WAGON REPAIR SHOP, KOTA

WAGON REPAIR SHOP, KOTA - West Central Railway zone › uploads › files...• KOTA workshop has been holding ISO 9001 Certification since 29/12/1999 , ISO 14001 Certification since

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • WAGON REPAIR SHOP, KOTA

  • Item A

    OUTTURN

  • Item-A

    395

    405

    425440

    450

    424435 435

    443.5

    464.8

    390

    400

    410

    420

    430

    440

    450

    460

    470

    2011-12 2012-13 2013-14 2014-15 2015-16 upto Jan-16

    Av

    g W

    ag

    on

    s/M

    on

    th

    Years

    Target Outturn

    OUTUTRN (Monthly Average)

  • Item-A

    MONTHLY OUTTURN (2015-16) Target – 450 Wagon

    451 452

    442

    461465

    503

    455452

    507

    460

    400

    420

    440

    460

    480

    500

    520

    Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16

    Wag

    on

    (Ve

    hic

    le U

    nit

    s)

    Month

    Outturn Target

    Target 450

  • 167 174204 191

    235

    160

    124

    69 85

    97

    0

    50

    100

    150

    200

    250

    2011-12 2012-13 2013-14 2014-15 2015-16 upto Jan-16

    Avg.

    Wag

    ons

    / m

    onth

    Years

    BOXN/BCN group v/s BTPN OutturnBOXN/BCN BTPN

    Focus on increasing BOXN/BCN

    POH

    Item-A

    Average Man hrs

    BOXN-856 hrs BCN-1107 hrs BTPN- 351 hrs

  • 41 57212

    1228

    0

    200

    400

    600

    800

    1000

    1200

    1400

    2012-13 2013-14 2014-15 2015-16 upto Jan-16

    Wag

    on

    s

    Years

    Stainless steel Wagon

    POH of Stainless Steel Wagons Item-A

  • OUTUTRN GROUP WISE (Monthly Average)

    16

    6

    17

    5 20

    3

    19

    1 23

    4

    20

    6

    17

    1

    12

    6

    13

    4 16

    0

    14

    38

    63 73

    37

    40

    53 4

    2 45 35

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    2011-12 2012-13 2013-14 2014-15 2015-16 upto Jan-16

    Avg

    . W

    ag

    on

    s / m

    on

    th

    Years

    Others BLC /BLL TANK BOXN /BCN

    Item-A

  • • Twin pipe conversion of BOXNHL, BCNHL and BVZI

    wagons

    • This year 164 BCNHL wagons fitted – departmentally-

    with 2 Piece sliding door by Jan-16 end.

    • First BOXNHAM rake made ready in Feb-16 with new

    design Spring Loaded Side Bearer.

    OUTTURN RELATED WORKS

    Item-A

  • (21 in 2014-15, 758 in 2015-16)

    Twin pipe conversion of BOXNHL wagons

    Item-A

    KOTA workshop is turning out 100% BOXNHL wagons

    with twin pipe brake system since Sep-2015

  • KOTA workshop is turning out 100% BCNHL wagons

    With twin pipe system since Nov-2014

    Twin pipe conversion of BCNHL

    wagons

    Item-A

  • Retro fitment of two piece sliding door

    in BCNHL wagon

    – 172 Nos. (8 in 2014-15, 164 in 2015-16)

    Item-A

    KOTA workshop is turning out 100% BCNHL wagons with

    modified doors from Aug-2013

  • • 172 nos. (8 in 2014-15, 164 in 2015-16)

    Strengthening of BCNHL side walls to prevent bulging and jamming of sliding doors

    Item-A

    KOTA workshop is turning out 100% BCNHL wagons with

    modified doors from Sep-2013

    Modification is innovated

    by KOTA workshop vide

    letter no.

    M 443/1/21 dated

    22/07/2014 and

    approved by RDSO vide

    letter no. MW/BCNHL-

    DOOR dated 09/04/2011

  • • KOTA workshop is turning out 100% BVZI wagons with

    twin pipe system since MAY-2012

    Twin pipe conversion of BVZI

    wagons.

    Item-A

  • Conversion of BOXN to BOXNHAM wagons

    Item-A

    BOXNHAM operational speed is 100/75 Kmph &

    BOXN Ordinary operational speed is 75/60 Kmph

    First BOXNHAM rake made ready in Feb-16 with new

    design Spring Loaded Side Bearer.

  • Conversion of BOXN to BOXNHAM wagons – New design spring loaded side bearer

  • BMBS system being fitted in BOXNHAM

    Item-A

  • Item B

    Quality Parameters

  • POSITION of HOT axle cases (as per RDSO)

    Year 2015-16 (upto Oct-15)

    Item-B

    WorkShop Outturn

    Total

    No of

    Hot

    Axle

    Per

    1000

    wagon

    outturn Rank

    No of

    Hot axle

    (

  • 90 Days Sick marking of KTTW as per IRCA

    Year Quarter Outturn Sick Marking

    % of Sick

    % of Sick Avg

    Rank in IR

    2013-14 Total 4375 50 1.14 1.14 1st

    2014-15

    1st 1164 12 1.03

    1.01 1st 2nd 1238 14 1.13

    3rd 1211 11 0.91

    4th 1153 11 0.95

    Total 4766 48 1.01

    2015-16 1st 1080 14 1.30

    1.26

    2nd 1292 16 1.24

    Total 2372 30 1.26

    Item-B

  • POSITION of Train Parting (as per RDSO)

    Year 2015-16 (upto Nov-15)

    Item-B

    Work Shop

    Outtu

    rn

    Total

    No of

    Train

    Parting

    Per

    1000

    wagon

    outturn Rank

    No of

    Train

    Parting

    (

  • MAINTENANCE OF

    INFRASTRUCTURE

  • Item-C

    MAINTENANCE OF INFRASTRUCTURE

    • DyCE post filled on 02 May 2014.

    • Workshop has now started doing Engineering

    tenders which were earlier done by Kota division.

    • The 4 Engineering tenders are awarded by

    DyCE/WRS/KTT

    • Out of which 2 works has been completed and

    2 works are running.

    • The 3 Engineering works are under tendering

    process.

  • MAINTENANCE OF INFRASTRUCTURE

    • No of M&P value more than 10 Lakhs – 56 Nos.

    • Total Break down hours of these M&Ps for period (Apr-15 to Jan-16) – 1034 hrs.

    Item-C

  • Item D

    CLEANLINESS

  • CLEANLINESS

    1. IMS Certificate

    2. Areas coved

    under IMS

    Mech.

    Elec.

    Store

    Accounts

    Establishment

    Item-D

  • CLEANLINESS • KOTA workshop has been holding

    ISO 9001 Certification since 29/12/1999 ,

    ISO 14001 Certification since 08/03/2007 and OHSAS 18001 Certification since

    05/01/2010.

    • KOTA workshop has obtained IMS

    Certification on 12/08/2013 which is valid

    upto Aug-2016.

    Item-D

  • CLEANLINESS • KOTA workshop is under process to obtain

    ISO-5000 (Energy Management System)

    • Certification audit conducted on

    08 to 10 Feb 2016 by Mr Jayant Shridakar

    Representative of

    M/s LMS Certifications Pvt. Ltd. Lacknow.

    • Recommended for ISO-5000 certification.

    Item-D

  • CLENLINESS

    Cleaned water Booth

    Item-D

  • CLENLINESS

    Cleaned toilet

    Item-D

  • CLEANLINESS-ENVIRONMENT CONTROL SYSTEM

    ETP & Incinerator

    Item-D

    ETP Incinerator

  • • Environment Lab Portable Carbon BOD High Value Mono Oxide Analyzer INCUBATOR Sampler Digital TDS Meter Sound Level Test Meter Spectro Photo Meter

    Item-D

    ENVIRONMENT CONTROL EQUIPMENT

  • CLEANLINESS Item-D

    U-Racks: For Storage of Pipes and Rods.

    Before After

    Advantages:

    • Use of Vertical space and less floor area requirement.

    • Safety from rusting, dust etc.

    • Portable - can be moved anywhere manually.

  • Buried scrap site Digging

    Buried Scrap Disposal: Scrap buried under 2-3 feet since last 20-30 years disposed off on “As is where is basis”.

    • Quantity Disposed: 1382 Mts.

    • Value realised: Approx. 2.76 Crores

    CLEANLINESS Item-D

  • Item E

    HOUSEKEEPING

  • HOUSE KEEPING

    1. No. Of Injuries in the current financial

    year 2015-16 = 28

    2. Availability of manual of safe practices - Yes

    3. Availability of Auto racks – No.

    4. Scrap disposal 2013-14 10424.7 MT

    2014-15 10374.1 MT

    2015-16 8855.43 MT(jan16)

    5. % Green area in workshop - 40%

    Item-E

  • GREENERY IN WORKSHOP

    Green area in workshop – 40%

    Item-E

  • GREENERY in WORKPLACE 100 plants planted in last two months

  • CWM office entrance gate

    Item-E

    Greenery

  • Heritage park

    Item-E

    GREENERY IN WORKSHOP

  • Greenery in Workshop

    Item-E

    GREENERY IN WORKSHOP

  • • Gardens

    Item-E

    GREENERY IN WORKSHOP

  • ITEM-F

    AMENITIES FOR STAFF

  • AMENITIES FOR STAFF

    • No of Employee = 2269

    • No of lockers available = 2468

    • No of meal served per day on canteen = 250

    • % of payment through ECS/Bank = 100% employees

    • No. of RO plants for drinking water = 10 Nos.

    Item-F

  • • ATM in Workshop premises

    AMENITIES FOR STAFF Item-F

  • AMENITIES FOR STAFF • Water coolers with RO plant

    Item-F

  • • New Staff Canteen

    AMENITIES for STAFF

  • AMENITIES FOR STAFF • Staff Canteen

    Item-F

  • AMENITIES FOR STAFF • Staff Canteen (separate ladies cabin)

    Item-F

  • AMENITIES FOR STAFF medical card

    Item-F

  • MEDICAL CAMPS IN WORKSHOP

    STAFF WELFARE Item-F

  • Innovations Initiatives

    Good work done Other items

  • SOLAR POWER

    “Solar power of 500

    KW capacity planned at KOTA workshop”

    • Tender floated - to open on 08/03/2016

    • Kota is the first wagon workshop to float tender

    for solar power.

  • INNOVATION

    CNG Cutting trial and demo by GAIL

  • INNOVATION CNG Cutting in Workshop started as a Pilot

    project

  • INNOVATION In house manufacture of Hydraulic operated work

    bench for Overhauling of BMBS Brake Cylinder

    This is

    First in IR

  • Ladder for welding/painting on BCNHL wagon roof

    INNOVATION

  • TRAINING CENTRE

    Class Room Air brake System Working Model

    Welding Lab Welding Lab

  • MOTIVATION and ENCOURAGEMENT

    • Man of the Month Award Display Board

  • Competitive Environment

    • Inter shop competition & Shield For

    1. Safety

    2. Cleanliness &

    House keeping

    3. Quality

    4. Attendance

  • LPG Valve Model BTPN Valve Model

    TRAINING CENTRE

  • Drum Pallets: For Storage and Transportation of Drums.

    Before After

    Advantages:

    • More drums at a time, hence saving of Diesel in Transportation.

    • Safe working.

    • Utilisation of Vertical space in storage

    HOUSE KEEPING

  • SPECIAL SAFETY MEASURES

    Gate Pass system by web camera

    Web Camera

    Gate pass with Photo

  • • CCTV Surveillance system at workshop gate

    SPECIAL SAFETY MEASURES

  • • Incoming & Outgoing Areas

    SAFETY POSTERS

  • VIGILENCE SEMINAR IN WORKSHOP

  • STAFF WELFARE • Gold plated coin to retired employees

  • STAFF WELFARE • TOUCH SCREEN KIOSK

  • NEW INFRASTURURE ADDED Extension of Store depot

  • Roof re-sheeting of various shops Cost 1 Cr.

    NEW INFRASTURURE ADDED

  • APM, LSD Test Bench

    New (important) M&P Added

  • Excavator & loader Rs. 17.36 Lakhs

    New (important) M&P Added

  • Static Weigh Bridge Rs. 21.36 Lakhs

    Weigh Bridge Digital Control Unit

    New (important) M&P Added

  • Wagon Model in CWM office entrance gate