11000 19
COUNTY:Andrews
STATE:TX
DATE:
9/6/15
DAY:
01
DEPTH (MD):
1250
DEPTH
(TVD): 1250
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,426
TOTAL GPM:
590
DAILY COST:
$44,062
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
13 3/8 54.5 j-55 stc -
-
-
-
MW 8.8 GEL 50 0
VIS 29 SALTGEL 23 23
PV LIME 0
YP CAUSTIC 0
GELS SODA ASH 0
pH BARITE 1 1
WL PAPER 3 0
HP/HT Soap Sticks 27 0
GC MF-55 2 0
CL 0
Ca 0
Sand 0
Solids 0
Oil % 0
0
0
0
ICS OCS DC LOC B/S G ODR RP Day Mud $0 0
Cum Mud $0 24 24
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 6:30 0.50 60 60
6:30 4:00 9.50 60 567 53
4:00 4:30 0.50 567 567
4:30 6:00 1.50 567 743 117
6:00 8:00 2.00 743 838 48
8:00 5:00 9.00 838 1187 39
5:00 6:00 1.00 1187 1250 63
24.00 64
LENGTH DEPTH
1.5 215
1 486
27.98 693
1 6.8 788
1 32.9 912
183.04 1038
3 1133
Units 444.95 1250
701.17
548.83
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36
PROGRESS:
AFE Dry Hole $: (COB)
CUM DRLG COST:
Zarvona Energy DAILY DRILLING REPORT
OPERATIONS:
CONTRACTOR:
Drilling Ahead
SENDERO RIG 15
1190
$1,344,426
WELL NAME:
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
LAST BOP TEST
University 30 Cobra 3012
80/80
Spud Date 9/5/15 6:00 AM
105
85
91
$44,062
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT
SLACK OFF WEIGHT
ROTATING WEIGHT
PLAN
1700
PSI:
1200
SPM:
FOOTAGE
MUD MIXED TIME DISTRIBUTION
BIT NO
SIZE
MFG
TYPE
BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES
TORQUE ON BOTTOM
TORQUE OFF BOTTOM
BIT #
1
17 1/2
ulterra
616
21558
4x18-4x16
0
60
HOURS
FT/HR
hP/dia inch
IMP FORCE
DC Anlr Vel
DP Anlr Vel
SER. NO
NOZZLES
TFA
OUT
IN
RU/RD
DRLG
REAM/WASH
SURVEY
TRIP
RIG SERVICE
CIRC & COND
RUN CSG/CMT
WOC
KICK
LOST CIRC.
MISC C/O, WELD HEAD
TOTAL (Daily/cum)
DULL CONDITION:
TIME DEPTH
NU/TST BOP
RIG REPAIR
LOG
FISHING/STUCK
CORE
DST
1190
23
52
DAILY AVG
ACTIVITY RPM
* First 4 hours drilling by hand while repairing auto drill
** Repairs to both pumps for liner and cap gaskets
*** Reduction in rop due to deviation
Ream each kelly
Drill from 838 to 1187, 12-14 wob, 80/85 rpms, 80/80 spm, 1180 pp
Drill from 1187 to 1250 15-18 wob, 80 rpms, 80/80 spm
Finish pre spud insp., air out pumps
Spud in at 6:30, drill from 60 to 567
Safety meeting, service rig
Drill from 567 to 743. 160 spm, 596 gpm, 80 rpm, 10/30 wob 1000 pp
Drill from 743 to 838, wob 20-25, 80 rpms, 80/80 spm
DESCRIPTION
BIT
X/O SUB
MOTOR
SHOWS/FLARE REPORT BHA SURVEYS
DEVIATION AZIMUTH
0.40 235.30
1.00 12.70
WASTE DISPOSAL SITE: 1.60 198.00
REAMER
SURVEY TOOL
6X8" DC,S
X/O SUB
15X6" DC,S
2.10 176.10
2.40 175.40
2.50 174.70
2.00 191.60
1.70 78.20
GAS
Background Gas:
Connection gas:
N/A
DAILY YDS SOLID -
WELL CUM SOLID -
PSI
BBLS LIQUID
CUM LIQUID
Trip Gas:
Max Gas:
6"X8"
DC SIZE
DP SIZE
4.5 XH
1
1
TOTAL DRILLED GAS
Consumed
BHA LENGTH
DRILL PIPE
WEIGHT OF BHA
WEIGHT OF BHA (below jars)
STROKE
9
9
MAKE
MZ-9
MZ-9
LINER
6.5
6.5
SPM
SLOW PUMP RATES
ACCIDENTS FUEL (gals)
NONE
Start
Received
End
11000 19
COUNTY:Andrews
STATE:TX
DATE:
9/7/15
Day
02
DEPTH (MD):
1663
DEPTH
(TVD): 1663
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
510
DAILY COST:
$102,000
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
0 0 13.375 54.5 j-55 stc - $0.00
0 0 0 0 0 0 - $0.00
0 0 0 0 0 0 - $0.00
0 0 0 0 0 0 - $0.00
MW 8.9 GEL 30
VIS 29 SALTGEL 22
PV LIME 14
YP CAUSTIC 1.5
GELS SODA ASH
pH 9.5 BARITE 0.5
WL paper 3
HP/HT mf-55 4
GC soap stix 10
CL
Ca
Sand
Solids
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $1,932
Cum Mud $3,297 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 12:00 6.00 1250 1409 90 15 27
12:00 12:30 0.50 1409 1409
12:30 3:00 2.50 1409 1472 80 10 25
3:00 3:30 0.50 1472 1472
3:30 4:30 1.00 1472 1504 80 8 32
4:30 5:00 0.50 1504 1504
5:00 6:00 1.00 1504 1528 80 20 24
6:00 9:30 3.50 1528 1599 80 25 20
9:30 10:00 0.50 1599 1599
10:00 6:00 8.00 1599 1663 80 15 8
24.00 81.666667 16 22.66429
LENGTH DEPTH
1.5 215
1 486
27.98 693
1 6.8 788
1 32.9 912
183.04 1038
3 1133
Units 444.95 1250
N/A 0 1327
N/A 0 1454
N/A 0 1530
N/A 0 0
0 0
0 0
0 0
701.17
961.83
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
End N/A WEIGHT OF BHA
Consumed #VALUE! WEIGHT OF BHA (below jars)
0 0.00
ACCIDENTS FUEL (gals) 0 0.00
Max Gas: 4.5 xh 0 0.00
0 0.00
Connection gas: 0 2.00 0.00
Trip Gas: DP SIZE 0 2.20 0.00
GAS DC SIZE 15X6" DC,S 2.50 174.70
Background Gas: 6"x8" 0 2.70 78.53
6X8" DC,S 2.10 176.10
TOTAL DRILLED GAS X/O SUB 2.40 175.40
WELL CUM SOLID - CUM LIQUID 1 SURVEY TOOL 1.70 78.20
DAILY YDS SOLID - BBLS LIQUID 1 REAMER 2.00 191.60
X/O SUB 1.00 12.70
WASTE DISPOSAL SITE: MOTOR 1.60 198.00
DESCRIPTION DEVIATION AZIMUTH
BIT 0.40 235.30
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
REDUCED ROP DUE TO VERTICAL CONTROL
WINC TOOL NOT WORKING PROPERLY, RUN DEVIATION SURVEYS ON RIG WIRELINE TOOL
INC. ONLY, NO AZI.
Drill F/ 1504-1528, wob 20, rpm,s 80, spm 160, gpm 586, pp 1355, diff. 230
Drill F/ 1528-1599, wob 20/25, rpm,s 80
Wireline survey at 1530
Drill F/ 1599-1663 wob 15, rpm,s 80, spm 140, gpm 510, diff 240
Drill F/ 1250-1409, wob 10/15, rpm,s 90, spm 160, diff. 220, pp 1320
Wire line survey
Drill F/ 1409-1472, wob 10, rpm,s 80 spm 160, pp 1220, diff. 150
Service Rig
Drill F/ 1472-1504, wob 8, rpm,s 80, spm 160, pp1160, diff. 150
Wire line survey
BIT # DULL CONDITION: LOST CIRC.
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DC Anlr Vel DST
DP Anlr Vel KICK
hP/dia inch FISHING/STUCK
IMP FORCE CORE
HOURS 45 0 RIG REPAIR
FT/HR 36 #DIV/0! LOG
IN 60 0 WOC
FOOTAGE 1603 0 NU/TST BOP
TFA 0 0 CIRC & COND
OUT 0 RUN CSG/CMT
SER. NO 21558 0 TRIP
NOZZLES 4x18-4x16 0 RIG SERVICE
MFG ulterra 0 REAM/WASH
TYPE 616 0 SURVEY
BIT NO 1 0 RU/RD
SIZE 17.5 0 DRLG
CASING STRINGSPICK UP WEIGHT 105 PLAN
BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
TORQUE ON BOTTOM 0
TORQUE OFF BOTTOM 0
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
413
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University 30 Cobra #3012OPERATIONS:
Drilling
PROGRESS:
PSI:
1050
SPM:
140
CUM DRLG COST:
SLACK OFF WEIGHT 95 1700
ROTATING WEIGHT 100 0
$152,000
DRILLING MECHANICS
11000 3
COUNTY:Andrews
STATE:TX
DATE:
9/8/15
Day
03
DEPTH (MD):1684
DEPTH
(TVD): 1684
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
510
DAILY COST:
$11,279
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
0 0 13.375 54.5 j-55 stc - $0.00
0 0 0 0 0 0 - $0.00
0 0 0 0 0 0 - $0.00
0 0 0 0 0 0 - $0.00
MW 8.8 GEL 20
VIS 29 SALTGEL 2.5
PV LIME 1
YP CAUSTIC 0.5
GELS SODA ASH 6
pH 9.5 BARITE
WL paper 2 2
HP/HT 13
GC
CL
Ca
Sand
Solids
Oil %
1
ICS OCS DC LOC B/S G ODR RP Day Mud $674
8 8 8 n x i bt td Cum Mud $3,971 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 6:30 0.50 1663 1670 80 20 14
6:30 7:00 0.50 1670 1670
7:00 9:00 2.00 1670 1684 80 28 7
9:00 11:00 2.00 1684 1684
11:00 4:00 5.00 1684 1684
4:00 5:00 1.00 1684 1684
5:00 6:00 1.00 1684 1684
6:00 6:00 12.00 1684 1684
24.00 80 24 10.5
LENGTH DEPTH
1.5 215
1 486
27.98 693
6.8 788
0 32.9 912
183.04 1038
3 1133
Units 444.95 1250
0 1327
0 1454
0 1530
0 1619
0 0
0 0
0 0
701.17
982.83
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
NONE
Start N/A BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
End WEIGHT OF BHA
Consumed #VALUE! WEIGHT OF BHA (below jars)
DP SIZE 0 2.20 0.00
0 0.00
ACCIDENTS FUEL (gals) 0 0.00
Max Gas: 4.5 xh 0 2.30 0.00
0 0.00
6X8" DC,S 2.10 176.10
TOTAL DRILLED GAS X/O SUB 2.40 175.40
GAS DC SIZE 15X6" DC,S 2.50 174.70
Background Gas: 6"x8" 0 2.70 78.53
Connection gas: 0 2.00 0.00
Trip Gas:
WELL CUM SOLID - CUM LIQUID 0 SURVEY TOOL 1.70 78.20
DAILY YDS SOLID - BBLS LIQUID REAMER 2.00 191.60
WASTE DISPOSAL SITE: MOTOR 1.60 198.00
BIT 0.40 235.30
X/O SUB 1.00 12.70
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
DESCRIPTION DEVIATION AZIMUTH
Float shoe, Float collar and 2 joint shoe track
19 centralizers
1 centr. 10ft. Above shoe, 1st collar, then every other collar for a total of 19 centralizers
1708 overall. Set at 1684
Safety meeting with rig personel and casing crews, rig up pickup machine and power tongs
Run 13 3/8 surface casing
* Circulating on bottom at 6:00 am
*** Ran 38 joints 13 3/8" 54.5# J-55 casing
Drill F/ 1663-1670, wob 20, rpm,s 80, diff. 220, spm 140
Wireline survey at 1619, 2.3 deg.
Drill F/ 1670-1684 TD, wob 28, rpm,s 80, diff. 150
Pump high vis sweeps, circulate 2 bottoms up, hole unloaded a lot of cuttings and cleaned up
Trip out of hole for casing, pulling tight, pumped out 15 joints
Lay down 8" Motor, survey tool, 17 1/2" reamer and bit.
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 34 #DIV/0! LOG
hP/dia inch FISHING/STUCK
FOOTAGE 1624 0 NU/TST BOP
HOURS 47.5 0 RIG REPAIR
OUT 1684 0 RUN CSG/CMT
IN 60 0 WOC
NOZZLES 4x18-4x16 0 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE 616 0 SURVEY
SER. NO 21558 0 TRIP
SIZE 17.5 0 DRLG
MFG ulterra 0 REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 1 0 RU/RD
TORQUE OFF BOTTOM 0
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 100 0
TORQUE ON BOTTOM 0
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 105 PLAN
SLACK OFF WEIGHT 95 1700
PSI:
1300
SPM:
140
CUM DRLG COST:
$163,279
OPERATIONS:
Circ. Casing on bottomPROGRESS:
21
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University 30 Cobra #3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 4
9/9/15
COUNTY:Andrews
STATE:TX
DATE:
9/9/15
Day
04
DEPTH (MD):
1684
DEPTH
(TVD): 1684
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
N/A
DAILY COST:
$32,005
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 j-55 stc - $0.00
0 0 0 0 0 0 - $0.00
0 0 0 0 0 0 - $0.00
0 0 0 0 0 0 - $0.00
MW GEL
VIS SALTGEL
PV LIME
YP CAUSTIC
GELS SODA ASH
pH BARITE
WL
HP/HT 8
GC 7
CL 9
Ca
Sand
Solids
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $0
Cum Mud $2,850 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 8:00 2.00 1684 1684
8:00 9:00 1.00
9:00 11:00 2.00
11:00 3:00 4.00
3:00 5:30 2.50
5:30 6:30 1.00
6:30 7:30 1.00
7:30 8:00 0.50
8:00 8:30 0.50
8:30 12:00 3.50
12:00 4:00 4.00
4:00 6:00 2.00
24.00
LENGTH DEPTH
1619
1
1
Units
0
0
0
0
0 0
0 0
0 0
0
1684
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
PSI:
N/A
SPM:
N/A
CUM DRLG COST:
$195,284
OPERATIONS:
Nipple up
PROGRESS:
0
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
ROTATING WEIGHT 0
TORQUE ON BOTTOM 0
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT PLAN
SLACK OFF WEIGHT 1700
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 1 0 RU/RD
TORQUE OFF BOTTOM 0
BIT RECORD PRESENT BIT PREVIOUS BIT
TYPE 616 0 SURVEY
SER. NO 21558 0 TRIP
SIZE 17.5 0 DRLG
MFG ulterra 0 REAM/WASH
OUT 0 RUN CSG/CMT
IN 0 WOC
NOZZLES 4x18-4x16 0 RIG SERVICE
TFA 0 0 CIRC & COND
FT/HR LOG
hP/dia inch FISHING/STUCK
FOOTAGE 0 0 NU/TST BOP
HOURS 0 RIG REPAIR
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
Circulate casing on bottom, rig down casing crew and pickup machine
Safety meeting with cementers and rig personel, rig up cementers
Cement 13 3/8 surface casing
Woc and wireline truck for temp survey
Rig up wireline truck, run temp survey
Rig down wireline truck, make up 1" pipe for top off cement job
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
**Cemented with 1010 sacks 35/65 C Lead cement, 6% gel, .25% cello-flake, .2% c-41p
390 sacks Class C Tail + 1.% cc, drop plug, displace with 249.6 bbl,s fresh water, land plug,
bump plug to 900#, check floats ok.Full circulation throughout job, no cement to surface
Run temp survey, top of cement at 219 ft. run 1" down backside as per RRC, cement to surface
with 30 bbl,s neat cement with 1.5% cc.
Run 1" pipe down backside, tag up at 85 ft., tie onto cementers
Cement
Rig down cementers
Cut off conductor and casing, lay out, install, weld and test well head "A" section
Nipple up bope, Test all bope with greenes nipple up services 1000# high, 250# low all ok.
Adjust flowline with welder, strap and caliper BHA #2
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
DESCRIPTION DEVIATION AZIMUTH
WASTE DISPOSAL SITE:
2.30
WELL CUM SOLID - CUM LIQUID 1
DAILY YDS SOLID - BBLS LIQUID 1
TOTAL DRILLED GAS
GAS DC SIZE
Background Gas: 6"x8" 0
Connection gas: 0
Trip Gas: DP SIZE 0
0 0.00
ACCIDENTS FUEL (gals) 0 0.00
Max Gas: 4.5 xh 0 0.00
0 0.00
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
End WEIGHT OF BHA
Consumed 0 WEIGHT OF BHA (below jars)
MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
11000 5
9/9/15
COUNTY:Andrews
STATE:TX
DATE:
9/10/15
Day
05
DEPTH (MD):
2220
DEPTH
(TVD): 2220
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
583
DAILY COST:
$69,070
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 j-55 stc - $24.10
0 0 0 0 0 0 - $0.00
0 0 0 0 0 0 - $0.00
0 0 0 0 0 0 - $0.00
MW 9.1 GEL 50
VIS 29 SALTGEL 17
PV LIME 25
YP CAUSTIC
GELS SODA ASH 5 5.5
pH 10.5 BARITE 0.5
WL mf-55 1
HP/HT paper 10
GC
CL 1
Ca
Sand
Solids
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $0
Cum Mud $3,800 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 7:00 1.00 1684 1684
7:00 9:30 2.50 1684 1684
9:30 10:00 0.50 1684 1684
10:00 12:30 2.50 1684 1684
12:30 3:30 3.00 1684 1684
3:30 5:30 2.00 1684 1744 30
5:30 6:00 0.50 1744 1744
6:00 6:00 12.00 1744 2220 55 12 40
24.00 55 12 34.83333
LENGTH DEPTH
1.5 1619
31.53 1685
12.3 1776
5.5 1865
30.5 1960
32.9 2059
6.15 0
Units 91.67 0
17 3 0
17 535.76 0
0 0
18 0 0
0 0
0 0
0 0
750.81
1469.19
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA
Consumed #VALUE! WEIGHT OF BHA (below jars)
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received N/A DRILL PIPE PSI SPM
0 0.00
ACCIDENTS FUEL (gals) 0 0.00
Max Gas: 4.5 XH 0 0.00 0.00
0 0.00
Connection gas: 18X6" D.C,S 0.00 0.00
Trip Gas: DP SIZE 0 0.00 0.00
DC SIZE 3X8" D.C.,S 0.00 0.00
Background Gas: 6"x8" X/O SUB 0.00 0.00
DEV. TOOL 1.30 141.90
TOTAL DRILLED GAS REAMER 0.00 0.00
GAS
WELL CUM SOLID - CUM LIQUID 0 8" D.C. 1.70 144.00
DAILY YDS SOLID - BBLS LIQUID REAMER 2.00 141.90
WASTE DISPOSAL SITE: SHOCK SUB 2.60 156.70
11" BIT 2.30 0.00
MOTOR 2.70 193.30
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
35% SS, 55% SH, 10% DOL/ANAHY DESCRIPTION DEVIATION AZIMUTH
Service Rig
Drill and surveys F/ 1744 to 2220,
Finish nipple up flo-line, strap bha
Pick up and make up bha #2
Test survey tool, ok
Trip in hole, pick up 10 joints from racks
Drill plug, cement and shoe
Drill new hole F/ 1684-1744
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 37 34 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 536 1624 NU/TST BOP
HOURS 14.5 47.5 RIG REPAIR
OUT 1684 RUN CSG/CMT
IN 1684 60 WOC
NOZZLES 6x18 5x18-5x16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U616S 616 SURVEY
SER. NO 30269 21558 TRIP
SIZE 11 17.5 DRLG
MFG ulterra Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 2 1 RU/RD
TORQUE OFF BOTTOM 0
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 108 0
TORQUE ON BOTTOM 0
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 110 PLAN
SLACK OFF WEIGHT 105 1700
PSI:
1085
SPM:
70/70
CUM DRLG COST:
$264,354
OPERATIONS:
Drilling Ahead
PROGRESS:
536
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 6
9/9/15
COUNTY:Andrews
STATE:TX
DATE:
9/11/15
Day
06
DEPTH (MD):
3394
DEPTH
(TVD): 3394
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
500
DAILY COST:
$40,822
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 j-55 stc - $24.10
0 0 8 5/8 32 L-80 0 - $20.97
0 0 8 5/8 32 J-55 0 - $14.30
0 0 0 0 0 0 - $0.00
MW 9.8 GEL 50
VIS 29 SALTGEL 23.5
PV LIME 31
YP CAUSTIC
GELS SODA ASH 6
pH 10.0 BARITE 0.5
WL MF-55 2
HP/HT PAPER 2
GC
CL 165000
Ca
Sand
Solids
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $818
Cum Mud $4,789 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 7:00 1.00 2220 2296 40 13 76
7:00 7:30 0.50 2296 2296
7:30 6:00 10.50 2296 2950 60 15 62
6:00 6:00 12.00 2950 3394 60 25 37
24.00 53.333333 18 58.42857
LENGTH DEPTH
1.5 1619
31.53 1685
12.3 1776
1 5.5 1865
1 30.5 1960
32.9 2059
6.15 2162
Units 91.67 2321
11 3 2511
16 535.76 2606
0 2796
20 0 2881
0 3018
0 3272
0 0
750.81
2643.19
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA 68 30
Consumed 0 WEIGHT OF BHA (below jars) 70 30
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.40 88.40
ACCIDENTS FUEL (gals) 0 0.00
Max Gas: 4.5 XH 0 0.70 126.40
0 0.50 110.90
Connection gas: 18X6" D.C,S 1.00 141.90
Trip Gas: DP SIZE 0 0.80 146.80
DC SIZE 3X8" D.C.,S 1.10 118.00
Background Gas: 6"X8" X/O SUB 1.20 138.40
DEV. TOOL 1.30 141.90
TOTAL DRILLED GAS REAMER 1.20 145.40
GAS
WELL CUM SOLID - CUM LIQUID 1 8" D.C. 1.70 144.00
DAILY YDS SOLID - BBLS LIQUID 1 REAMER 2.00 141.90
WASTE DISPOSAL SITE: SHOCK SUB 2.60 156.70
30% DOLO, 45%SH, 15% ANAHY, 10% SS. 11" BIT 2.30 0.00
MOTOR 2.70 193.30
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
DESCRIPTION DEVIATION AZIMUTH
Repairs to both pumps
Drill F/ 2220 to 2296, vertical control
Service Rig
Drill F/ 2296 to 2950, bring deviation inc. back to 1 degree
Drill F/2950 to 3394
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 31 34 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 1174 1624 NU/TST BOP
HOURS 38 47.5 RIG REPAIR
OUT 1684 RUN CSG/CMT
IN 1684 60 WOC
NOZZLES 6x18 5x18-5x16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U616S 616 SURVEY
SER. NO 30269 21558 TRIP
SIZE 11 17.5 DRLG
MFG ulterra Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 2 1 RU/RD
TORQUE OFF BOTTOM 0
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 120 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 125 PLAN
SLACK OFF WEIGHT 118 1700
PSI:
1150
SPM:
120
CUM DRLG COST:
$305,176
OPERATIONS:
Drilling Ahead
PROGRESS:
1174
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 3
9/9/15
COUNTY:Andrews
STATE:TX
DATE:
9/12/15
Day
07
DEPTH (MD):
4757
DEPTH
(TVD): 4757
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
628
DAILY COST:
$48,931
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 j-55 stc - $24.10
0 0 8.625 32 L-80 0 - $20.97
0 0 8.625 32 J-55 0 - $14.30
0 0 0 0 0 0 - $0.00
MW 10.0 GEL 135
VIS 28 SALTGEL 23
PV LIME 26
YP CAUSTIC
GELS SODA ASH 8
pH 9.5 BARITE 1
WL paper 7
HP/HT mf-55 1
GC soap sticks 35
CL 187000
Ca 3600
Sand
Solids 0.2
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $1,157
Cum Mud $5,946 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 9:30 3.50 3394 3622 60 22 65
9:30 10:30 1.00 3622 3622
10:30 6:00 7.50 3622 4059 60 22 58
6:00 6:00 12.00 4059 4757 60 25
24.00 60 23 61.70476
LENGTH DEPTH
1.5 3272
31.53 3392
12.3 3557
1 5.5 3707
1 30.5 3937
32.9 4183
6.15 4437
Units 91.67
7 3
10 535.76
0
27 0
0
0
0
750.81
4006.19
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA
Consumed 0 WEIGHT OF BHA (below jars)
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0
ACCIDENTS FUEL (gals) 0
Max Gas: 4.5 xh 0
0
Connection gas: 18X6" D.C,S
Trip Gas: DP SIZE 0
DC SIZE 3X8" D.C.,S
Background Gas: 6"x8" X/O SUB
DEV. TOOL 0.80 22.90
TOTAL DRILLED GAS REAMER 0.80 63.70
GAS
WELL CUM SOLID - CUM LIQUID 1 8" D.C. 0.70 51.70
DAILY YDS SOLID - BBLS LIQUID 1 REAMER 0.10 14.40
WASTE DISPOSAL SITE: SHOCK SUB 0.40 35.50
11" BIT 0.40 88.40
MOTOR 0.30 137.70
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
15% DOLO, 70%SH, 5% SALT, 10% LS DESCRIPTION DEVIATION AZIMUTH
Receive 8 5/8 intermediate casing, drift, clean and talley
Drill F/ 3394 to 3622
Service Rig, repair auto driller
Drill F/ 3622 to 4059
Drill F/ 4059 to 4757
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 50 34 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 3073 1624 NU/TST BOP
HOURS 61 47.5 RIG REPAIR
OUT 1684 RUN CSG/CMT
IN 1684 60 WOC
NOZZLES 6x18 5x18-5x16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U616S 616 SURVEY
SER. NO 30269 21558 TRIP
SIZE 11 17.5 DRLG
MFG ulterra Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 2 1 RU/RD
TORQUE OFF BOTTOM 0
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 147 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 150 PLAN
SLACK OFF WEIGHT 145 1700
PSI:
2300
SPM:
85/85
CUM DRLG COST:
$515,469
OPERATIONS:
Drilling Ahead
PROGRESS:
1363
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 8
9/9/15
COUNTY:Andrews
STATE:TX
DATE:
9/13/15
Day
08
DEPTH (MD):
5345
DEPTH
(TVD): 5345
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
591
DAILY COST:
$29,234
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 j-55 stc - $24.10
0 0 8.625 32 L-80 0 - $20.97
0 0 8.625 32 J-55 0 - $14.30
0 0 0 0 0 0 - $0.00
MW 10.3 GEL
VIS 35 SALTGEL 120 10.5
PV 4 LIME 8
YP 6 CAUSTIC
GELS 6--10 SODA ASH 4 6.5
pH 9.5 BARITE 0.5
WL 8 STARCH 104 3.5
HP/HT IRONWOOD 40 3
GC MYACIDE 1
CL 188000
Ca 3600
Sand tr
Solids 2.7
Oil %
2
ICS OCS DC LOC B/S G ODR RP Day Mud $6,953
1 2 2 o x i n td Cum Mud $12,900 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 4:00 10.00 4750 5335 60 20 59
4:00 4:30 0.50 5335 5335
4:30 5:30 1.00 5335 5335
5:30 6:00 0.50 5335 5345 60 20 20
6:00 6:30 0.50 5345 5345
6:30 8:00 1.50 5345 5345
8:00 10:00 2.00 5345 5345
10:00 3:00 5.00 5345 5345
3:00 4:00 1.00 5345 5345
4:00 6:00 2.00 5345 5345
24.00 60 20 39.25
LENGTH DEPTH
1.5 3272
31.53 3392
12.3 3557
1 5.5 3707
1 30.5 3937
32.9 4183
6.15 4437
Units 91.67 4789
3 5042
535.76 5194
0 0
0 0
0 0
0 0
0 0
750.81
4594.19
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA 105 30
Consumed 0 WEIGHT OF BHA (below jars) 110 30
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.00 0.00
ACCIDENTS FUEL (gals) 0 0.00 0.00
Max Gas: 4.5 XH 0 0.00 0.00
0 0.00 0.00
Connection gas: 18X6" D.C,S 0.50 25.70
Trip Gas: DP SIZE 0 0.00 0.00
DC SIZE 3X8" D.C.,S 0.80 36.50
Background Gas: 6"X8" X/O SUB 0.40 41.20
DEV. TOOL 0.80 22.90
TOTAL DRILLED GAS REAMER 0.80 63.70
GAS
WELL CUM SOLID - CUM LIQUID 1 8" D.C. 0.70 51.70
DAILY YDS SOLID - BBLS LIQUID 1 REAMER 0.10 14.40
WASTE DISPOSAL SITE: SHOCK SUB 0.40 35.50
11" BIT 0.40 88.40
MOTOR 0.30 137.70
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
DESCRIPTION DEVIATION AZIMUTH
Circ, condition hole for casing
Strap out of hole, rig up laydown mach. Lay down 8" tools
Safety meeting with casing crews and rig personel, rig up power tongs
Run 8 5/8" 32# L-80 and J-55 casing
Drill F/ 4750 to 5335, mud up and starch up at 5000 ft.
Service Rig
Circ., drop carbide, calc. hole volume for cement
Drill F/ 5335 to 5345 TD Intermediate hole
Circulate
Short trip 10 stands, no problems
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 51 34 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 3661 1624 NU/TST BOP
HOURS 71.5 47.5 RIG REPAIR
OUT 5345 1684 RUN CSG/CMT
IN 1684 60 WOC
NOZZLES 6x18 5x18-5x16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U616S 616 SURVEY
SER. NO 30269 21558 TRIP
SIZE 11 17.5 DRLG
MFG ulterra Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 2 1 RU/RD
TORQUE OFF BOTTOM 0
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT PLAN
SLACK OFF WEIGHT 1700
PSI:
2275
SPM:
160
CUM DRLG COST:
$544,703
OPERATIONS:
Run 8 5/8" intermediate casing
PROGRESS:
588
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 9
9/13/15
COUNTY:Andrews
STATE:TX
DATE:
9/14/15
Day
09
DEPTH (MD):
5506
DEPTH
(TVD): 5506
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
443
DAILY COST:
$150,966
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 j-55 stc - $24.10
1508 0 8.625 32 L-80 0 - $20.97
3842 0 8.625 32 J-55 0 - $14.30
0 0 0 0 0 0 - $0.00
MW 8.4 GEL
VIS 28 SALTGEL 3
PV LIME
YP CAUSTIC
GELS SODA ASH 5
pH 8.5 BARITE
WL
HP/HT 9.5
GC
CL 6.5
Ca
Sand
Solids
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $950
Cum Mud $12,900 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 10:00 4.00 5345 5345
10:00 10:30 0.50 5345 5345
10:30 3:00 4.50 5345 5345
3:00 3:30 0.50 5345 5345
3:30 6:00 2.50 5345 5345
6:00 7:00 1.00 5345 5345
7:00 10:00 3.00 5345 5345
10:00 11:30 1.50 5345 5345
11:30 3:00 3.50 5345 5345
3:00 3:30 0.50 5298 5345 94
3:30 6:00 2.50 5345 5506 60 30 64
24.00 60 30 79.2
LENGTH DEPTH
1 5194
27.65 5376
7.31
1 32.35
1 7.34
535.76
Units
6
9
6 0
13 0 0
0 0
0 0
0 0
611.41
4894.59
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA
Consumed 0 WEIGHT OF BHA (below jars)
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.00 0.00
ACCIDENTS FUEL (gals) 0 0.00 0.00
Max Gas: 4.5 XH 0 0.00 0.00
0 0.00 0.00
Connection gas:
Trip Gas: DP SIZE 0 0.00 0.00
DC SIZE
Background Gas: 6"
18 x 6" D.C,S
TOTAL DRILLED GAS
GAS
WELL CUM SOLID - CUM LIQUID 1 Reamer 7 7/8"
DAILY YDS SOLID - BBLS LIQUID 1 WINC 6"
WASTE DISPOSAL SITE: Reamer 7 7/8"
Bit 7 7/8" 0.50 25.70
Motor 6" 0.50 13.70
bump plug w/ 1790#, check floats ok, circulate 55 bbl,s cement, good pressure, full circ.
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
SAN ANDRES 90% LS, 10% SH DESCRIPTION DEVIATION AZIMUTH
Ran 35 joints, 1508 ft. 32# L-80 8 5/8" casing, 86 joints, 3838 ft. 32# J-55 8 5/8" casing
5350 ft. overall, set at 5345 KB, Centralizers on 1st joint, 3rd thru 16th collars then every
3rd collar thereafter for a total of 43 centralizers
Cemented with 1300 sacks 50/50 pox premium plus c cement, Lead, 11.8 wt, 2.46 yield
Tail, 200 sax 50/50 poz premium plus c cement 14.2#, 1.30 yield, displace with 315 bbl,s F/W
Nipple up bope and casing, test to 1500# ok ( rig pumps)
Pick up, make up bha #3, test survey tool, OK
Trip in hole with bha #3, test pipe rams and annular, 1500# ok, tag plug at 5298
Drill plug, cement and shoe
Drill F/ 5345 to 5506 "new 7 7/8" hole"
Run 8 5/5" intermediate casing
Circulate, rig down casing crew and pick up machine
Safety meeting with Baker, rig up cementers, cement intermediate casing
Rig down cementers
Nipple down bope, set slips with 80% (120 k) cut off, remove spacer spool
Nipple up "B" section, test well head to 1200# ok
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 64 51 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 161 3661 NU/TST BOP
HOURS 2.5 71.5 RIG REPAIR
OUT 5345 RUN CSG/CMT
IN 5345 1684 WOC
NOZZLES 7 X16 9X16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U716M U616S SURVEY
SER. NO 30159 30269 TRIP
SIZE 7 7/8 11 DRLG
MFG ulterra Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 3 2 RU/RD
TORQUE OFF BOTTOM 0
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 140 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 145 PLAN
SLACK OFF WEIGHT 135 1700
PSI:
1700
SPM:
120
CUM DRLG COST:
$695,669
OPERATIONS:
Drilling Ahead
PROGRESS:
161
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 10
9/13/15
COUNTY:Andrews
STATE:TX
DATE:
9/15/15
Day
10
DEPTH (MD):
7440
DEPTH
(TVD): 7440
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
554
DAILY COST:
$63,831
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 j-55 stc - $24.10
1508 0 8.625 32 L-80 0 - $20.97
3842 0 8.625 32 J-55 0 - $14.30
0 0 0 0 0 0 - $0.00
MW 8.4 GEL 50
VIS 28 SALTGEL 23.5
PV LIME 10
YP CAUSTIC
GELS SODA ASH 10
pH 9.0 BARITE 0.5
WL MF-55 1
HP/HT SOAP STIX 28
GC IRONWOOD 8
CL 4500
Ca
Sand
Solids 2
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $279
Cum Mud $13,325 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 2:00 8.00 5506 6140 60 35 79
2:00 2:30 0.50 6140 6140
2:30 6:00 3.50 6140 6393 60 35 72
6:00 6:00 12.00 6393 7440 60 35 87
24.00 60 35 79.59524
LENGTH DEPTH
1 5194
27.65 5376
7.31 5601
1 32.35 5823
1 7.34 6045
535.76 6266
0 6468
Units 0 6722
0 7007
0 7261
0 0
0 0
0 0
0 0
0 0
611.41
6828.59
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End N/A WEIGHT OF BHA 115 30
Consumed #VALUE! WEIGHT OF BHA (below jars) 122 30
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.00 0.00
ACCIDENTS FUEL (gals) 0 0.00 0.00
Max Gas: 4.5" 0 0.00 0.00
0 0.00 0.00
Connection gas: 0 0.50 20.70
Trip Gas: DP SIZE 0 0.00 0.00
DC SIZE 0 0.50 160.20
Background Gas: 6" 0 0.70 69.30
18 x 6" D.C,S 0.30 197.60
TOTAL DRILLED GAS 0 0.50 177.80
GAS
WELL CUM SOLID - CUM LIQUID 1 Reamer 7 7/8" 0.10 200.40
DAILY YDS SOLID - BBLS LIQUID 1 WINC 6" 0.30 5.20
WASTE DISPOSAL SITE: Reamer 7 7/8" 0.30 344.10
Bit 7 7/8" 0.50 25.70
Motor 6" 0.50 13.70
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
DESCRIPTION DEVIATION AZIMUTH
Drill F/ 5506-6140
Service Rig
Drill F/ 6140-6393
Drill F/ 6393-7440
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 81 51 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 2095 3661 NU/TST BOP
HOURS 26 71.5 RIG REPAIR
OUT 5345 RUN CSG/CMT
IN 5345 1684 WOC
NOZZLES 7 X16 9X16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U716M U616S SURVEY
SER. NO 30159 30269 TRIP
SIZE 7.875 11 DRLG
MFG ulterra Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 3 2 RU/RD
TORQUE OFF BOTTOM 0
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 170 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 175 PLAN
SLACK OFF WEIGHT 165 1700
PSI:
2750
SPM:
75/75
CUM DRLG COST:
$759,500
OPERATIONS:
Drilling Ahead
PROGRESS:
1934
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 3
9/13/15
COUNTY:Andrews
STATE:TX
DATE:
9/16/15
Day
11
DEPTH (MD):
8327
DEPTH
(TVD): 8327
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
517
DAILY COST:
$33,510
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 J-55 STC - $24.10
1508 0 8.625 32 L-80 BTC - $20.97
3842 0 8.625 32 J-55 BTC - $14.30
0 0 5.5 17 P-110 LTC - $0.00
MW 8.4 GEL 15
VIS 29 SALTGEL 23
PV LIME 18
YP CAUSTIC
GELS SODA ASH 5
pH BARITE 1
WL MF-55 2
HP/HT PAPER 3
GC IRONWOOD 3
CL 10000
Ca 520
Sand
Solids 2.19
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $1,574
Cum Mud $14,899 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 4:00 10.00 7440 7852 60 32 41
4:00 4:30 0.50 7852 7852
4:30 6:00 1.50 7852 7883 60 32 21
6:00 3:00 9.00 7883 8267 60 25 43
3:00 3:30 0.50 8267 8267
3:30 6:00 2.50 8267 8327 60 28 24
24.00 60 29 32.13333
LENGTH DEPTH
1 5194
27.65 5376
7.31 5601
32.35 5823
0 7.34 6045
535.76 6266
0 6468
Units 0 6722
55 0 7007
102 0 7261
0 7504
383 0 7757
0 7863
0 8022
0 8243
611.41
7715.59
44,203 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA 115 30
Consumed #VALUE! WEIGHT OF BHA (below jars) 122 30
NONE
Start N/A BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.10 333.50
ACCIDENTS FUEL (gals) 0 1.80 8.80
Max Gas: 4.5 XH 0 1.50 311.00
0 1.10 325.80
Connection gas: 0 0.50 20.70
Trip Gas: DP SIZE 0 1.90 318.70
DC SIZE 0 0.50 160.20
Background Gas: 6" 0 0.70 69.30
18 x 6" D.C,S 0.30 197.60
TOTAL DRILLED GAS 0 0.50 177.80
GAS
WELL CUM SOLID - CUM LIQUID 0 Reamer 7 7/8" 0.10 200.40
DAILY YDS SOLID - BBLS LIQUID WINC 6" 0.30 5.20
WASTE DISPOSAL SITE: Reamer 7 7/8" 0.30 344.10
10%SS, 80%SH, 10%LS Bit 7 7/8" 0.50 25.70
Motor 6" 0.50 13.70
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
Spraberry DESCRIPTION DEVIATION AZIMUTH
*** Drilling ahead with no problems
Drill F/ 7440-7852
Service Rig
Drill F/ 7852-7883
Drill F/ 7883-8267
Service Rig
Drill F/ 8267-8327
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 61 51 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 2982 3661 NU/TST BOP
HOURS 49 71.5 RIG REPAIR
OUT 5345 RUN CSG/CMT
IN 5345 1684 WOC
NOZZLES 7 X16 9X16 RIG SERVICE
TFA 1.374443933 0 CIRC & COND
TYPE U716M U616S SURVEY
SER. NO 30159 30269 TRIP
SIZE 7.875 11 DRLG
MFG ulterra Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 3 2 RU/RD
TORQUE OFF BOTTOM 11000
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 190 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 200 PLAN
SLACK OFF WEIGHT 185 1700
PSI:
2200
SPM:
140
CUM DRLG COST:
$793,010
OPERATIONS:
Drilling Ahead
PROGRESS:
887
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 3
9/13/15
COUNTY:Andrews
STATE:TX
DATE:
9/18/15
Day
13
DEPTH (MD):
10100
DEPTH
(TVD): 10100
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
502
DAILY COST:
$42,894
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 J-55 STC - $24.10
1508 0 8.625 32 L-80 BTC - $20.97
3842 0 8.625 32 J-55 BTC - $14.30
0 0 5.5 17 P-110 LTC - $0.00
MW 8.6 GEL
VIS 35 SALTGEL 250 23.5
PV 6 LIME 1
YP 8 CAUSTIC
GELS 10--13 SODA ASH
pH 9.5 BARITE 0.5
WL 8 W Starch 100
HP/HT Myacide 2
GC Ironwood 3
CL 15300
Ca 840
Sand
Solids 1
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $6,995
Cum Mud $24,172 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 4:30 10.50 9056 9688 45 35 60
4:30 5:00 0.50 9688 9688
5:00 6:00 1.00 9688 9734 45 35 46
6:00 6:00 12.00 9734 10100 45 35 31
24.00 45 35 45.56349
LENGTH DEPTH
1 8243
27.65 8469
7.31 8683
1 32.35 8904
1 7.34 9131
535.76 9381
0 9636
Units 0 9916
11 0 10043
60 0 0
0 0
95 0 0
0 0
0 0
0 0
611.41
9488.59
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA 356 44
Consumed 0 WEIGHT OF BHA (below jars) 328 38
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.00 0.00
ACCIDENTS FUEL (gals) 0 0.00 0.00
Max Gas: 4.5XH 0 0.00 0.00
0 0.00 0.00
Connection gas: 0 0.00 0.00
Trip Gas: DP SIZE 0 0.00 0.00
DC SIZE 0 1.00 354.00
Background Gas: 6" 0 1.10 358.90
18 x 6" D.C,S 0.30 19.30
TOTAL DRILLED GAS 0 1.00 341.30
GAS
WELL CUM SOLID - CUM LIQUID 1 Reamer 7 7/8" 1.10 37.60
DAILY YDS SOLID - BBLS LIQUID 1 WINC 6" 1.10 34.80
WASTE DISPOSAL SITE: Reamer 7 7/8" 2.10 31.30
90%SH, 10%LS Bit 7 7/8" 1.80 8.80
Motor 6" 1.90 23.60
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
WOLFCAMP DESCRIPTION DEVIATION AZIMUTH
**Switch to steel pits and start mud up at 9800
Drill F/ 9056-9688
Service Rig
Drill F/ 9688-9734
Drill F/ 9734-10100
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 51 51 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 4755 3661 NU/TST BOP
HOURS 94 71.5 RIG REPAIR
OUT 5345 RUN CSG/CMT
IN 5345 1684 WOC
NOZZLES 7 X16 9X16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U716M U616S SURVEY
SER. NO 30159 30269 TRIP
SIZE 7.875 11 DRLG
MFG ulterra Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 3 2 RU/RD
TORQUE OFF BOTTOM 11000
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 220 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 230 PLAN
SLACK OFF WEIGHT 210 1700
PSI:
2600
SPM:
136
CUM DRLG COST:
$863,893
OPERATIONS:
Drilling Ahead
PROGRESS:
1044
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 3
9/13/15
COUNTY:Andrews
STATE:TX
DATE:
9/19/15
Day
14
DEPTH (MD):
10311
DEPTH
(TVD): 10311
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
502
DAILY COST:
$10,076
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 J-55 STC - $24.10
1508 0 8.625 32 L-80 BTC - $20.97
3842 0 8.625 32 J-55 BTC - $14.30
0 0 5.5 17 P-110 LTC - $0.00
MW 8.6 GEL
VIS 35 SALTGEL 9
PV 6 LIME
YP 8 CAUSTIC
GELS 10--13 SODA ASH 15
pH 9.5 BARITE
WL 8
HP/HT
GC
CL 15300
Ca 840
Sand
Solids 1
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $950
Cum Mud $12,350 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 3:00 9.00 10100 10311 45 38 23
3:00 4:00 1.00 10311 10311
4:00 10:30 6.50
10:30 11:30 1.00
11:30 3:30 4.00
3:30 6:00 2.50 10311 4124
24.00 45 38 2073.922
LENGTH DEPTH
1 8243
27.56 8469
8683
1 32.35 8904
1 7.34 9131
535.76 9381
0 9636
Units 0 9916
62 0 10043
94 0 0
0 0
228 0 0
0 0
0 0
0 0
604.01
9706.99
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA
Consumed 0 WEIGHT OF BHA (below jars)
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.00 0.00
ACCIDENTS FUEL (gals) 0 0.00 0.00
Max Gas: 4.5 XH 0 0.00 0.00
0 0.00 0.00
Connection gas: 0 0.00 0.00
Trip Gas: DP SIZE 0 0.00 0.00
DC SIZE 0 1.00 354.00
Background Gas: 6" 0 1.10 358.90
18 x 6" D.C,S 0.30 19.30
TOTAL DRILLED GAS 0 1.00 341.30
GAS
WELL CUM SOLID - CUM LIQUID 1 Reamer 7 7/8" 1.10 37.60
DAILY YDS SOLID - BBLS LIQUID 1 WINC 6" 1.10 34.80
WASTE DISPOSAL SITE: 2.10 31.30
75% SH, 25% LS Bit 7 7/8" 1.80 8.80
Motor 6" 1.90 23.60
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
ATOKA DESCRIPTION DEVIATION AZIMUTH
Operations next report, trip in hole with bit #4, drill f/ 10311 to td
* Trip out of hole for bit, ROP
** Pump 15 joints out off bottom, tight hole, finish trip out, ( bit worn out)
*** Slip and cut drill line
Drill F/ 10100-10311
Pump slug, set kelly back, try to trip out ( tight ) pick up kelly, pump 15 joints out
Set kelly back, trip out of hole
Break out bit, motor and bottom reamer, lay down same
Make up new bit and motor, trip in hole to casing shoe
Slip and cut drill line
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 48 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 4966 NU/TST BOP
HOURS 103 RIG REPAIR
OUT 10311 RUN CSG/CMT
IN 10311 5345 WOC
NOZZLES 7X16 7X16 RIG SERVICE
TFA 0 CIRC & COND
TYPE U716M U716M SURVEY
SER. NO 29318 30159 TRIP
SIZE 7 7/8 7 7/8 DRLG
MFG ULTERRA Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 4 3 RU/RD
TORQUE OFF BOTTOM 11000
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 210 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT PLAN
SLACK OFF WEIGHT 1700
PSI:
2600
SPM:
136
CUM DRLG COST:
$873,969
OPERATIONS:
Trip in hole
PROGRESS:
211
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 3
9/13/15
COUNTY:Andrews
STATE:TX
DATE:
9/20/15
Day
15
DEPTH (MD):
11123
DEPTH
(TVD): 11123
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
517
DAILY COST:
$41,919
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 J-55 STC - $24.10
1508 0 8.625 32 L-80 BTC - $20.97
3842 0 8.625 32 J-55 BTC 0 $14.30
11123 0 5.5 17 P-110 LTC - $0.00
MW 9.4 GEL
VIS 50 SALTGEL 133 13
PV 12 LIME 4 0.5
YP 16 CAUSTIC
GELS 21/28 SODA ASH 19 7
pH 9.0 BARITE 160
WL 7 STARCH 150 3.5
HP/HT MYACIDE 8
GC IRONWOOD 8
CL 19500
Ca 400
Sand
Solids 6.1
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $13,212
Cum Mud $37,384 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 10:00 4.00 10311 10311
10:00 10:30 0.50 10311 10311
10:30 6:00 7.50 10311 10865 45 30 74
6:00 11:00 5.00 10865 11106 60 33 48
11:00 11:30 0.50 11106 11106
11:30 12:00 0.50 11106 11123 60 33 34
12:00 3:00 3.00 11123 11123
3:00 6:00 3.00 11123 11123
24.00 55 32 52.02222
LENGTH DEPTH
1 8243
27.56 8469
0 8683
1 32.35 8904
1 7.34 9131
535.76 9381
0 9636
Units 0 9916
0 10043
0 10421
0 10783
0 10860
0 0
0 0
0 0
604.01
10518.99
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA
Consumed 0 WEIGHT OF BHA (below jars)
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.00 0.00
ACCIDENTS FUEL (gals) 0 0.00 0.00
Max Gas: 4.5 0 0.40 116.60
0 0.00 0.00
Connection gas: 0 0.70 56.70
Trip Gas: DP SIZE 0 0.30 34.10
DC SIZE 0 1.00 354.00
Background Gas: 6" 0 1.10 358.90
18 x 6" D.C,S 0.30 19.30
TOTAL DRILLED GAS 0 1.00 341.30
GAS
WELL CUM SOLID - CUM LIQUID 1 Reamer 7 7/8" 1.10 37.60
DAILY YDS SOLID - BBLS LIQUID 1 WINC 6" 1.10 34.80
WASTE DISPOSAL SITE: 0 2.10 31.30
Bit 7 7/8" 1.80 8.80
Motor 6" 1.90 23.60
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
WOODFORD DESCRIPTION DEVIATION AZIMUTH
Short trip 25 stands, no problems
Circulate, condition mud and hole for logs
* CIRCULATE TRIP GAS OUT AFTER SHORT TRIP
**SPOT WT . PILL ON BOTTOM, START OUT FOR LOGS AT 6:00 AM
Trip in hole with bit #4
Wash and ream 75 feet to bottom
Drill F/ 10311-10865
Drill F10865-11106
Circulate samples
Drill F/ 11106-11123 TD
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR 62 48 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 812 4966 NU/TST BOP
HOURS 13 103 RIG REPAIR
OUT 11123 10311 RUN CSG/CMT
IN 10311 5345 WOC
NOZZLES 7X16 7X16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U716M U716M SURVEY
SER. NO 29318 30159 TRIP
SIZE 7.875 7.875 DRLG
MFG ULTERRA Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 4 3 RU/RD
TORQUE OFF BOTTOM 11000
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 232 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 240 PLAN
SLACK OFF WEIGHT 220 1700
PSI:
2600
SPM:
140
CUM DRLG COST:
$915,888
OPERATIONS:
Circulate for logs
PROGRESS:
812
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 3
9/13/15
COUNTY:Andrews
STATE:TX
DATE:
9/21/15
Day
16
DEPTH (MD):
11123
DEPTH
(TVD): 11123
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM:
221
DAILY COST:
$37,402
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 J-55 STC - $24.10
1508 0 8.625 32 L-80 BTC - $20.97
3842 0 8.625 32 J-55 BTC - $14.30
11123 0 5.5 17 P-110 LTC - $0.00
MW 9.3 GEL
VIS 45 SALTGEL
PV 12 LIME
YP 16 CAUSTIC
GELS 21/28 SODA ASH 13
pH 9.0 BARITE
WL 7 1
HP/HT
GC
CL 19500
Ca 400
Sand 10
Solids 6.1
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $0
Cum Mud $37,384 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 6:30 0.50 11123
6:30 1:00 6.50
1:00 2:00 1.00
2:00 6:00 4.00
6:00 9:30 3.50
9:30 11:00 1.50
11:00 5:00 6.00
5:00 6:00 1.00 11123 11123
24.00 11123
LENGTH DEPTH
1
1
1
535.76
0
Units 0
0
0
0
0
0 0
0 0
0 0
536.76
10586.24
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA
Consumed 0 WEIGHT OF BHA (below jars)
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.00 0.00
ACCIDENTS FUEL (gals) 0 0.00 0.00
Max Gas: 4.5 0
0 0.00
Connection gas: 0
Trip Gas: DP SIZE 0
DC SIZE 0
Background Gas: 6 0
18 x 6" D.C,S
TOTAL DRILLED GAS 0
GAS
WELL CUM SOLID - CUM LIQUID 1
DAILY YDS SOLID - BBLS LIQUID 1
WASTE DISPOSAL SITE:
Bit 7 7/8"
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
DESCRIPTION DEVIATION AZIMUTH
Trip in hole, ( stage in, breaking circ.)
Circulate, condition hole and mud for casing
**Close hydril, circulate trip gas through gas buster to working pits
Spot pill on bottom, set kelly back
Strap out of hole for logs
Safety meeting with loggers, rig up logging truck
Run halliburton wireline logs ( loggers TD 11122 )
Logging
Rig down logging truck
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR #DIV/0! 48 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 0 4966 NU/TST BOP
HOURS 103 RIG REPAIR
OUT 10311 RUN CSG/CMT
IN 5345 WOC
NOZZLES 7X16 7X16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U716M U716M SURVEY
SER. NO 29318 30159 TRIP
SIZE 7.875 7.875 DRLG
MFG ULTERRA Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 4 3 RU/RD
TORQUE OFF BOTTOM 11000
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT PLAN
SLACK OFF WEIGHT 1700
PSI:
425
SPM:
60
CUM DRLG COST:
$953,290
OPERATIONS:
Circulate condition hole for casing
PROGRESS:
0
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS
11000 3
9/13/15
COUNTY:Andrews
STATE:TX
DATE:
9/22/15
Day
17
DEPTH (MD):
11123
DEPTH
(TVD): 11123
SUPV: Ronnie
McWhirter
AFE Dry Hole
$: $1,344,428
TOTAL GPM: DAILY COST:
$139,814
ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft
1684 0 13.375 54.5 J-55 STC - $24.10
1508 0 8.625 32 L-80 BTC - $20.97
3842 0 8.625 32 J-55 BTC - $14.30
11123 0 5.5 17 P-110 LTC - $10.58
MW GEL
VIS SALTGEL
PV LIME
YP CAUSTIC
GELS SODA ASH 10
pH BARITE 0.5
WL 5.5
HP/HT 8
GC
CL
Ca
Sand
Solids
Oil %
ICS OCS DC LOC B/S G ODR RP Day Mud $0
Cum Mud $42,478 24 0
WOB ROP
START END HRS FROM TO (M lbs) (fph)
6:00 6:30 0.50 11123
6:30 8:30 2.00
8:30 10:00 1.50
10:00 10:30 0.50
10:30 11:00 0.50
11:00 12:00 1.00
12:00 5:30 5.50
5:30 6:00 0.50
6:00 7:00 1.00
7:00 3:00 8.00
3:00 6:00 3.00 11123 3708
24.00 3707.667
LENGTH DEPTH
1 0
0 0
0 0
1 0 0
1 0 0
535.76 0
0 0
Units 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
536.76
10586.24
0 Pump #1
0 Pump #2
PUMP SPM % EFF GPM BPM TBPM
1 80 95 295 7.36 14.72
2 80 95 295 7.36MZ-9 6.5 9
MAKE LINER STROKE
MZ-9 6.5 9
End WEIGHT OF BHA
Consumed 0 WEIGHT OF BHA (below jars)
NONE
Start 0 BHA LENGTH SLOW PUMP RATES
Received DRILL PIPE PSI SPM
0 0.00 0.00
ACCIDENTS FUEL (gals) 0 0.00 0.00
Max Gas: 0 0.00 0.00
0 0.00 0.00
Connection gas: 0 0.00 0.00
Trip Gas: DP SIZE 0 0.00 0.00
DC SIZE 0 0.00 0.00
Background Gas: 0 0.00 0.00
18 x 6" D.C,S 0.00 0.00
TOTAL DRILLED GAS 0 0.00 0.00
GAS
WELL CUM SOLID - CUM LIQUID 1 0 0.00 0.00
DAILY YDS SOLID - BBLS LIQUID 1 0 0.00 0.00
WASTE DISPOSAL SITE: 0 0.00 0.00
Bit 7 7/8" 0.00 0.00
0 0.00 0.00
DAILY AVG
SHOWS/FLARE REPORT BHA SURVEYS
DESCRIPTION DEVIATION AZIMUTH
String weight 160,000.
Currently on bottom circulating waiting on cementers, job was set up for 12:00 midnight,
latest ETA is 8:00 am
Circulating with good returns and no hole problems
Finish lay down drill pipe and collars, break kelly
Service rig
Safety meeting with rig crew and casing crews, rig up power tongs
Run 5 1/2" production casing, staging in hole to 11123
Circulate, wait on cementers
Circulate, condition hole
Circulate, rig up lay down machine
Spot pill on bottom, set kelly back, lay down drill pipe 11123-8670, h2s alarms activated
Get all personnel off floor, sniff check ok
lay down drill pipe
H2s alarms going off, get everyone off floor to briefing area, wait on Midland safety, faulty sensor
MISC
TOTAL (Daily/cum)
TIME DEPTHACTIVITY RPM
DP Anlr Vel KICK
BIT # DULL CONDITION: LOST CIRC.
IMP FORCE CORE
DC Anlr Vel DST
FT/HR #DIV/0! 48 LOG
hP/dia inch FISHING/STUCK
FOOTAGE 0 4966 NU/TST BOP
HOURS 103 RIG REPAIR
OUT 10311 RUN CSG/CMT
IN 5345 WOC
NOZZLES 7X16 7X16 RIG SERVICE
TFA 0 0 CIRC & COND
TYPE U716M U716M SURVEY
SER. NO 29318 30159 TRIP
SIZE 7.875 7.875 DRLG
MFG ULTERRA Ulterra REAM/WASH
MUD PROPERTIES MUD MIXED TIME DISTRIBUTION
BIT NO 4 3 RU/RD
TORQUE OFF BOTTOM 11000
BIT RECORD PRESENT BIT PREVIOUS BIT
ROTATING WEIGHT 230 1500
TORQUE ON BOTTOM 4000
DRILLING MECHANICS CASING STRINGSPICK UP WEIGHT 250 PLAN
SLACK OFF WEIGHT 220 1700
PSI: SPM: CUM DRLG COST:
$1,093,104
OPERATIONS:
Circulate, wait on cementers
PROGRESS:
0
CONTRACTOR:
SENDERO RIG 15
AFE Dry Hole $: (COB)
$1,344,428
Spud Date 9/5/15 6:00 AM LAST BOP TEST
WELL NAME:
University Cobra 3012
Zarvona Energy DAILY DRILLING REPORT
AFE # : SA-C3012-1 AFE DEPTH AFE DAYS