Water Efficient Buildings

  • Upload
    hutuguo

  • View
    222

  • Download
    0

Embed Size (px)

Citation preview

  • 7/27/2019 Water Efficient Buildings

    1/41

    1

    Water Efficient Buildings

    Wong Wai ChengManager (Water Demand Management)

  • 7/27/2019 Water Efficient Buildings

    2/41

    2

    Total water consumption

    58 % for domestic consumption

    42 % for non domestic consumption

    Water Consumption in Spore

  • 7/27/2019 Water Efficient Buildings

    3/41

    3

    Why Conserve Water

    Reduce Operation Cost

    Contribute to National effort to Conserve Water

  • 7/27/2019 Water Efficient Buildings

    4/41

    4

    WaterConservation

    Strategy

    PricingReflect the strategic

    importance and scarcityvalue of water

    Voluntary3P approachPromote ownership of

    water conservation

    MandatoryCut down on excessiveflow and wastage of water

  • 7/27/2019 Water Efficient Buildings

    5/41

    5

    Water Tariff Structure

    WCT : Water Conservation Tax - Broad-based Tax levied by the Government

    Tariff

    category

    Domestic

    Non-domestic

    Consumption

    block

    (m3 per mth)

    W.e.f. 1 July 2000

    Tariff

    (/m3)

    WCT

    (%)

    1 to 40

    Above 40

    All units 117

    140

    117 30

    45

    30

    Pricing

  • 7/27/2019 Water Efficient Buildings

    6/41

    6

    Mandatory

    Since 1983

    Self-Closing Delayed-ActionTaps

    (non domestic premises including

    common amenities ofcondominiums)

    Constant Flow Regulators

    (all premises)

    Since 1997Low Capacity Flushing Cistern

    9 litre flushing cistern 4.5 litre flushing cistern

    Installation of Water Saving Devices

  • 7/27/2019 Water Efficient Buildings

    7/41

    7

    Reduction of Max Allowable Flow-rates

    Area of Usage

    Maximum Allowable

    Flowrate

    (litres/min)

    Water Efficient Flow

    Rate

    (litres/min)

    Remarks

    New

    Basin Tap & Self

    Closing Delayed

    Action Basin Tap

    62 (toilets)

    4 (others)

    For self closing

    delayed action basin

    taps, timing shall

    remain at between 2

    and 3 sec

    Sink / Kitchen Tap and

    Wash Area8 6

    Shower Tap & Self-

    Closing DelayedAction Shower Tap

    9*

    12 (hotels)7

    For self closing

    delayed action

    shower tap, timingshall remain at

    between 13 and 15

    sec

    Other Areas 8 6

    Mandatory

  • 7/27/2019 Water Efficient Buildings

    8/41

    8

    Voluntary

    Water Efficient Buildings (WEB)

    Reviewwater usage pattern/habits

    Reducewater usage, keep to efficientflow rates/flush volume. Recycle/reusewherepossible

    Repair leaking fittings promptly to avoidwater wastage

    More than 900 buildings/premisescertified as WEB

    Encourage building owner / managementagent to take ownership

  • 7/27/2019 Water Efficient Buildings

    9/41

    9

    Website PortalWater Volunteer

    Groups (WVGs)

    Mandatory

    Installation of

    Dual Flush

    LCFCs

    WaterEfficiency

    Labeling

    Scheme

  • 7/27/2019 Water Efficient Buildings

    10/41

    10

    Water Efficiency Labelling Scheme

    (WELS)

  • 7/27/2019 Water Efficient Buildings

    11/41

    11

    WATER EFFICIENCY LABELLING SCHEME

    (WELS)

    A voluntary labelling scheme dedicatedto promoting Water Efficient Products

    Jointly administered by the Singapore

    Environment Council (SEC) & PUB

    Launched on 31st Oct 2006

  • 7/27/2019 Water Efficient Buildings

    12/41

    12

    WATER EFFICIENCY LABELLING SCHEME

    (WELS)

    Objectives Facilitate consumer to make informed choice

    when purchasing products

    Increase public awareness on water conservation

    Encourage manufacturers/importers to bring in

    more water efficient products

    Promote water efficient building design

  • 7/27/2019 Water Efficient Buildings

    13/41

    13

    The Water Efficiency Label comprises:

    the title Water Efficiency

    ticks that indicate water efficiency of the labelled products (the

    more ticks, the more water efficient is the product)

    the water efficiency rating in words:

    Good (for products with 1 tick)Very Good (for products with 2 ticks)

    Excellent (for products with 3 ticks)

    Water Consumption

    Type of Product Brand

    Model

    Serial No.

    WATER EFFICIENCY LABELLING SCHEME

    (WELS)

  • 7/27/2019 Water Efficient Buildings

    14/41

    14

    Water Efficiency Labelling Scheme

    Products

    Shower Head Dual Flush Cistern

    Washing Machine Basin/ Sink Tap

    3-tier Rating System

    Excellent

    Very Good

    Good

  • 7/27/2019 Water Efficient Buildings

    15/41

    15

    Criteria For Water Efficiency Labelling Scheme (WELS)

    FITTINGS MAXIMUM ALLOWABLE GOOD

    RATING

    VERY GOOD

    RATING

    EXCELLENT

    RATING

    Shower Taps, Mixers &

    Showerheads

    (L/min)

    9 >7 to 9 >5 to 7 5 or less

    Basin Taps & Mixers

    (L/min)6 >4 to 6 >2 to 4 2 or less

    Sink/Bib Taps (L/min) 8 >6 to 8 >4 to 6 4 or less

    Flushing Cisterns Dual

    Flush Type (L/flush)

    4.5 (full flush)

    3.0 (low flush)

    >4.0 - 4.5

    (full flush)

    > 2.5 -3.0

    (low flush)

    >3.5 to 4.0

    (full flush)

    > 2.5 3.0

    (low flush)

    3.5 or less (1)

    (full flush)

    2.5 or less

    (low flush)

    Urinals & Urinal Flush

    Valve

    (L/flush)

    1.5 > 1.0 to 1.5 > 0.5 to 1.0

    0.5 or less (2)

    Or waterless

    urinals

    Washing Machine

    (L/Kg)15 > 12 -15 > 9 -12 9 or less

    (1) To pass laboratory simulation test on waste transportation efficiency in pipe.

    (2) To pass dilution test

    WELS WEBSITE

  • 7/27/2019 Water Efficient Buildings

    16/41

    16

    WELS WEBSITE

    www.sec.org.sg/wels.

    INCORPORATE WATER EFFICIENT

    http://www.sec.org.sg/welshttp://www.sec.org.sg/wels
  • 7/27/2019 Water Efficient Buildings

    17/41

    17

    INCORPORATE WATER EFFICIENTLABELLED PRODUCTS IN BUILDINGS

    WELS is incorporated under BCAs Green Mark criteria for

    new buildings air con and residential buildings. BCAs Green Mark for Schools will be announced soon

    Encourage developers, govt agencies as well as professionals

    to incorporate this scheme in their developments/buildings

    design specification

  • 7/27/2019 Water Efficient Buildings

    18/41

    18

    Green Mark for Air Con Buildings

    - Water Efficiency Criteria

  • 7/27/2019 Water Efficient Buildings

    19/41

    19

  • 7/27/2019 Water Efficient Buildings

    20/41

    20

    Green Mark for Residential Buildings

    - Water Efficiency Criteria

  • 7/27/2019 Water Efficient Buildings

    21/41

    21

  • 7/27/2019 Water Efficient Buildings

    22/41

    22

    Water Efficient Building Design

    (1) Submetering

    (2) Installation of Pressure Reducing Valves

    (3) Install Water Saving Devices/ use of Water

    Efficient Labelled Products

    (4) Water Substitution / Recycling of used water

    (5) Water Efficient Landscaping

  • 7/27/2019 Water Efficient Buildings

    23/41

    23

    Monitor water usage - Key element

    Sub-meters should be installed

    Installation of submeters/private meters on all

    major water systems, such as cooling tower,

    irrigation, hot water devices, etc.\

    Know how water is used

    Identification of leak areas quickly

    Shall be accessible for meter

    readings and maintenance

    (1) Submetering

  • 7/27/2019 Water Efficient Buildings

    24/41

    24

    Residential

    Units

    Irrigation

    Swimming

    Pool

    Public Toilets

    Water Tank

    m

    m

    m

    m

    Sub

    meters

    Bulk Meter

    Water Tank

    m

    m

  • 7/27/2019 Water Efficient Buildings

    25/41

    25

    Maintenance officers are encouraged to take

    water meter readings regularly

    (daily/weekly/fortnightly) Monitor the water consumption on a plotted

    graph

    Any sudden increase may indicate a leak in the

    system Investigate immediately

    Take prompt action to repair leaks, if any

  • 7/27/2019 Water Efficient Buildings

    26/41

    26

    main and sub-meters should be linked to a building

    management system (BMS)

    water usage trends can be recorded

    Alarm activated if there is a sudden increase in water

    consumption or a new trend in water consumption as

    this will indicate the possibility of a water leakage

  • 7/27/2019 Water Efficient Buildings

    27/41

    27

    (2) Pressure Reducing Valves

    Install Pressure reducing valves at every floor to

    maintain the water pressure of the water supply to

    every dwelling unit at 1.5 bar

  • 7/27/2019 Water Efficient Buildings

    28/41

  • 7/27/2019 Water Efficient Buildings

    29/41

    29

    (3) Water Saving Devices/ Use of Water

    Efficient Labelled products

    - Use Water Efficient Labelled products

    with Excellent rating

    - Install water saving devices

    Basin Taps : thimbles or CFRs

    Flushing cistern : use dual flush low capacity

    flushing cistern

    : cistern water saving bags for

    9 litre flushing cistern

    Urinals : reduce flush volumes or use waterless urinals

    Low Flow Showerheads

  • 7/27/2019 Water Efficient Buildings

    30/41

    30

    Encourage substitution with

    NEWater for non potable use eg.Air con cooling towers, process

    use, etc.

    Encourage recycling of processwater or used water

    Cheaper

    (4) Water Substitution/Recycling

    Water Substitution (NEWater)

  • 7/27/2019 Water Efficient Buildings

    31/41

    31

    Water Substitution (NEWater)

    Seletar5 mgd

    2004

    Kranji9 mgd

    Jan 2003

    Bedok6 mgd

    Jan 2003

    NEWater pipeline

    NEWater Plant

    Service Reservoir

    Legend

    Ulu Pandan

    25 mgdEarly 2007

  • 7/27/2019 Water Efficient Buildings

    32/41

    32

    Water Efficient Plants

    - Use drought resistant plants or plants that fit naturallyinto the existing climatic conditions

    - Limit amount of turf area , turf grasses need a lot of water

    and require continual upkeep

    - Group plants by their water needs such as plants that

    need high, moderate or little to no irrigation.

    (5)Water Efficient Landscaping

    Draught resistant plants Limit turf Area

  • 7/27/2019 Water Efficient Buildings

    33/41

    33

    Water Efficient Irrigation Systems

    -Drip irrigation uses 30% to 50% less water than sprinkler

    irrigation

    - Drip irrigation applies water slowly and directly to the rootsof plants. Hence, evaporation and runoff is minimized

    - Adopt flexible irrigation schedule to save water by adjusting

    to changing weather conditions

    - Recycled water should be used- Potable water is only permitted for system to be turned on

    manually and turned off automatically

  • 7/27/2019 Water Efficient Buildings

    34/41

    34

    Rainwater Collection

    16 Mar 2004

    non-potable usage

    (irrigation, washing, toiletflushing, etc)

  • 7/27/2019 Water Efficient Buildings

    35/41

    35

    Thank You

  • 7/27/2019 Water Efficient Buildings

    36/41

    36

    Urinals

    recommended flush volume for standard

    size urinal (300mm width) is 0.5 litresper flush

    Waterless Urinals :

    Eliminate the use of water in flushing- save water

    Low installation cost as water connection

    and flush valve are not needed

    Proper maintenance is crucial to ensure

    the waterless urinal do not cause

    unpleasant smells.

    Shower Taps & Low Flow Showerheads

  • 7/27/2019 Water Efficient Buildings

    37/41

    37

    Shower Taps & Low Flow Showerheads

    < 5 L/min

    The flow rate should not exceed 7 litre/min

    Install Low Flow Showerheads with less than 5 litre/min

    Washbasin Taps

  • 7/27/2019 Water Efficient Buildings

    38/41

    38

    Washbasin Taps

    6 l/min

    (Turbulence)

    2 l/min

    (Laminar)2 l/min with Thimble

    (Spray)

    Or

    2 l/min CFR

    For sensor taps with 2 litre/min flow rate, cut

    off supply when hand is removed from basin or

    preset timing of not more than 60 secs is

    reached,whichever is earlier.

    Before insallation of

    thimble or CFRAfter insallation of

    thimble (3.8 L/min)

  • 7/27/2019 Water Efficient Buildings

    39/41

    39

    Cistern Water Saving Bag for9 litre Flushing cistern

    Dual Flush Low Capacity

    Flushing Cistern

  • 7/27/2019 Water Efficient Buildings

    40/41

    40

    Take Water Meter Readings Regularly

    2005 Monthly Water

  • 7/27/2019 Water Efficient Buildings

    41/41

    41

    500

    600

    700

    800

    900

    1000

    1100

    1200

    JAN FEB M AR APR M AY JUN JUL AUG SEP OCT NOV DEC

    Months (2005)

    Consumption(m3)

    2005 Monthly Water

    Consumption