WELCOMEYOUSE
PULU
H
SUMBER ANUGERA
H
EPC GENERAL CONTRACTOR
www.pt-ssa.co.id2
VISION AND MISSION
OUR PHILOSOPHY
To be the most admirable companyby the public of Indonesia
At the same time, to be the bestEPC Contractor in Indonesia
-a professional company in the fields ofEngineering, Procurement and Construction.
Efficient Communication
Awareness of Social Responsibility
Systemize and Simplify
Maximizing Client’s Satisfaction
www.pt-ssa.co.id 3
“Keep the promise, over deliver and work until the costumer issatisfied”
This is the drive engine for SSA.
I have founded this company from the scratch. Now SSA has proundlygrown into Grade 7 EPC contractor in Indonesia.
26 years ago, I only had one shovel in my hands. Now I have got greatnumber of employees to back me up, but our drive engine stays thesame. I have not stopped working to deliver satisfactory work to theclients until present day.
Take SSA as your partner and you will get to know what it means to beSatisfied.
“SSA is a doer company”We do not sit and lean our back talking about a project. Werather stand up and start doing the project. In this world, thereare lots of people who talk about great vision and better future.However, we do not meet many people who are actual “doer”then talker.
SSA is a doer company. We like ideas but we loveImplementations. We like planing but we love doing things.and most likely, we love what we do.So once you choose to work with SSA, you will experience awhole new world of “doers”.
Edwin Setya HwangFounder and President Director
CONSTRUCTIONSERVICE
WUR PACKAGE D
4
Client :PT.ChevronPacificIndonesiaPlant : Oil & Gas SKK MigasLocation : Pekanbaru Riau, Sumatera IndonesiaWork Scope : Earth Work, Civil, Mechanical, Electrical, Construction Services for Piping. Tank & Road Improvement.Period : Jun’10-May’15Amount : US$ 69.770.904
www.pt-ssa.co.id
5
Company Name :PT. SEPULUH SUMBER ANUGERAH
Established : 1992
Juridical Status : DOMESTIC INVESTMENT
Country : INDONESIA
Business Entity Constructed Integrated Services :0000001
TaxCertificate:01.754.787.8-415.000
Workshop :JL. RAYA JAKARTA SERANG, KM 68
KAW. MODERN INDUSTRI KAV. 8CIKANDE, SERANG – BANTEN
TEL.: +62-254-4029647 – 49FAX : +62-254-402951
QUALITY POLICYPT. SEPULUH SUMBER ANUGERAH
Management and employees at all levels of theorganization, have committed in running the business
and will deliver BEST SERVICES to all our clients.WE will continuously improve or quality, HSE
(health, safety and environment) and productivity.We promise to give competitive price, on schedule work
with zero pollution to all our clients, ensuring theirvaluableprofit.
We employees of PT. SEPULUH SUMBER ANUGERAHAre subject to improve our competency by increasing our
Soft skills, hard skills and technologies. We are also dedicatedto enchance safety and environmental awareness, as well as
excellent project managementPT. SEPULUH SUMBER ANUGERAH is also committed
To do sophisticated equipment investment.
SEPU
LUH
SUMBER ANUGERA
H
EPC GENERAL CONTRACTOR
GENERAL
INFO
www.pt-ssa.co.id
Client : PT. Doosan Heavy IndustriesRemarks : PLTU Cirebon 660 MWLocation : Cirebon, Central Jawa IndonesiaWork Space : Coal Siio, Boiler Steel Structure, VAC Works, GRP Instalation Work, Boiler Insullation, TBN, Esp. BOP Insullation, Road Paving ^ DrainagePeriod : Aug 08-Sep 11Amount : US$ 15.813.000
www.pt-ssa.co.id6
www.pt-ssa.co.id 7
PT. Sepuluh Sumber Anugerah has been successfullycompleting various project in engineering, procurement and
construction. No matter how remote and challenging the
locations of projects are, SSA has been showing itsprofessionalism by effectively executing the projects. Whether
is a commercial initiative or a secured government project,Wedeliversollutionsthatfulfillstheneedsofeachcostumer.
We offer innovative, on-time and under budget workRegardless of the size and the scope of a project.
PT. Sepuluh Sumber Anugerah offers aFull service of engineering, procurement andconstruction. We offer up-to-date high technologies
in engineering, various vendors who are willing to givebest price for procurement and high quality work from
A to Z on construction. You can count on SSA when youFacedifficultchallenges.
With high portfolio of project and management solutions,SSA encompasses client to the right direction they should
Walk on. Your mission is always accomplished with us.
EPCCHALLENGES
UPGRADING FASILITASPENIMBUNAN GASOLIN
INCLUDE FASILITASBLENDING
www.pt-ssa.co.id8
Client : PT. Wijaya Karya (Persero), Tbk.Remarks : Upgrading Fasilitas Penimbunan Gasoline Include Fasilitas BlendingLocation : Tanjung UbanWork Space : Tank Fabrication & InstallationPeriod : July’14-May’16Amount : US$ 5.055.000
www.pt-ssa.co.id 9
OIL & GAS PLANT
PETRO-REFINERY
PETRO-CHEMICAL
CHEMICAL / PHARM PLANT
MANUFACTURING PLANT
POWER GENERATION PLANT
INDUSTRIAL PLANT
PUBLICINFRASTRUCTURE
HIGH RISE BUILDING
ENGINEERING
PROCUREMENT
CONSTRUCTION
COMMISSIONING
MANPOWER SUPPLY
SHOP FABRICATION
ARCHITECTURE
CIVIL
STEEL STRUCTURE
HVAC
MECHANICAL
ELECTRICAL
HEAVY RIGGING
INSULATION
PIPING / PIPELINE
TANK
PAINT
FIRE FIGHTHING
DETAILED SECTORS
LINE OF SERVICES
FIENDS OF OPERATION
GENERAL SECTORS
NATIONALEPCSERVISES
www.pt-ssa.co.id10
Indonesia is one of the most developing countries in the wholeworld. It has developeda lot in recent years but more developments are coming in near future. Being the largestarchipelago in the world brings lots of challenges that occur due to locations. Challengesin remote areas make it harder for investors to explore. However, SSA is an expertin executing projects in remote area as well as in some of the culturally challengingplaces in Indonesia. SSA has experience in every major island in Indonesia andin different small islands.
www.pt-ssa.co.id 11
Access to a remote area is one thing to consider. However, there is always more thanJust a location when talk about challenges. Indonesia has more than 300 distinctNative ethnic groups with 742 different languages and dialects. This means challengesFrom cultural difference is huge. SSA is consist of employees with different ethnicities.SSA is also well known for great adaptation. These reasons make SSA a professionalin regulating challenges within this nation.
SSA not only provides an excellent access to a remote area but also provides a solutionTo take care of social acceptance when a project starts in a new area. Whether a projectIs for building LNG facility. Public infrastructure, housing complex, or any sort ofConstraction – SSA can run the project in a way that can blend in successfully withThe social atmosphere at the local site.
One can counton SSA – whenever, wherever.
www.pt-ssa.co.id12
JOB JAMBI MERANGOIL & GAS
DEVELOPMENTPROJECT
Client : HESS - PT. TripatraRemarks : Oil & Gas PlantLocation : Jambi, Sumatera IndonesiaWork Scope : Steel Structure, Piping & Mechanical WorksPeriod : May’09-Dec’10Amount : US$ 10.217.000
www.pt-ssa.co.id 13
SSA is a certified ISO company as well as an approved Grade 7 EPCContractor In Indonesia. This means we are professional on what we do. Over25years,ourclientshavebeensatisfiedwithourwork.Mostof theclientsareSurprised about our outcome since everything about a project is effectively andEfficientlymanagedbySSA.
Highly qualified work within a given time and given budget is hard to find,Especially among EPC contractors in Indonesia. However, we are different. WeKeep our pholisophy – maximizing clients’ satisfaction, commitment to safetyAnd quality awareness of social responsiblility and reality. We deliver client – focusedApproach for each project and make sure we complete the mission.
BENEFITWe offer :
Decision making solutions that are based on accurate, real-time data.
Zero accidents and zero harm.
This means we take care of Health, Safety and Environment seriously.Optimum productivity.
High quality, under budget procurement service.
Readiness of manpower.
COUNTONSSA
FOR MORE INFORMATION ABOUT SSA,PLEASE VISIT OUT WEBSITE
at www.pt-ssa.co.id
www.pt-ssa.co.id14
EDWIN SETYA HWANGPRESIDENT
HEAD QUARTERMANAGEMENT
PROPOSAL& FACTORY MARKETINGPROJECT
JUSTIN K. AHNEXECUTIVE DIRECTOR
PROJECTMANAGER
PROJECTMANAGER
FINANCEMANAGER
FINANCEMANAGER
PROCUREMENTMANAGER
PROCUREMENTMANAGER
HRDMANAGER
HRDMANAGER
KWANG JIN JUNDIRECTOR
HENYDIRECTOR
FINANCEMANAGER
PROCUREMENTMANAGER
HRDMANAGER
DOCUMENTCONTROL
MOKHTASORDIRECTOR
PROPOSALTEAM
WORKSHOPMANAGER
FABRICATIONCOORDINATOR
ENGINEERINGCOORDINATOR
FINANCECOORDINATOR
HRD & GACOORDINATOR
PARK BYEONG YEOLMARKETING DIRECTOR
MARKETINGMANAGER
MARKETINGTEAM
COMPANY ORGANIZATION
OUR PEOPLE & ORGANIZATION
www.pt-ssa.co.id 15
TYPICAL SITE ORGANIZATIONPRESIDENT DIRECTOR
PROJECT DIRECTOR
PROJECT DIRECTOR
HEAD OFFICETEAM
FINANCE& ACC
STAFF
STAFF
STAFF
HRD
ADMMECH
PAYROLL
STAFF
PROJECTCONTROLLER
PLANNER
EXPEDITER
DOC.CONTROL
SITESUPERINTENDENT
SUPERVISOR
FOREMAN
FOREMAN
FOREMAN
QA / QC& SAFETY
QC MECH
QC CIVIL
QC PIPING
SAFETY OFF
CONTROLLOGISTIC
WAREHOUSE
SITEPROCUREMENT
ENGINEER DIV.
CIVILENGINEER
MECH.ENGINEER
PIPING
DRAFTER
HSE DIVISION
HSE MANAGER
HSE COORDINATOR
HSE OFFICE
HEAD OFFICETEAM
OUR PEOPLE & ORGANIZATION
SSA people vary from 2,500 people to maximum 5,000 people according to the projects we handle at onespecifictime.
SSA people travel along the sites and share their expertise on the job. The mixture Ofpermanent and seasonal employees are on sites.However, SSA does keep track of people and take care of our people regardless of their status – most of people who had experience with us – always want to comeBack and work for us when we need them. A great combination of local IndonesiaExperts and global professionals give us an Ideal synergy to harmonize our work.
www.pt-ssa.co.id16
INDONESIAGRINDING MILL
PLANT (ADIK)
Client : PT. Comsteel Indonesia Molycop Group - AustraliaLocation : Cilegon, Banten IndonesiaWork Scope : Industrial Plant EPC WorkPeriod : Feb’12-May’14Amount : US$ 10.108.864
www.pt-ssa.co.id 17
ONCHART
CONSTRUCTION PERSONELIN PERCENTAGE
WORK CATEGORYIN PERCENTAGE
FIELDS OF OPERATIONIN PERCENTAGE
Construction Manager (1%)Civil Works (8%)
Building (7%)Structural Steel (11%)
Mechanical Erection (3%)Piping (58%)
Electrical (1%)Instrument (3%)Insulation (2%)
Painting (2%)Quality (2%)Safety (2%)
*) By Project percentage In the last 5 years
Piping (35%)Tank (10%)
Steel Structure (5%)Mechanical Erection (15%)
Civil Works (22%)Building (8%)
Electrical & Instrumentain (2%)Insulation & Painting (3%)
Oil & Gas Plant (47%)Power Plant (22%)
Industrial Plant (14%)Petrochem Plant (9%)
Public Construction (8%)
www.pt.ssa.co.id18
SSA owns two workshops to support various projects. They are located in Kawasan Modern IndustriCikande Serang. Our major workshop has total area of 44.456 m2 and other one is 7.200 m2.
TheworkshopisdesignedtoflawlesslycarryoutfabricationprocessforTank,Piping,Steelstructureandother mechanical work that SSA is specialized in at workshop, SSA has driliing machine600 ton, gantry crane with lifting capacity of 10 ton, rolled machine with capacity up to 20 mmthickness, engine welding machine, plasma cutting machine, forklift, TMC with lifting capacity 10 tonand 25 ton mobile crane.
SSA is thefirstcompany in IndonesiatoownAutomaticWeldingMachineforspoolpipingfabrication.SSA has two of these Automatic Welding Machine that with International patent. SSA can produce spool piping NPS from 2”to 40” with productivity more than 300 DI per day per machine with zero rejectionrate.
WORKSHOP
www.pt.ssa.co.id 19
SSA workshop procedures are aligned with that ofISO 9001. On top of this, SSA adds on procedures andqualifications that we’ve learned from global standardclients such as Exxon Mobile, Chevron, Shell and BP.
A smaller workshop produces corrugated pipes.
SSA workshop’s capacity to produce quality items iscertainly the best in Indonesia.
217.
888
231618
1st Area : 218m x 232mSpeciality : Tank, Steel Structure, Pipe Spooling
www.pt-ssa.co.id20
EXXON MOBILE CEPU TDL
(E-MCL)
Client : EXXON MOBIL CEPU LTD [E-CML] - Cepu Ltd Tripatra Samsung ConsrotiumRemarks : Oil & GasLocation : Bojonegoro, Jawa Timur IndonesiaWork Scope : Piping Fabrication, Installation Tank / PaintingPeriod : Dec’12-Aug’14Amount : US$ 13.368.412
www.pt-ssa.co.id 21
1 SET < 20TON TRAILER
1SET 60~20TON TRAILER
3 SETS SURVEY INSTRUMENT
15 SETS B/DOZER
2 SETS MIXER
15 SETS EXCAVATOR
2 SETS COMPRESSOR
2 SETS PRIMOVER
12 SETS P-FOOT COMPACTOR
2 SETS WATER PUMP
6 SETS HAND COMPRESSOR
1 SET VIBRO ROLLER
3 SETS 100~50 TON CRANE
5 SETS CRANE UNDER 50 TON
72 SETS WELDING M/C [TIG]
40 SETS WELDING M/C [ENGINE]
134 SETS WELDING M/C [ARC]
10 SETS FOCOTRUCK
9 SETS FUEL TRUCK
12 SETS S-FOOT COMPACTOR
6 SETS MOTOR GRADER
4 SETS LOW/HIGH BOY
24 SETS COMPACTOR
43 SETS DUMP TRUCK
SSA’s list of equipment varies time to time. SSA does not hesitate to invest in newequipment when it is necessary. To meet all requirements from clients, we invest inrequired equipment. SSA also invests in new technologies when we seeopportunities to serve our client better. SSA sends people to globalconventions to seek for new technologies that can be implemented in Indonesia.
EQUIPMENT
www.pt-ssa.co.id22
PROJECTPROFILEOI
L &
GAS
Contract Name Client / Main ContractorContact Period Location
SiteWork Scope
Start Finish
Cilacap Blue Sky Project (Piping and Tank Field Installation Work) PT Pertamina
Consortium - PT. Encona IntiIndustri / JGC / PT. JGC
IndonesiaDec-16 Jun-18 Cilacap Piping & Tank Installation
Work
Medco Block A Gas Development (Aceh) Piping Shop Fabrication PT. Medco E&P Malaka
PT. JEC (PT. JGC Indonesia-PT. Encona Inti Industri
Consortium)Dec-16 Jun-17 Cikande
Workshop Piping Fabrication Work
Gas Pipeline (JBB & SBS 3) PT PGN PT PGN Dec-15 Jun-18
Cirebon,Karawang,Bekasi,Jakarta,
Bogor,Tangerang,Colegon & Palembang
EPC
Civil & Arch Work of Pembangkit Listrik Tenaga Uap PT PLN PT Adhi Karya Oct-15 Jul-16 Sintang
Kalimantan Construction Civil & Arch
Fasilitas Penimbunan Gasoline di Tanjung Uban PT Pertamina PT Wijaya Karya (WIKA) Jul-14 May-16 Tanjung Uban Tank Fabrication &
Installation
BP LNG Tangguh Project BP Berau PT Wijaya Karya (WIKA) May-14 Jun-16 Tangguh Sorong Piping Fabrication,Installation & Tank Work
Fabrication & Installation - Piping, Tank / Painting Work
Exxon Mobil CepuLimited (E-MCL)
Tripatra SamsungConsortium Dec-12 Dec-14 Bojonegoro Piping Fabrication,
Installation & Tank Work
North Duri Development (NDD) Area 13 PT. Chevron Pacific Indonesia Sep-12 Dec-15 Duri, Riau EPC
NGL Extraction Plant PT. Perta - Samtan Gas PT. Tripatra E & C May-11 Nov-11 Prabumulih-Palembang
Piping, Steel Structure, Painting
Construction Service LT WUR -Package D PT. Chevron Pacific Indonesia May-10 Dec-15 Minas
Construction Services for Piping, Tank, Mechanical,
Electrical, RoadImprovement & Earth Works
JOB Jambi Merang Development Project HESS PT. Tripatra May-09 Dec-10 JambiSumatra
Steel Structure, Piping & Mechanical
Works
Turnaround Work of LBO Plant Dumai Site in 2009 PT. Pertamina PT. Patra SK May-09 Sep-09 DumaiSumatra Piping
Turnaround Work of LBO Plant Dumai Site in 2009 PT. Pertamina PT. Patra SK May-09 Sep-09 DumaiSumatra Piping & Tank Work
Building Work Package 2 - Office Building PT. Pertamina PT. Rekayasa Industri Aug-08 Mar-09 Balongan Civil Work & Building Work
L-Project PT. Patra SK SK Engineering & Construction Jan-07 Mar-08 DumaiConstruction Services for Me-
chanical&Tank& Piping Works
Pipeline 8” - 11,5 Km PT. PGN PT. Rekayasa Industri May-06 Jul-07 Purwakarta Piping
Pipeline PT. PGN PT. Rekayasa Industri Jun-06 Mar-07 BojonegaraLampung Piping
UCO Balikpapan Tank Project PT. Pertamina PT. Patra SK Jun-11 Jun-12 Dumai Sumatra Tank Terminal Work
Kufpec Phase-1 Facility Epic PJ Pipeline & Piping Work,Kufpec Phase-l Facility Epic PJ STL/ STR Work, KufpecPhase-l Facility EPIC PJ Pipe Support
PT. DongwooCorporation Jul-01 Oct-02 Bula Civil & Mechanical Work
www.pt-ssa.co.id 23
BASED ON FIELDS OF OPERATIONPO
WER
PLA
NT
Contract Name Client / Main ContractorContact Period Location
SiteWork Scope
Start Finish
Central Java 2 X 1000MW Coal Fired Power Plant Project,Central Java Province, Indonesia
PT. PLN PT. Jurong Engeneering Lestari Apr-18 Mar-20 Batang, JawaTengah Piping Work & Tank Work
200 MW In aggregate Off-Gas Generation Power Plant Project
Posco Engineering &Construction CO.,LTD PT. Soehee Indonesia Jun-12 Jul-13 Cilegon Fabrication Sea Water Pipe
Cirebon Coal Fired Power Plant Project PT. Doosan HeavyIndustrias Aug-10 Sep-11 Cirebon
Coal Silo, Boiler Steel Structure, VAC
Works, GRP Installation Work, BoilerInsullation, TBN,ESP,BOP Insul-
lation,Road Paving & Drainage
Civil Work & CWD Canal - PLTU Pacitan PT.PLN Hubei Honyhuan Power
Eng. China Jan-09 Jul-11 Pacitan Civil & Piping
Site Fabricated Tanks For Tanjung Priok Gas Fired Power Plant Project, Indonesia Mitsubishi Corporation Oct-09 Oct-10 Tanjung Priok Engineering &
Fabrication
Civil Work Main Building - PLTU 3 Banten PT. PLN SEPCO China Oct-08 Sep-09 Teluk Naga Construction Work
Civil, CWD, Supply, Fabrication & Installation Coal Bunker PT. PLN PT. Rekayasa Industri Dec-08 Nov-09 Suralaya Engineering, Fabrication & Instal-
lation
Site Fabricated Storage Tanks For Muara Karang Gas Power Plant Project Mitsubishi Corporation Feb-08 Mar-09 MuaraKarang Tank Engineering &
Fabrication Work
Wayang Windu Unit 2 Geothermal Power Project
Magma NusantaraLtd PT. Rekayasa Industri Apr-08 Nov-08 Pengalengan
Bandung Piping
Discharge Cooling Water Pipe Fab & Installation PT. PLN Jul-06 Jul-06 Lampung
Sumatra Civil & Mechanical Work
Fabrication Work, MakeUp Water Tank, Erection Work, Bypass Stack & Diffuser Piping & Add.Work
PT. SamsungCorporation Sep-03 Jun-04 Bekasi Mechanical Work
Piping Work For Paiton Private Power Plant Additional Work, Piping Work, Additional Work, fabrication of Operation, Goods
PT. Shinwa E & C Sep-96 Sep-98 Paiton Mechanical Work
PLN Jawa-2 Combined Cycle Power Plant (1x800NW) PT. PLN Mitsubishi Corporation Dec-16 Jun-17 Jawa - Tanjung Priok Tank Fabrication Work
www.pt-ssa.co.id24
Client : PT. Hon Chuan IndonesiaRemarks : Industrial PlantLocation : Mojokerto Surabaya, Jawa Timur IndonesiaWork Scope : Industrial Plant EPC WorkPeriod : Mar’14-Mar’15Amount : US$ 20.174.000
NGORO BEVERAGEASEPTIC PLANT
PROJECT
www.pt-ssa.co.id 25
Contract Name Client / Main ContractorContact Period Location
SiteWork Scope
Start Finish
SRI-u3 (AY3201 Steel Struture Work CombinedPakacage 1 & 2)
PT. Synthetic RubberIndonesia (SRI)
PT. Inti Katya Persada Teknik(IKPT)
Aug-16 Sep-17 Ciwandan, Cilegon Steel Structure Site Installation Work
Piping Work of Banggai Ammonia Plant PT. Panca Amara Utama PT. REKAYASA Jan-16 Jul-17 Luwuk, Sulawesi Piping
LOBP Monas Project PT Shell Indonesia JGC Indonesia Mar-14 Jun-15 Marunda TanjungPriok Piping Fabrication & Installation Work
Ngoro Beverage Aseptic Plant Project PT Hon Chua Indo-nesia Mar-14 Jul-15 Mojokerto Industrial Plant EPC Work
Indonesia Griding Mill Plant Project (ADIK) Molycop Group - PT.Comsteel Indonesia Fab-12 Jan-14 Cilegon Industrial Plant EPC Work
Daekyung Plant Project - Office Building & Shop PT. Daekyung Industry Apr-09 Fab-10 Cilegon EPC
Intake & Demin, Area Piping, Tank & Civil Work PT.Kirin Miwon Foods PT.Kirin Miwon Foods Feb-07 Jul-07 SumatraLampung
Intake & Demin, Area Piping, Tank & Civil Work Kirin MiwonFoods Miwon Foods Feb-07 Jul-07 Lampung
Sumatra Civil & Piping Works
Clean water Project Installation & Piping PT. Primer KoperasiAngkatan Darat Jul-05 Mar-06 Bandung Civil, M&E Work
Pam Oil Factory Construction PT.PutrabangunNusagriya Jan-04 Feb-05 Tanah laut Steel Structure & Mechanical Work
Mechanical & Piping Work PT.Punj Lyod Mar-03 Nov-03 Sumatra Steel Structure, Piping & MechanicalWorks
RTGC 9 Unit, Mech. Erection Work, JNPT RMQC 2 Unit, Mech. Erection Work, Jict Erection Work, Mech. Erection Work, SAGT RTGC 10 Units, Mech.Erection Work, RMQC 2 Units, Fab & Erection Work
Hanjung Engineering &Construction CO.,LTD Aug-02 Sep-03 Lampung
Sumatra M&E Work
KPI Project, Process Area A/G Piping Work PT.Shin Wha Eng’g Jan-00 Oct-01 Bontang Mech & Piping
Aboveground Piping, Installation Works, AMJ Project, Aboveground Piping Work PT.Shin Wha Eng’g Sep-98 Mar-01 Bontang Mechanical Work
Bosowa Cement Plant, Piping Work,Additional Work, Material Supply, A dd Work Steel Fabrica-tion & Erection Work,A dd Work Untilities & Fire Fighting, Maintenance & Piping Work
PT. Daewoo Corpo-ration Jun-97 Oct-98 Ujung Pandang Mechanical Work
Piping Work for T-Project Eng’g & Piping Work Refinery & Fermation PT. Chell Samsung Jan-97 Sep-98 Pasuruan Building / M&E Work
UA #3 Project EQ.Erection & Piping Temporary Office Work Platfrom & Ladder PT. Hyundai Eng’g May-97 Feb-98 Merak Civil, M&E Work
EQ Erection Work For FBJ-1 Project Duct FAB & Erection work, Insulation For Duct, Piping Work, Additional Work, Fabrication Of Operation Goods
PT. Kolon Engineering Sep-96 Apr-97 Serang Civil & Building Work
ISP-5 Project : Silo Fab & Erection, SSP Erection, CP OSBL Mechanical Work, ISP & OSBL Insula-tion Work, TPA Conveying Work, ISP-V Additional Work
PT.Sunkyong Keris Feb-96 Dec-96 Tangerang Civil, M&E Work
ISP-4 Project : Duct Work, IBL Piping, Add Work PT.Sunkyong Keris May-95 Jan-96 Tangerang Mechanical & Electical Work
Lucky Eng,MNT & VCR Factory, Duct Work, U/G Piping Work, ISBL Piping Work PT. Lucky Sep-95 Dec-95 Cibitung Building, Civil, M&E Work
ISP-3 Project : Jacket Piping, Single Piping, SteelStructure, EQ. Erection, Fab & Erection of Tank, TPA Piping, Insulation & Painting
PT.Sunkyong Keris Jan-94 Sep-94 Tangerang Manufacturing Shop, StorageMechanical & Electrical Work
ISP-1 Project : Qs Duct, Support Frame, General Duct, Kolene Facility, Take-up Frame PT.Sunkyong Keris Oct-91 Sep-92 Tangerang Building, Civil & Mechanical Work
KS-POSCO Mill Plant (Civil-Phase1) KS-POSCO POSCO E&C Sep-11 Dec-12 Cilegon MILL Plan Civil Work ~ PETRO PLANT
Lotte Shopping Avenue Facility Project PT. Lotte Shopping Sep-12 Aug-13 Jakarta Engineering, M&E ~ PUBLICINFRASTRUCTURE
Keraton at The Plaza (48 Floors) Ssangyong Indonesia Mar-08 Feb-09 Jakarta Mechanical Electical~PUBLICINFRASTRUCTURE
PROJECTPROFILE BASED ON FIELDS OF OPERATIONIN
DUST
RIAL
PLA
NT
www.pt-ssa.co.id26
A JOURNEYCONTRACT PERIOD BASED
PT. SUNGKYONG KERISISP-1
Oct’91-Sep’92
PT. SUNGKYONG KERISISP-2
May’93-Sep’93
PT. DAE HWA LEATHERCARRIER & DRYER
Nov’94-Jan’95
PT. SUNKYONG KERISSP-4
May’95-Jan’96
PT. CHEIL SAMSUNGT-PROJECT ENG’G &
PIPINGJan’97-Sep’98
PT. HYUNDAI ENG’GUA#3 PROJECTMay’97-Feb’98
PT. CHEIL SAMSUNGPIPING WORKOct’97-Sep’98
PT. YASSAM TEXTILE COEXTRACTOR CARRIER
Nov’94-Jan’95
PT. SUNGKYONG KERISISP-3
Jan’94-Sep’94
PT. SUNGKYONG KERISISP-5
Feb’96-Dec’96
PT. KOLON ENGINEERINGEQ ERECTION, PIPING
Sept’96-Apr’97
PT. KIA TIMOR MOTORINSTALLATIONSep’97-Nov’97
PT. SHIN WHA ENG’GABOVEGROUND PIPING
PUPUK KALTIMSep’98-Mar’00
PT. DAEWOO CORPORATIONBASOWA CEMENT PLANT
Jun’97-Oct’98
PT. SHINWA E & CPIPING FOR PAITON
PRIVATE POWER PLANTSep’96-Sep’98
PT. LUCKY LUCKY ENG, MNT & VCR
Sep’95-Dec’95
C.M
M
M&E C. M&E
C. M&E
C. M&E C. M&E
M M
M
C. M&E C. M&E
C. M&E M&E
C.
C.
92 93 94 95 96 97 98
www.pt-ssa.co.id 27
OIL & GAS PLANT POWER PLANT INDUSTRIAL PLANT PUBLIC INFRASTRUCTUREPETRO PLANT
PT. PUNJ LYODMECHANICAL & PIPING
WORKJan’03-Nov’03
PT. MANDIRI MAJU JAYAFABRICATION WORK
CHIMNEYOct’03-Nov’03
PT. MULTI ARTHA PRATAMA
TUNNEL UNDER BRIDGEJul’05-Oct’05
PT. CILEGONFABRICATOR
FABRICATION STL/STRJan’05-Mar’05
PT. MAWATINDOMEDITERENEAN PIPE
TOLL CIPULARANG PROJECTJan’05-Apr’05
PT. ADHIKARYA/WASKITAMEDITERENEAN PIPE
TOLL CIPULARANG PROJECTSep’04-Dec’04
PT. DAYA MULYA-JASA MARGAMEDITERENEAN PIPE
TOLL CIPULARANG PROJECTSep’04-Dec’04
PT. FOSTER WHEELERFABRICATION TUBE BUNDLE
PREHEATER, BOILER-May’04-Jul’04
PT. HYUNDAI ENG’G & CONST.
SUMPAL GAS PROJECTMay’01-Nov’01
HANJUNG ENGINEERING &CONSTRUCTION CO., LTDRTGC, JNPT RMQC, SAGT
Aug’00-Sep’03
PT. DONGWOO ENWIRINDONESIA
DONGWOO PROJECTAug’02-Mar’03
PT. DONGWOO CORP.KUFPEC PHASE-1
Jul’01-Oct’02
PT. SAMSUNG CORP.FABRICATION-PT. PLN
Sep’03-Jun’04
PT. PUTRABANGUN NUSAGIRIYAPAM OIL FACTORY
CONSTRUCIONJun’04-Feb’05
PT. PLNDISCHARGE COOLING WATER PIPE
FAB & INSTALLATIONJul’05-Jul’06
PT. PRIM KOPERASIANGKATAN DARAT
Jul’05-Mar’06
YAMAHA INDONESIADRAINAGE PUPE FAB &
ERECTIONJul’05-Mar’06
PT. FAJAR LAKS. STOBA PULP PROJECT FAN.
ESP PARTOct’04-Mar’05
PT. SHIN WHA ENG’GKPI PROJECT
PUPUK KALTIMJun’00-Oct’01
M
M
M
M
C.M
C
C C. M&E
C. M&E
M&E
C. M C. C. C.
M Piping
C. C.
C. M&E
99 2000 01 02 03 04 05 06
www.pt-ssa.co.id28
PT. PNG OIL & GASPT. REKAYASA INDUSTRI
PIPINGJun’06-Mar’07
PT. PNG OIL & GASPT. REKAYASA INDUSTRI
PIPINGJun’06-Dec’06
PT. PNG OIL & GASPT. REKAYASA INDUSTRI
PIPINGOct’06-Nov’06
PT. REKAYASA INDUSTRIGIS SURALAYA PP
Dec’08-Jun’09
CHEVRON PACIFICINDONESIA
Jan’09-Feb’09
PT. REKAYASA INDUSTRICWD – SURALAYA PP
Dec’08-Jun’09
HESS – PT. TRIPATRAJOB JAMBI MERANG
May’09-Dec’10KS-POSCO E & C
KS-POSCO MILL PLANTSep’11-Dec’12
PT. PERTAMINASK E & C
UCO BALIKPAPAN TANKJul’11-Jun’12
PT. PERTA-SAMTAN GASPT. TRIPATRA E & C
NGL EXTRACTION PLANTMay’11-Nov’11
PT. PLNMITSUBISHI CORPORATIONTANJUNG PRIOK GAS POWER
Oct’09-Oct’10
POSCO ENGINEERING &CONSTRUCTION CO., LTDBAHAMA GREEN FIELD
Nov 2010
DOOSAN MARUBENICIREBON CFPP – PT. PLN
Oct’08-Sep’11
MAGMA NUSANTARA LTDPT. REKAYASA INDUSTRIWAYANG WINDU GEOTHERMAL
Apr’08-Nov’08
SK ENGINEERING& CONSTRUCTION
L-PROJECT PERTAMINAJan’07-Mar’08
SSANGYONG INDONESIAKERATON AT THE PLAZA
Mar’08-Feb’09
PT. PLNPT. REKAYASA INDUSTRI
SURALAYA PPJan’08-Aug’08
PT. PLNPT. REKAYASA INDUSTRI
CWD SURALAYA PPDec’08-Nov’09
PT. PLNSEP CO CHINA
PLTU 3 BANTENOct’08-Oct’09
PT. PERTAMINAPT. PATRA SK
LBO PLANT DUMAIMay’09-Sep’09
PT. DAEKYUNGINDUSTRY1
Apr’09-Feb’10
PT. PLNHUBEI HONYHUAN
POWER ENG.-CHINAJan’09-Jul’11
PT. PERTAMINAPT. PATRA SK
LBO PLANT DUMAIMay’09-Sep’09
PT. CHEVRONPACIFIC INDONESIA
LT WURMay’10-Nov’14
PT. DOOSANHEAVY INDUSTRIAS
CIREBON CFPP – PT. PLNAug’10-Sep’11
PT. KIRIN MIWON FOODSINTAKE & DEMIN AREA
PIPING TANKFeb’07-Jul’07
PT. PERTAMINAPT. REKAYASA INDUSTRI
OFFICE BUILDINGAug’08-Mar’09
PT. PLNMITSUBISHI CORPORATION
MUARA KARANG GAS POWERFeb’08-Mar’09
PT. PNG OIL & GASPT. REKAYASA INDUSTRI
PIPINGMay’06-Jul’07
C. M
C. M C.
C. C. C.
C. C.
C. C.C. EC.C.
EPC
C. M C. M&E
C. M
C.
C. M
C.
C. C.
C. C. M&E
C. M
C. M
C. M&E
06 07 08 09 10 11 12
www.pt-ssa.co.id 29
BE A PART OF USGREAT JOURNEY WITH SSA
PT. PERTAMINAPT. PATRA SKApr’12-Sep’13
PT. SHELL INDONESIAJGC LOBP MONAS
Mar’14-Dec’14
PT. ADHIKARYA TBKIDR 29.880.000.000
Nov’15-Jul’16
PT. MITSUBISHICORPORATIONNov’17-Jan’19
PT. JURONGENGINEERING LESTARI
Apr’18-Mar’20
PT. KMKDec’18
PT. IKPTJun’16-Jun’17
PT. SOEHEE INDONESIAPOSCO ENGINEERING
Jun’12-Jul’13
PT. HON CHUAN INDONESIANGORO BEVERAGE
Mar’14-Mar’15
MOLYCOP GROUPPT. COMSTEEL INDONESIA
(ADIK)Feb’12-Jan’14
PT. CHEVRON PACIFICINDONESIA – (NDD)
AREA 13Sep’12-Dec’15
EXXON MOBILE CEPUTRI PATRA-SAMSUNG
Dec’12-Jun’14
PT. LOTTE SHOPPINGLOTTE SHOPPING
AVENUESep’12-Aug’13
BP LNG TANGGUHPT. WIJAYA KARYA
(WIKA)May’14-Apr’16
PT. PNGNov’15-Dec’16
PT. PERTAMINAWIKA-TANJUNG UBAN
Jul’14-Jul’16
PT. REKAYASA INDUSTRIFeb’16-Jul’17
MEDCO ENERGYE & P MALAKADec’16-Jul’17
PT. JGC INDONESIADec’16-Jun’18
OIL & GAS PLANT POWER PLANT INDUSTRIAL PLANT PUBLIC INFRASTRUCTUREPETRO PLANT
EPC EPC EPC
C.C. C. C. C.
C.
EPC
M C.
C. C. C.C. EPC
EPC C.
13 14 15 16 17 18 19 20
www.pt-ssa.co.id30
LICENSES
COMPANY REGISTER CERTIFICATE FACTORY DOMISILI CIKANDE
BUSINESS ENTLTY CONSTRUCTEDINTEGRATED SERVICES CERTIFICATE
www.pt-ssa.co.id 31
LICENSES
www.pt-ssa.co.id32
LICENSES
www.pt-ssa.co.id 33
KS-POSCOMILL PLANT
CIVIL-PHASE 1
Client : Krakatau Steel - POSCO E&CRemarks : Mill Plant Civil WorksLocation : Cilegon Banten, Jawa IndonesiaWork Space : Mill Plant Civil WorksPeriod : Sep’11-Dec’12Amount : US$ 6.430.000
www.pt-ssa.co.id34
WAYANG WINDUGEOTHERMALPOWER PROJECTUNIT 2
Client : Magma Nusantara Ltd PT. Rekayasa IndustriRemarks : Private Power PlantLocation : Pengalengan Bandung, Jawa Barat IndonesiaWork Scope : PipingPeriod : Apr’08-Nov’08Amount : US$ 2.032.000
www.pt-ssa.co.id 35
EXXON MOBILCEPU TDL
(E-MCL)
Client : EXXON MOBIL CEPU LTD [E-CML] - Cepu Ltd Tripatra Samsung ConsrotiumRemarks : Oil & GasLocation : Bojonegoro, Jawa Timur IndonesiaWork Scope : Piping Fabrication, Installation Tank / PaintingPeriod : Dec’12-Aug’14Amount : US$ 13.368.412
www.pt-ssa.co.id36
THANKYOU