"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 1
Update on the ULCOS program
Jean-Pierre Birat, ArcelorMittal, European Coordinator
of the ULCOS program
Ultra Low CO2 Steelmaking
www.ulcos.org
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 2
Outline
• timeline and perspective
• the ULCOS process solutions
• ULCOS-BF
• HIsarna
• ULCORED
• ULCOwin & ULCOlysis
• conclusions
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 3
Outline
• timeline and perspective
• the ULCOS process solutions
• ULCOS-BF
• HIsarna
• ULCORED
• ULCOwin & ULCOlysis
• conclusions
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 4
Timeline
Rio
Kyoto
ETS in EU
2013
2020
2050
1st papers
from Steel
IISI
working groups
ULCOS II
ULCOS II pilotsULCOS II deployment
ULCOS
worldsteel CO2 BP
ULCOS II demonstrators
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 5
Outline
• timeline and perspective
• the ULCOS process solutions
• ULCOS-BF
• HIsarna
• ULCORED
• ULCOwin & ULCOlysis
• conclusions
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 6
ULCOS process solutions…
Coal & sustainable biomass Natural gas Electricity
Revamped BF Greenfield Revamped DR Greenfield
ULCOS-BF HIsarna ULCORED ULCOWIN
ULCOLYSIS
Pilot tests (1.5 t/h)
Demonstration
under way
Pilot plant (8 t/h)
start-up 2010
Pilot plant (1 t/h)
to be erected in
2011 ?
Laboratory
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 7
ULCOS-BF with >> 50% reduction
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
0,90
1,00
1,10
ULCOS-
BF
sinter
plant
reheating
furnace
steel
plant
hot
stoves
lime kiln coke
ovens
compared to ULCOS-BF Mill
emissions
compared to emissions of the
benchmark Mill
Rate of CO2 capture (each bar means
adding one more plant to the Steel Mill)Cumulated
capture rate100%
capture
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 8
Virgin & recycling routes…
0
500
1000
1500
2000
2500
3000
2010 2050 trend 2050 LC
Steel production (Mt/yr)
CO2 generation (Mt/yr)
today
2050
BAU trendMt/yr 2050
low-carbon
economy
socio-economic projections
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 9
Energy (GJ/tHRC)
0,0
5,0
10,0
15,0
20,0
25,0
BBF
BBF+C
CS(P
P)
TGR-B
F V4
HIS
ARNA
HIS
ARNA+C
CS
HIS
ARNA+E
AF
HIS
ARNA+C
CS+E
AF
MID
REX
MID
REX+C
CS
ULC
ORED
ULC
OW
IN
ULC
OLY
SIS
GJ/t
HR
C
Coals, oil and other C-rich sources Natural gas and biomass gas Electricity and energy vectors (steam, H2)
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 10
CO2 reduction (tCO2/tHRC)
-2,0
-1,5
-1,0
-0,5
0,0
0,5
1,0
1,5
2,0
BBF
BBF+C
CS(P
P)
TGR-B
F V4
HIS
ARNA
HIS
ARNA+C
CS
HIS
ARNA+E
AF
HIS
ARNA+C
CS+E
AF
MID
REX
MID
REX+C
CS
ULC
ORED
ULC
OW
IN
ULC
OLY
SIS
t C
O2/t
HR
C
Scope 1 Scope 2 CO2 captured
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 11
Operating costs (index)
0
20
40
60
80
100
120
140
BB
F
BB
F+
CC
S(P
P)
TG
RB
F V
4
HIS
AR
NA
HIS
AR
NA
+E
AF
HIS
AR
NA
+C
CS
HIS
AR
NA
+C
CS
+E
AF
ULC
OR
ED
MID
RE
X
MID
RE
X +
CC
S
ULC
OW
IN
ULC
OLY
SIS
CO2 release
Raw material and energy
Fix
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 12
Cost of avoided CO2
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
BB
F
BB
F+
CC
S(P
P)
TG
R-B
F V
4
HIS
AR
NA
HIS
AR
NA
+C
CS
HIS
AR
NA
+EA
F
HIS
+C
CS+
EA
F
MID
REX
MID
REX+
CC
S
ULC
OR
ED
ULC
OW
IN
ULC
OLYSIS
2010
index
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 13
Productivity
• all ULCOS solutions expected to operate
at higher productivity than the
conventional process they substitute for,
e.g. 30% for ULCOS-BF
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 14
ULCOS II consortium
MoU stage
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 15
Outline
• timeline and perspective
• the ULCOS process solutions
• ULCOS-BF
• HIsarna
• ULCORED
• ULCOwin & ULCOlysis
• conclusions
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 16
ULCOS-BF
CO2
COO2
Underground
storage of CO2
0.8 t/tsteel
-100 kg coke/tsteel
CO2 emissions of the steel plant: - 60%
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 17
ULCOS-BF project
CO2 storage
ULCOS I3 projets RFCS + 1 FP
Eisenhüttenstadt-EHS
Florange
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 18
CO2 storage
Storage in a deep saline aquifer, with pipe
transport of dense CO2 from capture site.
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 19
ULCOS-BF: key figuresTimeline:
• Eisenhüttenstadt project approved December 2010
• NER-300 proposal filed in Paris on 9 February 2011, to cover the Florange demonstrator
• Consortium Agreement under final stage of negotiation among members
• start up 2013 in Germany and 2014 (BF) - 2015 (Storage) in France. 10 years of operation in France planned for 2016-2025
• permitting process launched for storage; FEED studies for the BF
Important milestones
• exploration permit approved
• start of site geophysical
exploration
• FEED studies for BF & pipeline
• filing of NER-300 in Brussels
• answer from the EU, etc.
Targets (demonstrator):
• 700,000 t/yr stored for 10 years
• 94% capture rate
Budgets:
• still a regret solution…
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 20
Outline
• timeline and perspective
• the ULCOS process solutions
• ULCOS-BF
• HIsarna (pilot: 2011-2014)
• ULCORED
• ULCOwin & ULCOlysis
• conclusions
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 21
iron
Iron ore
Coal
Oxygen
Oxygen
CCF cyclone
(CORUS)
Smelter
(HIsmelt)
HIsarnaCCS
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 22
HIsarna
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 23
Outline
• timeline and perspective
• the ULCOS process solutions
• ULCOS-BF
• HIsarna
• ULCORED
• ULCOwin & ULCOlysis
• conclusions
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 24
ULCORED
• EDRP* planned by LKAB in Luleå
(1 t/hr)
• ULCORED features implemented
within an RFCS project to be
proposed in 2012 at the earliest
* Experimental Direct Reduction Pilot
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 25
Outline
• timeline and perspective
• the ULCOS process solutions
• ULCOS-BF
• HIsarna
• ULCORED
• ULCOwin & ULCOlysis
• conclusions
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 26
ULCOwin
electrowinning cell • 4 kg samples
• pure Fe + O2 evolution
• 110 °C (=room temperature
electroreduction)
• water alkaline electrolyte
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 27
ULCOlysis
• 1 g samples
• pure Fe + O2 evolution
• 1550 °C = pyroelectrolysis
• slag electrolyte
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 28
Outline
• timeline and perspective
• the ULCOS process solutions
• ULCOS-BF
• HIsarna
• ULCORED
• ULCOwin & ULCOlysis
• conclusions
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 29
Conclusion: innovation & risks
• if the demonstrators are successful…
• …and if the economic conditions for implementing the ULCOS routes are right…
• … then deployment should follow up for most of the Steel Mills in Europe, and, eventually in the world, for the Steel Industry to meet its post-Kyoto targets
• however, ULCOS was a research initiative, has turned into a demonstration initiative but it IS NOT a plan for reducing the emissions of the Steel sector!
"How will employment and labor markets develop in the context
of a transition towards a low-carbon economy?", Brussels, 1 March 2011 30
Thank you!