NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting

Update on Steel, Coils, Fixtures, and Prototyping

  • Upload
    nan

  • View
    26

  • Download
    0

Embed Size (px)

DESCRIPTION

Update on Steel, Coils, Fixtures, and Prototyping. J.K. Nelson 12/98 MINOS Meeting. Outline. Steel Purchase and Fabrication Steel bid package Finalizing the machining package Coil and Magnetics Initial test program First magnetics data Fringe Fields: Data vs FEA Fixtures 4PP Plans. - PowerPoint PPT Presentation

Citation preview

Page 1: Update on Steel, Coils, Fixtures, and Prototyping

NUMI

Update onSteel, Coils, Fixtures, and Prototyping

J.K. Nelson

12/98 MINOS Meeting

Page 2: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

2

NUMI

Outline

• Steel Purchase and Fabrication• Steel bid package

• Finalizing the machining package

• Coil and Magnetics• Initial test program

» First magnetics data

• Fringe Fields: Data vs FEA

• Fixtures

• 4PP Plans

Page 3: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

3

NUMI

Steel Purchase

• Steel Advanced Procurement Plan and Specifications• Approved by MINOS, consultants, PPD, and Procurement on

11/11/98

• Steel bid package went public 12/1• Sent to 4 prequalified vendors

– Ryerson (IL, MN)– USX (IN)– Bethlehem (IN)– Olympic (MN, IL)

• Open for bid for one month • Purchase of 4 planes and options for up to 3 SM and Near

• Opening of bids expected the first week of 1/99• Selection and Best-and-Final to follow

Page 4: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

4

NUMI

Steel Purchase (Cont.)

• Machining bid package expected to be released in a week.• Prequalified vendors

– Ryerson (MN, IL)

– Olympic (MN, IL)

– SVF (IL)

– Napco (IL)

• Same steps as in the steel procurement

• Final mill and fabricator will be selected based on lowest total cost (including transportation costs).

Page 5: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

5

NUMI

Magnetics Test Program

• 150 turn coil wrapped around the 1PP and powered on 10/29

• Then• A sense coil read out by an integrator monitored the flux

• Now • 4 additional mini-sense coils• Hall probe measurements of fields in air

Sensor WHT BRN ORG VIO BLK

# of turns 1 5 5 5 5

Area (m2) 0.0737 0.0184 0.0184 0.00460.0046

Page 6: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

6

NUMI

(Cont.)

• Near-term goals

– Obtain an absolute calibration of average field in a coil.

– Estimate the effective gap span in the spates

• Future: Try to measure the inductance using an oscillator and mini-sense coil

Page 7: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

7

NUMI

First Magnetics Results

VIO COIL

-1.500

-1.000

-0.500

0.000

0.500

1.000

1.500

-200.00 -150.00 -100.00 -50.00 0.00 50.00 100.00 150.00 200.00

Page 8: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

8

NUMI

Fields in In Gaps, in Holes, and Beyond the Steel

• Used Hall probe to look at fields in the largest crack (~1/8”).

• The field was about 800Gauss

• Used Hall probe to look at fields in a 3/8” hole drilled through both plates.

• The field was about 60Gauss

• Used Hall Probe to look at fringe fields.• Values ranged from

Page 9: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

9

NUMI

Measured Fields

Some of the flux seems to be returning via the steel support beams.

Page 10: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

10

NUMI

Fringe Field Calculation in the Plane of the Steel

Page 11: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

11

NUMI

Fringe Field Calculation: Steel Layout

Page 12: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

12

NUMI

Fringe Field Calculation: 4cm in front of the steel plane

Page 13: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

13

NUMI

Thermal Data

• After 60min at 100A the core temperature (without cooling) was 170C in the core of the coil

• Our thermal models will be tested for accuracy in this extreme case

Page 14: Update on Steel, Coils, Fixtures, and Prototyping

J. Nelson, Steel UpdateLondon MINOS Meeting 12/98

14

NUMI

4PPTF

• Planned meeting for 1/15-16 at Fermilab• The 15th will be devoted to issues related to steel, magnetics, steel

installation and handling• The 16th will be devoted to integration issues including

» Mounting modules» Installation » Clear cable routing» Electronics support and locations» Readout requirements» 4PP DAQ

• Planned meeting for 2/7 in LA• MINOS Steel and Coil meetings at Fermilab

» (almost weekly) Thursdays at 1:30 in 11SW