Victor Ballesteros Current Position : Assist Resident Engineer - Mechanical

HOME ADDRESS

Blk 15 Lot 12 Montville Place, Amethyst St.

Don Antonio Hts.Quezon City, Philippines, Zip Code 1127

Mobile Nos.(Saudi / Phils) : +966-559079019 /+63-9993173869

Personal Email 1 : [email protected]

Personal Email 2 : [email protected]

Personal Web Site : www.victorballesteros.webs.com

PERSONAL DATA

Nationality : FILIPINO

Date of Birth : OCT 03, 1975

Age : 40 Yrs. Old

Status : MARRIED

Saudi Driving License : Valid Until 28 June 2022

EDUCATIONAL ATTAINMENT

UNIVERSITY OF LUZON

Bachelor of Science in Mechanical Engineering

Year Graduated : 1996

SAINT CHARLES ACADEMY

Year Graduated : 1992

COLILING ELEMENTARY SCHOOL

Year Graduated : 1986

PROFESSIONAL QUALIFICATION

APPROVED - Piping/Mechanical Inspector by SAUDI ARAMCO

SAP # 70006074

PASSED - Mechanical Engineer National Board Examination

PRC License # 0051515

TRAINED - Occupational Safety and Health of America

OSHA30 - Cert # 9152152

TRAINED - RT Film Interpretation based on SNT- TC-1A, 2006 Ed. APEX Engineering

Cert # N01567-2011-RTFI32-0001

MEMBER - Saudi Council of Engineers (2014 to 2016)

SCE Membership # 218497

MEMBER - American Society of Mechanical Engineers (2013 to 2016)

ASME Membership #100697739

MEMBER - Philippine Society of Mechanical Engineers (1997 to 2015)

PSME Membership #93199

CERTIFICATES ASME Standards and Certification - Assessment Based Course (Dec 14, 2014)

Certificate # 81457046

SEMINARS - 62ND P S M E National Convention (Oct.22 - 25, 2014)

SMX Convention Center, Mall of Asia Complex, Pasay City, Philippines

Page 2: Victor_Resume Updated_JZ-2069

Resume of Victor Ballesteros

Page 2of6

SEMINARS - 1ST KFUPM Technology Showcase (Jan 6, 2015)

King Fahd University of Petroleum and Minerals

Dharan, Kingdom of Saudi Arabia

INTERNATIONAL and PROJECT STANDARDS FAMILIARITY

ASME Standard

API Standard

SABIC and ARAMCO Standards WORK HISTORY

More than 17 years of extensive working experience in various engineering practices involving QA/QC

Inspection and field engineering works with emphasis of inspection on testing and commissioning,

fabrication and erection of refineries, industrial, power and water station projects and phases of oil -

gas and petrochemical industry which involved in mechanical, piping & welding, non-destructive

testing including plant maintenance, start up and commissioning activities.

WORKING EXPERIENCE

Project : Yanbu 2 Water and Power Plant Project

Project Description : 3 x 240 MW Arabian Heavy Oil Fired Power Plant

Company : Jacobs ZATE Engineers and Consultants

Project Management and Consultancy (PMC)

Marafiq Execution Team (MET)

Owner : Marafiq Company, KSA

Assistant Resident Engineer – Mechanical, Sept 2012 to Present

Responsible on mechanical installation, erection and inspection during construction phase of the plant,

Assigned in welding inspection for all the power and water facilities which includes Steam Generator,

Tanks and all aspects of welding works. Conduct welder performance qualification testing (WPQT) for

all incoming welders prior to production welding. Responsible in welding inspection for all boiler

pressure parts materials including turbine piping fabrication. Responsible in witness and inspection for

all mechanical rotating and static equipments alignment. Responsible in reviewing all NDE testing RT,

UT, MT&PT reports. Responsible in reviewing all generated test package prior to pressure test.

Reports daily plant activities and generate Plant Observation Notice Report (PON) and Non

Conformance Report if necessary. Attend final walk down activities of pre-com and commissioning

activities prior to system energization and witnessed commissioning activities.

Project : Rabigh Independent Power Plant Project

Project Description : 2x660MW Arabian Heavy Oil Fired Power Plant

Company : Rabigh Electricity Company

Owner : Rabigh Electricity Company, KSA

Mechanical Supervisor, June 2011 to August 2012

Responsible on all mechanical installation, erection and inspection during construction phase of the

major equipment of the plant. Provide technical assistance to senior mechanical engineers. Promotes

good relationship between the contractors and assist them on technical minor problems during

installation and erection of major equipment. Witness major testing activities on the plant during start

up and commissioning.

Page 3: Victor_Resume Updated_JZ-2069

Resume of Victor Ballesteros

Page 3of6

Project : Shuqaiq Water and Power Project

Project Description : 3x340MW Arabian Heavy Oil Fired Power Plant

Owners Engineer : ILF Consulting Engineers GmBH ,

Owner : Shuqaiq Water and Electricity Company, KSA

Sr. Mechanical Inspector,June 2009 to December 2010

Responsible on all mechanical activities at SQWEC II site. Witness motor run test during no load and

full load operation and check all vibration, temperature, noise decibels, rpm and starting current for the

runing motors. Witness final alignment of Steam Turbine and Generator and responsible for erection

activities.Witness inspection of comissioning of 3 units boiler and steam turbine including desalination

plant activities from initial firing / first water production up to reliability test.Responsible in Walk Down

activities together with the contractor commisioningpersonnels.Responsible in all mechanical

alignment of all rotating equipments of Power and Water plant.Responsible in line check, hydrotest, re-

instatement activities of the piping system. Responsible for the inspection of 20ӯ & 38ӯ - 6.0 klms

long main fuel line offshore pipeline from Jetty (unloading station) to Metering Station of SQWEC II.

Project : Shaybah GOSP IV, Central Processing Facilities Project

Company : SNC Lavalin Europe BV

Client : Saudi Aramco Company, KSA

QC Inspector- Mechanical and Piping, April 2008 to May 2009

Responsible for conducting the inspection activities and enforcing the applicable standards,

documents and procedures as per Saudi Aramco Engineering Standards and Standard drawings.

Responsible for monitoring and inspection during receiving fabrication storage, installation and

conduct inspection in accordance with Aramco Typical Inspection Plan and Checklist. Familiar in

Saudi Aramco Code and Standard using SAIC, SATR, SATIP and SAES forinspection.Involved in

Hydrotesting of all valves to be used on all aspects of piping system. Responsible for line checking

and pressure testing of newlyconstructed plant piping which are designed and constructed in

accordance with ASME B31.3 codes as applicable.

Project : Hawiyah NGL-Gas Treat & Compression Plant Project

Company : SnamprogettiEni Group,

Client : Saudi Aramco Company, KSA

QC Inspector- Mechanical and Piping, June 2007 to March 2008

Responsible for the monitoring and inspection of all piping fabrication & erection including installation

at the Turbine and Compressor Area.Familiar in Saudi Aramco Code and Standard using SAIC,

SATR, SATIP and SAES for inspection.Involved on all types of piping testing such as hydrotest,

pneumatic, gravity and visual testing. Conduct punch listing of the line prior to testing (hydro,

pneumatic, service, visual and gravity test. Conduct in-process inspection during pipe installation and

construction.

Project : Ju’aymah Gas Plant Expansion Project

Company : Mohammed Al-Mojil Group,

Client : Saudi Aramco Company, KSA

QC Inspector- Mechanical and Piping, March 2006 to March 2007

Conduct and prepare surveillance reports on all activities which does not conformed to Aramco and

ASME standards. Review Test Packages prior to hydrotest. Conduct punch listing on all installed

process pipelines. Conduct, witness and inspect all hydrotest and re-instatement activities. Coordinate

with client and sub-contractors on all inspection activities. Prepare reports and documentations for all

Page 4: Victor_Resume Updated_JZ-2069

Resume of Victor Ballesteros

Page 4of6

inspections and testing activities. Perform other duties as maybe assigned by superior. Familiar on

Saudi Aramco code and standard using SAIC, SATR, SATIP and SAES for inspection.Involved in

hydrotesting of all valves to be used on all aspects of piping system. Inspection on supplied material

according to material receipt and manufacturer certificate and advised warehouse personnel to store

according to its use systematize by using there item code, material code, serial number, description of

material and classification. Conduct fit-up inspection such as preparation, orientation and identification

number of pipes and fittings prior for welding.

Project : Linear AlphineOlefines Project

Company : Mohammed Al-Mojil Group

Client : Saudi Basic Industry, KSA

QC Inspector- Mechanical and Piping,October 2005 to March 2006

Monitor and prepare documentation on pipe fabrication and site installation to determined and verify

conformance to the project specification requirements in area of welding and non-destructive testing.

Review all Welding Procedure Specification (WPS) and monitor welders qualification testing and

procedures for welding verification and conformance to contract project specification and

requirements. Witness piping system prior for hydro-test and other activities before and after final tie-in

of pipes. Inspect and records all Non-Destructive Testing of piping system as per requirements.

Project : Saudi Arabian Fertilizer Co. (Ammonia & Urea Plant)

Company : Mohamed Al-Mojil Group

Client : Saudi Basic Industry, KSA

QC Inspector- Piping and Welding, November 2004 to October 2005

Familiarized client and company procedures & engineering standards and references. Review all

welding procedure specification (WPS) and monitor welders qualification testing and procedures for

welding verification and conformance to contract project specification and requirements. Ensure

drawings are in current revisions and approved by the customer authorized representative. Check /

Inspection incoming material. Check electrodes and rods to be used by welders per client technical

procedures and specification. Visual inspection of fit-up piping joints prior to welding. Inspection on

supplied material according to material receipt and manufacturer certificate and advised warehouse

personnel to store according to its use systematize by using there item code, material code, serial

number, description of material and classification. Conduct fit-up inspection such as preparation,

orientation and identification number of pipes and fittings prior for welding.

Project : Petron Bataan Refinery / Offsite Automation Project

Company : EEI Corporation

Client : EdeleanuSnd. Bhd., Singapore

Senior QA/QC Engineer- Mechanical, July 2004 to November 2004

Monitor and prepare documentation on pipe fabrication and site installation to determined and verify

conformance to the project specification requirements in area of welding and non-destructive

testing. Review all Welding Procedure Specification (WPS) and monitor welders qualification testing

and procedures for welding verification and conformance to contract project specification and

requirements. Prepare test package for piping system prior for hydro-test and other activities before

and after final tie-in of pipes. Inspect and records all Non-Destructive Testing of piping system as per

requirements.

Page 5: Victor_Resume Updated_JZ-2069

Resume of Victor Ballesteros

Page 5of6

Project : Rio Tuba Nickel Hydro-Metallurgical Project

Company : EEI Corporation

Client : Japan Gas Corporation, Japan

Senior QA/QC Engineer - Mechanical,April 2003 to July 2004

Inspect all materials furnish by client on mechanical installation to insure all material within the material

specification in accordance with project specification. Inspect all mechanical equipment (rotary and

static) that is to ensure traceability prior for installation. Performs inspections of all equipment

installation work in progress on a continue basis. Witnessed test and alignment and completes final

equipment checks and test prior to client turnover and acceptance.

Project : San Roque Hydro-Electric Multipurpose Project

Project Description : 3x175MW Hydro Power Plant

Company : EEI Corporation

Client : ABB – Alstom Power, Portugal

Senior QA/QC Engineer- Mechanical, April 2001 to January 2003

QC In-charge and perform all types of inspection including painting inspection. Inspect all materials

furnished by client on mechanical and electrical installation. Insure all material within the material

specification in accordance with project specification. Inspect all radial gate elements that is to ensure

traceability of material, workmanship, quality of works and issued Non-Conformance Reports (NCR)

when there are deficiency at work which renders the quality of an item to be inspected. Inspect and

witnessed all records of NDT for all radial gate elements which shall include the following; Visual Test

(VT) Liquid Penetrant Test (PT) Ultrasonic Test (UT). Monitor and prepare documents on pipe

fabrication for hydraulic piping to determine and verify conformance in area of welding and NDT.

Review all Welding Procedure Specification (WPS) and monitor welder’s qualification testing and

procedures for welding verification and conformance to contract project specification and

requirements. Inspection and witness records all testing on electrical installation works, which include

cable pulling, insulationresistance /continuity test and termination, check activities. Project : Sual Power Station

Project Description : 2x600MW Coal Fired Power Plant

Company : Southern Company, Philippines

CEPA Operation and Maintenance

Mechanical Maintenance,February 2000 to March 2001

Performed maintenance and repair of Coal & Ash Plant Conveying System which include the following

major equipment:

Two Units of Ship Unloader(Bucket Elevator Type),

TwoUnits of Stacker and Re-claimer,

Transfer Tower Equipment,

Coal Sampler System,

Conveyor Drivers,

Coal Crusher Ball Mills

Project : Masinloc Thermal Power Plant Project

Project Description : 2x300MW Coal Fired Power Plant

Company : EEI Corporation

Client : Mitsubishi Heavy Industries, Japan

Junior QA/QC Engineer - Mechanical, September 1999 to January 2000

Page 6: Victor_Resume Updated_JZ-2069

Resume of Victor Ballesteros

Page 6of6

Conduct inspection activities on Steam Turbine and Generator prior for disassembly and re-assembly.

Check visual and dimensional clearances of the turbine generator parts such as rotor assembly,

bearings, packing glands, oil seal, etc. including coupling alignment and bolt stressing. Performs visual

and dimensional inspection of turbine valves such as Main Stop Valve (M.S.V.) interceptor Valves,

(I.V.), Reheat Stop Valve (R.S.V.) and Governor Valve (G.V.) Witness NDT on Steam Turbine blades,

rotor and Generator. Coordinate with Field Operation Group on matters affecting quality of works to

minimized re-works and man-hours losses. Prepare necessary documents on all activities done for

client approval and final acceptance. Project : Quezon Thermal Power Plant Project

Project Description : 1x440MW Coal Fired Power Plant

Company : EEI Corporation

Client : Bechtel Overseas Corporation, USA

Junior QA/QC Engineer- Mechanical, July 1997 to September 1999

Responsible for directing quality control activities to ensure that standard of quality in all aspects of

production activities is attained. Provides technical assistance to the mechanical or equipment

superintendent and area supervisor and keeps them informed on matters relating to quality control.

Performs inspections of all equipment installation work in progress on a continuing basis, Witness test

and alignment and completes final equipment checks and test prior to client turnover and

acceptance.Maintain an open dialogue with site factory vendor representative to assist requirements

and needs for having vendor representatives at site. Generates monthly accomplishment reports on

accepted, rework/rejected and clients disposition QCIR’s and submitted to QC (Quality Control) in-

charge for monthly reports.

I certify that all written above are true with the best of my last knowledge.

Applicant

Victor Ballesteros

Registered Mechanical Engineer

Verify my license here :

http://www.prc.gov.ph/services/default.aspx?id=16