UPDATE OF CAA CHANGESUPDATE OF CAA CHANGES& PROPOSALS& PROPOSALS
WHICH COULD AFFECTWHICH COULD AFFECTDESIGN DELEGATIONSDESIGN DELEGATIONS
Peter GillPeter GillAirworthiness EngineerAirworthiness Engineer
Aircraft Certification UnitAircraft Certification Unit
ContentsContents
Update to changes proposed at last Delegation Seminar 2007
Delegation Issue Presentation
Review of new STC process
Update to 2007 Change ProposalsUpdate to 2007 Change Proposals
Major Design Changes – STC’s As announced at 2007 Seminar Limitation to prohibit major approvals “that
changed data on the TCDS” Comments requested:
No comments at all – assumed universal agreement
Update to 2007 Change ProposalsUpdate to 2007 Change Proposals
Major Design Changes – STC’s Consistency with other authorities and
proposed Rule change Limitation now proposed as “design
change which is classified as major” Comments requested:
Need mechanism to be able to approve “one-off” major changes
Definition of “major” needs revision
Update to 2007 Change ProposalsUpdate to 2007 Change Proposals
Major Design Changes – STC’s Limitation now proposed as “prohibit approval
of design change which is classified as major without prior agreement of the CAA”.
Agreement will be given promptly and at no cost where:CAA agrees it is appropriate for a “one-off”
approvalNot contrary to CAA policy
Update to 2007 Change ProposalsUpdate to 2007 Change Proposals
Major Design Changes – STC’s Areas being looked at before policy can be
introduced:Level at which CAA agreement to approve “one-off”
major change is given (needs to be ACU level) Definition of Major
Have looked at origin of current Rule Part 1 definition Want to introduce common definition with FAA/EASA Affects other areas of CAA Embodied in Rule Part 1 – Not easily changed Looking at new definition of Major Design Change
Design Delegation Issue Design Delegation Issue PresentationPresentation
Presentation available, covering: Purpose of a Design Delegation Part 21 – Approval of technical data Legal basis for Design Delegations Part 146 – Design organisations Design Delegation issue process
Review of New STC ProcessReview of New STC Process
AC 21-8 introduced February 2009 Certification Project Plans (PSCP) Compliance testing Conformity inspections Flight Testing
Note: STC applications already existing in February 2009 continue under old process
Review of New STC ProcessReview of New STC Process
Certification Project Plans (PSCP) Need to be taken seriously and compiled
carefully Get CAA agreement on Plan Should fully detail all areas delegated to
Design Organisation or other third parties Should fully detail any areas where the
proposed project differs from AC 21-8
Review of New STC ProcessReview of New STC Process
Certification Project Plans (PSCP) Contd Specify Certification Basis
Until a Changed Product rule is introduced to Part 21, AC 21-8 recommends using the latest certification basis
If you are not proposing to use the latest Rule you should state why in the PSCP
You can go to earlier amendment states for individual paragraphs where it is impractical to meet the latest requirements.
Review of New STC ProcessReview of New STC Process
Compliance Testing Detailed Test Plans
Test LoadsMethod of Application of LoadsMeasurement of Results (including Instrument
Calibration)Verification of test set-up (Part 146 SOC)Witnessing of test (authorised by PSCP)
Review of New STC ProcessReview of New STC Process
Compliance Testing Conformity inspections
Test article definitionManufacturing documentation (Form One or
equivalent)Conformity Certification (8130-9 signed by
LAME for minor and IA for major design changes, or as specified in PSCP)
Review of New STC ProcessReview of New STC Process
Flight Testing Specialised type of Compliance Testing Conformity inspection of Test article Special-Experimental airworthiness
certificate for aircraft Test Pilot approval of Pilot (AC 19-1) Detailed Flight Test Plan
Any Questions?