Watershed Evaluation Watershed Evaluation of BMPs of BMPs (WEBs) (WEBs) Beneficial Management Practices Beneficial Management Practices and Water Quality and Water Quality Brook Harker Brook Harker WEBs Project Manager WEBs Project Manager Agriculture and Agri-Food Canada Agriculture and Agri-Food Canada (AAFC), (AAFC), DUC, & other partner agencies DUC, & other partner agencies http://www.agr.gc.ca/env/greencover- verdir/ March 2005

Watershed Evaluation of BMPs (WEBs) Beneficial Management Practices and Water Quality Brook Harker WEBs Project Manager Agriculture and Agri-Food Canada

Embed Size (px)

Citation preview

Watershed EvaluationWatershed Evaluation of BMPs of BMPs (WEBs) (WEBs)

Beneficial Management PracticesBeneficial Management Practicesand Water Qualityand Water Quality

Brook Harker Brook Harker WEBs Project ManagerWEBs Project Manager

Agriculture and Agri-Food Canada (AAFC),Agriculture and Agri-Food Canada (AAFC),DUC, & other partner agenciesDUC, & other partner agencies

http://www.agr.gc.ca/env/greencover-verdir/

March 2005

Does Conservation Programming Work?Does Conservation Programming Work?

ActivityActivity YearYear ExtentExtent $ Spent$ Spent

Permanent Permanent CoverCover

’’89-’9489-’94 .5 M ha.5 M ha 70.0 M70.0 M75-160/ha75-160/ha

ShelterbeltsShelterbelts ’’81-’0181-’01 34 K km34 K km 50.0 M50.0 M

Zero TillageZero Tillage 2001 2001 censuscensus

9 M ha9 M ha __

GreenCoverGreenCover ‘‘04-’0804-’08 ~ 280 K ha~ 280 K ha(land conversion)(land conversion)

$110 M$110 M

Total cult land (2001): 40 M ha (30 M seeded, 5 M fallow, 6 M pasture)

Five major programs 1984-2004 (20 yrs), 4-5 yrs each, total = $180 M

WEBsWEBs oobjectivesbjectives:: Envt. and econ. performance BMPsEnvt. and econ. performance BMPs

Begin the process. . .Begin the process. . . Micro-watershed scale (~ 300 ha)Micro-watershed scale (~ 300 ha) 7 7 regionalregional sites Canada-wide sites Canada-wide

Water quality as primary indicatorWater quality as primary indicator Predict, apply BMPs, validatePredict, apply BMPs, validate

Correlate other agenciesCorrelate other agencies, projects and studies, projects and studies Fed/Prov; Ag Industry; HC/MST (microbial sources); Fed/Prov; Ag Industry; HC/MST (microbial sources); EC/NAESI (envt stds.); NAHARP (agri-envt indicators).EC/NAESI (envt stds.); NAHARP (agri-envt indicators). USDA/CEAPUSDA/CEAP (Conservation Effects Assessment) (Conservation Effects Assessment)

WEBs CommitteesWEBs Committees Management CommitteeManagement Committee

PFRA, Research Branch, EC, Fed/Prov Working PFRA, Research Branch, EC, Fed/Prov Working Grp, Policy Br., DUCGrp, Policy Br., DUC

Technical CommitteeTechnical Committee Watershed Leads, DUC, subcommittee reps, Watershed Leads, DUC, subcommittee reps,

NAHARP, WEBs MgtNAHARP, WEBs Mgt

Subcommitees:Subcommitees: • EconomicsEconomics• ModelingModeling• CommunicationsCommunications

Watershed Selection CriteriaWatershed Selection Criteria

AAFC-led teamAAFC-led team Key regional, multi-agency partnersKey regional, multi-agency partners

Existing long-term sitesExisting long-term sites Where practicalWhere practical

Small sub-watershedsSmall sub-watersheds Known data setsKnown data sets

Runoff proneRunoff prone To drive the processTo drive the process

In-Field MethodologyIn-Field Methodology

Verify environmental effect:Verify environmental effect: Benchmark, paired w-sheds, edge-of-fieldBenchmark, paired w-sheds, edge-of-field

Verify economic effect:Verify economic effect: On-farm benefit:cost; net benefit to societyOn-farm benefit:cost; net benefit to society

Integrate environmental andIntegrate environmental and

economic impact:economic impact: Modeling within project sitesModeling within project sites Scaling-up as appropriateScaling-up as appropriate

Pu

bli

shin

g

Inte

gra

ted

Mo

de

ling

Wa

ters

hed

BM

PR

ese

arc

h

Hydraulic Model

Non-Market

Behaviour

On-Farm

WatershedData

WatershedData

Economic Model

Two Parallel Paths

WEBs BudgetWEBs Budget Site establish.Site establish. (BMPs, monitoring) (BMPs, monitoring) 10 % 10 % ($ .80 M)($ .80 M)

Operate expensesOperate expenses (access, data)(access, data) 40 % 40 % ($2.90 M)($2.90 M)

Sci. staffingSci. staffing (summer, modelers)(summer, modelers) 30 % 30 % ($2.30 M)($2.30 M)

ModelingModeling 06 % 06 % ($ .50 M)($ .50 M)

EconomicsEconomics 05 % 05 % ($ .35 M)($ .35 M)

CommunicationsCommunications 04 % 04 % ($ .20 M)($ .20 M)

Tech. Comm, annual reviewTech. Comm, annual review 04 % 04 % (($ .25 M)$ .25 M)

Grand TotalGrand Total $7.30 M$7.30 M

APF 60% ($4.41 M); DUC 17% ($1.25 M); Others 23% ($1.65 M)

Approvals ProcessApprovals Process

Spring ‘03Spring ‘03 - ‘Terms of Reference’ - ‘Terms of Reference’ circulated federal, provincial & NGO agenciescirculated federal, provincial & NGO agencies

Summer ’03 -Summer ’03 - explored watershed interest explored watershed interest encouraged specific proposal developmentencouraged specific proposal development

Dec ’03Dec ’03 - AAFC-wide call for proposals - AAFC-wide call for proposals Full internal & peer reviewFull internal & peer review

March ’04March ’04 13 letters of intent13 letters of intent 7 projects approved7 projects approved

WEBs – 7 WEBs – 7 RegionalRegional Project Sites Project Sites

WEBs - BMP FocusWEBs - BMP Focusby Watershedby Watershed

LocationLocation Key IssuesKey Issues BMPs BMPs ApproachApproach

Lwr Ltl Bow Lwr Ltl Bow (Alberta)(Alberta)

N, P & bact. N, P & bact. loadingloading

Off-str water, Off-str water, buff., mnr-mgtbuff., mnr-mgt

Edge-of-fld, Edge-of-fld, up/dn streamup/dn stream

So. Tobacco So. Tobacco (Manitoba)(Manitoba)

N & soluble P N & soluble P loadingloading

Zero till, small Zero till, small dams, ripariandams, riparian

Edge-of-field, Edge-of-field, cumul w-shedcumul w-shed

Bras d’Henri Bras d’Henri (Quebec)(Quebec)

Nutr, bactr & Nutr, bactr & herbic loadingherbic loading

Herb use, Herb use, buff, slury mgtbuff, slury mgt

2 test, 2 cntl 2 test, 2 cntl edge-of-fieldedge-of-field

Project StatusProject Status Sites are at various stages of implementationSites are at various stages of implementation

- $$ difficulties; BMP application is well underway- $$ difficulties; BMP application is well underway

- ongoing monitoring & evaluation- ongoing monitoring & evaluation

Setting economics and modeling protocolsSetting economics and modeling protocols- significant development still required!- significant development still required!

Continue to liaise with other APF projectsContinue to liaise with other APF projects CooperationCooperation

- Encourage multi-agency,- Encourage multi-agency,

multi-disciplinary work.multi-disciplinary work.

www.agr.gc.ca/env/greencover-verdir/