeology, Architectural and Cultural Heritage Study
Mott MacDonald Pettit Limited, the design engineers for the project, and Bord Gáis Éireann contributed to the preparation of the EIS.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Site Location
Ringaskiddy
Midleton
Whitegate
Cobh
Crosshaven
R630
Site Location
Figure NTS1August 2006C1662.40
Non Technical Summary - Whitegate IPP
NOTE: Drawing is for diagrammatic purposes only. No measurements to be taken.
Ordnance Survey Ireland Licence No EN 0002806 © Government of IrelandOrdnance Survey Ireland Licence No EN 0002806 © Government of Ireland
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Figure NTS2August 2006C1662.40
Non Technical Summary - Whitegate IPP
Site Layout - ProposedNote: This graphic is for diagrammatic purposes. No measurements to be taken.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Grave Yard
(In Ruins)
Church
School
(C of I)Church
Angel's Well
Paddock Wood
Spring
UND
OS2
DWD1
5.63
4.70
18.58
11.05
15.14
12.11
6.73
31.6331.63
31.5731.57
30.8230.82
29.04
26.48
24.41
22.95
CRCR
3.97
2.98
CR
6000 N
10Kv
110Kv
110Kv110Kv
10Kv
10Kv
10Kv
10Kv10Kv
New
FLARE
Angel's Well
FF
Paddock Wood
UN
D
CP
CALOR TEORANTA SITE
UN
D
BS
UN
D
CR
CFUND
Spring
I-2
I-3
I-4
P-12
P-13
U-2U-1
U-4U-3
I-1
P-22
I-7I-8
I-9I-10
I-15I-11
I-12
I-13
I-14
P-14
P-15
P-16
P-17
S-1S-2
S-3S-4
P-1
P-3
P-7
P-8 P-18
P-19
P-20
P-21
P-23
P-6
P-5
P-4P-11
P-10P-9
U-8
U-5
PHASE 1
Wayleave for Existing
Wayleave for New L.P.
Location for Site
5.63
18.58
11.05
15.14
12.11
6.73
BSBSBSBS
31.6331.63
31.5731.57
30.8230.82
29.04
26.48
24.41
22.95
PIPESTILLUN
ITO
NEW
HYDROF
BOIL
True
P-2
UP
UP
UP
183081.059E
062617.886N
LANDSCAPEMASTERPLAN
WHITEGATE IPP
JULY 2006 Figure 1.2
Landscape Architects
Unit 9, 7/10 Robert Scott House,Patricks Quay, Cork, Ireland.
Ordnance Survey Ireland Licence No AR 0001306© Government of Ireland
N
1
2
3
3
4
5
5
0M
5010
20
30
40 100 M
200 M
1 WOODLAND PLANTING ON THE NORTHERNBOUNDARY OF THE PROPOSEDWHITEGATE IPP SITE TO BREAK UP THEMASSING OF THE STRUCTURE
2 TREE LINED ENTRANCE ROAD
3
4
5 LOCAL MOUNDING TO SCREEN THEROADS, AND SERVICES, PIPE RUNS ETC
EVERGREEN HEDGE PLANTING TO THESITE BOUNDARIES AS BACKDROP TOSCREEN THE PALLISADE FENCE
WHITEGATE IPP SITE BOUNDARY
LEGEND
E XIS T ING V E G E T AT ION
E AR T H B UNDS
T HE S IT E
P R OP OS E D WOODLAND S HE LT E RB E LT P LANT ING WIT HIN T HE S IT E
E XIS T ING V E G E T AT ION T O B EC LE AR E D
PLANTING PROPOSALST HE AIMS OF T HE P LANT ING AR E T O:1. S C R E E N OR F ILT E R V IE WS OF T HE S IT E2. AS S IS T T HE DE V E LOP ME NT T O INT E G R AT E
WIT H T HE S UR R OUNDING LANDS C AP E .3. P R OV IDE ALL Y E AR S C R E E NING WIT H
S E LE C T ION OF B OT H E V E R G R E E N S P E C IE SAND INDIG E NOUS S P E C IE S .
S E MI MAT UR E T R E E S T O T HE E NT R ANC E R OAD:HOLM OAK (Quercus ilex) 5.5-6.0m height.
WOODLAND S HE LT E R B E LT P LANT INGB AR E R OOT WHIP S AND F E AT HE R S(90-120cm height at 1.2m centres)C OR S IC AN P INE (P inus nigra) 50%S C OT S P INE (P inus sylvestris ) 15%HOLM OAK (Quercus ilex) 20%AS H (F raxinus escels ior) 5%B IR C H (B etula pubescens) 5%HAZE L (C orylus avellana) 5%
HE DG E R OW P LANT ING T O T HE B OUNDAR YHAWT HOR N (C ratageus mongyna)B AR E R OOT WHIP S P LANT E D IN DOUB LES T AG G E R E D R OWS AT 0.3M C E NT R E S .
Figure NTS3August 2006C1662.40
Non Technical Summary - Whitegate IPP
Landscape PlanNote: This graphic is for diagrammatic purposes. No measurements to be taken.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Figure NTS4August 2006C1662.40
Non Technical Summary - Whitegate IPP
Photomontage View from WhitegateNote: This graphic is for diagrammatic purposes. No measurements to be taken.
As Existing
As Proposed
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
Figure NTS5August 2006C1662.40
Non Technical Summary - Whitegate IPP
Photomontage View from Entrance to TrabolganNote: This graphic is for diagrammatic purposes. No measurements to be taken.
As Existing
As Proposed
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 25-07-2013:21:57:58