Upload
dangque
View
242
Download
4
Embed Size (px)
Citation preview
Civil/ConstructionMaterial Testing
Industrial Hygiene
Mechanical/Material Testing Environmental Testing
Metallurgical FailureInvestigation
Geotechnical Engineering
Full Ring Test
Marine, NDT, HeatTreatment & Inspection
Analytical Chemistry
VERS
ATILI
TYSP
ECIA
LIZAT
ION
INTE
GRAT
ED S
ERVIC
ES
Indoor Air Quality
Lonestar Laboratories (Lonestar Dubai & Abu Dhabi) are ISO/IEC 17025:2005 Accredited Testing Laboratories by DAC (LB-019 & LB-223) & ENAS (NAL-065 & NAL-046) in accordance with Laboratory Scope of Accreditation.
Both Laboratories are also Certified to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by LRQA
Rev-04-2016
Website: www.Lonestar-Lab.com
LOCATIONS
DUBAI ABU DHABI OMAN IRAQ KUWAIT
Lonestar Technical Services (L.L.C) Lonestar Technical & Industrial Services (L.L.C)
P.O. Box 8817, Dubai P.O. Box 6098, Abu Dhabi
United Arab Emirates United Arab Emirates
Telephone: +971 4 324 3888 Telephone: +971 2 550 0767
Facsimile : +971 4 324 3682 Facsimile : +971 2 550 0838
Email: [email protected] Email: [email protected]
C O M P A N Y P R O F I L E
C O M P A N Y P R O F I L E
CC OO MM PP AA NN YY PP RR OO FF II LL EE
Lonestar Laboratories (Lonestar Dubai & Lonestar Abu Dhabi) are ISO/IEC 17025:2005 Accredited Testing Laboratories by ENAS & DAC in Accordance with the Laboratory Scope of Accreditation Available on ENAS & DAC Website. Both Laboratories are also Certified to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by LRQA.
LL oo nn ee ss tt aa rr LL aa bb oo rr aa tt oo rr ii ee ss
Company Profile
TT AA BB LL EE OO FF CC OO NN TT EE NN TT SS
Sections
Company Introduction ................................................................................................... 1
Mission Statement ........................................................................................................ 2
Quality Policy ................................................................................................................ 3
Health, Safety & Environmental Policy ......................................................................... 4
FANR Permit ................................................................................................................. 5
Accreditation & Certification .......................................................................................... 6
Awards / Achievements ................................................................................................ 7
Registration & Prequalification with Major Oil Companies ............................................ 8
Scope of Testing ........................................................................................................... 9
Analytical Chemistry & Environmental Division ......................................... A
Industrial Hygiene-IH / Indoor Air Quality-IAQ Division ............................. B
Material / Mechanical Testing Division ...................................................... C
Metallurgical Failure Investigation Division ............................................... D
Non Destructive Testing (NDT) Division ................................................... E
Civil / Construction Material Testing Division ............................................ F
Geotechnical Services Division ................................................................. G
Third Party Inspection (TPI) Services Division........................................... H
Partial List of Major Ongoing & Completed Projects ................................................... 10
Organizational Chart ................................................................................................... 11
Location Maps ............................................................................................................. 12
Company Profile
CC OO MM PP AA NN YY II NN TT RR OO DD UU CC TT II OO NN
Lonestar Technical Services
P.O. Box 8817 Tel: +971 4 324-3888 Dubai Ship Docking Yard (Al Jadaf) Fax: +971 4 324-3682 Building # DY–34 email: [email protected] Dubai - United Arab Emirates website: www.lonestar-lab.com
BRIEF COMPANY INTRODUCTION
Lonestar is a testing and analytical laboratory established and registered in Emirate of Dubai, United Arab Emirates, and located in Business Bay Area inside Dubai Ship Docking Yard – Al Jadaf. The laboratory has been in operation since 1992. Lonestar not only continues to offer the same reliable analytical and testing services offered in the past, but also has substantially expanded its scope of services and laboratory locations in Abu Dhabi, Oman, Erbil (Iraq) and Kuwait.
The uniqueness of Lonestar is its personnel. Our technical personnel have been working in many diverse industrial applications for numerous years. We are therefore able to better understand and address problems in a more realistic manner. At Lonestar all tests are conducted in accordance with internationally accepted test methods and specifications. Due to cooperative agreements between Lonestar and other reputable laboratories in Europe and the USA, we are able to address the most complex analytical requirement, should the need arise. The areas of service currently covered by Lonestar are as follows:
Chemical Analysis Industrial Hygiene – IH Scale /Deposit Analysis Geotechnical Investigation Petroleum Products Analysis Construction Materials Testing (Civil) Environmental Testing Supply of Certified Inspectors Effluent Analysis Non Destructive Testing-NDT Mechanical / Material Testing Radiography -RT Metallography Magnetic Particle Testing -MPI Metallurgical Failure Investigation Liquid Penetrant Testing –PT NACE corrosion Testing Ultrasonic Testing –UT Full Ring Test Heat Treatment –HT Coating Test Welder and Procedure Qualification Indoor Air Quality Monitoring
Lonestar Dubai & Lonestar Abu Dhabi are ISO/IEC 17025:2005 accredited testing laboratories by DAC (LB-019) and ENAS (NAL-065 & NAL 046) in accordance with the laboratory scope of accreditation. Both Laboratories are also certified to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by LRQA, which maintains a rigorous QA/QC program, towards chain of custody, sample preparation and analysis. Quality management system is established along the guidelines of ISO IEC 17025:2005
Lonestar Dubai is registered and licensed as a laboratory with Dubai Municipality, the regulatory authority of the Emirate.
Lonestar’s operations are carried out through its various operating sections. A supervisory staff specialist, with many years of experience in the relevant discipline, heads each of the operating departments.
Lonestar’s list of clients include oil and gas companies, construction and fabrication companies, insurance companies, entertainment Companies, shipping companies, municipalities and most of the commercial laboratories in the UAE.
•••
Company Profile
MM II SS SS II OO NN SS TT AA TT EE MM EE NN TT
Company Profile
M I S S I O N S T A T E M E N T
It is the policy of this Company to conduct its business in a manner, which demonstrates technical
competence and reliability while continuously improving and providing a cost effective service for the
laboratory’s Clients.
Signed
Syed S. Hussaini
General Manager
Company Profile
QQ UU AA LL II TT YY PP OO LL II CC YY
Company Profile
Company Profile
HH SS EE PP OO LL II CC YY
Company Profile
Company Profile
FF AA NN RR PP EE RR MM II TT
Company Profile
Company Profile
AA CC CC RR EE DD II TT AA TT II OO NN && CC EE RR TT II FF II CC AA TT II OO NN
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
AA WW AA RR DD SS // AA CC HH II EE VV EE MM EE NN TT SS
Company Profile
ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS (ADCO)
SAFETY AWARD PRESENTED TO LONESTAR
FOR CONTRIBUTION IN ACHIEVING 10,000,000
MAN HOURS WORK WITHOUT LTI
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
Company Profile
RREEGGIISSTTRRAATTIIOONN && PPRREEQQUUAALLIIFFIICCAATTIIOONN WWIITTHH MMAAJJOORR OOIILL CCOOMMPPAANNIIEESS
Company Profile
LONESTAR is registered with the following major organization in the Middle East:
ORGANIZATION REGISTRATION #
Abu Dhabi Defense 563/2011
Abu Dhabi Gas Dev. Co. (AL HOSN GAS) 1344
Abu Dhabi Municipality & Town Planning – Sewerage planning Committee
-
Abu Dhabi Sewerage Services Company -
ADCO – Abu Dhabi Company for Onshore Oil Operations
14453
ADGAS – Abu Dhabi Gas Liquefaction Company Ltd.
1051
ADMA OPCO – Abu Dhabi Marine Operating Company
14005
ADNOC – Abu Dhabi National Oil Company 506217
ADOC– Japan L-0026
ADWEA – Abu Dhabi Water & Electricity Authority 003195
COMMERCIAL REGISTRATION
Company Profile
ORGANIZATION REGISTRATION #
ADYARD ABU DHABI 52691
ARABTEC – Artabtec Construction LLC ARTC/SSP/11/6/7/1351
ARAMCO – Saudi Arabian Oil Company 10035796
BOROUGE 132395
BUNDUQ L-121
Department of Transport – Abu Dhabi 3378910
Descon -
Dolphin Energy
DEL-DCA-07-01-LT-00568
ESNAAD 904834
ENEC – Emirates Nuclear Energy Corporation 149
EPPI – Emirates Preinsulated Pipes Industries -
FERTIL – Ruwais Fertilizer Industries 30998
Company Profile
ORGANIZATION REGISTRATION #
GASCO – Abu Dhabi Gas Industries Ltd. 904307
IMCC – International Management and Construction Corporation
13118
KOC – Kuwait Oil Company 10311
MASDAR 1543312982
McDermott International -
Ministry of Public Works 133188
Mubadala -
Nakheel 1598
NDC – National Drilling Company 2599
Occidental Petroleum of Qatar Limited. -
NPCC – National Petroleum Construction Company
8747
PDO – Petroleum Development Oman LLC -
Company Profile
ORGANIZATION REGISTRATION #
PETRONAS Carigali Iraq Holdings B.V. -
Qatar Petroleum 300219
SAIPEM Spa -
TAKREER 904178
TECHNOMAK -
Western Region Municipality -
ZADCO – Zakum Development Company 31805
Company Profile
SS CC OO PP EE OO FF TT EE SS TT II NN GG
Company Profile
AA NN AA LL YY TT II CC AA LL CC HH EE MM II SS TT RR YY && EE NN VV II RR OO NN MM EE NN TT AA LL DD II VV II SS II OO NN
Company Profile
WATER / EFFLUENT / SEA WATER / SOIL / SEDIMENT ANALYSIS
Acidity Ph Cobalt Vanadium
Alkalinity Phenols Copper Zinc
Ammonia Phosphates Hexavalent Chromium Aromatic Volatile Organics (BTEX)
Bicarbonate Phosphorus Iron Chlorinated Hydrocarbons
BOD Residual Chlorine Lead Crude & Refined Product Fingerprinting
Boron Salinity Lithium Extractable Organic halides
Bromate Sodium Absorption Ratio Magnesium Haloacetic Acids
Carbonate Sulfates Manganese Halogenated Volatile Organics
Chlorides Sulfide Mercury Herbicides & Pesticides
COD TDS Molybdenum Nitroaromatic And Cyclic Ketones
Color Temperature Nickel Organic And Volatile Acids
Conductivity Total Hardness Niobium PCB's
Cyanides Total Nitrogen Potassium Phenols
Dissolved Oxygen Total Organic Carbon Selenium Polynuclear Aromatic Hydrocarbons (PAH)
Fluoride TSS Silicon Pthalate Esters
Free chlorine Turbidity Silver Semi Volatile Organic Compounds
Magnesium Hardness Aluminum Sodium Total Organic Halides
Nitrates Antimony Strontium Total Petroleum Hydrocarbons (DRO/GRO)
Nitrites Arsenic Thallium Trihalomethanes
Oil & Grease Barium Tin Volatile Organic Compounds
Organic Nitrogen Beryllium Titanium Aromatic Volatile Organics (BTEX)
SOIL / SEDIMENT ANALYSIS – ADDITIONAL TESTS
Ammoniacal Nitrogen Grain Size Sodium Absorption Ratio
Bulk Density Leachable metals Total Organic Carbon
Cation Exchange capacity Moisture content Total Organic Matter
MICROBIOLOGICAL ANALYSIS
Fecal Coliforms Pseudomonas Streptococcus
Fungi SRB Total Aerobic Bacteria
Iron bacteria Staphylococcus Total Coliforms
Company Profile
STEEL CHEMISTRY
Alloys ASTM G 48 (Various) Chemical Composition of steel
Aluminum Alloys ASTM G 66,67 Diffused Hydrogen test
ASTM A 262 (Various) Brass & bronze Purity of metal
FOAM ANALYSIS
Foam Expansion ratio Sediment content
Foam Stability Specific Gravity
pH(3%solution) Surface tension
pH(neat) Viscosity
OIL ANALYSIS
Appearance Color Net Calorific Value Sulfur
Ash content Copper Corrosion Oil content Total Acid Number
Carbon Conradson Residue Flash point Pour point Total Base Number
Cetane Index Gross Calorific Value Sediment Viscosity
Cloud point Metals Specific Gravity Water content
AMBIENT AIR / STACK MONITORING
Carbon dioxide Oxides of nitrogen SO2
Carbon monoxide Oxygen Total Acid concentration
Chlorine content Ozone Total Hydrocarbon
Hydrogen sulfide RPM (PM 10, 5, 2.5) Total Particulate Concentration
Lower Explosion Limit Semi volatile organic compounds Volatile Organic Compounds
Company Profile
II NN DD UU SS TT RR II AA LL HH YY GG II EE NN (( II HH )) // II NN DD OO OO RR AA II RR QQ UU AA LL II TT YY (( II AA QQ )) DD II VV II SS II OO NN
Company Profile
INDUSTRIAL HYGIENE (IH) / INDOOR AIR QUALITY (IAQ)
Asbestos Bulk sample analysis. Total & Respirable fibers.
Asbestos Fiber concentration in air. Total & Respirable Particulates.
Bacterial & Microbial Identification Total Plate count
Fungal/Mould identification Toxic Vapors
Metals VOC & SVOC
Noise Monitoring/Dosimetry TWA Yeast & Mould identification
Company Profile
MM AA TT EE RR II AA LL // MM EE CC HH AA NN II CC AA LL TT EE SS TT II NN GG DD II VV II SS II OO NN
Company Profile
MATERIAL/MECHANICAL TESTING CAPABILITIES
All Weld Tensile Test Hot Tensile Test
Breaking Load Impact Test
Brinell Hardness Test Load Test
Coating Adhersion Macro Examination
Coating Continuity Nick Break
Coating Thickness Nick Break Test
Compression Test Peel Test
CTOD Test Portable Hardness
Drift Expansion Positive Metal Identification - PMI Analysis
Face Bend Proof Load Test
Failure Load Rockwell Hardness
Ferrite Measurement Test Root Bend Test
Fillet Fracture Test Side Bend Test
Flattening Test Tensile Test
Flexure Through Thickness Tensile Test
Fracture Topography Vickers Hardness Test
CORROSION TESTING
Corrosion Susceptibility for Aluminum Alloys series 5 XXX (G66)
Intergranular Corrosion for Aluminum Alloys (G67)
Hydrogen Induced Cracking – HIC - NACE Standards
Intergranular Corrosion Tests for Aluminum Alloys – G28
CSCC – G36 Pitting Crevice Corrosion – G48
Intergranular Corrosion – ASTM A262 SSCC – NACE TM0177
PHYSICAL TESTING CAPABILITIES
Cemented Carbide Products Plastics, Elastomers and Composite Materials
Coatings and Coated Products Steel Bars, Wires & Fabric for Concrete Reinforcement
Fasteners Welder Qualification Test Coupons
Galvanized Steel Products Welding Consumable Qualification Test Coupons
Metal Castings Welding Procedure Qualification Test Coupons Metals and Alloy products such as Plates, Shapes, Bars, Pipes and Fittings
Welding Production test Coupons
Paper and Fiber Products Welder Operators Qualification Test coupons
Company Profile
MM EE TT AA LL LL UU RR GG II CC AA LL FF AA II LL UU RR EE II NN VV EE SS TT II GG AA TT II OO NN DD II VV II SS II OO NN
Company Profile
LABORATORY METALLOGRAPHY & MICROSCOPY
Scanning Electron Microscopy – SEM Stereomicroscopy
Energy Dispersive X-ray Analysis – EDAX Fracture Tapography
Macrostructural Examination Microstructural Examination
Microhardness Evaluation
REPLICA AND IN-SITU METALLOGRAPHY
Failure Analysis and Investigation Replica Metallography
In-Situ Metallography Replication of Fractures
Replication of Surface Features
CORROSION TESTING AND EVALUATION
Resistance to Pitting & Crevice Corrosion Susceptibility to Intergranular Corrosion
Resistance to Sulfide Stress Cracking – SSC Resistance to Hydrogen Induced Cracking – HIC
Examination of Scales & Corrosion Products Full Ring CAPCIS Test as per OTI 95 635
CONDITION, USABILITY & REMAINING LIFE ASSESSMENT
Power Plant And Auxiliary Boiler Tubes, Headers & Connectors
Turbine Nozzles, Vanes, Combustor Liners and Casings
Oil And Gas Processing Equipment and Components
Equipment and Components of Marine / Offshore Structures
Drilling and Downhole Equipment and Components
Engine Components
COATING TEST FACILITIES
Cathodic Disbondment Impact Strength
Penetration Resistance Porosity Testing
Pull Off Adhesion Strength Peel Off Adhesion Strength
Holiday Detection Coating Thickness Verification
Elevated Temperature Testing and Conditioning Dry Film Thickness
Hot Water Immersion Test Electrical Insulation Resistance/Coating Resistivity
Hot Water Resistance
Company Profile
NN OO NN DD EE SS TT RR UU CC TT II VV EE TT EE SS TT II NN GG (( NN DD TT )) DD II VV II SS II OO NN
Company Profile
NDT SERVICES
Condition Monitoring Thickness Surveys, for Plant piping, Equipment & pipelines
Positive Material Identification
UT Thickness Survey of Mobile vessels, Mobile offshore Drilling Units
Ferrite content Measurement
Conventional Manual Ultrasonic Flaw detection Hardness Testing
Phased Array - Ultrasonic Flaw detection Eddy Current Testing
Liquid Penetrant Testing (Color contrast & Fluorescent)
NDT Training & Certification
Magnetic Particle Testing (wet/ Dry, (Color contrast & Fluorescent)
IRIS Inspection
Radiography (X-ray, Gamma-ray Iridium-192 & Selenium-75, Pipeline crawlers)
Digitization of Radiographs
Tank Floor corrosion survey by MFL Holiday Testing of Coating
INSPECTION SERVICES
Third Party Inspection Assistance in Preparation of WPS / PQR / Welder Qualification certification
Survey for Radiation contamination check Inspection witness during Welder / Procedure qualification Tests
Supply of QC – Welding Inspector / NDT Technicians to off shore / onshore projects
Supply of ASNT Level – III Film Interpreter
HEAT TREATMENT SERVICES
Heat treatment (Degassing, Pre heating, post Heating) by Electrical resistance method
Stress Relieving (Local & Furnace method) by Electrical resistance method
Supply of Heat Treatment Equipment on Hire Consultation for Heat Treatment Parameters
Company Profile
CC II VV II LL // CC OO NN SS TT RR UU CC TT II OO NN MM AA TT EE RR II AA LL TT EE SS TT II NN GG DD II VV II SS II OO NN
Company Profile
AGGREGATES / ROCK SECTION
Particle Size Distribution (Wet and Dry Material Finer than 75 micron Sieve (Fine Passing No. 200) in Mineral Aggregate by Washing
Flakiness Index of Aggregates Specific Gravity/Water Absorption of Fines and Coarse Aggregate
Elongation Index of Aggregate Clay Lumps and Friable Particles
Shell Content in Coarse Aggregate Bulk Density of Aggregate
Aggregate Crushing Value Unconfined Compressive Strength of Rock Core
Aggregate Impact Value Point Load Index
Ten Percent Fine Value Determination of Size / weight Distribution of Quarried Stone
Los Angeles Abrasion Test Determination of Drop Test Breakage Index
Soundness of Aggregate
STEEL SECTION
Tensile Test on Steel Reinforcement Bars Mechanical Test on Multi wire Strand
Tensile Test on Steel Reinforcement Bar with Coupler
Bend test / Re bend Test on Steel Reinforcement Bar
Tensile Test on Anchor Bolt Determination of Coating Thickness
Tensile test on Tie Rods Determination of Coating Flexibility
Tensile Test on Welded Steel Rebar Galvanizing Coating thickness on Steel Articles
Tensile Test on Steel Pipes
CEMENT SECTION
Compressive Strength Soundness
Specific Surface (Blaire) Initial and Final Setting Time
Normal Consistency of Hydraulic Cement
CHEMICAL SECTION (MATERIAL)
Chloride Content of Aggregate using Nitric Acid Extract from Aggregates
Carbonate Content in Soil
Total Sulphate by Acid Extraction Method Chemical Composition of Limestone
Organic Impurities in Fine Aggregate Analysis of Water for Concrete Purpose
Potential Alkali Reactivity Analysis of Steel including Carbon Equivalent Value (CEV)
Light Weight Particles in Aggregate Chemical Analysis of Cement / GGBS /Microsilica Chloride Content / Sulphate Content in Hardened Concrete
Chemical Analysis of Admixture
pH of Soil
Company Profile
SOIL SECTION
In-situ density by Sand Replacement Method using Large and Small Pouring Cylinders
Sedimentation by Hydrometer Method
In place Density Test by sand Cone Method Linear Shrinkage
In place Density test by Nuclear Densitometer Particle Density of Soil
Dry Density-Moisture Content Relationship Using 4.5 kg Rammer for Course and Medium Gravel Size Particle
Determination of Maximum and Minimum Density of Granular Soil
Particle Size Distribution Plate Bearing Test
California Bearing Sand Equivalent Test
Liquid Limit / Plastic Limit and Plasticity Index
CONCRETE SECTION
Determination of Compressive Strength of Concrete Cubes
Method for Bleeding Fresh Concrete
Determination of Dimension and Compressive Strengths of Concrete Masonry Unit
Transverse Strength of Kerbstone
Determination of Dimensions and Compressive Strength of Concrete Paving Blocks
Water Absorption of Pre cast Concrete Flags, Kerbstones, Channels &Edgings
Electrical Indication of Concrete’s Ability to Resist Chloride ion Penetration (RCP)
Compressive Strength of Concrete Cores
Depth of Penetration of Water under Pressure of Hardened Concrete
Flexural Strength of Concrete Beams
Recommendation for Determination of the Initial Surface Absorption of Concrete
Compressive Strength of Mortar Cubes
Method of Sampling of Concrete at Site Determination of Compressive Strength of Concrete ( Using Rebound Hammer)
Determination of Slump and Temperature Fresh Concrete
Pulse Velocity Through Concrete (Crack Depth)
Determination of Air Content in Fresh Concrete Cover Meter Survey (To Determine the Concrete Cover Thickness and Rebar Location)
Determination of Air Content in Fresh Concrete Pile Integrity Test
Company Profile
GG EE OO TT EE CC HH NN II CC AA LL SS EE RR VV II CC EE SS DD II VV II SS II OO NN
Company Profile
GEOTECHNICAL SERVICES
Drilling Sampling
In-Situ Borehole Testing Interpretation of Field Data
Preparation of Borehole Log Preparation of factual
Refine the design parameters Engineering report with bearing pressure recommendation
Foundation type Foundation concrete and guidelines for ground improvement
Onshore / Offshore ground investigation Infrastructure and pipeline projects
Company Profile
TT HH II RR DD PP AA RR TT YY II NN SS PP EE CC TT II OO NN (( TT PP II ))
SS EE RR VV II CC EE SS DD II VV II SS II OO NN
Company Profile
INSPECTION DURING NEW FABRICATION
Pressure Equipment, piping & pipelines Storage Tanks
Compressors Valves and Fittings
Pumps & Blowers Turbines
Instrumentation and Control Systems Generators
UPS & Transformers
IN SERVICE INSPECTION
Re qualification of Plant Equipment, Piping Maintenance inspection
MANPOWER DEPLOYMENT
Supply of Technical Resources & Manpower Witnessing Performance Test
NDT Personnel Qualification NDE Crew
Expediting Services Project Management
Qualification of Welding Procedures and Welders
Company Profile
PP AA RR TT II AA LL LL II SS TT OO FF MM AA JJ OO RR OO NN GG OO II NN GG && CC OO MM PP LL EE TT EE DD PP RR OO JJ EE CC TT SS
Company Profile
AA NN AA LL YY TT II CC AA LL CC HH EE MM II SS TT RR YY ,, AA II RR QQ UU AA LL II TT YY AA NN DD EE NN VV II RR OO NN MM EE NN TT AA LL
AA NN AA LL YY SS II SS DD II VV II SS II OO NN
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
1 Land contamination study at Al in power plant
Al Ain Tebodin Middle
East Soil and ground water sampling & analysis
2013 Ongoing
2 S2 Water Quality Assessment. Ruwais URS Corporation Water Analysis 2012 Ongoing
3 Potable Water & Seawater Outfall
Ruwais S2 Operation & Maintenance
Company W.L.L Water Analysis 2012 Ongoing
4 S.W.O # 177086101 Ruwais Gasco Analysis of Water 2012 Completed
5 SO # 182347101 Habshan GASCO Stationary Source Monitoring 2012 Completed
6 Development of North Al Wathba infrastructure
Al Wathba ATKINS AAQMS & Diffusion tube monitoring
2012 Completed
7 Train -2 Turn Around Das Island ADGAS Hazardous Wastes Sample 2012 Completed
8 Sewage (Inlet & Outlet), Seawater Intake & Outfall)
Sewage Treatment Plant
Inlet. Site: Al Ruwais.
Shuweihat CMS International
Power Company
Analysis of Table A, B & C from Sewage Water & Sea water outfall
2011 Ongoing
9 LPG and Naphtha Tanks – GASCO Project 5249 Ruwais Refinery
Ruwais CBI Easter
Anstalt
Alkalinity, Calcium Hardness, Chlorides, Chlorine, Sulfates, TDS, Total Sulfides, pH, & Total Aerobic Bacteria
2011 Ongoing
10
(C2 – Services of Contractor – Das Island) Occupational Hygiene Monitoring for Welding Fumes
Das Island ADGAS Occupational Hygiene Monitoring for Welding Fumes
2011 Ongoing
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
11 Environmental Monitoring Services Emirates Steel
Ind.
Ambient Air Monitoring, Noise Monitoring, Waste Water Analysis/Monitoring, Mobilization & Boring Wells, Sediments & Slude
2011 Ongoing
12 ADGAS Hazardous Wastes and Effluent Analysis
Das Island ADGAS Analysis of effluents and Wastes 2011 Ongoing
13 Potable Water Analysis, Sea Water Inlet Analysis, and Outfall Water Analysis
Abu Dhabi S2 Operation &
Maint Co, Water Analysis 2011 Ongoing
14 RSB Analysis Al Taweelah EMAL RSB Analysis 2011 Ongoing
15 Monthly Waste Water Sampling, Testing & Submission of the Parameters as required by EFG
ICAD Emirates Float
Glass BOD Analysis 2011 Ongoing
16 Collection and Analysis of Process Water Sample from HRSG and other Steam
Al Ruwais Shuweihat O & M Ltd Partnership
Collection and Analysis of Potable Water
2011 Ongoing
17 STP & OST Analysis for 2nd & 3rd Qtr.
Salam Street National Drilling
Company
Collection, Analysis of Water Sample and Oil & Grease APHA 5520 B
2011 Ongoing
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
18 Provision of Waste Water Analysis
Abu Dhabi GASCO
Analysis of Petroleum Hydrocarbon Sludge, Analysis of Filter Elements, Organic Liquid & Waste Water Sludge
2011 Ongoing
19 ADGAS Service Order: IQD11-095/04.06.2011
Das Island ADGAS Indoor Air Quality Srvey 2011 Completed
20 Hermal Oxydizer Stack, Ethylene Furnaces & Auxilliary Boilers
Qatar Qatar Chemical Company LTD
Stack Monitoring 2011 Completed
21 Air & Stack Monitoring Project-EPC
Qatar Qatar Chemical Company LTD
Stack Monitoring 2011 Completed
22 Installation of Groundwater Monitoring Wells at QSGTL Site
Ras Laffah Ind City, QATAR
URS Soil and Ground Water Analysis 2011 Completed
23 Baseline Air Quality Monitoring and Assestment
Tanker Berth 11 Gulf Refining Air Monitoring 2011 Completed
24 Contamination Test (Additional Requirements) Soil and Ground Water Samples Analysis
Abu Dhabi Spektra Jeotek Geotechnical
Engineers
pH, Chlorides, Cyanides, Nitrogen, Sulfates, Cadmium, Chromium, Copper, Iron, Lead, Nickel, Zink, Arsenic, Boron, Selenium, Mercury, Polynuclear Aromatic Hydrocarbons, Total Petroleum Hydrocarbonates, Water Analysis, & PHENOL
2011 Completed
25 Airborne Sampling at Bunduq Offshore Complex.
Abu Dhabi Bunduq Company Limited
Sampling of O2, TVOC, CO, H2S Contaminants & Metrological Parameters.
2011 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
26 Various Abu Dhabi EMDAD
Carbon Dioxide, Carbon Monoxide, Hydrogen Sulfide, Oxides of Nitrogen, Perticulates, Sulfur Dioxide, Total Volatile Organic, Mobilization & Demobilization of equipments
2011 Completed
27 Occupational Noise Monitoring Abu Dhabi Exeed Geotextile Sampling, Occupational Noise Monitoring, Mobilization & Demobilization of Equipment
2011 Completed
28 Analysis of Corrosion Product Sampes
Ruwais Refinery Devision
TAKREER Analysis of Corrosion Product Samples
2010 Completed
29 ADCO Shahil and Shah Full Development Project
ADCO Field CCIC Water Analysis 2010 Completed
30 Habshan Flare Gas Project Habshan CCIC Water Analysis 2010 Completed
31 Air Emission and Water Monitoring
Abu Dhabi Technimont Air Emission and Water Monitoring
2010 Completed
32 Air Analysis for Fiber Concentration
Abu Dhabi Chalmers Air Bulk Sampling, Analysis 2010 Completed
33
Environmental Analytical Services & Industrial Hygiene Monitoring services at Rass Laffan
LTS-Dubai & ORYX-GTL Site,
Qatar
ORYX GTL Limited, Qatar
Environmental Services & Industrial Hygiene Monitoring
2009 Ongoing
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
34 Sea Water Analysis for T-14-I-11 Project
Abu Dhabi ADWEA Analysis of sea water 2009 Completed
35 Abu Dhabi Refinery Turn Around
Abu Dhabi Descon Analysis of Hydrocarbon Sludge, Catalyst, Liquid Waste, Sulphur, and Demisters
2009 Completed
36 Outsourcing of 4 Parameters of Water Quality Tests
Abu Dhabi ADDC Water Analysis for Cyanides and PAH
2009 Completed
37 MASDAR Development Abu Dhabi Abu Dhabi Future Energy Company
Laboratory Service for Water Quality Monitoring
2009 Completed
38 DAS Island Das Island ADGAS Sampling of Effluents & Analysis of Water
2008 Completed
39 Air Monitoring for Asbestos Abatement
Abu Dhabi Seven Seas Air Sampling and Monitoring 2008 Completed
40 Air Analysis
GTS Analysis of Airborne Total Suspended Particles
2008 Completed
41 Air Analysis Abu Dhabi EPSCO Analysis of Air Bacteria and Fungus Spores in Air
2008 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
42 Sewege Unit Abu Dhabi National Drilling
Company Analysis of Water collected from offshore rig
2007 Completed
43 GASCO Ruwais Refinery Abu Dhabi CBI Eastern Anstalt
Water Analysis 2007 Completed
44 Hazard Waste Analysis Umm Al Nar TAKREER Chemical Analysis of Waste Filter Media Samples
2007 Completed
45 Emmision Monitoring UAE Emirates Steel Wool
Mobilization of equipment & Sampling of emission from stock
2007 Completed
46 Stack Monitoring
New Cleaning Est
Mobilization / Demobilization of equipment, Stock Monitoring, Analysis & Sampling of emission from stock
2007 Completed
Company Profile
II NN DD UU SS TT RR II AA LL HH YY GG II EE NN (( II HH )) // II NN DD OO OO RR AA II RR QQ UU AA LL II TT YY (( II AA QQ )) DD II VV II SS II OO NN
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR IIHH//IIAAQQ DDIIVVIISSIIOONN –– HHOOSSPPIITTAALLSS HHEEAALLTTHHCCAARREE
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
1 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
LLH Hospital – Abu Dhabi, UAE
LLH Hospital – Abu Dhabi, UAE
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2015 Ongoing
2 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
American Hospital – Dubai, UAE
American Hospital – Dubai, UAE
Air Quality Monitoring of required areas within Medical Facilities (Formaldehyde CH2O, Xylene)
2015 Ongoing
3 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Al Raha Hospital Abu Dhabi, UAE
Al Raha Hospital Abu Dhabi, UAE
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2015 Completed
4 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Arzanah Medical Complex – Abu Dhabi, UAE
JBI SERCO MIDDLE EAST
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2015 Completed
5 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Zuleka Hospital – Al Nadha, Dubai, UAE
PAX KENT INT’L
Air Quality Monitoring of required areas within Medical Facilities Bacteria
2015 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR IIHH//IIAAQQ DDIIVVIISSIIOONN –– HHOOSSPPIITTAALLSS HHEEAALLTTHHCCAARREE
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
6 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Arzanah Medical Complex – Abu Dhabi, UAE
JBI SERCO MIDDLE EAST
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2014 Completed
7
IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Gulf Medical University – Ajman, UAE
Gulf Medical University – Ajman, UAE
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2014 Completed
8 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
LIFECARE Hospital – Abu Dhabi, UAE
LIFECARE Hospital – Abu Dhabi, UAE
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2014 Completed
9 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Arzanah Medical Complex – Abu Dhabi, UAE
JBI SERCO Middle East
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2014 Completed
10 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Al Raha Hospital Abu Dhabi, UAE
Al Raha Hospital Abu Dhabi, UAE
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2014 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR IIHH//IIAAQQ DDIIVVIISSIIOONN –– HHOOSSPPIITTAALLSS HHEEAALLTTHHCCAARREE
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
11 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
LLH Hospital – Abu Dhabi, UAE
LLH Hospital – Abu Dhabi, UAE
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2014 Completed
12 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Emirates Hospital Abu Dhabi, UAE
Emirates Hospital Abu Dhabi, UAE
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2014 Completed
13 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
HealthPoint Medical Center – Abu Dhabi, UAE – Phase 2 Clearances
JBI SERCO Middle East
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2013 Completed
14 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
HealthPoint Medical Center – Abu Dhabi, UAE – Phase 1 Baselines
JBI SERCO Middle East
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2013 Completed
15 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Zuleka Hospital – Al Nadha, Dubai, UAE
Zuleka Hospital – Al Nadha, Dubai, UAE
Air Quality Monitoring of required areas within Medical Facilities (Formaldehyde CH2O)
2013 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR IIHH//IIAAQQ DDIIVVIISSIIOONN –– HHOOSSPPIITTAALLSS HHEEAALLTTHHCCAARREE
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SCOPE OF WORK YEAR REMARKS
16 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
ADNOC - Ruwais Hospital - Abu Dhabi, UAE
ADNOC - Ruwais Hospital - Abu Dhabi, UAE
Air Quality Monitoring of required areas within Medical Facilities (CO,CO2,O2,O3,TVOC,Temp, R/H, Bact, Mold Spores, PM10,PM2.5,TSP,Noise (Area)
2012 Completed
17 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
American Hospital – Dubai, UAE
American Hospital – Dubai, UAE
Air Quality Monitoring of required areas within Medical Facilities (Formaldehyde CH2O, Xylene)
2011 Completed
18 IAQ Project Monitoring of Medical Facilities per AD EHSMS HAAD Guidelines
Mafraq Hospital – Abu Dhabi, UAE
Angus Middle East, Dubai
Air Quality Monitoring of required areas within Medical Facilities Total Fiber Concentration in air
2010 Completed
Company Profile
MM EE CC HH AA NN II CC AA LL // MM AA TT EE RR II AA LL TT EE SS TT II NN GG AA NN DD MM EE TT AA LL LL UU RR GG II CC AA LL
FF AA II LL UU RR EE II NN VV EE SS TT II GG AA TT II OO NN DD II VV II SS II OO NN
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN
Company Profile
SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION
1 Gulf Piping Co. W.L.L (IMCC) Project: C-1397 Mechanical & Corrosion Services 2015 2 Years
2 National Petroleum Construction Company
DANA GAS – EPC OF PIPELINES PROJECT / NPCC PROJECT NO. 02296
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2015 2 Years
3 National Petroleum Construction Company
ADMA OPCO ULFFD PHASE II PROJECT – PKG 2 / NPCC PROJECT 4204
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2015 2 Years
4 National Petroleum Construction Company
AO ULFFD Project PKG2 / NPCC Project No: 2208
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2015 2 Years
5 DODSAL ENGG. & CONST. PTE, LTD
EPC for Rumaitha / Shanayel Facilities – Phase III
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2015 2 Years
6 Gulf Piping Co. W.L.L (IMCC) Project: C-1394 Mechanical & Corrosion Services 2015 1 Year
7 China Petroleum Engineering & Construction
ASAB Unit 6&7 Project Mechanical Services 2014 6 Months
8 DAEWOO E & C Ruwais Refinery Expansion Project UAE
Mechanical / Metallurgical & Chemical Analysis Services
2014 6 Months
9 Abu Dhabi Company for Onshore Oil Operation (ADCO)
Various Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 3 Year
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN
Company Profile
SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION
10 Abu Dhabi Gas Development Company (Al Hosn)
Various Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 3 Year
11 Consolidated Contractors International Company
Bab Habshan-1 Development Project Phase-I & II
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
12 National Petroleum Construction Company
AO ZKOLR PROJECT – PHASE 1 / NPCC PROJECT NO. 2272
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
13 National Petroleum Construction Company
ADMA OPCO – ZAKUM OIL LINES REPLACEMENT PROJECT – PHASE 1 / NPCC PROJECT NO. 2272
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
14 National Petroleum Construction Company
DANA GAS – EPC OF PIPELINES PROJECT / NPCC PROJECT NO. 02296
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
15 National Petroleum Construction Company
ADMA OPCO ULFFD PHASE II PROJECT – PKG 2 / NPCC PROJECT 4204
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
16 National Petroleum Construction Company
AO ULFFD Project PKG2 / NPCC Project No: 2208
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
17 Gulf Piping Co. W.L.L (IMCC) Project: C-1397 Mechanical & Corrosion Services 2014 2 Years
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN
Company Profile
SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION
18 Penta Global Engineering LLC
Upper Zakum 750 Project – EPC2, Project No P7512
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
19 Al Hassan Engineering Co Satah Al Razboot (SARB) Field Development Project – Package 3 EPC Work.
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
20 Alsa Engineering & Construction Co. LLC
EPC BAB FAR NORTH CO2 INJECTION PILOT PROJECT
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
21 Alsa Engineering & Construction Co. LLC
EPC FOR RUMAITHA NORTH CO2 INJECTION PROJECT
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
22 Galfar Engineering & Contracting
Construction of Flowlines and Well Head Installation of Typical Works in ADCO’S Fields (Package A)
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
23 Galfar Engineering & Contracting
EPC WAG Wells & Conversion of New of Existing Gas Injectors Wells to WAG Wells at SAHIL ADCO
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
24 Zakum Development Company Various Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 2 Years
25 Alsa Engineering & Construction Co. LLC
NITROGEN GAS INJECTION (PURE CASE)
Mechanical Services 2014 1 Year
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN
Company Profile
SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION
26 Gulf Piping Co. W.L.L (IMCC) Project: C-1394 Mechanical & Corrosion Services 2014 1 Year
27 Essar Constructions Overseas Limited
N/A Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 1 Year
28 DODSAL ENGG. & CONST. PTE, LTD
ESI Carbon Capture and Storage (CCS) Project Phase-1
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 1 Year
29 TIANJIN PIPE CORP. (Middle East) LTD
EPC – BAB GAS COMPRESSION PROJECT PHASE-II
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2014 1 Month
30 Gulf Piping Co. W.L.L (IMCC) Project: C-1381 Mechanical & Corrosion Services 2013 2 Years
31 Denholm Yam Contracting Company L.L.C
Satah Al Razboot (SARB) Field Development Project
Mechanical Services 2013 2 Years
32 Denholm Yam Contracting Company L.L.C
REALM 1 ACCOMODATION SUPPORTING VESSEL
Mechanical Services 2013 2 Years
33 National Petroleum Construction Company
SEP550 PROJECT 096 Mechanical & Corrosion Services 2013 2 Years
34 National Petroleum Construction Company
OOCEP MUSANDAM OFFSHORE PIPELINE EPC WORKS
Mechanical & Corrosion Services 2013 2 Years
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN
Company Profile
SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION
35 National Petroleum Construction Company
ZADCO - UZ 750K PROJECT P7511 / NPCC PROJECT NO. 1217
Mechanical & Corrosion Services 2013 2 Years
36 National Petroleum Construction Company
AO ULFFD PROJECT PKG1 / NPCC PROJECT NO. 2207
Mechanical & Corrosion Services 2013 2 Years
37 Alsa Engineering & Construction Co. LLC
Construction Works for ASR Gas Well Heads and Flowline Installation at BAB and ASAB
Mechanical Services 2013 2 Years
38 Alsa Engineering & Construction Co. LLC
EPC FOR OPTICAL TRANSFER NETWORK AT BAB FIELD, REPLACEMENT OF EXISITING ESD SYSTEM AT BCDS, REPLACEMENT OF RDS-3 TRANSFER LINE AT BAB ADCO
Mechanical & Corrosion Services 2013 1 Year
39 Valentine Maritime Gulf L.L.C PROJECT / CLIENT: C1304 DUBAI PETROLEUM
Mechanical & Corrosion Services 2013 1 Year
40 ROBT STONE (ME) L.L.C PROJECT NAME: TAKREER IRP-II PROJECT
Mechanical & Corrosion Services 2013 1 Year
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN
Company Profile
SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION
41 Alsa Engineering & Construction Co. LLC
FUEL GAS AND CONDENSATE SUPPLY TO OFFSHORE: CONSTRUCTION WORKS-INSTALLATION OF 20" PIPELINE SECTION AND ASSOCIATED WORKS
Mechanical & Corrosion Services 2013 1 Year
42 MATRIX CONSTRUCTION Project: P12170 – EPC FOR BATCH-1 PLANT MODIFICATION AT BU-HASA
Mechanical & Corrosion Services 2013 1 Year
43 MATRIX CONSTRUCTION HABSHAN P.B172 Mechanical & Corrosion Services 2013 1 Year
44 DODSAL ENGG. & CONST. PTE, LTD
PROJECT NAME: HABSHAN-MAQTA-TAWEELAH (HMT) GAS PIPELINES PROJECT NO. 5272
Mechanical & Corrosion Services 2013 1 Year
45 Descon Engineering SGD-AMW-P-1935 Ruwais Mechanical & Corrosion Services 2013 1 Year
46 Denholm Yam Contracting Company L.L.C
Rig Refurbishment Project Mechanical Services 2013 1 Year
47 National Petroleum Construction Company
ZADCO SAFFD PROJECT 0265 Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 4 Years
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN
Company Profile
SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION
48 National Petroleum Construction Company
AO AND L & T – NASR PHASE 1 DEVELOPMENT PROJECT 1284
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 4 Years
49 National Petroleum Construction Company
ONGC WO-16 CLUSTER & SB-14 WHP PROJECT 1229
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 4 Years
50 National Petroleum Construction Company
ZADCO STFFD PV PROJECT 2248 Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 4 Years
51 Consolidated Contractors International Company
Qusahwira Full Field Development Project (QFD)
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 2 Years
52 Consolidated Contractors International Company
Bab Thamama “G” & Habshan-2 Development 1.8 MM BOPD
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 2 Years
53 Larsen & Toubro Limited E & C Division
Habshan Ruwais Shuweihat (HRS) Gas Pipeline Project
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 2 Years
54 DODSAL ENGG. & CONST. PTE, LTD
HABSHAN SULPHUR GRANULATION PLANT (HSGP)
Mechanical & Corrosion Services 2012 2 Years
55 Galfar Engineering EPC for Bab Facilities-modification & Remedial Works
Mechanical & Corrosion Services 2012 2 Years
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR MMEECCHHAANNIICCAALL TTEESSTTIINNGG//MMEETTAALLLLUURRGGIICCAALL FFAAIILLUURREE IINNVVEESSTTIIGGAATTIIOONN DDIIVVIISSIIOONN
Company Profile
SL # CLIENT'S NAME PROJECT NAME DESCRIPTION OF WORK YEAR DURATION
56 Alsa Engineering & Construction Co. LLC
MIRFA RUWAIS NITROGEN PIPELINE PROJECT
Mechanical & Corrosion Services 2012 2 Years
57 CHINA PETROLEUM PIPELINE BUREAU IRAQ BRANCH
INFIELD PIPELINE WORKS FOR FCP, MAJNOON OIL FIELD
Mechanical & Corrosion Services 2012 1 Year
58 CONTRACTING AND TRADING CO “C.A.T” ABU DHABI BR
CONSTRUCTION OF GAS PIPELINE TONEW AL AIN CEMENT PLANT FOR ARKAN
Mechanical & Corrosion Services 2012 1 Year
59 SPECIALIST SERVICES PIG LAUNCHER Mechanical / Metallurgical / Corrosion & NDT Services
2012 1 Year
60 PUNJ LLOYD LTD EPC FOR TIE-IN WORKS AT SE Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 1 Year
61 PUNJ LLOYD LTD EPC FOR SPIKING GAS COMPRESSOR AT SHAH CDS
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 1 Year
62 Larsen & Toubro Limited E & C Division
Shah Gas Development Program- Pkg-5
Mechanical / Metallurgical / Corrosion & Chemical Analysis Services
2012 1 Year
63 Descon Engineering ADCO THAMAMA-B PROJECT NO:1345
Mechanical Services 2012 1 Year
Company Profile
NN OO NN DD EE SS TT RR UU CC TT II VV EE TT EE SS TT II NN GG (( NN DD TT )) DD II VV II SS II OO NN
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
1 Gasco Asab 1 & 2 Plant Shutdown March / April 2015
ASAB GASCO Emdad NDT Services 2015 Ongoing
2 EPC For Supply of Sales Gas To Takreer Norm Project At Beaat Ruwais Plant
Al Ain GASCO Tecton NDT Services 2015 Ongoing
3 Sge Capacity & Reliability Jebel Ali - NASH RT Gamma-ray 2015 Ongoing
4 Oxy Qatar Field Development Project
- FTV Proclad RT Gamma-ray 2015 Ongoing
5 Halfaya Phase III Project Jebel Ali - FTV Proclad PWHT 2015 Ongoing
6 Musallim Third Module And ILS Replacement Project
Jebel Ali - Petronash RT Gamma-ray 2015 Ongoing
7 Midyan Gas Processing Facilities Jebel Ali - Petronash RT Gamma-ray 2015 Ongoing
8 Fahud West Testing Facility Development
Jebel Ali - Petronash RT Gamma-ray 2015 Ongoing
9 Gas Modular Skid Jebel Ali - Petronash RT Gamma-ray 2015 Ongoing
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
10 Umm Lulu Full Field Development Project
HFZ - SEKO RT Gamma-ray 2015 Ongoing
11 Umm Lulu Full Field Development Project
HFZ - SEKO DPT 2015 Ongoing
12 Water Supply System For Fujairah Distribution
Fujairah - KING CITY RT Gamma-ray 2015 Ongoing
13 Project # 10584 Jebel Ali - National Oilwell Varco
RT Gamma-ray 2015 Ongoing
14 Provision of Shop Inspection, Quality Control & Associated Services
World Wide ADCO - TPI Services 2015 Ongoing
15 Provision of QA/QC Inspection Services Call-Off Contract for ADCO Projects
World Wide ADCO - TPI Services 2014 Ongoing
16 G 5809 SWSR PROJECT Liwa TRANSCO Al Nasr NDT Services 2014 Ongoing
17 Upper Zakum UZ750 Project Musaffah/ North Island /South Island
ZADCO Offshore
Al Jaber RT Gamma rays, MUT, MT, PT, Hardness, PMI, PWHT & Pre Heating
2014 Ongoing
18 Egyptiam Refining Co Jebel Ali - Al Reyami UT, MT 2014 Ongoing
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
19 Shah Gas Development Package 2 & 3
Shah Al Hosn Samsung RT Gamma-ray, MT, PT, PAUT, MUT, PMI & Hardness
2013 Ongoing
20 EPC Works RUWAIS -Surge Drum - E-019
Ruwais GASCO Al Hassan Eng NDT Services 2014 Ongoing
21 OMR.14.043 TRAIN-2 MAJOR SHUTDOWN – FEB 2015 AT RUWAIS PLANT
RUWAIS GASCO Emdad RT / Welding Inspector 2015 Completed
22 Installation of Steam Turbine # 21 Isolation Valves
Al Ain TTEOM Hidromontaza NDT Services 2015 Completed
23 E-019-RUWAIS Surge Drum Protection And Battery Limit Esd Valves At Train 1 & 2
Musaffa/ Ruwais
GASCO Al Hassan Eng RT Gamma rays, MUT, MT, PT, Hardness, PMI, PWHT & Pre Heating
2014 Completed
24 Satah Al Razboot (SARB) Field Development Project - EPC Work Zirku Island ( Pipeline)
Mafraq/ Sarb Island
PIL/ADMA Al Hassan Eng RT Gamma rays, MUT, MT, PT, Hardness, PMI, PWHT & HDT
2014 Completed
25 SWSR ME Works 4A – 4B Liwa POSCO JV ACC NDT Services 2014 Completed
26 Tie-in for 5 water injectors (AE – 237)
Musaffa/ Bu Hasa
ADCO Alsa Engineering & Cont Co.
NDT Services 2014 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
27 Steam Trap For HP Steam Header Project
Ruwais BOROUGE DESCON NDT Services 2014 Completed
28 Extension in Hiring the Services of PMI Services on Call out Basis
Ruwais BOROUGE DESCON PMI Services 2014 Completed
29 Habshan Acid Gas Flare Recovery Project 5265
Habshan GASCO DESCON NDT Services 2014 Completed
30 Ruwais Sulphur Handling Terminal-2 Ruwais GASCO Al Jaber NDT Services 2014 Completed
31 Hiring of PWHT Technicians Ruwais GASCO Al Jaber PWHT 2014 Completed
32 EPC for Batch-1 Plant Modification at Buhasa,New Process Water Storage Tanks
Musaffa/ Bu Hasa
ADCO Matrix Construction
NDT Services 2013 Completed
33 Habshan-3 Total Shutdown 5066532 Habshan GASCO - Heat Treatment 2013 Completed
34
Installation of MPFM at RDS-1, 2, 3, 4, 6 & BSDS, Replacement of Nitrogen Supply at BSDS & Provision of Chemical Injection Pump at RDS-5
Habshan ADCO ALSA NDT Services 2013 Completed
35 EPC for Procurement & Installation of NGL Pipeline
ASAB GASCO ACC NDT Services 2013 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
36 Samsung S2 Shuweihat Project Ruwais SAMSUNG / C & T Corporation
- NDT Services 2013 Completed
37 IGD Habshab-5 (JGD Portion) Habshan JGC – Technimont Joint Venture
- Welding Inspection 2013 Completed
38 IGD Habshab-5 (JGD Portion) Habshan
JGC – Technimont Joint Venture
RT Film Digitization Work 2013 Completed
39 Shah Gas Development Project Shah Gas Samsung Samsung PWHT 2013 Completed
40
EPC for Optical Transfer Network at BAB Field, Replacement of Existing ESD system at BCDS, Replacement of RDS-3 Transfer line at BAB
Habshan ADCO Alsa Engineering & Cont Co.
NDT Services 2013 Completed
41 Shah Gas Development Shah Al Hosn Saipem/Descon
RT Gamma-ray, MT, PT, PAUT, MUT, PMI & Hardness
2012 Completed
42 Ruwais Sulphur Handling Terminal-2 Ruwais / Mussafah
GASCO Al Jaber/EKL RT Gamma-ray, MUT, MT, PT, PWHT & Hardness
2012 Completed
43 Ruwais Sulphur Handling Terminal-2 Ruwais / Mussafah
GASCO Sigma RT Gamma-ray 2012 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
44 Al Dabiya Additional Injection Wells Tie-ins
Al Dabiya ADCO Matrix Const. RT Gamma-ray, UT, MT, PT, Hardness, PWHT
2012 Completed
45 Fuel Gas and Condensate Supply to Offshore
Jebel Ali DUSUP JP Kenny / ALSA E&C
RT Gamma-ray, UT, MT 2012 Completed
46 Borouge 3 PO & LDPE Project Ruwais BOROUGE TSJ/Kentech Int’l.
RT Gamma-ray, PT & PMI
2012 Completed
47 Habshan-4 Plant Extension Project (IGD-4)
Habshan GASCO Descon RT Gamma-ray, UT, MT, PT, PMI, Hardness
2012 Completed
48 Dubai Petroleum project Jebel Ali - Nash RT Gamma & X-ray, MT, 2012 Completed
49 Rajasthan Northern Fields Development
Jebel Ali - Nash RT Gamma-ray, UT, MT & PT
2012 Completed
50 Fertile Plant Shutdown Ruwais FERTIL ALSA E&C MT, PT, PMI & Ferrite 2012 Completed
51 Fertile Plant Shutdown Ruwais FERTIL Descon RT Gamma& X-ray 2012 Completed
52 Strategic Water Storage Recovery Liwa ADWEA/ TRANSCO
ACC RT Gamma-ray, Crawler & MT
2012 Completed
53 Strategic Water Storage Recovery Liwa ADWEA/ TRANSCO
Al Nasar / Hidromontaza
RT Gamma-ray, Crawler, MUT, MT, & PT
2012 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
54 Qusahwira FFD Qusahwira / Mussafah
ADCO/NPCC CCIC RT Gamma-ray, MUT, MT, PT, PMI, Ferrite & Hardness Testing.
2012 Completed
55 HP Looping – Buhasa EMPD Habshan / Buhasa
ADCO ALSA Eng’g & Const
RT Gamma-ray, Crawler & X-ray, MUT, MT, PT, PWHT & Hardness
2012 Completed
56 Additional Production of Manifolds at BAB RDS-3
Habshan / Buhasa
ADCO ALSA Eng’g & Const
RT Gamma-ray, UT, MT, PT, PWHT & Hardness
2012 Completed
57 Replacement of Damaged Pipeline for H2O Injection Cluster 43, 44, 47 & 48.
Habshan / Buhasa
ADCO ALSA Eng’g & Const
RT Gamma-ray, Crawler & X-ray, MUT, MT & Hardness
2012 Completed
58 Construction of Oil & Water Flow Lines & Tie-in
Habshan / Buhasa
ADCO ALSA Eng’g & Const
RT Gamma-ray, Crawler & X-ray, PAUT, MUT, MT & Hardness
2012 Completed
59
Implementation of Vapour Recovery Compressor Modifications & Miscellaneous Plant Modifications, NEB
Habshan / Buhasa
ADCO ALSA Eng’g & Const
RT Gamma-ray & PT 2012 Completed
60 EPC For New Stand by Acid Gas Knockout Drum At Habshan
Habshan GASCO ALSA Eng’g & Const
MUT, RT Gamma-ray, MT, PT, Hardness & PWHT
2012 Completed
61
Construction of units 6 & 7 Flow Lines segregation, Additional Manifolds and Provision for Hook Up of Temporary Testing facilities
Habshan ADCO Galfar RT Gamma & X-ray, MUT, MT, PT, PWHT & Hardness
2012 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
62 EPC for BAB Gas Surface Facilities Modifications & Remedial Works
Habshan ADCO Galfar RT Gamma & X-ray, MUT, MT, PT & Hardness
2012 Completed
63 Spiking Compressor Project Asab ADCO Punj Lloyd
RT Gamma & X-ray, UT, MT, PT, PWHT, Hardness, PMI & Ferrite scope
2012 Completed
64 Tie-ins Pipeline Project Shah, Asab & Sahil
ADCO Punj Lloyd RT Gamma & X-ray, UT, MT, PT, PWHT, PMI, Ferrite & Hardness
2012 Completed
65 Ruwais Sulphur Handling Terminal-2 Mussafah TECHFIT Al Reyami RT Gamma-ray, UT, MT & PT
2012 Completed
66 Qusahwira FFD Qusahwira ADCO/NPCC Al Reyami RT Gamma-ray, UT, MT & PT
2012 Completed
67 EPC for Construction of Thamama “B” Gas Lift Pilot for 2 WellsBb-97 & Bb-603
Habshan ADCO Descon Eng’g. RT Gamma-ray 2012 Completed
68 South Pars Gas Field Development Project – Phase 14
Jebel Ali TOTAL NASH RT Gamma-ray, UT, MT & PT
2012 Completed
69 Jet Fuel Storage Transportation tanks
Jebel Ali TOTAL NASH RT Gamma-ray, UT, MT & PT
2012 Completed
70 Effluent water injection phase 1 and seawater injection phase 2
Jebel Ali - FTV Proclad RT Gamma-ray & PWHT 2012 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
71 Borouge-3 - U&O Ruwais BOROUGE Descon RT Gamma-ray 2012 Completed
72 Borouge P3A Ruwais BOROUGE Descon RT Gamma-ray, WI 2012 Completed
73 Pipeline Works for FCP Manjoon Oil, Iraq
Mussafah CPPEC - RT Gamma-ray, MT, & PT
2012 Completed
74 EMAL Phase-2 project – Piping & Fabrication & Installation
Mussafah EMAL Venus Electromechanical
Gamma & X-ray, UT, MT, PT & Hardness
2012 Completed
75 Borouge-3 - XLPE Ruwais BOROUGE Nasr Al Hajri RT Gamma-ray, MUT, MT & PT
2011 Completed
76 Construction of BQ Facilities, RDS-1 & 16” Transfer Line
Buhasa / Mussafah
ADCO L&T ECC
RT Gamma-ray & Crawler, MUT, PA-UTMT, PT, PWHT, PMI & Hardness
2011 Completed
77 Construction of above ground Jet A1 Tank & Misc. jobs at Al Ain Aviation Depot
Al Ain ADIA Dhafir Technology
RT Gamma-ray, UT, MT & PT
2011 Completed
78 Habshan-5 (IGD-5) Process Plant Habshan GASCO Descon RT X & Gamma-ray, UT, MT, PMI & Film Digitization
2011 Completed
79 Borouge-3 - Polyolefin’s Unit Ruwais BOROUGE Ellimetal PA-UT, MUT & PT 2011 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
80 Borouge-3 - Polyethylene Unit Ruwais BOROUGE Jansen & Dieprink
MUT & PT 2011 Completed
81 Construction Work for ASR Gas Well Heads & Flow Line Installation at BAB & ASAB
Asab & Habshan
ADCO ALSA Eng’g & Const.
RT Gamma-ray, Crawler & X-ray, UT, MT, PT, PWHT & Hardness
2011 Completed
82 BAB Thamama “G” & Habshan-2 Development
Habshan ADCO CCIC RT Crawler & Gamma-ray, MUT, PAUT, MT, PT, PMI & Ferrite scope
2011 Completed
83 ADCO – EPC for Sahil & Shah FFD Mussafah ADCO CCIC / OGASCO
RT Gamma-ray, MT & PT 2011 Completed
84 In-service Maintenance @ Mirfa Power Plant
Mirfa ADWEA Galfar RT Gamma, MT & PT 2011 Completed
85 Siemens Power Plant extension Ruwais ADWEA Galfar RT Gamma & PT 2011 Completed
86 PA-UT of 36” MOL Pipeline , ADCO ASAB FFD
ASAB ADCO Petrofac PA-UT of 36” dia. / 17.5mm, 20mm & 22mm thickness pipeline weld.
2011 Completed
87 Borouge Plant Expansion Ruwais BOROUGE Descon RT Gamma-ray & Digitization of Radiographs
2010 Completed
88 Abu Dhabi Manufacturing Workshop (AMW)
Ruwais BOROUGE / GASCO
Descon RT Gamma-ray & Digitization of Radiographs
2010 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
89 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac
Mussafah & ASAB
ADCO CAT
RT Gamma-ray, Crawler & X-ray, UT, MT, PT, FT, PMI, Hardness & Digitization of Radiographs
2010 Completed
90 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac
Jebel Ali ADCO FTV Proclad RT Gamma-ray, UT, MT, PT, Preheat & PWHT
2010 Completed
91 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac
Jebel Ali ADCO Petronash RT Gamma-ray, UT, MT, PT, Preheat & PWHT
2010 Completed
92 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac
Jebel Ali ADCO Al Reyami RT Gamma-ray, UT, MT, PT, Preheat & PWHT
2010 Completed
93 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac
ICAD-1 Mussafah
ADCO OGASCO RT Gamma-ray, UT, MT & PT
2010 Completed
94 ADCO – EPC for ASAB FFD EPC Contractor - Petrofac
ICAD-2 Mussafah
ADCO Denholm-Yam RT Gamma-ray, UT, MT, PT, FT, PMI, Hardness & PWHT
2010 Completed
95 BAB Gas Compression Habshan ADCO SKEC/KTI RT Gamma-ray, UT, MT, PT, FT, PMI, Hardness & PWHT
2010 Completed
96 ADCO – NEB Export Lines, EPC for ASAB FFD
Mussafah / Rumaitha / Al Daabiaa
ADCO Matrix Const RT Gamma-ray, UT, MT, PT, FT, PMI, Hardness & PWHT
2010 Completed
97 Corrosion Inhibitor Skids for KHUFF & Unayza Wells
Jebel Ali Saudi Aramco Petronash RT Gamma-ray, UT, MT & PT
2010 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
98 Dubai- Dry Docks Vessel Development
Al Jadaf Dubai Dry Docks
DNV / Grandweld
RT Gamma-ray, UT, UTG, MT & PT
2010 Completed
99 Iraq EPS Development Jebel Ali Petrofac Nash Engg RT X-Ray & Gamma, UT, MT & PT
2010 Completed
100 Habshan-Ruwais Shuweihat Gas Pipeline
Habshan & Ruwais
ADCO CPECC RT X-Ray & Gamma, UT, MT & PT
2010 Completed
101 ADCO – EPC for Sahil & Shah FFD Project (Temporary Facility)
ICAD-1 Mussafah
ADCO CCIC / TR / OGASCO
RT X-Ray & Gamma, UT, PA-UT, MT & PT
2010 Completed
102 NDT inspection project for25 Tons I-Beam
Jebel Ali -- Al Wathba Steel/Al Est.
MT & VT 2010 Completed
103 Beach Development Al Raha -- Systems Engg UT, MT & PT 2010 Completed
104 Souk Al Bahr Al Bahr -- Bilt M.E. LLC UT & PT 2010 Completed
105 Industrial Gasses Plant Mussafah Bechtel - Linde
Descon RT X-Ray & Gamma-ray, UT, MT & PT
2010 Completed
106 Various structural steel project Jebel Ali - Al Reyami UT, MT & PT 2010 Completed
107 Dubai Aluminum Jebel Ali DUBAL Emirates Heavy Engg
RT Gamma-ray, MT & PT 2010 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
108 Structural Building Fabrication Works Taweelah - Hadeed Emirates Co.
RT Gamma-ray, MT & PT 2010 Completed
109 Abu Dhabi International Airport T-1 Refurbishment
Abu Dhabi ADIA Yousuf M/c Structural’s
UT, MT &PT 2010 Completed
110 Garden Community Retail Center Al Raha ADIA Yousuf M/c Structural’s
PWHT 2010 Completed
111 Bashra, Iraq Jebel Ali - Petrofac UT & UTG 2010 Completed
112 IKEA Expansion Yas Island IKEA Al Futtaim Engg
RT Gamma-ray 2010 Completed
113 District Cooling Scheme DM-08,09,10,12 14,14 DMGLP & ETS
Deira TABREED Steel Const Engg Co.
UT,MT & PT 2010 Completed
114 D-1 Tower Culture Village Deira - Golden Metal UT, MT & PT 2010 Completed
115 DM 08, 09 ETS’s Associated with Green Line & CHW
Deira TABREED Parson Int’l Ltd. RT X-Ray & Gamma-ray & PT
2010 Completed
116 NGL Train -3 Habshan GASCO CBI / Descon RT X-Ray & Gamma-ray & MT
2010 Completed
117 Air separation Plant Piping Habshan Descon Descon Crawler & X-Ray 2009 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
118 Oman Gas Development Oman PDO FTV Proclad RT Gamma-ray 2009 Completed
119 Various structural steel project Jebel Ali Saudi Aramco FTV Proclad RT Gamma-ray 2009 Completed
120 Sulphur Expansion Project - CTA Tank
Ruwais TAKREER Gulfar / Dodsal RT Gamma-ray, MPI, PT & PWHT
2009 Completed
121 In Service Maintenance ADMA-OPCO Project Shut down work
Das Island ADMA-OPCO Descon RT Gamma-ray, UT, MPI, PT & PWHT
2009 Completed
122 New Inter Refinery Piping & Modifications
Ruwais TAKREER PUNJ LLOYD’S
RT Gamma-ray, MT, PT & PWHT
2009 Completed
123 Abu Dhabi Airport Expansion Abu Dhabi ADIA King Electro Mech
WQT, RT and UT 2009 Completed
124 Project 1514 – OGD Tank piping Ruwais TAKREER Descon RT Gamma-ray 2009 Completed
125 Abu Dhabi & Al Ain Air port Aviation Fuel storage Tanks
Abu Dhabi ADIA DHAFIR Tech RT Gamma-ray 2009 Completed
126 Majnoon Oil Field Development, Iraq Jebel Ali - Petrofac UT & UTG 2009 Completed
127 Various structural steel project Jebel Ali Various Lamprell UT, RT, MT & PT & WQT 2009 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
128 Abu Dhabi Airport Expansion Abu Dhabi ADIA Spark Engg / Dhafeir Tech
WQT & RT Gamma-ray 2009 Completed
129 X-ray Radiographic Testing for Aluminum Piping
Ruwais GASCO Punj Lloyd RT X-ray 2009 Completed
130 FERTIL Expansion Project – Plant Piping
Ruwais FERTIL Descon RT Gamma-ray & PWHT 2008 Completed
131 Various structural steel project Sharjah Various Lootah BC Gas RT Gamma-ray 2008 Completed
132 Dish Ends for GASCO Sulphur Tanks
Abu Dhabi TAKREER RRD
CPECC RT Gamma-ray & MT 2008 Completed
133 Plant Piping Ruwais TAKREER RRD
CPECC RT Gamma-ray, UT, MPI & PT
2008 Completed
134 X-ray Radiographic Testing for CTA (Sulphur) Tank
Ruwais TAKREER RRD
- RT X-ray 2008 Completed
135
Inspection of Underground Sections of Firewater Pipelines at Ruwais Refinery and Sulphur Handling Terminal.
Ruwais TAKREER RRD
Descon UT, MPI & PT 2007 Completed
136 Inspection of 102 B-01 Catalyst Tubes for Mid Wall Micro Fissure and Creep at Ruwais Refinery
Ruwais - Descon RT Gamma-ray, UT, MPI, PT, Hardness & field Metallography
2007 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
137 In-service NDE of Plant and Facilities
Sharjah - Lloyd’s Reg
NDT Level III inspector services, RT X-Ray & Gamma-ray, UT, MT & PT
2006 Completed
138
Steel Pipe Network Construction & Testing for PMP (Eu-273) Phase-I at Ruwais Project (BOROUGE), Project#7103. PReplacement of Radiant Coil Tubes (BOROUGE), Project#1301.
Ruwais BOROUGE Descon UT, RT, PMI & Replica Metallography
2005 Completed
139 ORYX GTL-Qatar Modification of Manifold Outlet Header, Project#6223.
Ras Laffan Various Descon UT, RT, PMI & Replica Metallography
2005 Completed
140
Marine vessels building projects: P37m Tugboat for AATCO PCOSMOS Luxury Yatch for Platinum PSHARF Aluminum Vessels for Oasis PDPA boat for Ministry of Fisheries and US navy
Al Jadaf Various ATOS Grandweld
UT, UTG, RT, MT, PT, PWHT, LT-Vacuum Box, Welding Inspection and NDT Level III inspector services
2004 Completed
141 Gas Turbine Refurbishment Jebel Ali Various Masaood John Brown
UT, RT, MT, PT & Welding Inspection
2003 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
NNDDTT,, PPWWHHTT && TTPPII
Company Profile
SL # PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
142 NDT & Inspection for new marine / offshore structures including rigs, platforms and buildings
Jebel Ali Various Lamprell
UT, RT, MT, PT, PWHT, Welding Inspection and NDT Level III inspector services
2003 Completed
143 Various Marine Vessels building Al Jadaf Various Albwardy ME
UT, UTG, RT, MT, PT, PWHT, LT-Vacuum Box, Welding Inspection and NDT Level III inspector services
2003 Completed
Company Profile
CC II VV II LL // CC OO NN SS TT RR UU CC TT II OO NN MM AA TT EE RR II AA LL TT EE SS TT II NN GG DD II VV II SS II OO NN
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
1 Inspection and Testing Services of Concrete Structures – DAS ISLAND
Das Island ADMA Opco
Civil & Inspection Services 2012 Ongoing
2 Shah Habshan Ruwais Railway
Habshan Saipem
United Gulf Contracting &
General Transport LLC
Field and Laboratory Testing / Civil Construction Material Testing
2012 Ongoing
3 BAB Thamama "G" & Habshan 2 Development Project
Habshan ADCO
Consolidated Contractors International Co, (CCIC)
Field and Laboratory Testing / Civil Construction Material Testing
2012 Ongoing
4 ZADCO ECW Project-Project # 8045
Zakum Island - Al Jaber Energy
Services
Field and Laboratory Testing / Civil Construction Material Testing
2012 Ongoing
5 132 KV Pumping Station P. No. N.L – 6311.1
Lot – 1, Shuwaihat, Abu Dhabi
ABB ETA Star
International
Field and Laboratory Testing / Civil Construction Material Testing
2012 Ongoing
6
EPC for Provision of New Stand By Acid Knock Out Drum P. No. 400185 (161769101) – GASCO
Habshan, Bab – Abu Dhabi
Alsa Engineering
N/A Field and Laboratory Testing / Civil Construction Material Testing
2012 Ongoing
7
Relocation and Tie-in Foam Injection Skid at CDS Buhasa P. No. 92216514 (AE 211) – ADCO
Buhasa, Abu Dhabi
Alsa Engineering
N/A Field and Laboratory Testing / Civil Construction Material Testing
2012 Ongoing
8
EPC Works for Non Process Buildings & Revamping of Existing Plant Buildings P. No. DJ-181 – FERTIL
Ruwais, Abu Dhabi
Amana Steel Bldg. &
Contracting N/A
Field and Laboratory Testing / Civil Construction Material Testing
2012 Ongoing
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
9 EPC for ASAB Full Field Development Project – ADCO
ASAB, Abu Dhabi
Petrofac Al Tulfaha Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2012 Ongoing
10 Gas Pipeline Shams – 1 Solar Power Plant P. No. 10117
Madinat Sayed, Abu
Dhabi
White Arc Gen. Cont.
N/A Field and Laboratory Testing / Civil Construction Material Testing
2012 Ongoing
11 EPC for ASAB Full Field Development Project – ADCO
ASAB, Abu Dhabi
United Gulf Cont. & Gen.
Transport N/A
Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
12
Installation of 12 inch Dia. PL from Takreer Petro-chemical Refining Plant to APC/ITM Umm Al Nar Power & Desalination Plant P. No. APC/MECH-762/0709
Umm Al Nar, Abu Dhabi
Sicon Oil & Gas SPA
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
13 Proposed Nakheel Palace P. No. 37
Al Bateen, Abu Dhabi
United Seven
Contracting N/A
Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
14 Segregation of Unit 6, 7, D-Flow Lines P. No. 7063 – ADCO
Habshan, Abu Dhabi
Galfar Engineering
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
15 Shah Gas Development Package No.1 – ADCO
Shah SGD – 1, Abu Dhabi
Obaid Al Qubaisi Trans. &
Gen. Cont.
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
16 New 8 Inch Shallow Waterline P. No. 127 – ADCO
ASAB, Abu Dhabi
Abwab Al Qalaah
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
17
Disposal of Water System De-Bottlenecking & Tie-in of 2 Numbers of Water Disposal Wells at BAB P. No. 101 – ADCO
Habshan, Abu Dhabi
Pure World Middle East
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
18
Satah Full Field Development Project EPC Works fo Produced Water Treatment Plant P. No. P-7218-PWT – ZADCO
Zirku Island, Abu Dhabi
Galfar Engineering
N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2011 Ongoing
19
Construction Works for ASR Gas Wellheads and Flowline Installation at BAB and ASAB P. No. 90152 (AE-205) – ADCO
BAB (Bb-799), Abu Dhabi
Alsa Engineering
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
20 Ahalia Hospital P. No. 216 Mussafah, Abu
Dhabi Al Mansouri
3B N/A
Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
21 EPC for Shah Spiking Compressor Project – ADCO
Shah, Abu Dhabi
Obaid Al Qubaisi Trans. &
Gen. Cont.
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
22
EPC for BABR North 3 New Water Injection Clusters P. No. 15173.01 EC 107888 (AE-203) – ADCO
Habshan, BAB, Abu
Dhabi
Alsa Engineering
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
23
33 KV OHL for Qusahwira Full Field Development Project, 1.8 MMBOPD Phase – 1 (ADCO P. No. P14364 / NPCCP. No. 9063)
Qusahwira, Abu Dhabi
NPCC / Larsen and Toubro ECC
Division
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
24 Bu Hasa Shuaiba Unit “H” Water Enhancement P. Np. P-12386 – ADCO
Bu Hasa, Abu Dhabi
Sicon Oil & Gas SPA
N/A Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
25 EPC for ASAB F Full Development Project P. No. P14333
ASAB, Abu Dhabi
Petrofac Meraj Gen. Transport
Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
26 ADCO ASAB Full Development Project
ASAB Tekfen N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2011 Ongoing
27 DJ – 176 Ruwais Distirbution Center
Ruwais Amana Steel
Bldg. & Contracting
N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2011 Ongoing
28 Commercial Stores & Offices Al Mafraq Al Mansouri
3B N/A
Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
29 Extension of Glenelg School Sas Al
Nakheel Al Mansouri
3B N/A
Field and Laboratory Testing / Civil Construction Material Testing
2011 Ongoing
30 Community Mall Al Salam
Street NBHH N/A
Field and Laboratory Testing / Civil Construction Material Testing
2011 Completed
31 21 Villas for Mr. Rashid Mohammed Mehran Al Bloushi
Khalifa City Dubuild
Contracting N/A
Field and Laboratory Testing / Civil Construction Material Testing
2011 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
32 R. R. E. Project No. 1 Ruwais Amana Steel
Bldg. & Contracting
N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2011 Completed
33 EPC for ASAB Full Field Development Project
ASAB Petrofac NBHH Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2010 On going
34 Dev’t of Shuweihat Phase – 2 Water Transmission System
Shuweihat Galfar N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2010 On going
35 Construction of NEB Tie-in and Cluster Modifications at ADCO – Dhabiya & Etc
Abu Dhabi Matrix N/A Field and Laboratory Testing / Civil Construction Material Testing
2010 Completed
36 Provision of Material Laboratory Services at Mubarraz Island
Mubarraz Island
Alsa Engineering
N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2010 Completed
37 Infrasructure of NDC Labor Camps at Tareef
Habshan and Madinat Zayed
Al Sitara Gulf Cont
N/A Field and Laboratory Testing 2010 Completed
38
Installation of Sour Gas Booster Compressor (C-300-TF) and Sour Gas Dehydration Unit (TEG-300-TF)
Abu Dhabi Alsa
Engineering N/A
Field and Laboratory Testing / Civil Construction Material Testing
2010 Completed
39 BAB Gas Compression Project ADCO Field SK
Engineering / Galfar
N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2009 On going
40 Abu Dhabi Crude Oil Pipeline Sweihan CPECC N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2009 On going
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
41 Construction Works for ASAB, Shahil, AGGI and Shah Oil Facilities Modification
ADCO Field Alsa
Engineering N/A
Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
42 EPC of 131 Pig Launchers & Receiver Across
ADCO Field Galfar
Engineering WLL Emirates
Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
43 Construction of Bridge and Tunnels at IP – 44 and Sea Palace Intersection
Al Salam Street
Nurol LLC N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2009 Completed
44 Installation of Law Pressure Gas Recovery Compressor, ADOC/PM-07/TN-07
Mubaraz Island
Alsa Engineering
/ ADOC Japan
N/A Field and Laboratory Testing / Civil Construction Material Testing / Site Lab
2009 Completed
45 Various Project Abu Dhabi Dua Cont & Gen Maint.
Est.N/A
Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
46 Various Project Abu Dhabi Lamartine Valley LLC
N/A Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
47 Shuweihat S2 IWPP Project for Power Plant
Jabel Dhana
Hanmi Corporation
(Korean Contracting Company)
N/A Field and Laboratory Testing 2009 Completed
48 EPC for Closed Drain System for Old RDS Abshan
Abu Dhabi Gulphar N/A Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
49 Construction of Flow Lines & Well Head Installation
ADCO Field Al Hussam
General Contracting
N/A Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
50 Various Project Abu Dhabi Al Tailah Const Est
N/A Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
51 Various Project Abu Dhabi
Creative Rock Gen
Cont & Maint
N/A Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
52 Various Project Abu Dhabi Modern Bldg
for Gen Contracting
N/A Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
53 Various Project Abu Dhabi Spectrum
Light Block LLC
N/A Field and Laboratory Testing / Civil Construction Material Testing
2009 Completed
54 Supply of Sales Gas to EMAL new 36” Pipeline
Taweelah Alsa
Engineering / GASCo
N/A Field and Laboratory Testing / Civil Construction Material Testing
2008 Completed
55 Potable Water Supply HDDE Pipe Works
ADWEA Code
Contracting N/A
Field and Laboratory Testing / Civil Construction Material Testing
2008
Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
Company Profile
SL NO.
PROJECT TITLE LOCATION MAIN CON. SUB CON SCOPE OF WORK YEAR REMARKS
56 P025 Gassar Al Sarb-Hameem Resort for M/s Adwea
Abu Dhabi CODE
Contracting N/A
Field and Laboratory Testing / Civil Construction Material Testing
2008 Completed
57 Office & Warehouse for H. H. Sheikh Hamed Bin Zayed Al Nahyan
Abu Dhabi Al Mansouri
3B LLC N/A
Field and Laboratory Testing / Civil Construction Material Testing
2008 Completed
58 Various Project Abu Dhabi Capital
Surveys N/A
Field and Laboratory Testing / Civil Construction Material Testing
2008 Completed
59 Various Project Abu Dhabi Memana
Gen Cont & Maint LLC
N/A Field and Laboratory Testing / Civil Construction Material Testing
2008 Completed
60 Various Project Abu Dhabi Al Mansouri
3B LLC N/A
Field and Laboratory Testing / Civil Construction Material Testing
2008 Completed
61 Various Project Abu Dhabi Monte Bleu
Consultancy N/A
Field and Laboratory Testing / Civil Construction Material T ti
2008 Completed
Company Profile
GG EE OO TT EE CC HH NN II CC AA LL SS OO II LL II NN VV EE SS TT II GG AA TT II OO NN DD II VV II SS II OO NN
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR GGEEOOTTEECCHHNNIICCAALL
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF
WORK YEAR REMARKS
1 Internal Roads and Services in Mbz City, Phase - 2 Sector Z-36 (Part A) Contract-3
Abu Dhabi ADDC/ Bin Hafeez Gen. Contr.
Sub-Contractor Geotechnical Investigation
2015 Ongoing
2 Internal Roads and Services in Al Rahba City, Phase - 1
Al Rahba, Abu Dhabi
ADDC/ Bin Hafeez Gen. Contr.
Sub-Contractor Geotechnical Investigation
2014 Ongoing
3 Internal Roads and Services in Al Rahba City, Contracting No. 659/2
Al Rahba, Abu Dhabi
ADDC/ ADSSC/ ADM/ ARC Contracting
Sub-Contractor Geotechnical Investigation
2014 Ongoing
4 Habshan Development - 132kV and 33 kV OHL works
Habshan ADCO/ Siemens/ NCC
Sub-Contractor Geotechnical Investigation
2014 Ongoing
5
Bu Hasa Thamama zone B Development Phase 1 Water Injection Enhancement Project P. 12436- New Water Injection Cluster 54
Bu Hasa, Abu Dhabi
ADCO/ Galfar Engg. & Contracting
Sub-Contractor Geotechnical Investigation
2015 Completed
6
Bu Hasa Thamama Zone B Development Phase 1- Water Injection Enhancement Project P .12436- 33kv Wooden Pole Single Circuit OHL
Bu Hasa, Abu Dhabi
ADCO/ Kelvin Gulf Sub-Contractor Geotechnical Investigation
2015 Completed
7 Lot 2.2 - 220kv OHL Works Bab 2 g/s, Bab and Habshan 5
Habshan Transco/ Larsen & Toubro Ltd.
Sub-Contractor Geotechnical Investigation
2015 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR GGEEOOTTEECCHHNNIICCAALL
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF
WORK YEAR REMARKS
8 33kv OHL Works at Cluster 14(N), Rumaitha
Rumaitha ADCO/ Kelvin Gulf Sub-Contractor Geotechnical Investigation
2015 Completed
9 EPC Works for Fire Training Ground Main Pump Station (Mps)
Habshan IPIC/ Alsa Engineering & Construction
Sub-Contractor Geotechnical Investigation
2015 Completed
10 Habshan Development Habshan ADCO/ Petrofac/ NCC
Sub-Contractor Geotechnical Investigation
2014 Completed
11 Bab Gas Compression Expansion Phase 2
Habshan ADCO/ Petrofac/ NCC
Sub-Contractor Geotechnical Investigation
2014 Completed
12 Sarb Package-1 Temporary Bridge Zirku Island
ADMA-OPCO / Archirodon Construction (OS) Co. SA
Sub-Contractor Geotechnical Investigation
2014 Completed
13 Epc for Buhasa Thamama Zone B Development Enhancement Phase-1 (Water Injection Cluster)
Bu Hasa ADCO/ Galfar Engg. & Contracting
Sub-Contractor Geotechnical Investigation
2014 Completed
14 Storage Facility for Valuable Spent Catalyst
Ruwais TAKREER/ Mission Gen. Service
Sub-Contractor Geotechnical Investigation
2014 Completed
15 Geotechnical Investigation for Internal Roads and services in Mohammed Bin Zayed City Phase -2 Sector Z36/01.
Abu Dhabi
ADDC/Al Jaber Transport and General Contracting
Sub-Contractor Geotechnical Investigation
2014 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR GGEEOOTTEECCHHNNIICCAALL
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF
WORK YEAR REMARKS
16 Design and Construction of Services Harbour and Control Tower at Ruwais Industrial Area
Ruwais ADNOC/ Code Contracting Co. L.L.C
Sub-Contractor Geotechnical Investigation
2014 Completed
17 SARB Package 3 Zirku Island ADMA-OPCO/ Al Geemi & Partners Cont. Co. LLC
Sub-Contractor Geotechnical Investigation
2014 Completed
18 PE – Color Grade Compounding Project Ruwais Borouge/ Essar Sub-Contractor Geotechnical Investigation
2014 Completed
19 Geotechnical and Topographic Survey for RDS-1 & RDS-5
Habshan ADCO/ Alsa Engineering Contract L.L.C
Sub-Contractor
Geotechnical Investigation and Topographic Survey
2014 Completed
20 Bab Bu Hasa road up gradation Habshan ADCO/ Jacobs Sub-Contractor Geotechnical Investigation
2014 Completed
21 Construction of Runway and airport facilities
Das Island ADNOC / Al Naboodah National Contg.
Sub-Contractor Geotechnical Investigation
2013 Completed
22 Geotechnical Investigation for Internal Roads and services in Mohammed Bin Zayed city Phase-2 Sector Z36 and Z31.
Abu Dhabi ADDC/ Bin Hafeez Gen. Cont. Est.
Sub-Contractor Geotechnical Investigation and Material testing
2013 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR GGEEOOTTEECCHHNNIICCAALL
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF
WORK YEAR REMARKS
23 Geotechnical Investigation for D- 102242- Water works including Kashona Pipe line & Construction/Renovation of washouts
Abu Dhabi TRANSCO/ CODE contracting Co.
Sub-Contractor Geotechnical Investigation
2013 Completed
24 Geotechnical Investigation/ Geophysical Testing and Early Civil Works
Abu Dhabi ZADCO/ Al Jaber Energy Services LLC
Sub-Contractor
Geo Technical /Geo Physical Investigation and Material Testing
2012 Completed
25 Earthing Holes in Al Ain Pumping Station Al Ain AADC/ ABB Transmission and Distribution
Sub-Contractor Geotechnical Investigation And Earthing
2012 Completed
26 Tie-in works at SE Shah, ASAB,
Sahil Field ADCO/ Punj Lloyd Sub-Contractor
Geotechnical Investigation
2012 Completed
27 Environmental Park Abu Dhabi Abu Dhabi EPAD/ Al Quadra Suez Services
Sub-Contractor Geotechnical Investigation and Geo Physical Test
2012 Completed
28 Musandam Gas Plant Project Offshore
Oman and UAE
Arabian Gulf/ Horizon Survey Company
Sub-Contractor Geotechnical Investigation and Geo Physical Test
2012 Completed
29 Ruwais Fertilizer Project P. No. DJ- 181 Ruwais FERTIL/ Amana Steel Bldg. & Contracting
Sub-Contractor Geotechnical Investigation
2012 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR GGEEOOTTEECCHHNNIICCAALL
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF
WORK YEAR REMARKS
30 Proposed Road Construction – Emirates Steel Phase - 2
ICAD, Mussafah, Abu Dhabi
Emirates Steel/ Daniel & Co. Officine Meccaniche SPA
Sub-Contractor Geotechnical Investigation
2011 Completed
31 Construction, Completion & Maintenance of 110 Houses for Citizens in Aharaa, Khorfakkan – Sharjah Municipality
Aharaa, Khorfakkan
Sharjah Municipality/ Al Nuaimi Group – Build. Division
Sub-Contractor Geotechnical Investigation
2011 Completed
32 Construction for Bab Thamama – “B” Gas Lift Pilot for two (2) wells (Bb - 97 & Bb – 603)
Habshan ADCO/ DESCON Sub-Contractor Geotechnical Investigation
2011 Completed
33 11 KV Switch Substation Mahwi
UAE Armed Forces/ Gulf Industrial Services Co.
Sub-Contractor Geotechnical Investigation
2011 Completed
34 Al Markaz Development Project Al Markaz Waha Land/ Bin Hafeez Gen. Cont. Est.
Sub-Contractor Geotechnical Investigation
2011 Completed
35
Installation of 12” Pipeline From TAKREER Petrochemical Refinery Plant to ADC / ITM Umm Al Nar Power Desalination Plant
Umm Al Nar, Abu Dhabi
Arabian Power Co. (APC)/ Sicon Oil & Gas SPA
Sub-Contractor Geotechnical Investigation
2011 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR GGEEOOTTEECCHHNNIICCAALL
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF
WORK YEAR REMARKS
36 MAHWI Military Camp Development MW – KH – 116 – 2009
Mahwi UAE Armed Forces/ CRC
Sub-Contractor Geotechnical Investigation
2011 Completed
37 Drilling of Deep Earth Well Bu Hasa ADCO/ Sicon Oil & Gas SPA
Sub-Contractor
Geotechnical Investigation and Drilling of Deep Earth Wells
2011 Completed
38 Prop. Ali & Sons Marine Engineering Factory
ICAD II, Mussafah, Abu Dhabi
Ali & Sons Sub-Contractor Geotechnical Investigation
2011 Completed
39 Geotechnical Survey for the Replacement of Jetty Substation Proj. No. 1339
Jebel Dhanna ADCO/ DESCON Sub-Contractor Geotechnical Survey
2011 Completed
40 Substation and Irrigation Pumping Station, Al Markaz development
Abu Dhabi ADDC/ Bin Hafeez Gen. Cont. Est.
Sub-Contractor Geotechnical Investigation
2011 Completed
41 Drilling and Installation of Earth Wells Shah &
Habshan ADCO/ Al Husam Sub-Contractor
Geotechnical Investigation and Drilling of Deep Earth Wells
2011 Completed
42 Prop. Al Ahlia Hospital Mussafah, Abu Dhabi
Al Ahlia Hospital/ Al Masoori JB LLC
Sub-Contractor Geotechnical Investigation
2011 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR GGEEOOTTEECCHHNNIICCAALL
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF
WORK YEAR REMARKS
43 Prop. Al Rayan Hospital Baniyas, Abu
Dhabi Al Rayan Hospital/ Memana
Sub-Contractor Geotechnical Investigation
2011 Completed
44 Drilling of Boreholes for Earthing Pit Ruwais ADNOC/ Code Contracting Co. L.L.C
Sub-Contractor Drilling of 110mm Dia. Earthing Pit
2011 Completed
45 Al Ain Hospital Dev’t Al Ain Al Ain Hospital/ AECOM
Sub-Contractor Geotechnical Investigation
2011 Completed
46 Well-head Scada Mast Foundation of the 12 Gas Producer Tie-in Project
Habshan ADCO/ Matrix Sub-Contractor Geotechnical Investigation
2011 Completed
47 Drillings and Sampling of Boreholes for Soil Investigation and Plate Bearing Test
Abu Dhabi
The Center Of Waste Management/ Emirates & Al Nasr Building Const.
Sub-Contractor Well Monitoring & Installation of peizometer
2010 Completed
48 Prop. Bu Hasa Shuaiba Unit “H” Water Injection Enhancement
Bu Hasa ADCO/ Sicon Oil & Gas SPA
Sub-Contractor Geotechnical Investigation and Site Test
2010 Completed
49 MAHWI Military Camp Development Mahwi UAE Armed Forces/ EGYCO
Sub-Contractor Geotechnical Investigation
2010 Completed
50 Dev’t of Shuweihat Phase – 2 Water Transmission System
Shuweihat TRANSCO/ Galfar Engg. & Contracting
Sub-Contractor Geotechnical Investigation
2010 Completed
PPAARRTTIIAALL LLIISSTT OOFF MMAAJJOORR OONNGGOOIINNGG && CCOOMMPPLLEETTEEDD PPRROOJJEECCTTSS
FFOORR GGEEOOTTEECCHHNNIICCAALL
Company Profile
SL # PROJECT TITLE LOCATION CLIENT SUB CON SCOPE OF
WORK YEAR REMARKS
51 Madinat Zayed to Gaya Road Project Abu Dhabi Western Region Municipality/ Ghantoot
Sub-Contractor Geotechnical Investigation
2009 Completed
52 Construction Work NGV Filling Station Sharjah Al Nuaimi Group – Build. Division
Sub-Contractor Geotechnical Investigation
2009 Completed
53 EPC for Closed Drain System for Old RDS Habshan
Abu Dhabi ADCO/ Galfar Engg. & Contracting
Sub-Contractor Geotechnical Investigation
2009 Completed
Company Profile
OO RR GG AA NN II ZZ AA TT II OO NN AA LL CC HH AA RR TT
Company Profile
Company Profile
Company Profile
LL OO CC AA TT II OO NN MM AA PP
Company Profile
Company Profile
• Versatility • Specialization • Integrated Services
Lonestar Laboratories
Lonestar Technical Services (L.L.C.)
P.O. Box: 8817, Building # DY34 Tel : +971 4 324 3888Located Inside Dubai Ship Docking Yard Fax: +971 4 324 3682Al Jadaf, Dubai - United Arab Emirates Email: [email protected]
Lonestar Technical & Industrial Services (L.L.C.)
P.O. Box: 6098, Building # 503 & 505 Tel : +971 2 550 0767Inside Industrial City of Abu Dhabi (ICAD) Fax: +971 2 550 0838Abu Dhabi - United Arab Emirates Email: [email protected]
Lonestar Alpha Laboratories - OmanP.O. Box: 1197, PC 130 Tel : +968 2 450 1524Inside Ghala Industrial Estate Fax: +968 2 450 3814Muscat - Sultanate of Oman Email: [email protected]
Lonestar Testing & Inspection Services - BasraCompanies Road, Burjeseya Tel : +964 782 403 2200Marabaa Al Iraq Al Kadraa Compound : +964 782 245 9990Basra - Iraq Email: [email protected]
Lonestar Technical Services - ErbilSuite 88, Sofi Mall, Gullan Street Tel : +964 750 390 9706Erbil - Iraq Email: [email protected]
Lonestar Technical Services - KuwaitP.O Box: 154, Safety Gas, Hawally, Tunis St, Tel : +965 6601 1265Al Khair Complex, Floor-1, Office-1, Email: [email protected] Shuhada - Kuwait
www.Lonestar-Lab.com