V-3200

Embed Size (px)

Citation preview

  • 8/12/2019 V-3200

    1/4

    TECH SPECS

    Vertical Centrifugal Pump Stations

    Features

    Testing

    All Rain Bird pump stations undergo

    rigorous quality testing at the

    manufacturing site. This includes

    operating the completely assembled pump

    station at its designed capacity to ensure

    that it is fully calibrated.

    Variable speed control

    All Rain Bird pump stations use electronic

    variable speed technology. Variable speed

    controlled pump sets maintain a constant

    pressure against variable flow. Variable

    speed control provides a smooth

    automated start and stop of the pumpstation and an extremely quiet low

    vibration operation.

    Remote control from your PC through

    RB Sweden Pump Manager Software

    The RB Sweden Pump Manager software

    offers the possibility to remotely control

    the pump station from a PC. The pump

    station is connected to the irrigation PC

    with Rain Bird 2 x 2.5 mm2cable and two

    modems or via radio communication. This

    also allows for troubleshooting of the

    pump station from a remote location.

    The possibility to direct link your Pump

    Station to your Central Control system

    through Smart Pump.

    This exclusive software module available

    with Rain Bird Site Control, Stratus LT,

    StratusII, NimbusII and Cirrus Central

    Control systems allows you to link your

    Rain Bird pump station directly with the

    irrigation central control system. Monitors

    and graphs both actual and controlled

    flow. Direct and real-time communication

    between the pump station and the

    irrigation central optimizes your irrigationcycle by adjusting flow demand according

    to actual field conditions.

    The most commonly used

    line that is suitable for

    most applications

    Standard configuration allows for

    installation of 2 - 6 pumps depending

    on duty required.

    Operating Range:

    Flow range: 20 600 m3/h

    5.6 166 l/sec.

    88 2640 GPM

    Pressure range: 5 13 bar

    70 188 PSI

    Motors: 4 45 kW5.3 60 hp

    Water temperature

    range: 0o 80oC

    Air temperature

    range: 2o 40oC

    Manifold sizes: DN80 DN250

    Standard construction include:

    Grundfos CR vertical multistage

    centrifugal pumps with operating

    efficiencies up to 80%

    Closed type IP55, high efficiency

    EFF1 motors, 3Ph, 400V, 50Hz,

    2950rpm

    Galvanized steel base frame

    Galvanized steel suction and dischargemanifolds

    Isolation valve for each pump

    Check valve for each pump

    Protective thermostat on each pump

    prevents motor from running too hot

    Pressure transmitter in stainless steel

    Hose point connection

    Flow meter with electronic signal to

    the control cabinet. Allows maximum

    flow setting. In the event of this

    threshold being exceeded (for example

    a pipe burst) the pumps will

    automatically shut down

    Automatic self-flushing cast-iron Y-strainer (mesh size 1.5mm) with PLC-

    controlled over pressure relief valve.

    Screen will be automatically flushed

    each time a pump starts and by

    customer defined time settings

    depending on water quality

    Main isolation valve on pump station

    outlet with gear handle

    Jockey pump included for pump sizes

    CR64 and larger

    Advanced touch-button user interface

    shows actual water flow, operating

    conditions and alarms and allows for

    easy pressure setting adjustment.Multi language settings with password

    protection.

    V-3200 Series

  • 8/12/2019 V-3200

    2/4

    Rain Bird V-3200 Pump Station Specification

    The pump station shall be skid mounted and feature vertical multistage centrifugal pumps. The pump station shallbe manufactured by Rain Bird Sweden.

    1. General Specifications

    1.1. The pump station shall use advanced variable frequency drive and PLC controller technology to maintain aconstant water pressure of ___ bar to a maximum flow of ___ m3/h.

    1.2. The system shall be completely wired, assembled, and tested prior to shipment. Assembly shall include afabricated skid to support all components.

    1.3. The complete pump station shall be CE certified for conformance to European Standards. Systems that haveonly the sub-assemblies and/or recognized components CE certified for conformance to European Standardsshould not be considered equal.

    2. Manufacturer Requirements2.1. The prefabricated pump station shall be a standard product of a single pump station manufacturer. Non stan-

    dard, "one of a kind" pump stations shall not be considered equal.The pump station shall be Rain Bird type V-3200 model _____

    2.2. The pump station shall be manufactured by Rain Bird Sweden.The following shall be provided:

    2.2.1. Pump duty performance curves2.2.2. Complete specification with submittal information on all major components of the pumping system2.2.3. Pump station drawing including top and elevation views and location and size of all major components2.2.4. Electrical schematic2.2.5. CE-approval for the entire pumping system assembly

    3. Pump Requirements3.1. The pump station shall consist of minimum ____ main pumps all with equal performance.3.2. Pump stations that have main duty pumps in excess of 45 m3/h shall include a jockey pump. This pump shall

    maintain the system prime during periods of low flow, provide manual watering etc.3.3. Pumps shall be of the vertical multi-stage centrifugal design. The pump suction/ discharge chamber, motor stool,

    and pump shaft coupling shall be constructed of cast iron. The impellers, pump shaft, diffuser chambers, outerdischarge sleeve, impeller seal rings, and seal ring retainers shall be constructed of stainless steel. Optionalmaterials for the suction/discharge chamber and motor stool liner shall be stainless steel.

    3.4. The motors shall be vertical IP55 high efficiency EFF1 motors, 3 phase, 400V, 50Hz, 2900 rpm.4. Skid Requirements

    4.1. The pump station base / skid shall be manufactured out of galvanized steel and designed to support all thestations components. Anchor plates shall be included to support the frame.

    5. Plumbing Requirements5.1. All fabricated steel pipe work, manifolds and fittings shall be hot dipped galvanized after fabrication and prior to

    assembly. No cutting, welding or drilling is permitted after galvanizing.Surface preparation shall consist of pickling, followed by hot dipped galvanizing.

    5.2. No threaded fittings will be permitted except for connections of 50mm nominal diameter or less.5.3. All items on the pump station including pipe work, manifolds, fittings etc. shall be rated at 16 bar.

    6. Pump Station RequirementsThe pump station shall include as a minimum but not be limited to:6.1. Pressure transmitter in stainless steel with build in over pressure security type Danfoss MBS3050.6.2. Wafer style butterfly isolation valve (per pump) type Danfoss / Socla model Sylax in epoxy coated cast iron and

    disc in stainless steel.6.3. Dual flap check valves (per pump) type Danfoss / Socla in epoxy coated cast iron and plates in stainless steel.6.4. Y-strainer with a mesh size of 1.5 mm2including automatic flushing and PLC-controlled high-pressure relief

    valve. The strainer shall be rated at 16 bar. Screen shall be automatically flushed each t ime a pump starts and /or by customer defined time settings.

    6.5. Glycerin filled pressure gauges, 0 - 16 bar, mounted before and after the Y-strainer.6.6. Flow meter with signal to the cabinet. The flow meter shall be installed with minimum 5 x pipe diameter before

    and minimum 3 x pipe diameter after the f low meter to ensure correct measuring of the flow. The flow metershall be ABB type Woltman meter or Siemens MagFlo, electromagnetic rated at 16 bar.

    6.7. A system isolation valve shall be installed on the pump station discharge to isolate the pump station from theirrigation system. The valve shall be equipped with a 5-position locking lever for dimensions DN80 and smalleror gear operator for dimensions DN100 and above. The valves shall be rated at 16 bar.

    6.8. Hose point connection on the discharge manifold.6.9. Protective thermostat per pump. These thermostats shall be set to app. 45oC to prevent overheating of thepumps.

  • 8/12/2019 V-3200

    3/4

    7. Electrical Requirements7.1. Circuit breakers shall always be used (instead of fuses).7.2. Main switch interlocked with the door shall be included.7.3. Emergency stop push button shall be mounted in the cabinet front. The push button shall be hard wired outside

    the PLC.7.4. All wires shall be labeled and correspond to the electrical schematic as well as the components.7.5. Standard industrial components (PLC, operator's panel, frequency converter, contactors, motor protective

    switches, circuit breakers, etc.) shall be used.7.6. Emergency run switches for minimum 2 pumps shall be incorporated for emergency use to run pumps manually

    in case of Frequency Converter, PLC or Operators Panel break down.7.7. Cooling fan to remove heat generated by VFD shall be included or if needed water-cooled heat exchanger. No

    water connections shall be made inside the electrical panel.7.8. Electrical panel shall be rated minimum IP54.7.9. VFD must be digital, pulse width modulation.7.10. The operator panel shall be Mitsubishi, E-300 touch button type or optional E-series color touch screen version.7.11. The PLC shall be Mitsubishi FX2N or FX3N.7.12. Solid state pressure transmitter in stainless steel with build in over pressure security type Danfoss MBS3050

    shall be utilized for pressure measurements.7.13. Optional.3-phase control system detecting over- and under voltage, reversal and phase loss shall be installed.

    8. Control System Requirements8.1. The complete instrumentation and control system shall automatically start, stop, and modulate pump speed to

    smoothly, efficiently and reliably pump variable flow rates at a constant discharge pressure. Full alarms andsafety features to protect equipment, irrigation piping, and personnel shall be provided.

    8.2. Control software shall be parameter driven, fully documented, and allow user to easily change ALL operationalparameters. Standard control features and equipment that need to be included as the minimum are as follows:8.2.1. Emergency Stop8.2.2. Low discharge pressure alarm8.2.3. High discharge pressure alarm8.2.4. Low water level alarm8.2.5. Protective thermostat mounted on the pumps8.2.6. Optional.High / low voltage, phase loss / phase reversal alarm8.2.7. VFD fault (shutdown VFD pump only and attempts restart)

    8.2.8. Flow meter fault8.2.9. Pressure transmitter fault8.2.10. Optional.Motor over temperature (PTC resistors)8.2.11. Selectable functions for Alarms to be auto resetable

    8.3. All alarms shall be logged with time and date and be indicated on the operator panel. Pilot light indicators shallnot be acceptable.

    8.4. The operator panel shall be able to access all pump information, including but not limited to logging, alarm, andcurrent status readings. The operator panel shall be able to select and change all pump and pressure settingswhile protecting the system from accidental programming errors by password protecting sensitive set upreadings. The operator panel shall have a default screen that shows the following information:8.4.1. Current pressure, actual and set point (selectable between bar and PSI)8.4.2. VFD Speed8.4.3. Actual flow (selectable between m3/h, l/sec and GPM)8.4.4. Fault conditions8.4.5. Pump selected for VFD operation8.4.6. Pump operation mode (Of / Standby / Running / Alarm)8.4.7. Number of pumps operating

    8.5. Two distinct set point pressures (normal and elevation 1). The low elevation set point can be tied into acomputerized irrigation system, or directly linked to low elevation satellites. When low elevation satellites areoperating, controls software will automatically and gradually decrease the pressure to the new desired set point.When finished, the low set point will be increased back to normal.

    8.6. Software shall be included to automatically and gradually ramp-up irrigation system pressure to the desiredoperating pressure (e.g., 0.1 bar every five seconds) without exceeding design pressure. This ramp-up timeshall be fully adjustable by the operator.

    8.7. Optional feature: Automatic alternation of VFD driven pump. This shall be accomplished by incorporating dualmechanically and electrically interlocked contactors.

    8.8. Real-time clock calendar shall allow operator panel to internally provide all date and time functions used above.8.9. Full manual operation capability with screen speed control for manually adjusting VFD speed.8.10. Pump station shall be able to communicate with remote software, compatible with Rain Bird Smart Pump.

    8.11. Operators panel shall display sequential pump station alarms with date and time.

  • 8/12/2019 V-3200

    4/4

    9. OptionalMonitoring Software Requirements9.1. Monitoring software must be integrated with Rain Bird Smart PumpTM software.9.2. Software shall display the current operation status. When the station is running, the display shall show the set

    point pressure, actual pressure, flow, and pump speed.9.3. Software shall display alarms recorded in memory and displayed with related detail information on the alarm

    time and date of.9.4. Software shall display individual pump run times.9.5. The software shall have the capability to show historical flow - and pressure curves.

    10. System Operation Requirements10.1. If Jockey pump is installed it shall cycle on and off as required to maintain irrigation system pressure during non-

    irrigation times. If the Jockey pump cannot maintain the desired pressure the system shall go to normal irrigationmode.When the system pressure drops then the VFD shall start the first pump and will gradually ramp the pressure upto the desired pressure regardless of flow. As the flow rate increases the pump speed shall be modulated to holda constant discharge pressure regardless of flow. As the f low rate increases and the VFD pump can no longermaintain pressure while at maximum speed, the next sequential pump shall be started. As the flow continues toincrease, pumps shall be started sequentially until all pumps are running. As the flow begins to decrease, pumpsshall be turned off sequentially until a single VFD pump is operating. When a no-flow / over-set point pressurecondition occurs, the VFD pump shall be turned off.

    11. Testing Requirements11.1. The complete Pump Station shall be fully assembled and tested to capacity.Calibrations required shall be

    performed during this factory test. Only minor adjustment needs to be done during start up. All electricalcalibration / control settings shall be recorded in the operation manual test section.

    11.2. The complete pumping system shall operate without undue vibration throughout the range of operatingconditions. The unit shall be given a running test of normal start and stop conditions under load.

    12. Training Requirements12.1. The pump station manufacturer shall provide training for the end user on proper operation of the pump station.

    The training shall be performed on the actual installed equipment after such time as installation, startup andcalibration have been completed.

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Rain Bird Europe S.A.R.L.900, rue Ampre

    B.P. 7200013792 Aix-en-Provence Cedex 3FRANCEPhone: (33) 4 42 24 44 61Fax: (33) 4 42 24 24 72

    Rain Bird France900, rue Ampre

    B.P. 7200013792 Aix-en-Provence Cedex 3FRANCEPhone: (33) 4 42 24 44 61Fax: (33) 4 42 24 24 72

    Rain Bird Turkeystiklal Mahallesi

    AlemdaCaddesi, No 26281240 mraniye stanbulTURKEYPhone: (90) 216 443 75 23Fax: (90) 216 461 74 52

    Rain Bird Iberica S.A.Pol. Ind. Prado del EspinoC/ Forjadores, Parc. 6, M18, S128660 Boadilla del Monte, MadridESPANAPhone: (34) 91 632 48 10Fax: (34) 91 632 46 45

    Rain Bird Deutschland GmbHSiedlerstrae 4671126 Gufelden NebringenDEUTSCHLANDPhone: (49) 07032 99010Fax: (49) 07032 990111

    Rain Bird Sverige A.BFleningevgen 315260 35 dkraSWEDENPhone: (46) 042 25 04 80Fax: (46) 042 20 40 65

    Registered Trademark of Rain Bird Corporation

    2005 Rain Bird Corporation 02/05

    http://www.rainbird.fre-mail:[email protected]