2
Weft knitting machine production The weft knitting maching production can be calculated using the below formula. Yards of knitted fabric per hour = (A X B X C) / (60 X D) Production per hour in lb= (A X BX C X E X F) / (G X 50400) To calculate the production of weft knitting machine, please use the below calculator. Calculate Yard of knitted fabric per hr Production in lbs per hr  Number of knitting feeders (A)*  Number of revolution/minute (B) * Efficiency of the machine (C)* %  Number of courses per inch (D)* Stitch length (E)* inches  Number of needles (F)* Yarn number in indirect system(English cotton count) (G)* * Required fields Calculate  Clear all Results: Upto decimal point Yards of knitted fabric per hour  Production per hour lbs þÿ þÿ þÿ þÿ þÿ þÿ þÿ þÿ þÿ þÿ

Weft Knitting Machine Production

Embed Size (px)

Citation preview

8/8/2019 Weft Knitting Machine Production

http://slidepdf.com/reader/full/weft-knitting-machine-production 1/1

Weft knitting machine production

The weft knitting maching production can be calculated using the below formula.

Yards of knitted fabric per hour = (A X B X C) / (60 X D)

Production per hour in lb= (A X BX C X E X F) / (G X 50400)

To calculate the production of weft knitting machine, please use the below calculator.

Calculate Yard of knitted fabric per hr Production in

lbs per hr 

 Number of knitting feeders (A)* 

 Number of revolution/minute (B)* 

Efficiency of the machine (C)*  % Number of courses per inch (D)* 

Stitch length (E)*  inches

 Number of needles (F)* 

Yarn number in indirect system(English

cotton count) (G)* 

* Required fields Calculate

 Clear all

Results:

Upto decimal point

Yards of knitted fabric per hour   

Production per hour  lbs