Conference on Implementing the 3rd Package

Brussels, 11th December 2008

European Regulators’ Work Programme 2009

Page 2: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 2

Introduction

• Joint CEER and ERGEG work programme

• Main focus in 2009 is threefold:

• paving the way for a speedy implementation of the proposed 3rd Energy Liberalisation Package (3rd Package);

• advancing the development of regional energy markets through the Regional Initiatives project; and

• monitoring the implementation of existing legislative requirements by Member States, so as to determine whether markets are delivering for consumers; monitoring GGPs developed in the past few years.

• Advice to the European Commission where appropriate

Page 3: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 3

Sta

keh

old

er i

nvo

lvem

ent

Work Programme

Task Forces prepare / amend draft documents

approvalno

approvalno

yes

Organisational discussion at the CEER

Board

approvalno

High level discussion at the CEER General

Assembly

yes

approval

no

no

Discussion at the ERGEG Plenum

Publicconsultation

yes

approval

no

ERGEG public document

yes

Public consultation

yes

CEER doc

Working Groups with experts from all NRAs

have a first general discussion on the

prepared documents

yes

CEER public document

yes

CEER/ERGEG Working Mode

Page 4: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 4

ENP

FIS

RIG

GWG

EWG

CWG

ISG

ENC

Electricity Working Group

Gas Working Group

Regional Initiatives Group

Energy Package Working Group

Customer Working Group

Financial Services Working Group

International Strategy Group

Energy Community Working Group

GA

ERGEG

CEER General Assembly

European Regulators’ Group for Electricity and Gas

CEER/ERGEG Working Group Structure 2009

Page 5: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 5

Energy Package Working Group (ENP)

• Main vehicle of the European energy regulators for providing input to and advice on 3rd package developments

• Draft consultation rules;

• Development of proposals in terms of organisational arrangements for the Agency;

• Drafting proposals for the Rules of Procedure of the Board of Regulators of the Agency;

• Guidelines for the cooperation between NRAs, and between NRAs and the Agency (as foreseen by the 3rd package).

• In parallel, the current status of liberalisation in the EU will be scrutinised. This includes a status review as well as a report focusing on the status of unbundling of DSOs.

Page 6: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 6

ENP deliverables

• ERGEG Advice on a Consultation Procedure for the Interim Period and ACER

• ERGEG Status Review on the Liberalisation and Implementation of the Regulatory Framework

• CEER Status Review on DSO Unbundling with Reference to GGP

Page 7: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 7

Financial Services Working Group (FIS)

• FIS deals with the interdependencies between financial and energy markets.

• In 2008, main focus was on the provision of advice to the European Commission on market abuse, transparency and record-keeping.

• A further elaboration of these recommendations will be a substantial part of the FIS work in 2009.

• In addition, the FIS WG will also deal with principles for the regulatory supervision of energy exchanges and hubs, and it will investigate possibilities for a harmonisation of the currently very different trading license requirements in the EU.

Page 8: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 8

FIS deliverables

• Open issues of the mandate to CESR/ERGEG

• ERGEG Advice on the Requirements for the Regulatory Oversight of Energy Exchanges, Gas Hubs and Energy trading

• ERGEG Advice on the Harmonisation and Mutual Recognition of Trading Licenses in the EU Electricity and Gas Markets

Page 9: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 9

Regional Initiatives Group (RIG)

• The Regional Initiatives are a key tool for the promotion of market integration as a step towards the Internal Energy Market (IEM).

• The new Regional Initiatives Group (RIG) will undertake work in the electricity and gas Regional Initiatives. Its task will be • to gather information; • to identify synergies; and • to promote best practices throughout the seven electricity and three

gas regions.

• The RIG will ensure that regional approaches are compatible with the European framework

• RI conference planned in autumn 2009

Page 10: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 10

RIG public deliverables

• ERGEG Status Review on Coherence and Convergence in the ERI

• ERGEG Status Review on Coherence and Convergence in the GRI

Page 11: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 11

Electricity Working Group (EWG)

• The EWG deals with issues related to the European electricity grids and the EU electricity market.

• Within the framework of the 3rd Package, the EWG will prepare the European energy regulators’ input for the framework guidelines.

• Further issues to be tackled:• security and reliability of electricity supply;

• regulatory aspects of European electricity generation from renewables;

• quality of supply;

• regulatory aspects of evolution towards “smart” electricity networks.

Page 12: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 12

EWG deliverables (1/2)

• Input to Framework Guidelines on

• Grid Connection and Access

• Electricity Market Design Harmonisation

• Capacity Allocation and Congestion Management

• Balancing, Intraday Markets and Automatically Activated Reserve

• Joint Grid Planning, Infrastructure and Generation Adequacy

• Energy Efficiency

• Harmonised Tariff Structures Including Locational Signals

Page 13: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 13

EWG deliverables (2/2)

• 3rd ERGEG Compliance Monitoring Report of Reg. 1228 and the Congestion Management Guidelines

• Framework for Generation Adequacy Treatment

• European Energy Regulators’ Position on the Pan-EU System Adequacy Forecast

• ERGEG Position Paper on Intelligent Electricity Networks (Smart Grids)

• CEER Status Review on Sustainable Development

• CEER Status Review on Wind Generation and the Implications of the Green Package

Page 14: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 14

Gas Working Group (GWG)

• The GWG addresses all regulatory matters in relation to the European gas markets.

• The main area of work in 2009 will be the development of input to framework guidelines and the 10-year investment plan

• For 2009, the European Commission has requested the European energy regulators monitor compliance with Articles 5 and 8 of Regulation (EC) 1775/2005.

• Also compliance with the existing GGP OS and GGP LNG will be carried out.

Page 15: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 15

GWG deliverables (1/2)

• Input to Framework Guidelines on

• CAM & CMP

• Transparency

• Balancing Rules, Including Network-Related Rules on Nomination Procedures, Rules for Imbalance Charges and Rules for Operational Balancing Between Transmission System Operator Systems

• Network Security and Reliability Rules, Grid Connection Rules, Data Exchange and Settlement Rules, Interoperability rules, Operational Procedures in an Emergency and Energy Efficiency Regarding Gas Networks

• Rules for Trading Related to Technical and Operational Provision of Network Access Services and System Balancing

Page 16: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 16

GWG deliverables (2/2)

• ERGEG Recommendations on the 10-Year Investment Plan

• ERGEG Compliance Monitoring Report on Articles 5 (capacity allocation and congestion management) and 8 (trading of capacity rights) of Regulation (EC) 1775/2005

• ERGEG Compliance Monitoring Report on the Implementation of the GGPs for Open Seasons

• ERGEG Compliance Monitoring Report on the Implementation of the GGPs for LNG

• ERGEG Status Review on the Experience of Regulators in Imposing Obligations in Article 22 Exemption Decisions

• ERGEG GGPs on Best Practice Approaches for CAM & CMP to Storage Facilities

Page 17: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 17

Customer Working Group (CWG)

• The CWG is dedicated to putting consumers first by working on customer empowerment and retail market functioning, in order to facilitate the development of competition in the energy consumers’ interests.

• The tasks of the CWG in 2009 include issues raised at the first Citizens’ Energy Forum in October 2008.

• The CWG will prepare several reports following requests from the European Commission and the Forum.

• The CWG will also update the 2008 report on end-user price regulation in Europe, which the European Commission considered to be among its priorities for monitoring the proper functioning of retail markets.

Page 18: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 18

CWG deliverables

• ERGEG Recommendations on Customer Complaint Handling

• ERGEG Status Review of the Definitions of Vulnerable Customers

• ERGEG Status Review of the Definitions of Supplier of Last Resort and Default Supplier

• ERGEG Status Review on the Situation of Countries with Regulated End-User Prices

• ERGEG Recommendations on Indicators for Retail Market Monitoring

• ERGEG Status Review on Regulatory Aspects of Smart Metering (Electricity and Gas)

• ERGEG Recommendations on Regulatory Aspects of Smart Metering (Electricity and Gas)

Page 19: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 19

International Strategy Group (ISG)

• The ISG is responsible for the coordination of the European energy regulators’ activities in the fields of international cooperation and training.

• The regulators will continue to implement their action plan for international cooperation drawn up in 2008. This consists of three axes: • the first axis aims at supporting the EU policy with regard to security of

supply; • the second axis is directed at supporting the implementation of the EU

energy acquis in non-EU countries; and • the third axis strengthens the dialogue between the European energy

regulators and other regulators or regulatory associations.

• Training: (a) Cooperation Florence School of Regulation and (b) wider use of the CEER experts database, a tool for the targeted use of CEER expert knowledge, will be fostered.

• Assistance in the preparation of the WVER IV (October 2009, Athens)

Page 20: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 20

Energy Community Working Group (ENC)

• The Energy Community Treaty entered into force on 1st July 2006.

• The representation of ERGEG and regulators of the contracting parties in the Energy Community Regulatory Board will ensure the active involvement of the European energy regulators in Energy Community developments.

• This is the area of responsibility of the Energy Community Working Group (ENC WG).

• It closely follows the work of the ECRB and provides relevant input to formulate its response to the regulatory developments in the Energy Community.

Page 21: Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009

Conference on Implementing the 3rd Package, Brussels, 11 December 2008 21

Thank you for your attention!More information is available at:

www.energy-regulators.eu