123
Civil/Construction Material Testing Industrial Hygiene Mechanical/Material Testing Environmental Testing Metallurgical Failure Investigation Geotechnical Engineering Full Ring Test Marine, NDT, Heat Treatment & Inspection Analytical Chemistry VERSATILITY SPECIALIZATION INTEGRATED SERVICES Indoor Air Quality Lonestar Laboratories (Lonestar Dubai & Abu Dhabi) are ISO/IEC 17025:2005 Accredited Testing Laboratories by DAC (LB-019 & LB-223) & ENAS (NAL-065 & NAL-046) in accordance with Laboratory Scope of Accreditation. Both Laboratories are also Certified to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by LRQA

VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: [email protected]

  • Upload
    dangque

  • View
    242

  • Download
    4

Embed Size (px)

Citation preview

Page 1: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Civil/ConstructionMaterial Testing

Industrial Hygiene

Mechanical/Material Testing Environmental Testing

Metallurgical FailureInvestigation

Geotechnical Engineering

Full Ring Test

Marine, NDT, HeatTreatment & Inspection

Analytical Chemistry

VERS

ATILI

TYSP

ECIA

LIZAT

ION

INTE

GRAT

ED S

ERVIC

ES

Indoor Air Quality

Lonestar Laboratories (Lonestar Dubai & Abu Dhabi) are ISO/IEC 17025:2005 Accredited Testing Laboratories by DAC (LB-019 & LB-223) & ENAS (NAL-065 & NAL-046) in accordance with Laboratory Scope of Accreditation.

Both Laboratories are also Certified to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by LRQA

Page 2: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Rev-04-2016

Website: www.Lonestar-Lab.com

LOCATIONS

DUBAI ABU DHABI OMAN IRAQ KUWAIT

Lonestar Technical Services (L.L.C) Lonestar Technical & Industrial Services (L.L.C)

P.O. Box 8817, Dubai P.O. Box 6098, Abu Dhabi

United Arab Emirates United Arab Emirates

Telephone: +971 4 324 3888 Telephone: +971 2 550 0767

Facsimile : +971 4 324 3682 Facsimile : +971 2 550 0838

Email: [email protected] Email: [email protected]

C O M P A N Y P R O F I L E

C O M P A N Y P R O F I L E

CC OO MM PP AA NN YY PP RR OO FF II LL EE

Lonestar Laboratories (Lonestar Dubai & Lonestar Abu Dhabi) are ISO/IEC 17025:2005 Accredited Testing Laboratories by ENAS & DAC in Accordance with the Laboratory Scope of Accreditation Available on ENAS & DAC Website. Both Laboratories are also Certified to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by LRQA.

LL oo nn ee ss tt aa rr LL aa bb oo rr aa tt oo rr ii ee ss

Page 3: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

TT AA BB LL EE OO FF CC OO NN TT EE NN TT SS

Sections

Company Introduction ................................................................................................... 1

Mission Statement ........................................................................................................ 2

Quality Policy ................................................................................................................ 3

Health, Safety & Environmental Policy ......................................................................... 4

FANR Permit ................................................................................................................. 5

Accreditation & Certification .......................................................................................... 6

Awards / Achievements ................................................................................................ 7

Registration & Prequalification with Major Oil Companies ............................................ 8

Scope of Testing ........................................................................................................... 9

Analytical Chemistry & Environmental Division ......................................... A

Industrial Hygiene-IH / Indoor Air Quality-IAQ Division ............................. B

Material / Mechanical Testing Division ...................................................... C

Metallurgical Failure Investigation Division ............................................... D

Non Destructive Testing (NDT) Division ................................................... E

Civil / Construction Material Testing Division ............................................ F

Geotechnical Services Division ................................................................. G

Third Party Inspection (TPI) Services Division........................................... H

Partial List of Major Ongoing & Completed Projects ................................................... 10

Organizational Chart ................................................................................................... 11

Location Maps ............................................................................................................. 12

Page 4: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

CC OO MM PP AA NN YY II NN TT RR OO DD UU CC TT II OO NN

Page 5: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Lonestar Technical Services

P.O. Box 8817 Tel: +971 4 324-3888 Dubai Ship Docking Yard (Al Jadaf) Fax: +971 4 324-3682 Building # DY–34 email: [email protected] Dubai - United Arab Emirates website: www.lonestar-lab.com

BRIEF COMPANY INTRODUCTION

Lonestar is a testing and analytical laboratory established and registered in Emirate of Dubai, United Arab Emirates, and located in Business Bay Area inside Dubai Ship Docking Yard – Al Jadaf. The laboratory has been in operation since 1992. Lonestar not only continues to offer the same reliable analytical and testing services offered in the past, but also has substantially expanded its scope of services and laboratory locations in Abu Dhabi, Oman, Erbil (Iraq) and Kuwait.

The uniqueness of Lonestar is its personnel. Our technical personnel have been working in many diverse industrial applications for numerous years. We are therefore able to better understand and address problems in a more realistic manner. At Lonestar all tests are conducted in accordance with internationally accepted test methods and specifications. Due to cooperative agreements between Lonestar and other reputable laboratories in Europe and the USA, we are able to address the most complex analytical requirement, should the need arise. The areas of service currently covered by Lonestar are as follows:

Chemical Analysis Industrial Hygiene – IH Scale /Deposit Analysis Geotechnical Investigation Petroleum Products Analysis Construction Materials Testing (Civil) Environmental Testing Supply of Certified Inspectors Effluent Analysis Non Destructive Testing-NDT Mechanical / Material Testing Radiography -RT Metallography Magnetic Particle Testing -MPI Metallurgical Failure Investigation Liquid Penetrant Testing –PT NACE corrosion Testing Ultrasonic Testing –UT Full Ring Test Heat Treatment –HT Coating Test Welder and Procedure Qualification Indoor Air Quality Monitoring

Lonestar Dubai & Lonestar Abu Dhabi are ISO/IEC 17025:2005 accredited testing laboratories by DAC (LB-019) and ENAS (NAL-065 & NAL 046) in accordance with the laboratory scope of accreditation. Both Laboratories are also certified to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by LRQA, which maintains a rigorous QA/QC program, towards chain of custody, sample preparation and analysis. Quality management system is established along the guidelines of ISO IEC 17025:2005

Lonestar Dubai is registered and licensed as a laboratory with Dubai Municipality, the regulatory authority of the Emirate.

Lonestar’s operations are carried out through its various operating sections. A supervisory staff specialist, with many years of experience in the relevant discipline, heads each of the operating departments.

Lonestar’s list of clients include oil and gas companies, construction and fabrication companies, insurance companies, entertainment Companies, shipping companies, municipalities and most of the commercial laboratories in the UAE.

•••

Page 6: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

MM II SS SS II OO NN SS TT AA TT EE MM EE NN TT

Page 7: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

M I S S I O N S T A T E M E N T

It is the policy of this Company to conduct its business in a manner, which demonstrates technical

competence and reliability while continuously improving and providing a cost effective service for the

laboratory’s Clients.

Signed

Syed S. Hussaini

General Manager

Page 8: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

QQ UU AA LL II TT YY PP OO LL II CC YY

Page 9: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 10: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

HH SS EE PP OO LL II CC YY

Page 11: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 12: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

FF AA NN RR PP EE RR MM II TT

Page 13: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 14: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

AA CC CC RR EE DD II TT AA TT II OO NN && CC EE RR TT II FF II CC AA TT II OO NN

Page 15: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 16: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 17: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 18: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 19: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 20: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 21: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 22: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 23: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 24: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 25: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

AA WW AA RR DD SS // AA CC HH II EE VV EE MM EE NN TT SS

Page 26: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS (ADCO) 

SAFETY AWARD PRESENTED TO LONESTAR  

FOR CONTRIBUTION IN ACHIEVING 10,000,000 

MAN HOURS WORK WITHOUT LTI 

Page 27: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 28: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 29: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 30: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 31: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 32: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 33: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 34: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 35: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

RREEGGIISSTTRRAATTIIOONN && PPRREEQQUUAALLIIFFIICCAATTIIOONN WWIITTHH MMAAJJOORR OOIILL CCOOMMPPAANNIIEESS

Page 36: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

LONESTAR is registered with the following major organization in the Middle East:

ORGANIZATION REGISTRATION #

Abu Dhabi Defense 563/2011

Abu Dhabi Gas Dev. Co. (AL HOSN GAS) 1344

Abu Dhabi Municipality & Town Planning – Sewerage planning Committee

-

Abu Dhabi Sewerage Services Company -

ADCO – Abu Dhabi Company for Onshore Oil Operations

14453

ADGAS – Abu Dhabi Gas Liquefaction Company Ltd.

1051

ADMA OPCO – Abu Dhabi Marine Operating Company

14005

ADNOC – Abu Dhabi National Oil Company 506217

ADOC– Japan L-0026

ADWEA – Abu Dhabi Water & Electricity Authority 003195

COMMERCIAL REGISTRATION

Page 37: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

ORGANIZATION REGISTRATION #

ADYARD ABU DHABI 52691

ARABTEC – Artabtec Construction LLC ARTC/SSP/11/6/7/1351

ARAMCO – Saudi Arabian Oil Company 10035796

BOROUGE 132395

BUNDUQ L-121

Department of Transport – Abu Dhabi 3378910

Descon -

Dolphin Energy

DEL-DCA-07-01-LT-00568

ESNAAD 904834

ENEC – Emirates Nuclear Energy Corporation 149

EPPI – Emirates Preinsulated Pipes Industries -

FERTIL – Ruwais Fertilizer Industries 30998

Page 38: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

ORGANIZATION REGISTRATION #

GASCO – Abu Dhabi Gas Industries Ltd. 904307

IMCC – International Management and Construction Corporation

13118

KOC – Kuwait Oil Company 10311

MASDAR 1543312982

McDermott International -

Ministry of Public Works 133188

Mubadala -

Nakheel 1598

NDC – National Drilling Company 2599

Occidental Petroleum of Qatar Limited. -

NPCC – National Petroleum Construction Company

8747

PDO – Petroleum Development Oman LLC -

Page 39: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

ORGANIZATION REGISTRATION #

PETRONAS Carigali Iraq Holdings B.V. -

Qatar Petroleum 300219

SAIPEM Spa -

TAKREER 904178

TECHNOMAK -

Western Region Municipality -

ZADCO – Zakum Development Company 31805

Page 40: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

SS CC OO PP EE OO FF TT EE SS TT II NN GG

Page 41: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

AA NN AA LL YY TT II CC AA LL CC HH EE MM II SS TT RR YY && EE NN VV II RR OO NN MM EE NN TT AA LL DD II VV II SS II OO NN

Page 42: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

WATER / EFFLUENT / SEA WATER / SOIL / SEDIMENT ANALYSIS

Acidity Ph Cobalt Vanadium

Alkalinity Phenols Copper Zinc

Ammonia Phosphates Hexavalent Chromium Aromatic Volatile Organics (BTEX)

Bicarbonate Phosphorus Iron Chlorinated Hydrocarbons

BOD Residual Chlorine Lead Crude & Refined Product Fingerprinting

Boron Salinity Lithium Extractable Organic halides

Bromate Sodium Absorption Ratio Magnesium Haloacetic Acids

Carbonate Sulfates Manganese Halogenated Volatile Organics

Chlorides Sulfide Mercury Herbicides & Pesticides

COD TDS Molybdenum Nitroaromatic And Cyclic Ketones

Color Temperature Nickel Organic And Volatile Acids

Conductivity Total Hardness Niobium PCB's

Cyanides Total Nitrogen Potassium Phenols

Dissolved Oxygen Total Organic Carbon Selenium Polynuclear Aromatic Hydrocarbons (PAH)

Fluoride TSS Silicon Pthalate Esters

Free chlorine Turbidity Silver Semi Volatile Organic Compounds

Magnesium Hardness Aluminum Sodium Total Organic Halides

Nitrates Antimony Strontium Total Petroleum Hydrocarbons (DRO/GRO)

Nitrites Arsenic Thallium Trihalomethanes

Oil & Grease Barium Tin Volatile Organic Compounds

Organic Nitrogen Beryllium Titanium Aromatic Volatile Organics (BTEX)

SOIL / SEDIMENT ANALYSIS – ADDITIONAL TESTS

Ammoniacal Nitrogen Grain Size Sodium Absorption Ratio

Bulk Density Leachable metals Total Organic Carbon

Cation Exchange capacity Moisture content Total Organic Matter

MICROBIOLOGICAL ANALYSIS

Fecal Coliforms Pseudomonas Streptococcus

Fungi SRB Total Aerobic Bacteria

Iron bacteria Staphylococcus Total Coliforms

Page 43: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

STEEL CHEMISTRY

Alloys ASTM G 48 (Various) Chemical Composition of steel

Aluminum Alloys ASTM G 66,67 Diffused Hydrogen test

ASTM A 262 (Various) Brass & bronze Purity of metal

FOAM ANALYSIS

Foam Expansion ratio Sediment content

Foam Stability Specific Gravity

pH(3%solution) Surface tension

pH(neat) Viscosity

OIL ANALYSIS

Appearance Color Net Calorific Value Sulfur

Ash content Copper Corrosion Oil content Total Acid Number

Carbon Conradson Residue Flash point Pour point Total Base Number

Cetane Index Gross Calorific Value Sediment Viscosity

Cloud point Metals Specific Gravity Water content

AMBIENT AIR / STACK MONITORING

Carbon dioxide Oxides of nitrogen SO2

Carbon monoxide Oxygen Total Acid concentration

Chlorine content Ozone Total Hydrocarbon

Hydrogen sulfide RPM (PM 10, 5, 2.5) Total Particulate Concentration

Lower Explosion Limit Semi volatile organic compounds Volatile Organic Compounds

Page 44: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

II NN DD UU SS TT RR II AA LL HH YY GG II EE NN (( II HH )) // II NN DD OO OO RR AA II RR QQ UU AA LL II TT YY (( II AA QQ )) DD II VV II SS II OO NN

Page 45: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

INDUSTRIAL HYGIENE (IH) / INDOOR AIR QUALITY (IAQ)

Asbestos Bulk sample analysis. Total & Respirable fibers.

Asbestos Fiber concentration in air. Total & Respirable Particulates.

Bacterial & Microbial Identification Total Plate count

Fungal/Mould identification Toxic Vapors

Metals VOC & SVOC

Noise Monitoring/Dosimetry TWA Yeast & Mould identification

Page 46: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

MM AA TT EE RR II AA LL // MM EE CC HH AA NN II CC AA LL TT EE SS TT II NN GG DD II VV II SS II OO NN

Page 47: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

MATERIAL/MECHANICAL TESTING CAPABILITIES

All Weld Tensile Test Hot Tensile Test

Breaking Load Impact Test

Brinell Hardness Test Load Test

Coating Adhersion Macro Examination

Coating Continuity Nick Break

Coating Thickness Nick Break Test

Compression Test Peel Test

CTOD Test Portable Hardness

Drift Expansion Positive Metal Identification - PMI Analysis

Face Bend Proof Load Test

Failure Load Rockwell Hardness

Ferrite Measurement Test Root Bend Test

Fillet Fracture Test Side Bend Test

Flattening Test Tensile Test

Flexure Through Thickness Tensile Test

Fracture Topography Vickers Hardness Test

CORROSION TESTING

Corrosion Susceptibility for Aluminum Alloys series 5 XXX (G66)

Intergranular Corrosion for Aluminum Alloys (G67)

Hydrogen Induced Cracking – HIC - NACE Standards

Intergranular Corrosion Tests for Aluminum Alloys – G28

CSCC – G36 Pitting Crevice Corrosion – G48

Intergranular Corrosion – ASTM A262 SSCC – NACE TM0177

PHYSICAL TESTING CAPABILITIES

Cemented Carbide Products Plastics, Elastomers and Composite Materials

Coatings and Coated Products Steel Bars, Wires & Fabric for Concrete Reinforcement

Fasteners Welder Qualification Test Coupons

Galvanized Steel Products Welding Consumable Qualification Test Coupons

Metal Castings Welding Procedure Qualification Test Coupons Metals and Alloy products such as Plates, Shapes, Bars, Pipes and Fittings

Welding Production test Coupons

Paper and Fiber Products Welder Operators Qualification Test coupons

Page 48: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

MM EE TT AA LL LL UU RR GG II CC AA LL FF AA II LL UU RR EE II NN VV EE SS TT II GG AA TT II OO NN DD II VV II SS II OO NN

Page 49: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

LABORATORY METALLOGRAPHY & MICROSCOPY

Scanning Electron Microscopy – SEM Stereomicroscopy

Energy Dispersive X-ray Analysis – EDAX Fracture Tapography

Macrostructural Examination Microstructural Examination

Microhardness Evaluation

REPLICA AND IN-SITU METALLOGRAPHY

Failure Analysis and Investigation Replica Metallography

In-Situ Metallography Replication of Fractures

Replication of Surface Features

CORROSION TESTING AND EVALUATION

Resistance to Pitting & Crevice Corrosion Susceptibility to Intergranular Corrosion

Resistance to Sulfide Stress Cracking – SSC Resistance to Hydrogen Induced Cracking – HIC

Examination of Scales & Corrosion Products Full Ring CAPCIS Test as per OTI 95 635

CONDITION, USABILITY & REMAINING LIFE ASSESSMENT

Power Plant And Auxiliary Boiler Tubes, Headers & Connectors

Turbine Nozzles, Vanes, Combustor Liners and Casings

Oil And Gas Processing Equipment and Components

Equipment and Components of Marine / Offshore Structures

Drilling and Downhole Equipment and Components

Engine Components

COATING TEST FACILITIES

Cathodic Disbondment Impact Strength

Penetration Resistance Porosity Testing

Pull Off Adhesion Strength Peel Off Adhesion Strength

Holiday Detection Coating Thickness Verification

Elevated Temperature Testing and Conditioning Dry Film Thickness

Hot Water Immersion Test Electrical Insulation Resistance/Coating Resistivity

Hot Water Resistance

Page 50: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

NN OO NN DD EE SS TT RR UU CC TT II VV EE TT EE SS TT II NN GG (( NN DD TT )) DD II VV II SS II OO NN

Page 51: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

NDT SERVICES

Condition Monitoring Thickness Surveys, for Plant piping, Equipment & pipelines

Positive Material Identification

UT Thickness Survey of Mobile vessels, Mobile offshore Drilling Units

Ferrite content Measurement

Conventional Manual Ultrasonic Flaw detection Hardness Testing

Phased Array - Ultrasonic Flaw detection Eddy Current Testing

Liquid Penetrant Testing (Color contrast & Fluorescent)

NDT Training & Certification

Magnetic Particle Testing (wet/ Dry, (Color contrast & Fluorescent)

IRIS Inspection

Radiography (X-ray, Gamma-ray Iridium-192 & Selenium-75, Pipeline crawlers)

Digitization of Radiographs

Tank Floor corrosion survey by MFL Holiday Testing of Coating

INSPECTION SERVICES

Third Party Inspection Assistance in Preparation of WPS / PQR / Welder Qualification certification

Survey for Radiation contamination check Inspection witness during Welder / Procedure qualification Tests

Supply of QC – Welding Inspector / NDT Technicians to off shore / onshore projects

Supply of ASNT Level – III Film Interpreter

HEAT TREATMENT SERVICES

Heat treatment (Degassing, Pre heating, post Heating) by Electrical resistance method

Stress Relieving (Local & Furnace method) by Electrical resistance method

Supply of Heat Treatment Equipment on Hire Consultation for Heat Treatment Parameters

Page 52: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

CC II VV II LL // CC OO NN SS TT RR UU CC TT II OO NN MM AA TT EE RR II AA LL TT EE SS TT II NN GG DD II VV II SS II OO NN

Page 53: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

AGGREGATES / ROCK SECTION

Particle Size Distribution (Wet and Dry Material Finer than 75 micron Sieve (Fine Passing No. 200) in Mineral Aggregate by Washing

Flakiness Index of Aggregates Specific Gravity/Water Absorption of Fines and Coarse Aggregate

Elongation Index of Aggregate Clay Lumps and Friable Particles

Shell Content in Coarse Aggregate Bulk Density of Aggregate

Aggregate Crushing Value Unconfined Compressive Strength of Rock Core

Aggregate Impact Value Point Load Index

Ten Percent Fine Value Determination of Size / weight Distribution of Quarried Stone

Los Angeles Abrasion Test Determination of Drop Test Breakage Index

Soundness of Aggregate

STEEL SECTION

Tensile Test on Steel Reinforcement Bars Mechanical Test on Multi wire Strand

Tensile Test on Steel Reinforcement Bar with Coupler

Bend test / Re bend Test on Steel Reinforcement Bar

Tensile Test on Anchor Bolt Determination of Coating Thickness

Tensile test on Tie Rods Determination of Coating Flexibility

Tensile Test on Welded Steel Rebar Galvanizing Coating thickness on Steel Articles

Tensile Test on Steel Pipes

CEMENT SECTION

Compressive Strength Soundness

Specific Surface (Blaire) Initial and Final Setting Time

Normal Consistency of Hydraulic Cement

CHEMICAL SECTION (MATERIAL)

Chloride Content of Aggregate using Nitric Acid Extract from Aggregates

Carbonate Content in Soil

Total Sulphate by Acid Extraction Method Chemical Composition of Limestone

Organic Impurities in Fine Aggregate Analysis of Water for Concrete Purpose

Potential Alkali Reactivity Analysis of Steel including Carbon Equivalent Value (CEV)

Light Weight Particles in Aggregate Chemical Analysis of Cement / GGBS /Microsilica Chloride Content / Sulphate Content in Hardened Concrete

Chemical Analysis of Admixture

pH of Soil

Page 54: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

SOIL SECTION

In-situ density by Sand Replacement Method using Large and Small Pouring Cylinders

Sedimentation by Hydrometer Method

In place Density Test by sand Cone Method Linear Shrinkage

In place Density test by Nuclear Densitometer Particle Density of Soil

Dry Density-Moisture Content Relationship Using 4.5 kg Rammer for Course and Medium Gravel Size Particle

Determination of Maximum and Minimum Density of Granular Soil

Particle Size Distribution Plate Bearing Test

California Bearing Sand Equivalent Test

Liquid Limit / Plastic Limit and Plasticity Index

CONCRETE SECTION

Determination of Compressive Strength of Concrete Cubes

Method for Bleeding Fresh Concrete

Determination of Dimension and Compressive Strengths of Concrete Masonry Unit

Transverse Strength of Kerbstone

Determination of Dimensions and Compressive Strength of Concrete Paving Blocks

Water Absorption of Pre cast Concrete Flags, Kerbstones, Channels &Edgings

Electrical Indication of Concrete’s Ability to Resist Chloride ion Penetration (RCP)

Compressive Strength of Concrete Cores

Depth of Penetration of Water under Pressure of Hardened Concrete

Flexural Strength of Concrete Beams

Recommendation for Determination of the Initial Surface Absorption of Concrete

Compressive Strength of Mortar Cubes

Method of Sampling of Concrete at Site Determination of Compressive Strength of Concrete ( Using Rebound Hammer)

Determination of Slump and Temperature Fresh Concrete

Pulse Velocity Through Concrete (Crack Depth)

Determination of Air Content in Fresh Concrete Cover Meter Survey (To Determine the Concrete Cover Thickness and Rebar Location)

Determination of Air Content in Fresh Concrete Pile Integrity Test

Page 55: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

GG EE OO TT EE CC HH NN II CC AA LL SS EE RR VV II CC EE SS DD II VV II SS II OO NN

Page 56: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

GEOTECHNICAL SERVICES

Drilling Sampling

In-Situ Borehole Testing Interpretation of Field Data

Preparation of Borehole Log Preparation of factual

Refine the design parameters Engineering report with bearing pressure recommendation

Foundation type Foundation concrete and guidelines for ground improvement

Onshore / Offshore ground investigation Infrastructure and pipeline projects

Page 57: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

TT HH II RR DD PP AA RR TT YY II NN SS PP EE CC TT II OO NN (( TT PP II ))

SS EE RR VV II CC EE SS DD II VV II SS II OO NN

Page 58: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

INSPECTION DURING NEW FABRICATION

Pressure Equipment, piping & pipelines Storage Tanks

Compressors Valves and Fittings

Pumps & Blowers Turbines

Instrumentation and Control Systems Generators

UPS & Transformers

IN SERVICE INSPECTION

Re qualification of Plant Equipment, Piping Maintenance inspection

MANPOWER DEPLOYMENT

Supply of Technical Resources & Manpower Witnessing Performance Test

NDT Personnel Qualification NDE Crew

Expediting Services Project Management

Qualification of Welding Procedures and Welders

Page 59: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

PP AA RR TT II AA LL LL II SS TT OO FF MM AA JJ OO RR OO NN GG OO II NN GG && CC OO MM PP LL EE TT EE DD PP RR OO JJ EE CC TT SS

Page 60: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

AA NN AA LL YY TT II CC AA LL CC HH EE MM II SS TT RR YY ,, AA II RR QQ UU AA LL II TT YY AA NN DD EE NN VV II RR OO NN MM EE NN TT AA LL

AA NN AA LL YY SS II SS DD II VV II SS II OO NN

Page 61: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

1 Land contamination study at Al in power plant

Al Ain Tebodin Middle

East Soil and ground water sampling & analysis

2013 Ongoing

2 S2 Water Quality Assessment. Ruwais URS Corporation Water Analysis 2012 Ongoing

3 Potable Water & Seawater Outfall

Ruwais S2 Operation & Maintenance

Company W.L.L Water Analysis 2012 Ongoing

4 S.W.O # 177086101 Ruwais Gasco Analysis of Water 2012 Completed

5 SO # 182347101 Habshan GASCO Stationary Source Monitoring 2012 Completed

6 Development of North Al Wathba infrastructure

Al Wathba ATKINS AAQMS & Diffusion tube monitoring

2012 Completed

7 Train -2 Turn Around Das Island ADGAS Hazardous Wastes Sample 2012 Completed

8 Sewage (Inlet & Outlet), Seawater Intake & Outfall)

Sewage Treatment Plant

Inlet. Site: Al Ruwais.

Shuweihat CMS International

Power Company

Analysis of Table A, B & C from Sewage Water & Sea water outfall

2011 Ongoing

9 LPG and Naphtha Tanks – GASCO Project 5249 Ruwais Refinery

Ruwais CBI Easter

Anstalt

Alkalinity, Calcium Hardness, Chlorides, Chlorine, Sulfates, TDS, Total Sulfides, pH, & Total Aerobic Bacteria

2011 Ongoing

10

(C2 – Services of Contractor – Das Island) Occupational Hygiene Monitoring for Welding Fumes

Das Island ADGAS Occupational Hygiene Monitoring for Welding Fumes

2011 Ongoing

Page 62: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

11 Environmental Monitoring Services Emirates Steel

Ind.

Ambient Air Monitoring, Noise Monitoring, Waste Water Analysis/Monitoring, Mobilization & Boring Wells, Sediments & Slude

2011 Ongoing

12 ADGAS Hazardous Wastes and Effluent Analysis

Das Island ADGAS Analysis of effluents and Wastes 2011 Ongoing

13 Potable Water Analysis, Sea Water Inlet Analysis, and Outfall Water Analysis

Abu Dhabi S2 Operation &

Maint Co, Water Analysis 2011 Ongoing

14 RSB Analysis Al Taweelah EMAL RSB Analysis 2011 Ongoing

15 Monthly Waste Water Sampling, Testing & Submission of the Parameters as required by EFG

ICAD Emirates Float

Glass BOD Analysis 2011 Ongoing

16 Collection and Analysis of Process Water Sample from HRSG and other Steam

Al Ruwais Shuweihat O & M Ltd Partnership

Collection and Analysis of Potable Water

2011 Ongoing

17 STP & OST Analysis for 2nd & 3rd Qtr.

Salam Street National Drilling

Company

Collection, Analysis of Water Sample and Oil & Grease APHA 5520 B

2011 Ongoing

Page 63: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

18 Provision of Waste Water Analysis

Abu Dhabi GASCO

Analysis of Petroleum Hydrocarbon Sludge, Analysis of Filter Elements, Organic Liquid & Waste Water Sludge

2011 Ongoing

19 ADGAS Service Order: IQD11-095/04.06.2011

Das Island ADGAS Indoor Air Quality Srvey 2011 Completed

20 Hermal Oxydizer Stack, Ethylene Furnaces & Auxilliary Boilers

Qatar Qatar Chemical Company LTD

Stack Monitoring 2011 Completed

21 Air & Stack Monitoring Project-EPC

Qatar Qatar Chemical Company LTD

Stack Monitoring 2011 Completed

22 Installation of Groundwater Monitoring Wells at QSGTL Site

Ras Laffah Ind City, QATAR

URS Soil and Ground Water Analysis 2011 Completed

23 Baseline Air Quality Monitoring and Assestment

Tanker Berth 11 Gulf Refining Air Monitoring 2011 Completed

24 Contamination Test (Additional Requirements) Soil and Ground Water Samples Analysis

Abu Dhabi Spektra Jeotek Geotechnical

Engineers

pH, Chlorides, Cyanides, Nitrogen, Sulfates, Cadmium, Chromium, Copper, Iron, Lead, Nickel, Zink, Arsenic, Boron, Selenium, Mercury, Polynuclear Aromatic Hydrocarbons, Total Petroleum Hydrocarbonates, Water Analysis, & PHENOL

2011 Completed

25 Airborne Sampling at Bunduq Offshore Complex.

Abu Dhabi Bunduq Company Limited

Sampling of O2, TVOC, CO, H2S Contaminants & Metrological Parameters.

2011 Completed

Page 64: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

26 Various Abu Dhabi EMDAD

Carbon Dioxide, Carbon Monoxide, Hydrogen Sulfide, Oxides of Nitrogen, Perticulates, Sulfur Dioxide, Total Volatile Organic, Mobilization & Demobilization of equipments

2011 Completed

27 Occupational Noise Monitoring Abu Dhabi Exeed Geotextile Sampling, Occupational Noise Monitoring, Mobilization & Demobilization of Equipment

2011 Completed

28 Analysis of Corrosion Product Sampes

Ruwais Refinery Devision

TAKREER Analysis of Corrosion Product Samples

2010 Completed

29 ADCO Shahil and Shah Full Development Project

ADCO Field CCIC Water Analysis 2010 Completed

30 Habshan Flare Gas Project Habshan CCIC Water Analysis 2010 Completed

31 Air Emission and Water Monitoring

Abu Dhabi Technimont Air Emission and Water Monitoring

2010 Completed

32 Air Analysis for Fiber Concentration

Abu Dhabi Chalmers Air Bulk Sampling, Analysis 2010 Completed

33

Environmental Analytical Services & Industrial Hygiene Monitoring services at Rass Laffan

LTS-Dubai & ORYX-GTL Site,

Qatar

ORYX GTL Limited, Qatar

Environmental Services & Industrial Hygiene Monitoring

2009 Ongoing

Page 65: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

34 Sea Water Analysis for T-14-I-11 Project

Abu Dhabi ADWEA Analysis of sea water 2009 Completed

35 Abu Dhabi Refinery Turn Around

Abu Dhabi Descon Analysis of Hydrocarbon Sludge, Catalyst, Liquid Waste, Sulphur, and Demisters

2009 Completed

36 Outsourcing of 4 Parameters of Water Quality Tests

Abu Dhabi ADDC Water Analysis for Cyanides and PAH

2009 Completed

37 MASDAR Development Abu Dhabi Abu Dhabi Future Energy Company

Laboratory Service for Water Quality Monitoring

2009 Completed

38 DAS Island Das Island ADGAS Sampling of Effluents & Analysis of Water

2008 Completed

39 Air Monitoring for Asbestos Abatement

Abu Dhabi Seven Seas Air Sampling and Monitoring 2008 Completed

40 Air Analysis

GTS Analysis of Airborne Total Suspended Particles

2008 Completed

41 Air Analysis Abu Dhabi EPSCO Analysis of Air Bacteria and Fungus Spores in Air

2008 Completed

Page 66: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

42 Sewege Unit Abu Dhabi National Drilling

Company Analysis of Water collected from offshore rig

2007 Completed

43 GASCO Ruwais Refinery Abu Dhabi CBI Eastern Anstalt

Water Analysis 2007 Completed

44 Hazard Waste Analysis Umm Al Nar TAKREER Chemical Analysis of Waste Filter Media Samples

2007 Completed

45 Emmision Monitoring UAE Emirates Steel Wool

Mobilization of equipment & Sampling of emission from stock

2007 Completed

46 Stack Monitoring

New Cleaning Est

Mobilization / Demobilization of equipment, Stock Monitoring, Analysis & Sampling of emission from stock

2007 Completed

Page 67: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

II NN DD UU SS TT RR II AA LL HH YY GG II EE NN (( II HH )) // II NN DD OO OO RR AA II RR QQ UU AA LL II TT YY (( II AA QQ )) DD II VV II SS II OO NN

Page 68: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR IIHH//IIAAQQ DDIIVVIISSIIOONN –– HHOOSSPPIITTAALLSS HHEEAALLTTHHCCAARREE

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

1 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

LLH Hospital – Abu Dhabi, UAE

LLH Hospital – Abu Dhabi, UAE

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2015 Ongoing

2 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

American Hospital – Dubai, UAE

American Hospital – Dubai, UAE

Air Quality Monitoring of required areas within Medical Facilities (Formaldehyde CH2O, Xylene)

2015 Ongoing

3 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Al Raha Hospital Abu Dhabi, UAE

Al Raha Hospital Abu Dhabi, UAE

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2015 Completed

4 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Arzanah Medical Complex – Abu Dhabi, UAE

JBI SERCO MIDDLE EAST

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2015 Completed

5 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Zuleka Hospital – Al Nadha, Dubai, UAE

PAX KENT INT’L

Air Quality Monitoring of required areas within Medical Facilities Bacteria

2015 Completed

Page 69: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR IIHH//IIAAQQ DDIIVVIISSIIOONN –– HHOOSSPPIITTAALLSS HHEEAALLTTHHCCAARREE

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

6 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Arzanah Medical Complex – Abu Dhabi, UAE

JBI SERCO MIDDLE EAST

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2014 Completed

7

IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Gulf Medical University – Ajman, UAE

Gulf Medical University – Ajman, UAE

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2014 Completed

8 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

LIFECARE Hospital – Abu Dhabi, UAE

LIFECARE Hospital – Abu Dhabi, UAE

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2014 Completed

9 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Arzanah Medical Complex – Abu Dhabi, UAE

JBI SERCO Middle East

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2014 Completed

10 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Al Raha Hospital Abu Dhabi, UAE

Al Raha Hospital Abu Dhabi, UAE

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2014 Completed

Page 70: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR IIHH//IIAAQQ DDIIVVIISSIIOONN –– HHOOSSPPIITTAALLSS HHEEAALLTTHHCCAARREE

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

11 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

LLH Hospital – Abu Dhabi, UAE

LLH Hospital – Abu Dhabi, UAE

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2014 Completed

12 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Emirates Hospital Abu Dhabi, UAE

Emirates Hospital Abu Dhabi, UAE

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2014 Completed

13 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

HealthPoint Medical Center – Abu Dhabi, UAE – Phase 2 Clearances

JBI SERCO Middle East

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2013 Completed

14 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

HealthPoint Medical Center – Abu Dhabi, UAE – Phase 1 Baselines

JBI SERCO Middle East

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2013 Completed

15 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Zuleka Hospital – Al Nadha, Dubai, UAE

Zuleka Hospital – Al Nadha, Dubai, UAE

Air Quality Monitoring of required areas within Medical Facilities (Formaldehyde CH2O)

2013 Completed

Page 71: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR IIHH//IIAAQQ DDIIVVIISSIIOONN –– HHOOSSPPIITTAALLSS HHEEAALLTTHHCCAARREE

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS

16 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

ADNOC - Ruwais Hospital - Abu Dhabi, UAE

ADNOC - Ruwais Hospital - Abu Dhabi, UAE

Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)

2012 Completed

17 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

American Hospital – Dubai, UAE

American Hospital – Dubai, UAE

Air Quality Monitoring of required areas within Medical Facilities (Formaldehyde CH2O, Xylene)

2011 Completed

18 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines

Mafraq Hospital – Abu Dhabi, UAE

Angus Middle East, Dubai

Air Quality Monitoring of required areas within Medical Facilities Total Fiber Concentration in air

2010 Completed

Page 72: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

MM EE CC HH AA NN II CC AA LL // MM AA TT EE RR II AA LL TT EE SS TT II NN GG AA NN DD MM EE TT AA LL LL UU RR GG II CC AA LL

FF AA II LL UU RR EE II NN VV EE SS TT II GG AA TT II OO NN DD II VV II SS II OO NN

Page 73: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN

Company Profile

SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION

1 Gulf Piping Co. W.L.L (IMCC) Project: C-1397 Mechanical & Corrosion Services 2015 2 Years

2 National Petroleum Construction Company

DANA GAS – EPC OF PIPELINES PROJECT / NPCC PROJECT NO. 02296

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2015 2 Years

3 National Petroleum Construction Company

ADMA OPCO ULFFD PHASE II PROJECT – PKG 2 / NPCC PROJECT 4204

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2015 2 Years

4 National Petroleum Construction Company

AO ULFFD Project PKG2 / NPCC Project No: 2208

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2015 2 Years

5 DODSAL ENGG. & CONST. PTE, LTD

EPC for Rumaitha / Shanayel Facilities – Phase III

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2015 2 Years

6 Gulf Piping Co. W.L.L (IMCC) Project: C-1394 Mechanical & Corrosion Services 2015 1 Year

7 China Petroleum Engineering & Construction

ASAB Unit 6&7 Project Mechanical Services 2014 6 Months

8 DAEWOO E & C Ruwais Refinery Expansion Project UAE

Mechanical / Metallurgical & Chemical Analysis Services

2014 6 Months

9 Abu Dhabi Company for Onshore Oil Operation (ADCO)

Various Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 3 Year

Page 74: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN

Company Profile

SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION

10 Abu Dhabi Gas Development Company (Al Hosn)

Various Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 3 Year

11 Consolidated Contractors International Company

Bab Habshan-1 Development Project Phase-I & II

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

12 National Petroleum Construction Company

AO ZKOLR PROJECT – PHASE 1 / NPCC PROJECT NO. 2272

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

13 National Petroleum Construction Company

ADMA OPCO – ZAKUM OIL LINES REPLACEMENT PROJECT – PHASE 1 / NPCC PROJECT NO. 2272

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

14 National Petroleum Construction Company

DANA GAS – EPC OF PIPELINES PROJECT / NPCC PROJECT NO. 02296

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

15 National Petroleum Construction Company

ADMA OPCO ULFFD PHASE II PROJECT – PKG 2 / NPCC PROJECT 4204

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

16 National Petroleum Construction Company

AO ULFFD Project PKG2 / NPCC Project No: 2208

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

17 Gulf Piping Co. W.L.L (IMCC) Project: C-1397 Mechanical & Corrosion Services 2014 2 Years

Page 75: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN

Company Profile

SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION

18 Penta Global Engineering LLC

Upper Zakum 750 Project – EPC2, Project No P7512

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

19 Al Hassan Engineering Co Satah Al Razboot (SARB) Field Development Project – Package 3 EPC Work.

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

20 Alsa Engineering & Construction Co. LLC

EPC BAB FAR NORTH CO2 INJECTION PILOT PROJECT

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

21 Alsa Engineering & Construction Co. LLC

EPC FOR RUMAITHA NORTH CO2 INJECTION PROJECT

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

22 Galfar Engineering & Contracting

Construction of Flowlines and Well Head Installation of Typical Works in ADCO’S Fields (Package A)

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

23 Galfar Engineering & Contracting

EPC WAG Wells & Conversion of New of Existing Gas Injectors Wells to WAG Wells at SAHIL ADCO

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

24 Zakum Development Company Various Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 2 Years

25 Alsa Engineering & Construction Co. LLC

NITROGEN GAS INJECTION (PURE CASE)

Mechanical Services 2014 1 Year

Page 76: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN

Company Profile

SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION

26 Gulf Piping Co. W.L.L (IMCC) Project: C-1394 Mechanical & Corrosion Services 2014 1 Year

27 Essar Constructions Overseas Limited

N/A Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 1 Year

28 DODSAL ENGG. & CONST. PTE, LTD

ESI Carbon Capture and Storage (CCS) Project Phase-1

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 1 Year

29 TIANJIN PIPE CORP. (Middle East) LTD

EPC – BAB GAS COMPRESSION PROJECT PHASE-II

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2014 1 Month

30 Gulf Piping Co. W.L.L (IMCC) Project: C-1381 Mechanical & Corrosion Services 2013 2 Years

31 Denholm Yam Contracting Company L.L.C

Satah Al Razboot (SARB) Field Development Project

Mechanical Services 2013 2 Years

32 Denholm Yam Contracting Company L.L.C

REALM 1 ACCOMODATION SUPPORTING VESSEL

Mechanical Services 2013 2 Years

33 National Petroleum Construction Company

SEP550 PROJECT 096 Mechanical & Corrosion Services 2013 2 Years

34 National Petroleum Construction Company

OOCEP MUSANDAM OFFSHORE PIPELINE EPC WORKS

Mechanical & Corrosion Services 2013 2 Years

Page 77: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN

Company Profile

SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION

35 National Petroleum Construction Company

ZADCO - UZ 750K PROJECT P7511 / NPCC PROJECT NO. 1217

Mechanical & Corrosion Services 2013 2 Years

36 National Petroleum Construction Company

AO ULFFD PROJECT PKG1 / NPCC PROJECT NO. 2207

Mechanical & Corrosion Services 2013 2 Years

37 Alsa Engineering & Construction Co. LLC

Construction Works for ASR Gas Well Heads and Flowline Installation at BAB and ASAB

Mechanical Services 2013 2 Years

38 Alsa Engineering & Construction Co. LLC

EPC FOR OPTICAL TRANSFER NETWORK AT BAB FIELD, REPLACEMENT OF EXISITING ESD SYSTEM AT BCDS, REPLACEMENT OF RDS-3 TRANSFER LINE AT BAB ADCO

Mechanical & Corrosion Services 2013 1 Year

39 Valentine Maritime Gulf L.L.C PROJECT / CLIENT: C1304 DUBAI PETROLEUM

Mechanical & Corrosion Services 2013 1 Year

40 ROBT STONE (ME) L.L.C PROJECT NAME: TAKREER IRP-II PROJECT

Mechanical & Corrosion Services 2013 1 Year

Page 78: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN

Company Profile

SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION

41 Alsa Engineering & Construction Co. LLC

FUEL GAS AND CONDENSATE SUPPLY TO OFFSHORE: CONSTRUCTION WORKS-INSTALLATION OF 20" PIPELINE SECTION AND ASSOCIATED WORKS

Mechanical & Corrosion Services 2013 1 Year

42 MATRIX CONSTRUCTION Project: P12170 – EPC FOR BATCH-1 PLANT MODIFICATION AT BU-HASA

Mechanical & Corrosion Services 2013 1 Year

43 MATRIX CONSTRUCTION HABSHAN P.B172 Mechanical & Corrosion Services 2013 1 Year

44 DODSAL ENGG. & CONST. PTE, LTD

PROJECT NAME: HABSHAN-MAQTA-TAWEELAH (HMT) GAS PIPELINES PROJECT NO. 5272

Mechanical & Corrosion Services 2013 1 Year

45 Descon Engineering SGD-AMW-P-1935 Ruwais Mechanical & Corrosion Services 2013 1 Year

46 Denholm Yam Contracting Company L.L.C

Rig Refurbishment Project Mechanical Services 2013 1 Year

47 National Petroleum Construction Company

ZADCO SAFFD PROJECT 0265 Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 4 Years

Page 79: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN

Company Profile

SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION

48 National Petroleum Construction Company

AO AND L & T – NASR PHASE 1 DEVELOPMENT PROJECT 1284

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 4 Years

49 National Petroleum Construction Company

ONGC WO-16 CLUSTER & SB-14 WHP PROJECT 1229

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 4 Years

50 National Petroleum Construction Company

ZADCO STFFD PV PROJECT 2248 Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 4 Years

51 Consolidated Contractors International Company

Qusahwira Full Field Development Project (QFD)

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 2 Years

52 Consolidated Contractors International Company

Bab Thamama “G” & Habshan-2 Development 1.8 MM BOPD

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 2 Years

53 Larsen & Toubro Limited E & C Division

Habshan Ruwais Shuweihat (HRS) Gas Pipeline Project

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 2 Years

54 DODSAL ENGG. & CONST. PTE, LTD

HABSHAN SULPHUR GRANULATION PLANT (HSGP)

Mechanical & Corrosion Services 2012 2 Years

55 Galfar Engineering EPC for Bab Facilities-modification & Remedial Works

Mechanical & Corrosion Services 2012 2 Years

Page 80: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN

Company Profile

SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION

56 Alsa Engineering & Construction Co. LLC

MIRFA RUWAIS NITROGEN PIPELINE PROJECT

Mechanical & Corrosion Services 2012 2 Years

57 CHINA PETROLEUM PIPELINE BUREAU IRAQ BRANCH

INFIELD PIPELINE WORKS FOR FCP, MAJNOON OIL FIELD

Mechanical & Corrosion Services 2012 1 Year

58 CONTRACTING AND TRADING CO “C.A.T” ABU DHABI BR

CONSTRUCTION OF GAS PIPELINE TONEW AL AIN CEMENT PLANT FOR ARKAN

Mechanical & Corrosion Services 2012 1 Year

59 SPECIALIST SERVICES PIG LAUNCHER Mechanical / Metallurgical / Corrosion & NDT Services

2012 1 Year

60 PUNJ LLOYD LTD EPC FOR TIE-IN WORKS AT SE Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 1 Year

61 PUNJ LLOYD LTD EPC FOR SPIKING GAS COMPRESSOR AT SHAH CDS

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 1 Year

62 Larsen & Toubro Limited E & C Division

Shah Gas Development Program- Pkg-5

Mechanical / Metallurgical / Corrosion & Chemical Analysis Services

2012 1 Year

63 Descon Engineering ADCO THAMAMA-B PROJECT NO:1345

Mechanical Services 2012 1 Year

Page 81: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

NN OO NN DD EE SS TT RR UU CC TT II VV EE TT EE SS TT II NN GG (( NN DD TT )) DD II VV II SS II OO NN

Page 82: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

1 Gasco Asab 1 & 2 Plant Shutdown March / April 2015

ASAB GASCO Emdad NDT Services 2015 Ongoing

2 EPC For Supply of Sales Gas To Takreer Norm Project At Beaat Ruwais Plant

Al Ain GASCO Tecton NDT Services 2015 Ongoing

3 Sge Capacity & Reliability Jebel Ali - NASH RT Gamma-ray 2015 Ongoing

4 Oxy Qatar Field Development Project

- FTV Proclad RT Gamma-ray 2015 Ongoing

5 Halfaya Phase III Project Jebel Ali - FTV Proclad PWHT 2015 Ongoing

6 Musallim Third Module And ILS Replacement Project

Jebel Ali - Petronash RT Gamma-ray 2015 Ongoing

7 Midyan Gas Processing Facilities Jebel Ali - Petronash RT Gamma-ray 2015 Ongoing

8 Fahud West Testing Facility Development

Jebel Ali - Petronash RT Gamma-ray 2015 Ongoing

9 Gas Modular Skid Jebel Ali - Petronash RT Gamma-ray 2015 Ongoing

Page 83: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

10 Umm Lulu Full Field Development Project

HFZ - SEKO RT Gamma-ray 2015 Ongoing

11 Umm Lulu Full Field Development Project

HFZ - SEKO DPT 2015 Ongoing

12 Water Supply System For Fujairah Distribution

Fujairah - KING CITY RT Gamma-ray 2015 Ongoing

13 Project # 10584 Jebel Ali - National Oilwell Varco

RT Gamma-ray 2015 Ongoing

14 Provision of Shop Inspection, Quality Control & Associated Services

World Wide ADCO - TPI Services 2015 Ongoing

15 Provision of QA/QC Inspection Services Call-Off Contract for ADCO Projects

World Wide ADCO - TPI Services 2014 Ongoing

16 G 5809 SWSR PROJECT Liwa TRANSCO Al Nasr NDT Services 2014 Ongoing

17 Upper Zakum UZ750 Project Musaffah/ North Island /South Island

ZADCO Offshore

Al Jaber RT Gamma rays, MUT, MT, PT, Hardness, PMI, PWHT & Pre Heating

2014 Ongoing

18 Egyptiam Refining Co Jebel Ali - Al Reyami UT, MT 2014 Ongoing

Page 84: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

19 Shah Gas Development Package 2 & 3

Shah Al Hosn Samsung RT Gamma-ray, MT, PT, PAUT, MUT, PMI & Hardness

2013 Ongoing

20 EPC Works RUWAIS -Surge Drum - E-019

Ruwais GASCO Al Hassan Eng NDT Services 2014 Ongoing

21 OMR.14.043 TRAIN-2 MAJOR SHUTDOWN – FEB 2015 AT RUWAIS PLANT

RUWAIS GASCO Emdad RT / Welding Inspector 2015 Completed

22 Installation of Steam Turbine # 21 Isolation Valves

Al Ain TTEOM Hidromontaza NDT Services 2015 Completed

23 E-019-RUWAIS Surge Drum Protection And Battery Limit Esd Valves At Train 1 & 2

Musaffa/ Ruwais

GASCO Al Hassan Eng RT Gamma rays, MUT, MT, PT, Hardness, PMI, PWHT & Pre Heating

2014 Completed

24 Satah Al Razboot (SARB) Field Development Project - EPC Work Zirku Island ( Pipeline)

Mafraq/ Sarb Island

PIL/ADMA Al Hassan Eng RT Gamma rays, MUT, MT, PT, Hardness, PMI, PWHT & HDT

2014 Completed

25 SWSR ME Works 4A – 4B Liwa POSCO JV ACC NDT Services 2014 Completed

26 Tie-in for 5 water injectors (AE – 237)

Musaffa/ Bu Hasa

ADCO Alsa Engineering & Cont Co.

NDT Services 2014 Completed

Page 85: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

27 Steam Trap For HP Steam Header Project

Ruwais BOROUGE DESCON NDT Services 2014 Completed

28 Extension in Hiring the Services of PMI Services on Call out Basis

Ruwais BOROUGE DESCON PMI Services 2014 Completed

29 Habshan Acid Gas Flare Recovery Project 5265

Habshan GASCO DESCON NDT Services 2014 Completed

30 Ruwais Sulphur Handling Terminal-2 Ruwais GASCO Al Jaber NDT Services 2014 Completed

31 Hiring of PWHT Technicians Ruwais GASCO Al Jaber PWHT 2014 Completed

32 EPC for Batch-1 Plant Modification at Buhasa,New Process Water Storage Tanks

Musaffa/ Bu Hasa

ADCO Matrix Construction

NDT Services 2013 Completed

33 Habshan-3 Total Shutdown 5066532 Habshan GASCO - Heat Treatment 2013 Completed

34

Installation of MPFM at RDS-1, 2, 3, 4, 6 & BSDS, Replacement of Nitrogen Supply at BSDS & Provision of Chemical Injection Pump at RDS-5

Habshan ADCO ALSA NDT Services 2013 Completed

35 EPC for Procurement & Installation of NGL Pipeline

ASAB GASCO ACC NDT Services 2013 Completed

Page 86: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

36 Samsung S2 Shuweihat Project Ruwais SAMSUNG / C & T Corporation

- NDT Services 2013 Completed

37 IGD Habshab-5 (JGD Portion) Habshan JGC – Technimont Joint Venture

- Welding Inspection 2013 Completed

38 IGD Habshab-5 (JGD Portion) Habshan

JGC – Technimont Joint Venture

RT Film Digitization Work 2013 Completed

39 Shah Gas Development Project Shah Gas Samsung Samsung PWHT 2013 Completed

40

EPC for Optical Transfer Network at BAB Field, Replacement of Existing ESD system at BCDS, Replacement of RDS-3 Transfer line at BAB

Habshan ADCO Alsa Engineering & Cont Co.

NDT Services 2013 Completed

41 Shah Gas Development Shah Al Hosn Saipem/Descon

RT Gamma-ray, MT, PT, PAUT, MUT, PMI & Hardness

2012 Completed

42 Ruwais Sulphur Handling Terminal-2 Ruwais / Mussafah

GASCO Al Jaber/EKL RT Gamma-ray, MUT, MT, PT, PWHT & Hardness

2012 Completed

43 Ruwais Sulphur Handling Terminal-2 Ruwais / Mussafah

GASCO Sigma RT Gamma-ray 2012 Completed

Page 87: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

44 Al Dabiya Additional Injection Wells Tie-ins

Al Dabiya ADCO Matrix Const. RT Gamma-ray, UT, MT, PT, Hardness, PWHT

2012 Completed

45 Fuel Gas and Condensate Supply to Offshore

Jebel Ali DUSUP JP Kenny / ALSA E&C

RT Gamma-ray, UT, MT 2012 Completed

46 Borouge 3 PO & LDPE Project Ruwais BOROUGE TSJ/Kentech Int’l.

RT Gamma-ray, PT & PMI

2012 Completed

47 Habshan-4 Plant Extension Project (IGD-4)

Habshan GASCO Descon RT Gamma-ray, UT, MT, PT, PMI, Hardness

2012 Completed

48 Dubai Petroleum project Jebel Ali - Nash RT Gamma & X-ray, MT, 2012 Completed

49 Rajasthan Northern Fields Development

Jebel Ali - Nash RT Gamma-ray, UT, MT & PT

2012 Completed

50 Fertile Plant Shutdown Ruwais FERTIL ALSA E&C MT, PT, PMI & Ferrite 2012 Completed

51 Fertile Plant Shutdown Ruwais FERTIL Descon RT Gamma& X-ray 2012 Completed

52 Strategic Water Storage Recovery Liwa ADWEA/ TRANSCO

ACC RT Gamma-ray, Crawler & MT

2012 Completed

53 Strategic Water Storage Recovery Liwa ADWEA/ TRANSCO

Al Nasar / Hidromontaza

RT Gamma-ray, Crawler, MUT, MT, & PT

2012 Completed

Page 88: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

54 Qusahwira FFD Qusahwira / Mussafah

ADCO/NPCC CCIC RT Gamma-ray, MUT, MT, PT, PMI, Ferrite & Hardness Testing.

2012 Completed

55 HP Looping – Buhasa EMPD Habshan / Buhasa

ADCO ALSA Eng’g & Const

RT Gamma-ray, Crawler & X-ray, MUT, MT, PT, PWHT & Hardness

2012 Completed

56 Additional Production of Manifolds at BAB RDS-3

Habshan / Buhasa

ADCO ALSA Eng’g & Const

RT Gamma-ray, UT, MT, PT, PWHT & Hardness

2012 Completed

57 Replacement of Damaged Pipeline for H2O Injection Cluster 43, 44, 47 & 48.

Habshan / Buhasa

ADCO ALSA Eng’g & Const

RT Gamma-ray, Crawler & X-ray, MUT, MT & Hardness

2012 Completed

58 Construction of Oil & Water Flow Lines & Tie-in

Habshan / Buhasa

ADCO ALSA Eng’g & Const

RT Gamma-ray, Crawler & X-ray, PAUT, MUT, MT & Hardness

2012 Completed

59

Implementation of Vapour Recovery Compressor Modifications & Miscellaneous Plant Modifications, NEB

Habshan / Buhasa

ADCO ALSA Eng’g & Const

RT Gamma-ray & PT 2012 Completed

60 EPC For New Stand by Acid Gas Knockout Drum At Habshan

Habshan GASCO ALSA Eng’g & Const

MUT, RT Gamma-ray, MT, PT, Hardness & PWHT

2012 Completed

61

Construction of units 6 & 7 Flow Lines segregation, Additional Manifolds and Provision for Hook Up of Temporary Testing facilities

Habshan ADCO Galfar RT Gamma & X-ray, MUT, MT, PT, PWHT & Hardness

2012 Completed

Page 89: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

62 EPC for BAB Gas Surface Facilities Modifications & Remedial Works

Habshan ADCO Galfar RT Gamma & X-ray, MUT, MT, PT & Hardness

2012 Completed

63 Spiking Compressor Project Asab ADCO Punj Lloyd

RT Gamma & X-ray, UT, MT, PT, PWHT, Hardness, PMI & Ferrite scope

2012 Completed

64 Tie-ins Pipeline Project Shah, Asab & Sahil

ADCO Punj Lloyd RT Gamma & X-ray, UT, MT, PT, PWHT, PMI, Ferrite & Hardness

2012 Completed

65 Ruwais Sulphur Handling Terminal-2 Mussafah TECHFIT Al Reyami RT Gamma-ray, UT, MT & PT

2012 Completed

66 Qusahwira FFD Qusahwira ADCO/NPCC Al Reyami RT Gamma-ray, UT, MT & PT

2012 Completed

67 EPC for Construction of Thamama “B” Gas Lift Pilot for 2 WellsBb-97 & Bb-603

Habshan ADCO Descon Eng’g. RT Gamma-ray 2012 Completed

68 South Pars Gas Field Development Project – Phase 14

Jebel Ali TOTAL NASH RT Gamma-ray, UT, MT & PT

2012 Completed

69 Jet Fuel Storage Transportation tanks

Jebel Ali TOTAL NASH RT Gamma-ray, UT, MT & PT

2012 Completed

70 Effluent water injection phase 1 and seawater injection phase 2

Jebel Ali - FTV Proclad RT Gamma-ray & PWHT 2012 Completed

Page 90: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

71 Borouge-3 - U&O Ruwais BOROUGE Descon RT Gamma-ray 2012 Completed

72 Borouge P3A Ruwais BOROUGE Descon RT Gamma-ray, WI 2012 Completed

73 Pipeline Works for FCP Manjoon Oil, Iraq

Mussafah CPPEC - RT Gamma-ray, MT, & PT

2012 Completed

74 EMAL Phase-2 project – Piping & Fabrication & Installation

Mussafah EMAL Venus Electromechanical

Gamma & X-ray, UT, MT, PT & Hardness

2012 Completed

75 Borouge-3 - XLPE Ruwais BOROUGE Nasr Al Hajri RT Gamma-ray, MUT, MT & PT

2011 Completed

76 Construction of BQ Facilities, RDS-1 & 16” Transfer Line

Buhasa / Mussafah

ADCO L&T ECC

RT Gamma-ray & Crawler, MUT, PA-UTMT, PT, PWHT, PMI & Hardness

2011 Completed

77 Construction of above ground Jet A1 Tank & Misc. jobs at Al Ain Aviation Depot

Al Ain ADIA Dhafir Technology

RT Gamma-ray, UT, MT & PT

2011 Completed

78 Habshan-5 (IGD-5) Process Plant Habshan GASCO Descon RT X & Gamma-ray, UT, MT, PMI & Film Digitization

2011 Completed

79 Borouge-3 - Polyolefin’s Unit Ruwais BOROUGE Ellimetal PA-UT, MUT & PT 2011 Completed

Page 91: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

80 Borouge-3 - Polyethylene Unit Ruwais BOROUGE Jansen & Dieprink

MUT & PT 2011 Completed

81 Construction Work for ASR Gas Well Heads & Flow Line Installation at BAB & ASAB

Asab & Habshan

ADCO ALSA Eng’g & Const.

RT Gamma-ray, Crawler & X-ray, UT, MT, PT, PWHT & Hardness

2011 Completed

82 BAB Thamama “G” & Habshan-2 Development

Habshan ADCO CCIC RT Crawler & Gamma-ray, MUT, PAUT, MT, PT, PMI & Ferrite scope

2011 Completed

83 ADCO – EPC for Sahil & Shah FFD Mussafah ADCO CCIC / OGASCO

RT Gamma-ray, MT & PT 2011 Completed

84 In-service Maintenance @ Mirfa Power Plant

Mirfa ADWEA Galfar RT Gamma, MT & PT 2011 Completed

85 Siemens Power Plant extension Ruwais ADWEA Galfar RT Gamma & PT 2011 Completed

86 PA-UT of 36” MOL Pipeline , ADCO ASAB FFD

ASAB ADCO Petrofac PA-UT of 36” dia. / 17.5mm, 20mm & 22mm thickness pipeline weld.

2011 Completed

87 Borouge Plant Expansion Ruwais BOROUGE Descon RT Gamma-ray & Digitization of Radiographs

2010 Completed

88 Abu Dhabi Manufacturing Workshop (AMW)

Ruwais BOROUGE / GASCO

Descon RT Gamma-ray & Digitization of Radiographs

2010 Completed

Page 92: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

89 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac

Mussafah & ASAB

ADCO CAT

RT Gamma-ray, Crawler & X-ray, UT, MT, PT, FT, PMI, Hardness & Digitization of Radiographs

2010 Completed

90 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac

Jebel Ali ADCO FTV Proclad RT Gamma-ray, UT, MT, PT, Preheat & PWHT

2010 Completed

91 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac

Jebel Ali ADCO Petronash RT Gamma-ray, UT, MT, PT, Preheat & PWHT

2010 Completed

92 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac

Jebel Ali ADCO Al Reyami RT Gamma-ray, UT, MT, PT, Preheat & PWHT

2010 Completed

93 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac

ICAD-1 Mussafah

ADCO OGASCO RT Gamma-ray, UT, MT & PT

2010 Completed

94 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac

ICAD-2 Mussafah

ADCO Denholm-Yam RT Gamma-ray, UT, MT, PT, FT, PMI, Hardness & PWHT

2010 Completed

95 BAB Gas Compression Habshan ADCO SKEC/KTI RT Gamma-ray, UT, MT, PT, FT, PMI, Hardness & PWHT

2010 Completed

96 ADCO – NEB Export Lines, EPC for ASAB FFD

Mussafah / Rumaitha / Al Daabiaa

ADCO Matrix Const RT Gamma-ray, UT, MT, PT, FT, PMI, Hardness & PWHT

2010 Completed

97 Corrosion Inhibitor Skids for KHUFF & Unayza Wells

Jebel Ali Saudi Aramco Petronash RT Gamma-ray, UT, MT & PT

2010 Completed

Page 93: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

98 Dubai- Dry Docks Vessel Development

Al Jadaf Dubai Dry Docks

DNV / Grandweld

RT Gamma-ray, UT, UTG, MT & PT

2010 Completed

99 Iraq EPS Development Jebel Ali Petrofac Nash Engg RT X-Ray & Gamma, UT, MT & PT

2010 Completed

100 Habshan-Ruwais Shuweihat Gas Pipeline

Habshan & Ruwais

ADCO CPECC RT X-Ray & Gamma, UT, MT & PT

2010 Completed

101 ADCO – EPC for Sahil & Shah FFD Project (Temporary Facility)

ICAD-1 Mussafah

ADCO CCIC / TR / OGASCO

RT X-Ray & Gamma, UT, PA-UT, MT & PT

2010 Completed

102 NDT inspection project for25 Tons I-Beam

Jebel Ali -- Al Wathba Steel/Al Est.

MT & VT 2010 Completed

103 Beach Development Al Raha -- Systems Engg UT, MT & PT 2010 Completed

104 Souk Al Bahr Al Bahr -- Bilt M.E. LLC UT & PT 2010 Completed

105 Industrial Gasses Plant Mussafah Bechtel - Linde

Descon RT X-Ray & Gamma-ray, UT, MT & PT

2010 Completed

106 Various structural steel project Jebel Ali - Al Reyami UT, MT & PT 2010 Completed

107 Dubai Aluminum Jebel Ali DUBAL Emirates Heavy Engg

RT Gamma-ray, MT & PT 2010 Completed

Page 94: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

108 Structural Building Fabrication Works Taweelah - Hadeed Emirates Co.

RT Gamma-ray, MT & PT 2010 Completed

109 Abu Dhabi International Airport T-1 Refurbishment

Abu Dhabi ADIA Yousuf M/c Structural’s

UT, MT &PT 2010 Completed

110 Garden Community Retail Center Al Raha ADIA Yousuf M/c Structural’s

PWHT 2010 Completed

111 Bashra, Iraq Jebel Ali - Petrofac UT & UTG 2010 Completed

112 IKEA Expansion Yas Island IKEA Al Futtaim Engg

RT Gamma-ray 2010 Completed

113 District Cooling Scheme DM-08,09,10,12 14,14 DMGLP & ETS

Deira TABREED Steel Const Engg Co.

UT,MT & PT 2010 Completed

114 D-1 Tower Culture Village Deira - Golden Metal UT, MT & PT 2010 Completed

115 DM 08, 09 ETS’s Associated with Green Line & CHW

Deira TABREED Parson Int’l Ltd. RT X-Ray & Gamma-ray & PT

2010 Completed

116 NGL Train -3 Habshan GASCO CBI / Descon RT X-Ray & Gamma-ray & MT

2010 Completed

117 Air separation Plant Piping Habshan Descon Descon Crawler & X-Ray 2009 Completed

Page 95: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

118 Oman Gas Development Oman PDO FTV Proclad RT Gamma-ray 2009 Completed

119 Various structural steel project Jebel Ali Saudi Aramco FTV Proclad RT Gamma-ray 2009 Completed

120 Sulphur Expansion Project - CTA Tank

Ruwais TAKREER Gulfar / Dodsal RT Gamma-ray, MPI, PT & PWHT

2009 Completed

121 In Service Maintenance ADMA-OPCO Project Shut down work

Das Island ADMA-OPCO Descon RT Gamma-ray, UT, MPI, PT & PWHT

2009 Completed

122 New Inter Refinery Piping & Modifications

Ruwais TAKREER PUNJ LLOYD’S

RT Gamma-ray, MT, PT & PWHT

2009 Completed

123 Abu Dhabi Airport Expansion Abu Dhabi ADIA King Electro Mech

WQT, RT and UT 2009 Completed

124 Project 1514 – OGD Tank piping Ruwais TAKREER Descon RT Gamma-ray 2009 Completed

125 Abu Dhabi & Al Ain Air port Aviation Fuel storage Tanks

Abu Dhabi ADIA DHAFIR Tech RT Gamma-ray 2009 Completed

126 Majnoon Oil Field Development, Iraq Jebel Ali - Petrofac UT & UTG 2009 Completed

127 Various structural steel project Jebel Ali Various Lamprell UT, RT, MT & PT & WQT 2009 Completed

Page 96: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

128 Abu Dhabi Airport Expansion Abu Dhabi ADIA Spark Engg / Dhafeir Tech

WQT & RT Gamma-ray 2009 Completed

129 X-ray Radiographic Testing for Aluminum Piping

Ruwais GASCO Punj Lloyd RT X-ray 2009 Completed

130 FERTIL Expansion Project – Plant Piping

Ruwais FERTIL Descon RT Gamma-ray & PWHT 2008 Completed

131 Various structural steel project Sharjah Various Lootah BC Gas RT Gamma-ray 2008 Completed

132 Dish Ends for GASCO Sulphur Tanks

Abu Dhabi TAKREER RRD

CPECC RT Gamma-ray & MT 2008 Completed

133 Plant Piping Ruwais TAKREER RRD

CPECC RT Gamma-ray, UT, MPI & PT

2008 Completed

134 X-ray Radiographic Testing for CTA (Sulphur) Tank

Ruwais TAKREER RRD

- RT X-ray 2008 Completed

135

Inspection of Underground Sections of Firewater Pipelines at Ruwais Refinery and Sulphur Handling Terminal.

Ruwais TAKREER RRD

Descon UT, MPI & PT 2007 Completed

136 Inspection of 102 B-01 Catalyst Tubes for Mid Wall Micro Fissure and Creep at Ruwais Refinery

Ruwais - Descon RT Gamma-ray, UT, MPI, PT, Hardness & field Metallography

2007 Completed

Page 97: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

137 In-service NDE of Plant and Facilities

Sharjah - Lloyd’s Reg

NDT Level III inspector services, RT X-Ray & Gamma-ray, UT, MT & PT

2006 Completed

138

Steel Pipe Network Construction & Testing for PMP (Eu-273) Phase-I at Ruwais Project (BOROUGE), Project#7103. PReplacement of Radiant Coil Tubes (BOROUGE), Project#1301.

Ruwais BOROUGE Descon UT, RT, PMI & Replica Metallography

2005 Completed

139 ORYX GTL-Qatar Modification of Manifold Outlet Header, Project#6223.

Ras Laffan Various Descon UT, RT, PMI & Replica Metallography

2005 Completed

140

Marine vessels building projects: P37m Tugboat for AATCO PCOSMOS Luxury Yatch for Platinum PSHARF Aluminum Vessels for Oasis PDPA boat for Ministry of Fisheries and US navy

Al Jadaf Various ATOS Grandweld

UT, UTG, RT, MT, PT, PWHT, LT-Vacuum Box, Welding Inspection and NDT Level III inspector services

2004 Completed

141 Gas Turbine Refurbishment Jebel Ali Various Masaood John Brown

UT, RT, MT, PT & Welding Inspection

2003 Completed

Page 98: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

NNDDTT,, PPWWHHTT && TTPPII

Company Profile

SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

142 NDT & Inspection for new marine / offshore structures including rigs, platforms and buildings

Jebel Ali Various Lamprell

UT, RT, MT, PT, PWHT, Welding Inspection and NDT Level III inspector services

2003 Completed

143 Various Marine Vessels building Al Jadaf Various Albwardy ME

UT, UTG, RT, MT, PT, PWHT, LT-Vacuum Box, Welding Inspection and NDT Level III inspector services

2003 Completed

Page 99: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

CC II VV II LL // CC OO NN SS TT RR UU CC TT II OO NN MM AA TT EE RR II AA LL TT EE SS TT II NN GG DD II VV II SS II OO NN

Page 100: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

1 Inspection and Testing Services of Concrete Structures – DAS ISLAND

Das Island ADMA Opco

Civil & Inspection Services 2012 Ongoing

2 Shah Habshan Ruwais Railway

Habshan Saipem

United Gulf Contracting &

General Transport LLC

Field and Laboratory Testing / Civil Construction Material Testing

2012 Ongoing

3 BAB Thamama "G" & Habshan 2 Development Project

Habshan ADCO

Consolidated Contractors International Co, (CCIC)

Field and Laboratory Testing / Civil Construction Material Testing

2012 Ongoing

4 ZADCO ECW Project-Project # 8045

Zakum Island - Al Jaber Energy

Services

Field and Laboratory Testing / Civil Construction Material Testing

2012 Ongoing

5 132 KV Pumping Station P. No. N.L – 6311.1

Lot – 1, Shuwaihat, Abu Dhabi

ABB ETA Star

International

Field and Laboratory Testing / Civil Construction Material Testing

2012 Ongoing

6

EPC for Provision of New Stand By Acid Knock Out Drum P. No. 400185 (161769101) – GASCO

Habshan, Bab – Abu Dhabi

Alsa Engineering

N/A Field and Laboratory Testing / Civil Construction Material Testing

2012 Ongoing

7

Relocation and Tie-in Foam Injection Skid at CDS Buhasa P. No. 92216514 (AE 211) – ADCO

Buhasa, Abu Dhabi

Alsa Engineering

N/A Field and Laboratory Testing / Civil Construction Material Testing

2012 Ongoing

8

EPC Works for Non Process Buildings & Revamping of Existing Plant Buildings P. No. DJ-181 – FERTIL

Ruwais, Abu Dhabi

Amana Steel Bldg. &

Contracting N/A

Field and Laboratory Testing / Civil Construction Material Testing

2012 Ongoing

Page 101: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

9 EPC for ASAB Full Field Development Project – ADCO

ASAB, Abu Dhabi

Petrofac Al Tulfaha Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2012 Ongoing

10 Gas Pipeline Shams – 1 Solar Power Plant P. No. 10117

Madinat Sayed, Abu

Dhabi

White Arc Gen. Cont.

N/A Field and Laboratory Testing / Civil Construction Material Testing

2012 Ongoing

11 EPC for ASAB Full Field Development Project – ADCO

ASAB, Abu Dhabi

United Gulf Cont. & Gen.

Transport N/A

Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

12

Installation of 12 inch Dia. PL from Takreer Petro-chemical Refining Plant to APC/ITM Umm Al Nar Power & Desalination Plant P. No. APC/MECH-762/0709

Umm Al Nar, Abu Dhabi

Sicon Oil & Gas SPA

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

13 Proposed Nakheel Palace P. No. 37

Al Bateen, Abu Dhabi

United Seven

Contracting N/A

Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

14 Segregation of Unit 6, 7, D-Flow Lines P. No. 7063 – ADCO

Habshan, Abu Dhabi

Galfar Engineering

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

15 Shah Gas Development Package No.1 – ADCO

Shah SGD – 1, Abu Dhabi

Obaid Al Qubaisi Trans. &

Gen. Cont.

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

16 New 8 Inch Shallow Waterline P. No. 127 – ADCO

ASAB, Abu Dhabi

Abwab Al Qalaah

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

Page 102: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

17

Disposal of Water System De-Bottlenecking & Tie-in of 2 Numbers of Water Disposal Wells at BAB P. No. 101 – ADCO

Habshan, Abu Dhabi

Pure World Middle East

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

18

Satah Full Field Development Project EPC Works fo Produced Water Treatment Plant P. No. P-7218-PWT – ZADCO

Zirku Island, Abu Dhabi

Galfar Engineering

N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2011 Ongoing

19

Construction Works for ASR Gas Wellheads and Flowline Installation at BAB and ASAB P. No. 90152 (AE-205) – ADCO

BAB (Bb-799), Abu Dhabi

Alsa Engineering

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

20 Ahalia Hospital P. No. 216 Mussafah, Abu

Dhabi Al Mansouri

3B N/A

Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

21 EPC for Shah Spiking Compressor Project – ADCO

Shah, Abu Dhabi

Obaid Al Qubaisi Trans. &

Gen. Cont.

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

22

EPC for BABR North 3 New Water Injection Clusters P. No. 15173.01 EC 107888 (AE-203) – ADCO

Habshan, BAB, Abu

Dhabi

Alsa Engineering

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

Page 103: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

23

33 KV OHL for Qusahwira Full Field Development Project, 1.8 MMBOPD Phase – 1 (ADCO P. No. P14364 / NPCCP. No. 9063)

Qusahwira, Abu Dhabi

NPCC / Larsen and Toubro ECC

Division

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

24 Bu Hasa Shuaiba Unit “H” Water Enhancement P. Np. P-12386 – ADCO

Bu Hasa, Abu Dhabi

Sicon Oil & Gas SPA

N/A Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

25 EPC for ASAB F Full Development Project P. No. P14333

ASAB, Abu Dhabi

Petrofac Meraj Gen. Transport

Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

26 ADCO ASAB Full Development Project

ASAB Tekfen N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2011 Ongoing

27 DJ – 176 Ruwais Distirbution Center

Ruwais Amana Steel

Bldg. & Contracting

N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2011 Ongoing

28 Commercial Stores & Offices Al Mafraq Al Mansouri

3B N/A

Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

29 Extension of Glenelg School Sas Al

Nakheel Al Mansouri

3B N/A

Field and Laboratory Testing / Civil Construction Material Testing

2011 Ongoing

30 Community Mall Al Salam

Street NBHH N/A

Field and Laboratory Testing / Civil Construction Material Testing

2011 Completed

31 21 Villas for Mr. Rashid Mohammed Mehran Al Bloushi

Khalifa City Dubuild

Contracting N/A

Field and Laboratory Testing / Civil Construction Material Testing

2011 Completed

Page 104: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

32 R. R. E. Project No. 1 Ruwais Amana Steel

Bldg. & Contracting

N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2011 Completed

33 EPC for ASAB Full Field Development Project

ASAB Petrofac NBHH Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2010 On going

34 Dev’t of Shuweihat Phase – 2 Water Transmission System

Shuweihat Galfar N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2010 On going

35 Construction of NEB Tie-in and Cluster Modifications at ADCO – Dhabiya & Etc

Abu Dhabi Matrix N/A Field and Laboratory Testing / Civil Construction Material Testing

2010 Completed

36 Provision of Material Laboratory Services at Mubarraz Island

Mubarraz Island

Alsa Engineering

N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2010 Completed

37 Infrasructure of NDC Labor Camps at Tareef

Habshan and Madinat Zayed

Al Sitara Gulf Cont

N/A Field and Laboratory Testing 2010 Completed

38

Installation of Sour Gas Booster Compressor (C-300-TF) and Sour Gas Dehydration Unit (TEG-300-TF)

Abu Dhabi Alsa

Engineering N/A

Field and Laboratory Testing / Civil Construction Material Testing

2010 Completed

39 BAB Gas Compression Project ADCO Field SK

Engineering / Galfar

N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2009 On going

40 Abu Dhabi Crude Oil Pipeline Sweihan CPECC N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2009 On going

Page 105: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

41 Construction Works for ASAB, Shahil, AGGI and Shah Oil Facilities Modification

ADCO Field Alsa

Engineering N/A

Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

42 EPC of 131 Pig Launchers & Receiver Across

ADCO Field Galfar

Engineering WLL Emirates

Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

43 Construction of Bridge and Tunnels at IP – 44 and Sea Palace Intersection

Al Salam Street

Nurol LLC N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2009 Completed

44 Installation of Law Pressure Gas Recovery Compressor, ADOC/PM-07/TN-07

Mubaraz Island

Alsa Engineering

/ ADOC Japan

N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab

2009 Completed

45 Various Project Abu Dhabi Dua Cont & Gen Maint.

Est.N/A

Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

46 Various Project Abu Dhabi Lamartine Valley LLC

N/A Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

47 Shuweihat S2 IWPP Project for Power Plant

Jabel Dhana

Hanmi Corporation

(Korean Contracting Company)

N/A Field and Laboratory Testing 2009 Completed

48 EPC for Closed Drain System for Old RDS Abshan

Abu Dhabi Gulphar N/A Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

Page 106: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

49 Construction of Flow Lines & Well Head Installation

ADCO Field Al Hussam

General Contracting

N/A Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

50 Various Project Abu Dhabi Al Tailah Const Est

N/A Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

51 Various Project Abu Dhabi

Creative Rock Gen

Cont & Maint

N/A Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

52 Various Project Abu Dhabi Modern Bldg

for Gen Contracting

N/A Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

53 Various Project Abu Dhabi Spectrum

Light Block LLC

N/A Field and Laboratory Testing / Civil Construction Material Testing

2009 Completed

54 Supply of Sales Gas to EMAL new 36” Pipeline

Taweelah Alsa

Engineering / GASCo

N/A Field and Laboratory Testing / Civil Construction Material Testing

2008 Completed

55 Potable Water Supply HDDE Pipe Works

ADWEA Code

Contracting N/A

Field and Laboratory Testing / Civil Construction Material Testing

2008

Completed

Page 107: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

Company Profile

SL NO.

PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS

56 P025 Gassar Al Sarb-Hameem Resort for M/s Adwea

Abu Dhabi CODE

Contracting N/A

Field and Laboratory Testing / Civil Construction Material Testing

2008 Completed

57 Office & Warehouse for H. H. Sheikh Hamed Bin Zayed Al Nahyan

Abu Dhabi Al Mansouri

3B LLC N/A

Field and Laboratory Testing / Civil Construction Material Testing

2008 Completed

58 Various Project Abu Dhabi Capital

Surveys N/A

Field and Laboratory Testing / Civil Construction Material Testing

2008 Completed

59 Various Project Abu Dhabi Memana

Gen Cont & Maint LLC

N/A Field and Laboratory Testing / Civil Construction Material Testing

2008 Completed

60 Various Project Abu Dhabi Al Mansouri

3B LLC N/A

Field and Laboratory Testing / Civil Construction Material Testing

2008 Completed

61 Various Project Abu Dhabi Monte Bleu

Consultancy N/A

Field and Laboratory Testing / Civil Construction Material T ti

2008 Completed

Page 108: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

GG EE OO TT EE CC HH NN II CC AA LL SS OO II LL II NN VV EE SS TT II GG AA TT II OO NN DD II VV II SS II OO NN

Page 109: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR GGEEOOTTEECCHHNNIICCAALL

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF

WORK YEAR REMARKS

1 Internal Roads and Services in Mbz City, Phase - 2 Sector Z-36 (Part A) Contract-3

Abu Dhabi ADDC/ Bin Hafeez Gen. Contr.

Sub-Contractor Geotechnical Investigation

2015 Ongoing

2 Internal Roads and Services in Al Rahba City, Phase - 1

Al Rahba, Abu Dhabi

ADDC/ Bin Hafeez Gen. Contr.

Sub-Contractor Geotechnical Investigation

2014 Ongoing

3 Internal Roads and Services in Al Rahba City, Contracting No. 659/2

Al Rahba, Abu Dhabi

ADDC/ ADSSC/ ADM/ ARC Contracting

Sub-Contractor Geotechnical Investigation

2014 Ongoing

4 Habshan Development - 132kV and 33 kV OHL works

Habshan ADCO/ Siemens/ NCC

Sub-Contractor Geotechnical Investigation

2014 Ongoing

5

Bu Hasa Thamama zone B Development Phase 1 Water Injection Enhancement Project P. 12436- New Water Injection Cluster 54

Bu Hasa, Abu Dhabi

ADCO/ Galfar Engg. & Contracting

Sub-Contractor Geotechnical Investigation

2015 Completed

6

Bu Hasa Thamama Zone B Development Phase 1- Water Injection Enhancement Project P .12436- 33kv Wooden Pole Single Circuit OHL

Bu Hasa, Abu Dhabi

ADCO/ Kelvin Gulf Sub-Contractor Geotechnical Investigation

2015 Completed

7 Lot 2.2 - 220kv OHL Works Bab 2 g/s, Bab and Habshan 5

Habshan Transco/ Larsen & Toubro Ltd.

Sub-Contractor Geotechnical Investigation

2015 Completed

Page 110: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR GGEEOOTTEECCHHNNIICCAALL

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF

WORK YEAR REMARKS

8 33kv OHL Works at Cluster 14(N), Rumaitha

Rumaitha ADCO/ Kelvin Gulf Sub-Contractor Geotechnical Investigation

2015 Completed

9 EPC Works for Fire Training Ground Main Pump Station (Mps)

Habshan IPIC/ Alsa Engineering & Construction

Sub-Contractor Geotechnical Investigation

2015 Completed

10 Habshan Development Habshan ADCO/ Petrofac/ NCC

Sub-Contractor Geotechnical Investigation

2014 Completed

11 Bab Gas Compression Expansion Phase 2

Habshan ADCO/ Petrofac/ NCC

Sub-Contractor Geotechnical Investigation

2014 Completed

12 Sarb Package-1 Temporary Bridge Zirku Island

ADMA-OPCO / Archirodon Construction (OS) Co. SA

Sub-Contractor Geotechnical Investigation

2014 Completed

13 Epc for Buhasa Thamama Zone B Development Enhancement Phase-1 (Water Injection Cluster)

Bu Hasa ADCO/ Galfar Engg. & Contracting

Sub-Contractor Geotechnical Investigation

2014 Completed

14 Storage Facility for Valuable Spent Catalyst

Ruwais TAKREER/ Mission Gen. Service

Sub-Contractor Geotechnical Investigation

2014 Completed

15 Geotechnical Investigation for Internal Roads and services in Mohammed Bin Zayed City Phase -2 Sector Z36/01.

Abu Dhabi

ADDC/Al Jaber Transport and General Contracting

Sub-Contractor Geotechnical Investigation

2014 Completed

Page 111: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR GGEEOOTTEECCHHNNIICCAALL

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF

WORK YEAR REMARKS

16 Design and Construction of Services Harbour and Control Tower at Ruwais Industrial Area

Ruwais ADNOC/ Code Contracting Co. L.L.C

Sub-Contractor Geotechnical Investigation

2014 Completed

17 SARB Package 3 Zirku Island ADMA-OPCO/ Al Geemi & Partners Cont. Co. LLC

Sub-Contractor Geotechnical Investigation

2014 Completed

18 PE – Color Grade Compounding Project Ruwais Borouge/ Essar Sub-Contractor Geotechnical Investigation

2014 Completed

19 Geotechnical and Topographic Survey for RDS-1 & RDS-5

Habshan ADCO/ Alsa Engineering Contract L.L.C

Sub-Contractor

Geotechnical Investigation and Topographic Survey

2014 Completed

20 Bab Bu Hasa road up gradation Habshan ADCO/ Jacobs Sub-Contractor Geotechnical Investigation

2014 Completed

21 Construction of Runway and airport facilities

Das Island ADNOC / Al Naboodah National Contg.

Sub-Contractor Geotechnical Investigation

2013 Completed

22 Geotechnical Investigation for Internal Roads and services in Mohammed Bin Zayed city Phase-2 Sector Z36 and Z31.

Abu Dhabi ADDC/ Bin Hafeez Gen. Cont. Est.

Sub-Contractor Geotechnical Investigation and Material testing

2013 Completed

Page 112: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR GGEEOOTTEECCHHNNIICCAALL

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF

WORK YEAR REMARKS

23 Geotechnical Investigation for D- 102242- Water works including Kashona Pipe line & Construction/Renovation of washouts

Abu Dhabi TRANSCO/ CODE contracting Co.

Sub-Contractor Geotechnical Investigation

2013 Completed

24 Geotechnical Investigation/ Geophysical Testing and Early Civil Works

Abu Dhabi ZADCO/ Al Jaber Energy Services LLC

Sub-Contractor

Geo Technical /Geo Physical Investigation and Material Testing

2012 Completed

25 Earthing Holes in Al Ain Pumping Station Al Ain AADC/ ABB Transmission and Distribution

Sub-Contractor Geotechnical Investigation And Earthing

2012 Completed

26 Tie-in works at SE Shah, ASAB,

Sahil Field ADCO/ Punj Lloyd Sub-Contractor

Geotechnical Investigation

2012 Completed

27 Environmental Park Abu Dhabi Abu Dhabi EPAD/ Al Quadra Suez Services

Sub-Contractor Geotechnical Investigation and Geo Physical Test

2012 Completed

28 Musandam Gas Plant Project Offshore

Oman and UAE

Arabian Gulf/ Horizon Survey Company

Sub-Contractor Geotechnical Investigation and Geo Physical Test

2012 Completed

29 Ruwais Fertilizer Project P. No. DJ- 181 Ruwais FERTIL/ Amana Steel Bldg. & Contracting

Sub-Contractor Geotechnical Investigation

2012 Completed

Page 113: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR GGEEOOTTEECCHHNNIICCAALL

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF

WORK YEAR REMARKS

30 Proposed Road Construction – Emirates Steel Phase - 2

ICAD, Mussafah, Abu Dhabi

Emirates Steel/ Daniel & Co. Officine Meccaniche SPA

Sub-Contractor Geotechnical Investigation

2011 Completed

31 Construction, Completion & Maintenance of 110 Houses for Citizens in Aharaa, Khorfakkan – Sharjah Municipality

Aharaa, Khorfakkan

Sharjah Municipality/ Al Nuaimi Group – Build. Division

Sub-Contractor Geotechnical Investigation

2011 Completed

32 Construction for Bab Thamama – “B” Gas Lift Pilot for two (2) wells (Bb - 97 & Bb – 603)

Habshan ADCO/ DESCON Sub-Contractor Geotechnical Investigation

2011 Completed

33 11 KV Switch Substation Mahwi

UAE Armed Forces/ Gulf Industrial Services Co.

Sub-Contractor Geotechnical Investigation

2011 Completed

34 Al Markaz Development Project Al Markaz Waha Land/ Bin Hafeez Gen. Cont. Est.

Sub-Contractor Geotechnical Investigation

2011 Completed

35

Installation of 12” Pipeline From TAKREER Petrochemical Refinery Plant to ADC / ITM Umm Al Nar Power Desalination Plant

Umm Al Nar, Abu Dhabi

Arabian Power Co. (APC)/ Sicon Oil & Gas SPA

Sub-Contractor Geotechnical Investigation

2011 Completed

Page 114: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR GGEEOOTTEECCHHNNIICCAALL

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF

WORK YEAR REMARKS

36 MAHWI Military Camp Development MW – KH – 116 – 2009

Mahwi UAE Armed Forces/ CRC

Sub-Contractor Geotechnical Investigation

2011 Completed

37 Drilling of Deep Earth Well Bu Hasa ADCO/ Sicon Oil & Gas SPA

Sub-Contractor

Geotechnical Investigation and Drilling of Deep Earth Wells

2011 Completed

38 Prop. Ali & Sons Marine Engineering Factory

ICAD II, Mussafah, Abu Dhabi

Ali & Sons Sub-Contractor Geotechnical Investigation

2011 Completed

39 Geotechnical Survey for the Replacement of Jetty Substation Proj. No. 1339

Jebel Dhanna ADCO/ DESCON Sub-Contractor Geotechnical Survey

2011 Completed

40 Substation and Irrigation Pumping Station, Al Markaz development

Abu Dhabi ADDC/ Bin Hafeez Gen. Cont. Est.

Sub-Contractor Geotechnical Investigation

2011 Completed

41 Drilling and Installation of Earth Wells Shah &

Habshan ADCO/ Al Husam Sub-Contractor

Geotechnical Investigation and Drilling of Deep Earth Wells

2011 Completed

42 Prop. Al Ahlia Hospital Mussafah, Abu Dhabi

Al Ahlia Hospital/ Al Masoori JB LLC

Sub-Contractor Geotechnical Investigation

2011 Completed

Page 115: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR GGEEOOTTEECCHHNNIICCAALL

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF

WORK YEAR REMARKS

43 Prop. Al Rayan Hospital Baniyas, Abu

Dhabi Al Rayan Hospital/ Memana

Sub-Contractor Geotechnical Investigation

2011 Completed

44 Drilling of Boreholes for Earthing Pit Ruwais ADNOC/ Code Contracting Co. L.L.C

Sub-Contractor Drilling of 110mm Dia. Earthing Pit

2011 Completed

45 Al Ain Hospital Dev’t Al Ain Al Ain Hospital/ AECOM

Sub-Contractor Geotechnical Investigation

2011 Completed

46 Well-head Scada Mast Foundation of the 12 Gas Producer Tie-in Project

Habshan ADCO/ Matrix Sub-Contractor Geotechnical Investigation

2011 Completed

47 Drillings and Sampling of Boreholes for Soil Investigation and Plate Bearing Test

Abu Dhabi

The Center Of Waste Management/ Emirates & Al Nasr Building Const.

Sub-Contractor Well Monitoring & Installation of peizometer

2010 Completed

48 Prop. Bu Hasa Shuaiba Unit “H” Water Injection Enhancement

Bu Hasa ADCO/ Sicon Oil & Gas SPA

Sub-Contractor Geotechnical Investigation and Site Test

2010 Completed

49 MAHWI Military Camp Development Mahwi UAE Armed Forces/ EGYCO

Sub-Contractor Geotechnical Investigation

2010 Completed

50 Dev’t of Shuweihat Phase – 2 Water Transmission System

Shuweihat TRANSCO/ Galfar Engg. & Contracting

Sub-Contractor Geotechnical Investigation

2010 Completed

Page 116: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS

FFOORR GGEEOOTTEECCHHNNIICCAALL

Company Profile

SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF

WORK YEAR REMARKS

51 Madinat Zayed to Gaya Road Project Abu Dhabi Western Region Municipality/ Ghantoot

Sub-Contractor Geotechnical Investigation

2009 Completed

52 Construction Work NGV Filling Station Sharjah Al Nuaimi Group – Build. Division

Sub-Contractor Geotechnical Investigation

2009 Completed

53 EPC for Closed Drain System for Old RDS Habshan

Abu Dhabi ADCO/ Galfar Engg. & Contracting

Sub-Contractor Geotechnical Investigation

2009 Completed

Page 117: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

OO RR GG AA NN II ZZ AA TT II OO NN AA LL CC HH AA RR TT

Page 118: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 119: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 120: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

LL OO CC AA TT II OO NN MM AA PP

Page 121: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 122: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

Company Profile

Page 123: VERSATILITY SPECIALIZATION INTEGRATED · PDF fileVERSATILITY SPECIALIZATION INTEGRATED SERVICES Analytical Chemistry Indoor Air Quality ... Building # DY–34 email: testing@lonestar-lab.com

• Versatility • Specialization • Integrated Services

Lonestar Laboratories

Lonestar Technical Services (L.L.C.)

P.O. Box: 8817, Building # DY34 Tel : +971 4 324 3888Located Inside Dubai Ship Docking Yard Fax: +971 4 324 3682Al Jadaf, Dubai - United Arab Emirates Email: [email protected]

Lonestar Technical & Industrial Services (L.L.C.)

P.O. Box: 6098, Building # 503 & 505 Tel : +971 2 550 0767Inside Industrial City of Abu Dhabi (ICAD) Fax: +971 2 550 0838Abu Dhabi - United Arab Emirates Email: [email protected]

Lonestar Alpha Laboratories - OmanP.O. Box: 1197, PC 130 Tel : +968 2 450 1524Inside Ghala Industrial Estate Fax: +968 2 450 3814Muscat - Sultanate of Oman Email: [email protected]

Lonestar Testing & Inspection Services - BasraCompanies Road, Burjeseya Tel : +964 782 403 2200Marabaa Al Iraq Al Kadraa Compound : +964 782 245 9990Basra - Iraq Email: [email protected]

Lonestar Technical Services - ErbilSuite 88, Sofi Mall, Gullan Street Tel : +964 750 390 9706Erbil - Iraq Email: [email protected]

Lonestar Technical Services - KuwaitP.O Box: 154, Safety Gas, Hawally, Tunis St, Tel : +965 6601 1265Al Khair Complex, Floor-1, Office-1, Email: [email protected] Shuhada - Kuwait

www.Lonestar-Lab.com