45
SKPPRA Warm House March 2012

Warmhouse report 3

Embed Size (px)

DESCRIPTION

Warmhouse report 3

Citation preview

Page 1: Warmhouse report 3

SKPPRA – Warm HouseMarch 2012

Page 2: Warmhouse report 3

Project Team

Local Energy Assessment Fund (Funding Agency)

Renderline Ltd. (Insulation Contractors)

Energy Solutions (North West London) (Energy Saving)

RS Designs (EPC Assessors)

Berrymans Lace Mawer LLP (Lawyers)

ICE Architects Ltd. (Architects)

South Kenton & Preston Park Residents Association (Client & Project Sponsor)

Page 3: Warmhouse report 3

South Kenton and Preston Park Residents Association 1937

Page 4: Warmhouse report 3

Association Area 1937-2012

Page 5: Warmhouse report 3
Page 6: Warmhouse report 3

EPC

-EX

ISTI

NG

HO

USE

RA

TIN

G ‘E

Page 7: Warmhouse report 3

1930s 3 Bed Semi-Detached House

Page 8: Warmhouse report 3

1930s 3 Bed Semi-Detached House

Page 9: Warmhouse report 3

1930s 3 Bed Semi-Detached House

Page 10: Warmhouse report 3

External Insulation

Residents did not want the appearance of the house, ..and therefore the appearance and character of the SKPPRA area to change after external insulation is applied to the house.

Page 11: Warmhouse report 3
Page 12: Warmhouse report 3

1150 homes

Page 13: Warmhouse report 3

Gas Costs £/annum & kWh/annum

Average 21,500kWh/annumSource - Residents’ entries to Warmhouse Draw

Page 14: Warmhouse report 3

Annual Cost of Gas Consumption

General Range £850-£1,100Source - Residents’ entries to Warmhouse Draw

Page 15: Warmhouse report 3
Page 16: Warmhouse report 3

27th

Feb

ruar

y 20

12 -

WAR

MH

OU

SED

raw

,P

rest

on P

ark

Scho

ol H

all

Page 17: Warmhouse report 3

43 Logan Road – Winning Entry

Page 18: Warmhouse report 3

Works to 41 & 43 Logan Road

Page 19: Warmhouse report 3

41 & 43 Logan Road – Rear Elevations

Page 20: Warmhouse report 3
Page 21: Warmhouse report 3

Works on site start 29th February 2012

Page 22: Warmhouse report 3
Page 23: Warmhouse report 3
Page 24: Warmhouse report 3

70mm Environwall Phenolic Insulation

Page 25: Warmhouse report 3

Under Eaves

Page 26: Warmhouse report 3

Windows

Page 27: Warmhouse report 3

20m

m in

sula

tion

at

win

dow

jam

bs

Page 28: Warmhouse report 3

Forecast U-Value: 0.25W/m2K

Page 29: Warmhouse report 3

Exi

stin

g D

rain

age

Pip

ewor

k

Page 30: Warmhouse report 3
Page 31: Warmhouse report 3
Page 32: Warmhouse report 3

For

ecas

t U

-Val

ue: 0

.25W

/m2 K

Page 33: Warmhouse report 3

Thermal Model Forecast: Existing

Page 34: Warmhouse report 3

Thermal Model Forecast: After Insulation

Page 35: Warmhouse report 3

Completion 30th March 2012

Page 36: Warmhouse report 3
Page 37: Warmhouse report 3
Page 38: Warmhouse report 3
Page 39: Warmhouse report 3
Page 40: Warmhouse report 3
Page 41: Warmhouse report 3
Page 42: Warmhouse report 3
Page 43: Warmhouse report 3
Page 44: Warmhouse report 3
Page 45: Warmhouse report 3

All rights reserved© 2012 ICE Architects Ltd.

www.ice-architects.comwww.skppra.co.uk