The Florida Department of Transportation (FDOT) is conducting a Project Development and Environment (PD&E) Study for U.S. 331 (State Roads 83 and 187) in north Walton County, Florida. The project extends 25 miles from Coy Burgess Loop Road to the Alabama state line. U.S. 331 passes through the City of DeFuniak Springs, the community of Liberty, and the City of Paxton. At the southern end, through DeFuniak Springs, U.S. 331 is a four-lane divided roadway with a raised median. The U.S. 90 segment is a four-lane divided roadway with a raised median at the western side and a two-way left turn lane on the eastern side. This area of the corridor is urban with a combination of commercial and residential development fronting the roadway. From U.S. 90 (near the airport) to the Alabama state line, U.S. 331 is a two-lane undivided roadway. The surrounding land uses along this segment are mostly rural. Purpose and Need The purpose of the project is to study and identify improvements for U.S. 331 to allow efficient and safe travel for all corridor users. The proposed improvements are needed to accommodate existing and future traffic, as well as address safety concerns. PROJECT DESCRIPTION Contacts The Florida Department of Transportation Complies with Various Non-Discrimination Laws and Regulations, Including Title VI of the Civil Rights Act of 1964. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express concerns about Title VI may do so by contacting: Peggy Kelley, Project Manager Florida Department of Transportation, District Three Environmental Management Office 1074 Highway 90 East Chipley, FL 32428 Toll-free (888) 638-0250, ext. 1517 [email protected].fl.us Ian Satter, Public Information Director Florida Department of Transportation, District Three 1074 Highway 90 East Chipley, FL 32428-0607 Toll-free (888) 638-0250 ext. 1205 [email protected].fl.us John Smith, Title VI Coordinator Florida Department of Transportation, District Three 1074 Highway 90 Chipley, FL 32428 Toll-free at (888) 638-0250, ext. 1520 [email protected].fl.us Jacqueline Paramore, State Title VI Coordinator Florida Department of Transportation Equal Opportunity Office 605 Suwannee Street, MS 65 Tallahassee, FL 32399-0450 (850) 414-4753 [email protected].fl.us Tentative Schedule Proposed Improvements Proposed improvements under evaluation include widening, potential roadway realignment, safety, traffic operations, intersection improvements, access management, bicycle lanes, and sidewalks. Since the corridor is so long and has a variety of land uses and community needs, the proposed improvements will vary throughout the corridor. The U.S. 331 corridor has been divided into three segments, which are shown on the map on the inside page. Within each segment, improvements are being evaluated on the existing U.S. 331 alignment. Alternative alignments to widen the existing roadway could occur along either side of the existing roadway or a combination of both sides (best fit alignment) to avoid and minimize impacts. In addition to the existing corridor, realignment alternatives are also being considered in the South Segment and the North Segment. The alternatives for each segment are described below. The No-Build Alternative leaves U.S. 331 in the existing condition. The No-Build Alternative is compared to the build alternatives and will remain a viable alternative through the Public Hearing. SOUTH SEGMENT (from Coy Burgess Loop Road to North of Walton Road) The South Segment includes improvements along the existing U.S. 331 corridor and two additional corridors, as described below. Corridor 1 – Existing U.S. 331 and U.S. 90 Corridors Corridor 1 is along the existing U.S. 331 corridor. The type of roadway differs along this segment to accommodate projected traffic and meet community needs. Alternatives under consideration along Corridor 1 include: • Coy Burgess Loop Road to Business Park Road: six-lane urban roadway with bike lanes within the existing right-of-way • Business Park Road to U.S. 90: six-lane urban roadway with bike lanes and sidewalks, with widening to the west, to the east, or on both sides (center alignment) • Along U.S. 90: four-lane urban roadway with bike lanes and sidewalks, with widening to the north or to the south • U.S. 90 to north of Walton Road: four-lane urban roadway with bike lanes and sidewalks, with widening to the west, to the east, or a best fit alignment to avoid and minimize impacts Corridor 2 – Realignment Southwest of U.S. 331 Corridor 2 utilizes Bob Sikes Road, heads north, and goes through the far east end of the DeFuniak Springs Municipal Airport. A four- lane divided urban roadway with bike lanes and sidewalks is under consideration along Corridor 2. The existing U.S. 331 could be redesignated and will remain as part of the local roadway network. Corridor 3 – Realignment Northeast of U.S. 331 Corridor 3 is in the vicinity of Wabash Avenue and Walton Road. A four-lane divided urban roadway with bike lanes and sidewalks is under consideration along Corridor 3. The existing U.S. 331 could be redesignated and will remain as part of the local roadway network. Project Activity Tentative Date Alternatives Refinement During this phase, the project team will review public feedback from the Corridor Analysis Public Meetings and other outreach activities, and further evaluate engineering considerations. The project team will refine and modify the proposed alternatives and develop the best solution in each segment. Public Hearing This is a formal meeting where FDOT will present the recommended alternative. Attendees will have the opportunity to review the recommended alternative and provide comments prior to final documentation. Location and Design Concept Acceptance This is the approval from the Federal Highway Administration on the preferred alternative to move into final design. Summer 2016 through Summer 2017 Fall 2017 Summer 2018 Project Development and Environment (PD&E) Study Walton County, Florida Project Development and Environment (PD&E) Study Walton County, Florida For more information visit the project website at: www.NWFLRoads.com (click on “Future Projects” and select U.S. 331 under Walton County) U.S. 331 (State Roads 83 and 187) From Coy Burgess Loop Road to the Alabama State Line U.S. 331 (State Roads 83 and 187) From Coy Burgess Loop Road to the Alabama State Line MIDDLE SEGMENT (from North of Walton Road to Wain Huckabee Road) The Middle Segment includes improvements along the existing U.S. 331 corridor. A four-lane divided roadway is under consideration. At the south end, the roadway includes curb and gutter for drainage and bike lanes and sidewalks. Near Lake Holley Circle, the roadway transitions to open drainage with no bike lanes or sidewalks but includes paved shoulders. The widening could occur to the west, to the east, or on a best fit alignment to avoid and minimize impacts. NORTH SEGMENT (from Wain Huckabee Road to Alabama State Line) The North Segment includes improvements along the existing U.S. 331 corridor and a corridor to the east of U.S. 331, as described below. Corridor 1 – Existing U.S. 331 Corridor Corridor 1 is along the existing U.S. 331 corridor. A four-lane divided urban roadway with bike lanes is under consideration along Corridor 1. The widening could occur to the west, to the east, or on a best fit alignment to avoid and minimize impacts. Corridor 2 – Realignment East of U.S. 331 Corridor 2 is east of U.S. 331. A four-lane rural roadway with an open drainage system is under consideration along Corridor 2. The existing U.S. 331 could be redesignated and will remain as part of the local roadway network. Financial Project Identication Numbers: 433743-2 and 433743-3 Financial Project Identication Numbers: 433743-2 and 433743-3 Florida Department of Transportation, District Three Continued on back page March 2016 (Revised March 1, 2016) Process PD&E STUDY DESIGN RIGHT-OF-WAY ACQUISITION CONSTRUCTION 2014 - 2018 2018 - 2019 Unfunded Unfunded

U.S. 331 (State Roads 83 and 187) · corridor is urban with a combination of commercial and residential development fronting the roadway. ... Davis Rd Adams Dr ... CORRIDOR ALTERNATIVES

  • Upload
    lethu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

The Florida Department of Transportation (FDOT) is conducting a Project Development and Environment (PD&E) Study for U.S. 331 (State Roads 83 and 187) in north Walton County, Florida. The project extends 25 miles from Coy Burgess Loop Road to the Alabama state line. U.S. 331 passes through the City of DeFuniak Springs, the community of Liberty, and the City of Paxton.

At the southern end, through DeFuniak Springs, U.S. 331 is a four-lane divided roadway with a raised median. The U.S. 90 segment is a four-lane divided roadway with a raised median at the western side and a two-way left turn lane on the eastern side. This area of the corridor is urban with a combination of commercial and residential development fronting the roadway. From U.S. 90 (near the airport) to the Alabama state line, U.S. 331 is a two-lane undivided roadway. The surrounding land uses along this segment are mostly rural.

Purpose and NeedThe purpose of the project is to study and identify improvements for U.S. 331 to allow efficient and safe travel for all corridor users. The proposed improvements are needed to accommodate existing and future traffic, as well as address safety concerns.

PROJECT DESCRIPTION

Contacts

The Florida Department of Transportation Complies with Various Non-Discrimination Laws and Regulations, Including Title VI of the Civil Rights Act of 1964. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express concerns about Title VI may do so by contacting:

Peggy Kelley, Project ManagerFlorida Department of Transportation, District ThreeEnvironmental Management Office1074 Highway 90 East Chipley, FL 32428

Toll-free (888) 638-0250, ext. [email protected]

Ian Satter, Public Information Director Florida Department of Transportation, District Three 1074 Highway 90 East Chipley, FL 32428-0607

Toll-free (888) 638-0250 ext. 1205 [email protected]

John Smith, Title VI CoordinatorFlorida Department of Transportation, District Three 1074 Highway 90Chipley, FL 32428

Toll-free at (888) 638-0250, ext. [email protected]

Jacqueline Paramore, State Title VI CoordinatorFlorida Department of Transportation Equal Opportunity Office605 Suwannee Street, MS 65Tallahassee, FL 32399-0450

(850) [email protected]

Tentative Schedule

Proposed ImprovementsProposed improvements under evaluation include widening, potential roadway realignment, safety, traffic operations, intersection improvements, access management, bicycle lanes, and sidewalks. Since the corridor is so long and has a variety of land uses and community needs, the proposed improvements will vary throughout the corridor. The U.S. 331 corridor has been divided into three segments, which are shown on the map on the inside page. Within each segment, improvements are being evaluated on the existing U.S. 331 alignment. Alternative alignments to widen the existing roadway could occur along either side of the existing roadway or a combination of both sides (best fit alignment) to avoid and minimize impacts. In addition to the existing corridor, realignment alternatives are also being considered in the South Segment and the North Segment. The alternatives for each segment are described below. The No-Build Alternative leaves U.S. 331 in the existing condition. The No-Build Alternative is compared to the build alternatives and will remain a viable alternative through the Public Hearing.

SOUTH SEGMENT (from Coy Burgess Loop Road to North of Walton Road)The South Segment includes improvements along the existing U.S. 331 corridor and two additional corridors, as described below.

Corridor 1 – Existing U.S. 331 and U.S. 90 CorridorsCorridor 1 is along the existing U.S. 331 corridor. The type of roadway differs along this segment to accommodate projected traffic and meet community needs. Alternatives under consideration along Corridor 1 include:

• C oy Burgess Loop Road to Business Park Road: six-lane urban roadway with bike lanes within the existing right-of-way• Business Park Road to U.S. 90: six-lane urban roadway with bike lanes and sidewalks, with widening to the west, to the east, or on

both sides (center alignment)• Along U.S. 90: four-lane urban roadway with bike lanes and sidewalks, with widening to the north or to the south• U.S. 90 to north of Walton Road: four-lane urban roadway with bike lanes and sidewalks, with widening to the west, to the east, or a

best fit alignment to avoid and minimize impacts

Corridor 2 – Realignment Southwest of U.S. 331Corridor 2 utilizes Bob Sikes Road, heads north, and goes through the far east end of the DeFuniak Springs Municipal Airport. A four-lane divided urban roadway with bike lanes and sidewalks is under consideration along Corridor 2. The existing U.S. 331 could be redesignated and will remain as part of the local roadway network.

Corridor 3 – Realignment Northeast of U.S. 331Corridor 3 is in the vicinity of Wabash Avenue and Walton Road. A four-lane divided urban roadway with bike lanes and sidewalks is under consideration along Corridor 3. The existing U.S. 331 could be redesignated and will remain as part of the local roadway network.

Project Activity Tentative DateAlternatives Refinement During this phase, the project team will review public feedback from the Corridor Analysis Public Meetings and other outreach activities, and further evaluate engineering considerations. The project team will refine and modify the proposed alternatives and develop the best solution in each segment.

Public Hearing This is a formal meeting where FDOT will present the recommended alternative. Attendees will have the opportunity to review the recommended alternative and provide comments prior to final documentation.

Location and Design Concept Acceptance This is the approval from the Federal Highway Administration on the preferred alternative to move into final design.

Summer 2016through Summer

2017

Fall 2017

Summer 2018

Project Development and Environment (PD&E) Study

Walton County, Florida

Project Development and Environment (PD&E) Study

Walton County, Florida

For more information visit the project website at: www.NWFLRoads.com (click on “Future Projects” and select U.S. 331 under Walton County)

U.S. 331 (State Roads 83 and 187) From Coy Burgess Loop Road to the Alabama State Line U.S. 331 (State Roads 83 and 187) From Coy Burgess Loop Road to the Alabama State Line

MIDDLE SEGMENT (from North of Walton Road to Wain Huckabee Road)The Middle Segment includes improvements along the existing U.S. 331 corridor. A four-lane divided roadway is under consideration. At the south end, the roadway includes curb and gutter for drainage and bike lanes and sidewalks. Near Lake Holley Circle, the roadway transitions to open drainage with no bike lanes or sidewalks but includes paved shoulders. The widening could occur to the west, to the east, or on a best fit alignment to avoid and minimize impacts.

NORTH SEGMENT (from Wain Huckabee Road to Alabama State Line)The North Segment includes improvements along the existing U.S. 331 corridor and a corridor to the east of U.S. 331, as described below.

Corridor 1 – Existing U.S. 331 CorridorCorridor 1 is along the existing U.S. 331 corridor. A four-lane divided urban roadway with bike lanes is under consideration along Corridor 1. The widening could occur to the west, to the east, or on a best fit alignment to avoid and minimize impacts.

Corridor 2 – Realignment East of U.S. 331Corridor 2 is east of U.S. 331. A four-lane rural roadway with an open drainage system is under consideration along Corridor 2. The existing U.S. 331 could be redesignated and will remain as part of the local roadway network.

Financial Project Identication Numbers: 433743-2 and 433743-3Financial Project Identication Numbers: 433743-2 and 433743-3

Florida Department of Transportation, District Three

Continued on back page

March 2016(Revised March 1, 2016)

ProcessPD&E STUDY DESIGN RIGHT-OF-WAY

ACQUISITIONCONSTRUCTION

2014 - 2018 2018 - 2019Unfunded

Unfunded

PaxtonPaxtonPaxton

10INTERSTATE

187

331

90

Bee BranchBee BranchBee BranchBig Swamp CreekBig Swamp CreekBig Swamp Creek

Middle CreekMiddle CreekMiddle Creek

Gum CreekGum CreekGum Creek

East BranchEast BranchPine Log CreekPine Log CreekEast BranchPine Log Creek

Turkey CreekTurkey CreekTurkey Creek

StaggersStaggersCreekCreekStaggersCreek

FloralaFloralaFlorala

83

83

ALABAMAALABAMAALABAMA

FLORIDAFLORIDAFLORIDA

N.T.S.N.T.S.N.T.S.

County Hwy 147 EDean Rd

Stewart Rd

Flowers Dr

Nan

ce R

d

Can

non

Dr

Clear Springs

Clear Springs

Clear Springs Rd

Kin

saul

Dr

Mathis Rd

Lake Rd

ChristianRd

Wallace Rd

County Hwy 0605

Davis Rd

Adam

sD

r

Punch Bowl R

d

Pen Williams Rd Leddon Rd

Sch

oel

d R

d

Mim

s R

d

B A

Kel

ly R

d

Burgess TrlBurgess TrlBurgess Trl Hem

phillRd

Woo

ds R

d

Farm

Rd

Icie

Pin

eR

d

Braxton RdCollinsworth Rd

Burnout BayBurnout BayBurnout Bay RdRdRdAlford Rd

Miller Dr

Mat

hew

s R

d

McdanielMcdanielRdRd

McdanielRd

Beck BridgeR

d

PhillipsRd

Bec

k R

d

Briar RdBriar RdBriar Rd

Glendale Farm Rd

Wilkerson Rd

Gus

And

rew

s R

d

Har

rison

Rd

Mck

ee R

d

Pric

e R

d

Brown Rd

Hall Rd

Thompson RdThompson RdThompson Rd Ralph Long Rd

Bry

an R

d

Tyso

n Ln

Bud

Mcb

room

Bell Rd

Ward Rd

Cro

wde

r R

d

Mcl

endo

n R

d

Bartlett Rd

Scott RdScott RdScott Rd

Laird Rd

Rachels Rd

Rai

lroad

Ave

Rai

lroad

Ave

Rai

lroad

Ave

T R

Mill

er R

d

War

d Tr

l

Yorkey Rd

Ford

Hill

Rd

Ingle RdRay RdRay RdRay Rd

DanielDanielWilkerson RdWilkerson Rd

DanielWilkerson Rd

Ted Adams Ln

Sunr

ise R

d

Cat Island Rd

SquirrelSquirrel

RdRdSquirrel

RdInstitution Rd

Coy Ellis Rd

Oak

Rid

ge R

dO

ak R

idge

Rd

Oak

Rid

ge R

d

Franck Dr

Franck Dr

Franck Dr

Walton RdWalton RdWalton Rd

Old

Lan

dll

Rd

Davis DrDavis DrDavis Dr

Perd

ue R

dPe

rdue

Rd

Perd

ue R

d

Bob Mccaskill DrBob Mccaskill DrBob Mccaskill Dr

Ruckel DrRuckel DrRuckel Dr

Jum

per

Lake

Jum

per

Lake

Rd

Rd

Jum

per

Lake

Rd

20th

St

20th

St

20th

St

Caswell RdCaswell RdCaswell Rd

Pio

neer

Pio

neer

Pio

neer

Martin RdMartin RdMartin Rd

Kin

gs L

ake

Rd

Mic

higa

n Ln

1087

Wyckoff Rd

Patc

h R

d

Woo

dyar

d R

dW

oody

ard

Rd

Woo

dyar

d R

d

Squ

irre

l Hav

enS

quir

rel H

aven

Rd

Rd

Squ

irre

l Hav

enR

d

Andy NowlingRd

Lakes BlvdLakes BlvdLakes BlvdOakwoodOakwoodOakwood

Lake Sylvia Rd

Chuc

k Jo

hnso

n Rd

Chuc

k Jo

hnso

n Rd

Chuc

k Jo

hnso

n Rd

Ate

s

Ranch

Rd

Boy

Sco

ut R

d

280

Oak

Rid

geO

ak R

idge

Cem

eter

y R

dC

emet

ery

Rd

Oak

Rid

geC

emet

ery

Rd

Will

ie B

Par

ker

Rd

Will

ie B

Par

ker

Rd

Will

ie B

Par

ker

Rd

Now

ling

Now

ling

Rd

Rd

Now

ling

Rd

Ran

ge R

d 21

0

Ran

ge R

d

Ran

ge

Range Rd 211

Eglin

Ran

ge R

d 21

2

Eglin

Ran

ge R

d38

1 Harr

ell R

d

Myers

Rd

Corbin Gainey RdCorbin Gainey RdCorbin Gainey Rd

Chesser Rd

Hewett Rd

Mou

ntai

nVa

lley

Rd

Mitchem

Rd

Mitchem

Rd

Mitchem

Rd

Ber

ry P

atch

Rd

Ber

ry P

atch

Rd

Ber

ry P

atch

Rd

Range Rd 382

Range R

d 212

Rd

212

Eglin

Ran

ge R

d 21

4

Ste

ele

Chu

rch

Rd

Ste

ele

Chu

rch

Rd

Ste

ele

Chu

rch

Rd

PeckPeck

Caw

thon Rd

Caw

thon Rd

Peck

Caw

thon Rd

Hub

bard

St

Hub

bard

St

Hub

bard

St

Hill StCorbettCorbettCorbett

DrDrDr

Bruce AveBruce AveBruce Ave

S 1

8th

St

S 1

8th

St

S 1

8th

St

Baldwin AveBaldwin AveBaldwin Ave

S 1

1th

St

S 1

1th

St

S 1

1th

St

Circle

Circle

Circle

Dr

Dr

Dr

Quebec AveQuebec AveQuebec Ave

N 4

th S

tN

4th

St

N 4

th S

t

N N

orw

ood

Rd

N N

orw

ood

Rd

N N

orw

ood

Rd

N 1

st S

tN

1st

St

N 1

st S

t

Bea

r B

ay F

lats

Rd

Jackson RdJackson RdJackson Rd

Life

Hill

cres

t Way

Hill

cres

t Way

Hill

cres

t Way

401

Williams Rd

Adams Rd Howard Jones Rd

Raley Rd

Dr

Nel

son

R

d

Sta

nley

Rd

Paul RdPaul RdPaul Rd

Gills RdGills RdGills Rd

Island Dr

Island Dr

Island Dr

ParadiseParadiseParadise

Bass

Bass

DrDrBass

DrHol

ley K

ing

Holley

Kin

gRdRd

Holley

Kin

gRd

Bell Dr

Bell Dr

Bell Dr

Thad Bell Rd

Alma Rd

Rd

Old D

airyO

ld Dairy

Rd

Rd

Old D

airy

Rd

Sex

ton

Rd

Fox

Hill

Rd

Dav

idso

n R

d

Dau

ghtr

y R

d

Plan

ters

Dr S

Plan

ters

Dr N

Cox

Rd Turkey Creek Rd

Campground Rd

Pittman RdN Suttles Dr

S Suttles Dr

Turner StTurner StTurner St

Harbuck Rd

Richardson RdRichardson RdRichardson Rd

Plantation LnPlantation LnPlantation Ln

Adams Ranch RdAdams Ranch RdAdams Ranch Rd

Wat

son

Rd

MW

atso

n R

d M

Wat

son

Rd

M

Cov

entr

y R

dC

oven

try

Rd

Cov

entr

y R

d

Mill Creek DrMill Creek DrMill Creek Dr

Spring Hill RdSpring Hill RdSpring Hill Rd

Ranger RdRanger RdRanger Rd

Trout DrTrout DrTrout Dr

Girl Girl Girl S

cout Rd

Scout R

dS

cout Rd

Warden R

dW

arden Rd

Warden R

d

Valle

y V

iew

Dr

Valle

y V

iew

Dr

Valle

y V

iew

Dr

Lanc

elot

La

ncel

ot

Rd

Rd

Lanc

elot

R

d

Aero D

r

Aero D

r

Aero D

r

Cou

ntry

Clu

b D

r

Cou

ntry

Clu

b D

r

Cou

ntry

Clu

b D

r Shoe

mak

er D

r

Shoe

mak

er D

r

Shoe

mak

er D

r

E Sloss AveE Sloss AveE Sloss Ave

Bay StBay StBay St

Dorsey AveDorsey AveDorsey Ave

N D

avis

Ln

N D

avis

Ln

N D

avis

Ln

Roberts DrRoberts DrRoberts Dr

Engl

es R

dLiddie Ln

Sand

y Pi

nes

Rd

10INTERSTATE

331

S 26

th S

t

S 26

th S

t

S 26

th S

t

S 20

th S

S 20

th S

S 20

th S

DrDrDr

Lake

Lake

Holley

Cir

Holley

Cir

Lake

Holley

Cir

Har

rison

Dr

54

280A

CORRIDOR ALTERNATIVES LOCATION MAP

LibertyLibertyLiberty

Wai

nW

ain

Huc

kabe

e R

dH

ucka

bee

Rd

Wai

nH

ucka

bee

Rd

Florida Department of Transportation, District Three

Aplin Rd

Ram

pS

andyR

d

Begin Study

End Study

DeFuniak SpringsDeFuniak SpringsDeFuniak Springs

285

1 3

2

1

12

1

Project Development and Environment (PD&E) Study

U.S. 331 (State Roads 83 and 187) From Coy Burgess Loop Road to the Alabama State Line

Walton County, FloridaFinancial Project Identication Numbers: 433743-2 and 433743-3

Corridor 1 (Existing U.S. 331 and U.S. 90 corridors) Alternatives include widening to west/south, widening to the east/north, a center alignment and a best fit alignment

Corridor 2 (Realignment southwest of U.S. 331)

Corridor 3 (Realignment northeast of U.S. 331)

SOUTH SEGMENT LEGEND

Corridor 1 (Existing U.S. 331 corridor)Alternatives include widening to the west, wideningto the east, and a best fit alignment

Corridor 2 (Realignment east of U.S. 331)

NORTH SEGMENT LEGEND

Corridor 1 (Existing U.S. 331 corridor) Alternatives include widening to the west, wideningto the east, and a best fit alignment

MIDDLE SEGMENT LEGEND