Navigating MAP-21 Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Embed Size (px)

Citation preview

Page 1: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Navigating MAP-21 Walter Brooks

Executive DirectorRegional Planning Commission

November 2, 2012

Page 2: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Moving Ahead for Progressin the 21st. Century Act

Map-21

(October 1, 2012 thru December 31, 2014)

Page 3: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

U.S. DOT Priorities

•PERFORMANCE MANAGEMENT APPROACH

•Identifies National Goals (23 USC 150 (b))

1. Safety2. Infrastructure Conditions3. Congestion Reduction4. System Reliability5. Freight Movement and Economic Vitality 6. Environmental Sustainability 7. Reduced Project Delivery Delays

Page 4: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Metropolitan Transportation Planning Metropolitan Transportation Plan (MTP)

((23 U.S.C. 134(i)(2)(A)(i))

• “Shall include identification of transportation facilities (including major roadways, transit, multimodal and intermodal facilities, nonmotorized transportation facilities, and intermodal connectors) that should function as an integrated metropolitan transportation system, giving emphasis to those facilities that serve important national and regional transportation functions.”

Page 5: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

MAP-21

• Performance – Based Federal Program• Emphasis on Multimodal Investments

(Retain “Flexing” Provision)• Corridor Planning with Environmental Linkages

Page 6: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Roles & Responsibilities• US DOT Establishes Performance Standards and Measures (13 hwy. and 2 transit areas)

•State DOT’s and MPO’s set Measurable Targets for each Performance Measure

•Conduct Sound Multimodal Planning Process

•Develop Plans and Programs and Select Projects to Demonstrate Target Acheivement

•US DOT to Track State and MPO Progress in Achieving Performance Targets (7/6/17)

Page 7: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

RPC as the Metropolitan Planning Organization

Long Range Transportation Plan (MTP)

Short Range Transportation Pan (TIP)

Page 8: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Transportation InvestmentsAverage Annual Investments1999 – Current $239M/year

2040 Plan• System Preservation 42%• Safety & Operations 27%• Bike/Ped 10%• New Capacity 21%

Transit• Discretionary $ Competitive Pot• New Starts 50% Local Share• Operating Cost TMAs 100% Local

Small Urbans 50/50%• Inter-City Rail FRA (not FTA)

Page 9: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Transportation Investments – FY-09

Preser-vation49.9%

($220 m)

Capacity28.8% ($127m)

Safety & Op-

erations 3.2%

($14m)

Transit14.4% ($64m)

Bike/Ped3.3% ($15m)

Enhancements 0.4% ($2m)

Total Investments $442m134 Projects

Page 10: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Transportation Investments – FY-10

Preserva-tion37%

($75M)

Capacity4.5% ($9M)

Safety & Operations17.7% ($36M)

Transit36.1%

($73M)

Bike/Ped1.3% ($3M)

Enhancements3.4% ($7M)

Total Investments $203M - 87 Projects

Page 11: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

HOW WE MAKE DECISIONS

Technical Advisory Committee

• Parish & Planning Directors• Parish Department of Public Works• Parish & City Chief Administrative Officers• Local Transit Operators• Louisiana DOTD• New Orleans Public Belt Railroad• Port of New Orleans• LA Motor Transport Association• Louisiana Airport Authority• National Safety Council• Greater New Orleans Expressway Commission• Crescent City Connection Commission• U.S. Housing and Urban Development (HUD)• Federal Highway Administration (FHWA)• Federal Transit Administration (FTA)

Advisory Councils• Complete Streets Advisory Council• Transit Advisory Council• Freight Advisory Council• Regional Livability Advisory Council

The General Public

RPC Staff

RPC Staff

RPC Transportation Policy Committee

Page 12: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

RPC’s Pedestrian and Bicycle Program Has Trained

250+ Engineers and Planners

40+ Police in 8 Jurisdictions

Page 13: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

RPC’s Pedestrian and Bicycle Program Effectiveness

Bicycle fatalities are 27%

Pedestrian fatalities 15%

Page 14: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Making Livable Communities Happen

The Magazine Street Example

Page 15: Walter Brooks Executive Director Regional Planning Commission November 2, 2012
Page 16: Walter Brooks Executive Director Regional Planning Commission November 2, 2012
Page 17: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Andrew Higgins Drive

Page 18: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Magazine Street

Page 19: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Andrew Higgins Drive

Page 20: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Wisner Blvd. and Trail

Page 21: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Harrison Avenue

Harrison Avenue

Page 22: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

• Road overlay & ADA access improvements through Submerged Roads Program

• String of commercial enterprises reopened, led by banks and followed by restaurants including Reginelli's, Lakeview Deli, the Steak Knife, Lakeview Harbor and Mondo (Susan Spicer)

Harrison Ave – Land Use and Transportation Success

Page 23: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Enhancement of existing development patternsVibrant, mixed-use neighborhood with a stable residential basePedestrian-oriented core centered on 18th Street Compatible transitions between the mixed-use core, residential

areas, and heavier commercial areas at the periphery

Fat City: Strategic Plan Vision

Page 24: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Pedestrian Core at 18th St.• Walkable mixed-use• 18th Street as ‘Main Street’ of Fat

City • Upper floor: mix of office, lodging,

and residences• Street level: restaurants, specialty

retail, and entertainment uses• 65’ height max

Page 25: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

TULANE AVENUE

Page 26: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Leake Avenue

Page 27: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Sustainable Streets

Page 28: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Phase I – I-10 East Beautification

Page 29: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

• Under construction• Overlay 8 streets• Installation of ADA

compliant ramps• Sidewalk replacement-

in-kind where needed• Improved signage and

striping for pedestrians and bicyclists

• Construction cost: $13.5M

• Work complete before Super Bowl

FRENCH QUARTER STREETS PROJECT

Page 30: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

• 5000+ ADA ramps installed through Submerged Roads

• New Orleans CBD improvements on high volume ped/transit routes

• Jefferson Parish ADA Transition Plan to identify barriers to accessibility and create a schedule for making improvements

ADA ACCESS IMPROVEMENTS

Page 31: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

• Awarded Bronze Level Bicycle Friendly Community by League of American Bicyclists

• Lane striping coordinated with Bike Master Plan

• Bike-on-bus Coordination

• Complete Streets policy• Training Workshops

BIKE AND PEDESTRIAN

Page 32: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

• 150+ yrs old & pedestrian only

• Address civil & structural needs in addition to architectural rehabilitation

• Aligns with CNO priorities of public safety, sustainable communities, and promoting family recreation areas

• $1.1M cost

MAGNOLIA BRIDGE

Page 33: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

• RPC initiated a market analysis and feasibility study based on community vision

• Army Corps of Engineers announced its intentions to locate a permanent pump station in the West End vicinity

• 1st Public Meeting held Jan 2012, 2nd Public Meeting held July

WEST END MASTER PLAN

Page 34: Walter Brooks Executive Director Regional Planning Commission November 2, 2012

Thank you