69
VLAB 1 Final presentation 2014/4/8@Taiwan Team members: Maha Siva ReddyShyam Sankar Shameeja Shafi(IIT) Alireza BorhaniWill Lippitt(UW) Yao-Yu, Benjamin, Yang Hsiang-Wen, Ken, Yang(NTU)

Vlab 1 final presentation ntu ncku

  • Upload
    i-edu

  • View
    239

  • Download
    6

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Vlab 1 final presentation ntu ncku

VLAB 1 Final presentation

2014/4/8@TaiwanTeam members: Maha Siva Reddy、Shyam Sankar、Shameeja Shafi(IIT)Alireza Borhani、Will Lippitt(UW)Yao-Yu, Benjamin, Yang、Hsiang-Wen, Ken, Yang(NTU)

Page 2: Vlab 1 final presentation ntu ncku

OUTLINE

• Teammate introduction

• Tasks

• Result analysis

• Conclusion

Page 3: Vlab 1 final presentation ntu ncku

TEAMMATE INTRODUCTION

Page 4: Vlab 1 final presentation ntu ncku

Teammate introduction

• IIT: mechanical background, pursuing MS in construction technology and management

• UW: architecture and civil engineering background, construction management

Page 5: Vlab 1 final presentation ntu ncku

Maha siva Reddy (IIT)

• Brief Biography

– Mechanical engineering background and master in construction tech. and management

– Familiar with CAD

– Speak Telugu, hindhi and India English

– Playing guitar, volleyball, rubik’s cube

Page 6: Vlab 1 final presentation ntu ncku

Shyam Sankar (IIT)

• Brief Biography

– Mechanical engineering background and master in construction tech. and management

– Familiar with CAD

– 2-year experience of pipline laying works, billing and procurement

– NBA and soccer follower, and playing basketball or football daily an hour

Page 7: Vlab 1 final presentation ntu ncku

Shameeja Shafi (IIT)

• Brief Biography

– Mechanical engineering background and master in construction tech. and management

– Familiar with CAD, Revit and MSproject

– Speak English, Hindi, Malayalam

– Reading books, listening to the music, playing badminton

Page 8: Vlab 1 final presentation ntu ncku

Will Lippitt (UW)

• Brief Biography

– Architecture background and MS in construction management

– Sketchup, CAD

– One year experience as a general contractor project manager and 8 year in construction

– Speak Japanese, French and English

– Walk a dog

Page 9: Vlab 1 final presentation ntu ncku

Alireza Borhani (UW)

• Brief Biography

– Civil engineering background and MS construction management

– AutoCAD

– Speak Persian, German and English

– Traveling and going to the movies

Page 10: Vlab 1 final presentation ntu ncku

TASKS

Page 11: Vlab 1 final presentation ntu ncku

Tasks

Tasks

A case study

Design strategy

3D Model 4D ModelCost

estimation

Page 12: Vlab 1 final presentation ntu ncku

Tasks

Tasks

A case study

Design strategy

3D Model 4D ModelCost

estimation

Page 13: Vlab 1 final presentation ntu ncku

A CASE STUDY

Page 14: Vlab 1 final presentation ntu ncku

LinBian: a township in

south Taiwan

Information

Location SituationHydrology

information

Solutions

FloodgateElevating the

baseWall Stilt house

A case study

Page 15: Vlab 1 final presentation ntu ncku

LinBian: a township in

south Taiwan

Information

Location SituationHydrology

information

Solutions

FloodgateElevating the

baseWall Stilt house

A case study

Page 16: Vlab 1 final presentation ntu ncku

Location

Global team project location

Case studylocation

Page 17: Vlab 1 final presentation ntu ncku

Location

LinBian train station

Page 18: Vlab 1 final presentation ntu ncku

Situation

• The flood was caused by land subsidence

Page 19: Vlab 1 final presentation ntu ncku

Situation

• Sedimentation after the flood

http://blog.xuite.net/jin.ishin/train/26020943-%E5%85%AB%E5%85%AB%E6%B0%B4%E7%81%BD%E5%B1%8F%E6%9D%B1%E6%95%91%E7%81%BD%E7%B4%80%E5%AF%A6

Page 20: Vlab 1 final presentation ntu ncku

Hydrology Information about LinBian

• Max. flood elevation (100-years recurrence interval )=5.9 meters

• Avg. flood elevation (100-years recurrence interval )=0.89 meters

• 100-year rainfall intensity=1012 mm per day

Page 21: Vlab 1 final presentation ntu ncku

LinBian: a township in

south Taiwan

Information

Location SituationHydrology

information

Solutions

FloodgateElevating the

baseWall Stilt house

A case study

Page 22: Vlab 1 final presentation ntu ncku

Near future solution

Installing the flood gate

Elevating the base

(gmap)

Page 23: Vlab 1 final presentation ntu ncku

Near future solution

Elevating the baseBuilding the wall

(gmap)

Page 24: Vlab 1 final presentation ntu ncku

Far future solution

• Stilt house

(elevated house)

The house in England(inthralld.com )

Green elevated house https://news.housefun.com.tw/news/article/35546949922.html

The house in Cambodia(Flickr CC)

Page 25: Vlab 1 final presentation ntu ncku

Tasks

Tasks

A case study

Design strategy

3D Model 4D ModelCost

estimation

Page 26: Vlab 1 final presentation ntu ncku

DESIGN STRATEGY

Page 27: Vlab 1 final presentation ntu ncku

Design Strategy

• It should be economical

• It should be completed in minimum time

• Renovation of an existing building

• It should serve the functionality of a flood house and be aesthetically appealing

• The building should be environmental friendly

Page 28: Vlab 1 final presentation ntu ncku

Tasks

Tasks

A case study

Design strategy

3D Model 4D ModelCost

estimation

Page 29: Vlab 1 final presentation ntu ncku

3D MODEL

Page 30: Vlab 1 final presentation ntu ncku

3D Model

• The original

• Second version

• Final version

• The special parts

Page 31: Vlab 1 final presentation ntu ncku

The original

Page 32: Vlab 1 final presentation ntu ncku

Second version

Page 33: Vlab 1 final presentation ntu ncku

Final version

Page 34: Vlab 1 final presentation ntu ncku

The roof is further extended such that rain water flows out and falls outside

the buildings boundary.

Page 35: Vlab 1 final presentation ntu ncku

Glass curtains are provided to make the structure aesthetically pleasing

Floodgate provided

Page 36: Vlab 1 final presentation ntu ncku

The fence height was increased to 1m to prevent heavy water floods from

hitting the building.

Floodgate provided

Page 37: Vlab 1 final presentation ntu ncku

Greenery that surrounds the building adding to its aesthetic appeal also

absorb water during floods.

Page 38: Vlab 1 final presentation ntu ncku

Tasks

Tasks

A case study

Design strategy

3D Model 4D ModelCost

estimation

Page 39: Vlab 1 final presentation ntu ncku

4D MODEL

Page 40: Vlab 1 final presentation ntu ncku

Original building

Page 41: Vlab 1 final presentation ntu ncku

See pictures

Page 42: Vlab 1 final presentation ntu ncku

Tasks

Tasks

A case study

Design strategy

3D Model 4D ModelCost

estimation

Page 43: Vlab 1 final presentation ntu ncku

COST ESTIMATION

Page 44: Vlab 1 final presentation ntu ncku

Cost estimation

Cost estimation

Process

Cost information

Tools

Results

Cost by items

Cost proportions

Page 45: Vlab 1 final presentation ntu ncku

Cost estimation

Process

Cost information

Tools

Results

Cost by items

Cost proportions

Page 46: Vlab 1 final presentation ntu ncku

Cost information

• Cost Database

– Website

– Material Cost Sheet

– Assumption

– Calculation

Page 47: Vlab 1 final presentation ntu ncku

The website

US Material

US Labor

US Equipment

Page 48: Vlab 1 final presentation ntu ncku

Documents

US cement price

India price list

Page 49: Vlab 1 final presentation ntu ncku

Assumption

• Labor: $USD 5/DAY

• Choose middle level price material

Page 50: Vlab 1 final presentation ntu ncku

Calculation

1) Find the item cost on the website or the document

2) Choose the middle level quality material

3) Change the labor cost from US cost to India cost

4) Search and Change the material cost from US cost to India cost

5) Change the unit to calculate the item cost

Page 51: Vlab 1 final presentation ntu ncku

The tools

• Autodesk Quantity Takeoff– Material checking

• Autodesk Revit– Quantity summary– Member details– Material filtering

• Microsoft Office Excel– Item compilation– Quick Calculation

• Matlab– Labor cost translation

Page 52: Vlab 1 final presentation ntu ncku

Cost estimation

Process

Cost information

Tools

Results

Cost by items

Cost proportions

Page 53: Vlab 1 final presentation ntu ncku

Cost by items

Page 54: Vlab 1 final presentation ntu ncku

Cost by items

Type Cost(USD)

Exterior - Brick on Mt.I. Stud 12730

Interior - 3 1/8" Partition (1-hr) 443

Interior - 6 1/8" Partition (2-hr) 1442

2' x 4' ACT System 784

Windows 74989

Generic - 9" 5960

Generic - 4" Brick 2264

Glazed 2814

Floor 61131

Wall 6669

Column 2001

Steel 551

Formwork 4520

Floodgate 7350

Total 177,833

Page 55: Vlab 1 final presentation ntu ncku

Comparison

$177,833 USD

• 8 rooms , 4 floors apartment

$25,000 USD

• 2 rooms apartment in India

177833-25000x4= $77833 USD

Page 56: Vlab 1 final presentation ntu ncku

Cost proportions

Floor38%

Windows38%

Exterior - Brick on Mt.I. Stud

6%

Floodgate4%

Wall3%

Generic - 9" 3%

formwork2%

Others6%

Type cost

Total cost is $200,005 USD

Page 57: Vlab 1 final presentation ntu ncku

Cost proportions

Sash36%

Metal deck28%

Cast-in-Place Concrete

15%

Masonry - Brick5%

Floodgate4%

Roof3%

formwork2%

Others7%

Material cost

Total cost is $200,005 USD

Page 58: Vlab 1 final presentation ntu ncku

RESULT ANALYSIS

Page 59: Vlab 1 final presentation ntu ncku

Result analysis

Result analysis

Time spent

Problems

Solved Unsolved

Page 60: Vlab 1 final presentation ntu ncku

Result analysis

Result analysis

Time spent

Problems

Solved Unsolved

Page 61: Vlab 1 final presentation ntu ncku

Time Spent (Ben)

• Ben (10 hours per week)(including 1 hour for regular meeting and 2 hours for regular course)

40%

60%

Time Spent (Ben)

Communication Individual work

Page 62: Vlab 1 final presentation ntu ncku

Time Spent (Ken)

• Ken (7 hours per week)(including 1 hour for regular meeting and 2 hours for regular course)

57%

43%

Time Spent (Ken)

Communication Individual work

Page 63: Vlab 1 final presentation ntu ncku

Result analysis

Result analysis

Time spent

Problems

Solved Unsolved

Page 64: Vlab 1 final presentation ntu ncku

Problems

Solved

• Icebreaking We wrote and shared a

document about ourselves.

• Not clear job assignment– Take over the cost estimation.

Unsolved

• Agenda preparing before regular meeting

Page 65: Vlab 1 final presentation ntu ncku

CONCLUSION

Page 66: Vlab 1 final presentation ntu ncku

Conclusion

Conclusion

ContributionLesson learned

Page 67: Vlab 1 final presentation ntu ncku

Contribution

• Design a flood safe renovation of an existing building

• Scheduling a construction

• A rough cost estimation

Page 68: Vlab 1 final presentation ntu ncku

Lesson Learned

Common views

• Different background makes some difficulties, but we think on the same line to finish the project.

• Hard to participate because of being in the virtual team.

• Work responsibility is not clear.

Different views

• UW: lack of specific information about the project and knowledge

• IIT: understand the India English problems and thank Will for his help

• IIT: 7:00 AM is too early

• IIT: hardware and Internet problems are challenges but it is getting better

Page 69: Vlab 1 final presentation ntu ncku

THANK YOU

Global Team Project

VLAB 1