Viridor Application Form 2008

Embed Size (px)

Citation preview

  • 8/14/2019 Viridor Application Form 2008

    1/13

    1

    Project Application Form

    For consideration by the East Sussex / West Sussex / Whitehead / Sheffield /Hampshire / Dorset / Thames / Essex / Kent / Somerset (Walpole) or Somerset (Dimmer)

    panel(please circle as appropriate)

    Total Project Cost

    Amount Applying For

    % of total cost %

    It is important to read the Guidance Notes before you fill out this form. Ifthe form is not completed in full it will be returned and your application

    delayed.

    Please return form to: For Office Use OnlyDate Received

    Reference No

    Bob Attwood

    Administrator

    Viridor Credits Environmental Company

    Aintree House

    Blackbrook Park AvenueTaunton

    Somerset

    TA1 2PX

    01823 624 656 : [email protected]

    Applicant

  • 8/14/2019 Viridor Application Form 2008

    2/13

    2

    SECTION 1 ORGANISATION DETAILS

    a. Name of Organisation or Applicant

    ___________________________________________________________________________________

    b.Contact Details

    Name_______________________________________________

    Address_____________________________________________

    ___________________________________________________

    ___________________________________________________Postcode_________________

    Position____________________________________________

    Telephone________________________ Fax__________________ E-Mail_______________________________

    ______________________________________________________________________________________________________

    c. How is your group constituted? E.g. Voluntary organisation, company, trust, other(please specify)

    ______________________________________________________________________________________________________

    d. Provide details on the background to your group and its aims and objectives

    ______________________________________________________________________________________________________

    e. Date of establishment of your organisation_____________________________

    f. Provide details of relevant insurance policies

    _____________________________________________________________________________________

  • 8/14/2019 Viridor Application Form 2008

    3/13

    3

    SECTION 2 PROJECT DETAILSA. GENERAL

    Name of Project

    ____________________________________________________________________________

    Name of and Distance from landfill site. ______________________We only look at applications that are within a maximum 10 mile radius of a Viridor Waste Landfill Site. Inthe case of the Thames, Beddington Landfill site this radius is reduced to 5 miles.

    Location of Project e.g. Address, Post code etc.

    ____________________________________________________________________________________

    Is your project registered with ENTRUST? If yes, please give project approval number.

    (Please provide copy of approval) (Registration with ENTRUST is not a prerequisite as wecan register for you).

    _____________________________________________________________________________________

    Describe your project including its aims and objectives

    _____________________________________________________________________________________

    Describe why there is a need for the project

    _____________________________________________________________________________________

    Provide a proposed timetable of work including project start date and date of completion(projects must be started within 12 months of application)

    ____________________________________________________________________________

  • 8/14/2019 Viridor Application Form 2008

    4/13

    4

    Indicate which objectives your project contributes to (you may tick more than one box)

    Reclamation, remediation, restoration or decontamination of land

    for economic use for environmental use

    for social use to reduce or prevent pollution

    _____________________________________________________________________________________

    Public Amenities and Parks

    provide a new local amenity protect an existing amenity

    improve an existing amenity other

    _____________________________________________________________________________________

    Building / Type of Facility

    of historical interest for residential use

    of architectural interest for educational use

    for social or recreational use other

    ____________________________________________________________________________

    Environment

    improve local environment a improve access

    increase public awareness increase biodiversity

    habitat environment other

    ____________________________________________________________________________

    Community Involvement

    encourage local participation allow local decision making

    involve community in development meet a local need

    take into account under-represented groups other

    ____________________________________________________________________________

  • 8/14/2019 Viridor Application Form 2008

    5/13

    5

    CATEGORYd/da ONLY

    Category d allows for the provision and maintenance of public amenities and parks.Such projects must be within the vicinity of a Viridor Waste landfill site and the facility

    must be open to the public and not operated for profit. We are unable under theregulations to fund school projects.

    Category da allows for the conservation and promotion of biological diversity. Thismust be connected to a specific natural habitat or a specific species. Such projects mustbe within 10 miles of a registered landfill site. We are unable under the regulations tofund school projects.

    How large a community will benefit?

    ____________________________________________________________________________

    Could this community be considered an adversely affected or deprived area?

    ____________________________________________________________________________

    Does the project cover the natural or social environment?

    ____________________________________________________________________________

    Is the ongoing maintenance of the projects focus or the projects area already agreed?

    ____________________________________________________________________________

    What proportion of the total funding for the project are you applying to Viridor Creditsfor?

    ____________________________________________________________________________

    What steps have been taken to ensure community support for the project?

    ____________________________________________________________________________

  • 8/14/2019 Viridor Application Form 2008

    6/13

    6

    CATEGORYda ONLY complete if relevant

    What type of habitat and/or species are you working upon or with at this site? Projects mustbe linked to specific areas at a site or a specific species. We cannot register multi site applications.

    ____________________________________________________________________________

    The protection of the environment. Please explain how this project will be for theprotection of the natural environment ?

    ____________________________________________________________________________

    The conservation of biodiversity. Please explain how your project will lead toconservation or promotion of biodiversity in relation to this specific habitat or species ?

    ____________________________________________________________________________

    Please indicate what support you have from partners in the biodiversity or conservationsphere?

    ___________________________________________________________________________

    CATEGORYeONLY

    Category e allows for the restoration and repair of buildings and structures that are forreligious worship or of architectural or historical interest. To qualify under this categorythe project must be within the vicinity of a Viridor Waste Management landfill site, be

    open to the public and must be operated on a not for profit basis.

    Why is this building or architecture unique? How special? How high profile?

    ____________________________________________________________________________

    How urgent are the repairs and if not undertaken how significant would any damage beto the whole structure?

    ____________________________________________________________________________

  • 8/14/2019 Viridor Application Form 2008

    7/13

    7

    ALL CATEGORIES

    Does the project have spin-offs in other categories?

    ____________________________________________________________________________

    Indicate how the project will be managed, maintained and funded in the long term

    ____________________________________________________________________________

    How do you intend to promote and publicise the project and in particular the award thatwe may make towards it?

    ____________________________________________________________________________

    Has LCF funding been received before. If so how much, from whom and when?

    ____________________________________________________________________________

    Have you applied to other LCF funders for this project? If so who and when do youexpect to hear?

    ____________________________________________________________________________

    Please indicate below whether the project will result in any volunteer, training oremployment benefits

    Output EstimatedNumber

    Detail

    Voluntary Opportunities

    Vocational Training opportunities

    Full-Time Jobs

    Part-time/Seasonal Jobs

    Other

  • 8/14/2019 Viridor Application Form 2008

    8/13

    8

    Youth VolunteeringIn 2006 the scheme was challenged by the Government to create new youth volunteeringopportunities. Consequently all applicants are required to provide the following information withregard to the project.

    Outline definition for use with youth volunteering statistics:

    A youth is someone who is between the ages of 16 and 25 when they start working on a project.

    A volunteer is somebody who has offered their time to participate in the project and will receive nothing morethan reasonable out of pocket expenses whilst carrying out works on the project site.

    Number of youth volunteers working on this project

    Number of youth volunteering days created by this project

    SECTION 3 SITE BASED/BUILDING PROJECTS ONLY

    Who owns the land and/or building on which the project is sited?

    _____________________________________________________________________________________

    If you do not own the land and/or building, who has control over the land?

    ____________________________________________________________________________

    If you have a lease or tenancy agreement please advise how many years remain we areunable to fund projects where short-life ownership rights exist.

    Does the project require planning permission or other form of consent? Give details(attach copy)

    ____________________________________________________________________________

    Designation of land eg. SSSI, AONB or of building eg. Grade II listed

    ____________________________________________________________________________

    Do you have the relevant permission to carry out the Project?(provide details)

    ____________________________________________________________________________

  • 8/14/2019 Viridor Application Form 2008

    9/13

  • 8/14/2019 Viridor Application Form 2008

    10/13

    10

    SECTION 4 FINANCE

    How is your organisation currently funded? Give details of general income and funding,and of grants received in the past year. Also list contacts and partnership organisationswhich contribute to your income.

    Income/grant Source/contact Timescale

    What is the total cost for this particular project?(Please demonstrate how the total was calculated inquotes section at end)

    ____________________________________________________________________________

    How much are you applying for from Viridor Credits?

    ____________________________________________________________________________

    Third Party Contribution This is payable to Viridor Waste Management as they do not get100% tax relief (Only 90%) for the amount they give to the scheme. Therefore a third partycontribution, equal to 10% of the grant awarded, is required. (This means that this sum is notavailable for the project)

    Who will make this contribution?

    ____________________________________________________________________________

  • 8/14/2019 Viridor Application Form 2008

    11/13

    11

    If the grant you are applying for is greater than 5,000 also enclose a detailed costingbudget with timeframes clearly identified. If requesting more than 20,000 a morecomprehensive business plan will be required._____________________________________________________________________________

    List other funding for this project

    Source of funding Amount requestedAmount confirmed/expected date of decision

    Total

    Please give details of the organisations bank account

    Bank Sort Code

    Branch Account No

    Title of Account

    If you are applying for a grant of less than 5,000, specify expenditure below, withtimescales

    Item Cost Timescale

  • 8/14/2019 Viridor Application Form 2008

    12/13

    12

    Enclosures (Tick if supplied)

    Constitution, Trust Deed or Memorandum & Articles of Association (compulsory)

    Note of formal agreement of the organisation to apply for funding, e.g. relevantminute of meeting (compulsory)

    ENTRUST Enrolled Environment Body registration letter (if registered) in mostinstances Viridor Credits will act as the Environmental body for you

    ENTRUST Project registration letter (if obtained)

    Evidence of other contributions and specific partner support for project(compulsory)

    Evidence of Local Support (compulsory) this shows evidence of the projects worth to thelocal community

    Documentation in evidence of the need and support for the project (compulsory)

    Audited annual accounts (for last 2 years, where appropriate)

    Quotations(s) for work to be undertaken on the project (compulsory) -aMinimum of3 Quotes are required by ourselves to satisfy the scheme regulations. Failure to providethese may lead to a delay in consideration of your projectPlease provide details below (Breakdown)

    Grant Payments Schedule (if more than 5,000)

    Capital works specifications (if requesting more than 5,000, if appropriate)

    Job description/s for salaried posts please note however that only in very exceptionalcircumstances will we provide funding for salaried posts.

    Budget and Cash flow plan (if requesting more than 5,000)

    Business plan (if requesting more than 20,000)

    Planning permission/consents/other relevant permission (if appropriate)

    Site plans (if available)

    Photographs(if available) Please include a few relevant photographs of the project site/area etc.They always help give our panels a feel for what you are asking for

    Other relevant material (please specify)

    Access Statement (provide on headed paper) this is compulsory for all projects and failure toprovide will lead to your application being delayed

  • 8/14/2019 Viridor Application Form 2008

    13/13

    13

    If the committee agrees to provide funding will you:

    Be prepared to sign a formal agreement guaranteeing the proper use ofsuch funds in accordance with the Landfill Tax regulations;

    Agree to provide progress reports to an agreed format and frequency;

    Provide any information required by ENTRUST;

    Provide and put in place an agreed publicity programme;

    Keep proper audited accounts for the project and make them available tous or our advisors on request;

    Make the first draw down of payment within 3 months of award approval,subject to project start date.

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Declaration

    I confirm to the best of my knowledge that the above information is correct and that theproject will be carried out as described.

    Signature Date

    Name

    Position

    QuotesFrom

    Details Total

    1 Name

    2 - Name

    3 - Name