Upload
others
View
21
Download
0
Embed Size (px)
Citation preview
90million sq. ft.of workspaces transformed
15,000+clientsacross the globe
26yearsof leadership and legacy
growing with 40+ partners
450+Unitilers
annual production capacity
120lakhs sq. ft.
across India
8offices
Choose What Matters To Your Business
www.unitileindia.com
WorldClass
Quality
Certified byBureau Veritas,France
Excellenceguaranteed with
third partytested at
TÜV SÜD PSB, Singapore
Environmental Conscientiousness
Health And Safety
Measures
SingaporeGreen
BuildingCouncil(SGBC)
www.unitileindia.com
Certification
www.unitileindia.com
Introduction to Raised Access Floor System
What is a Raised Access Floor System?
Raised access floors is a platform built several inches above the structural floor, creating a cavity/void between the existing floor/slab and the top
surface of raised access floor system.
Passing ElectricalData/Voice
Power cables
01
Purpose of Cavity
Air conditioningpiping and cable in equipment room.
02
Plumbingpipes
03
The system responds to organizational andtechnological changes quickly and easily.
Provides a tremendous amount of flexibility &capacity in minimal time.
An access floor system reduces the facilitieslife cycle costs.
Designed to meet the most demanding needs ofnew or refurbished buildings.
A long term cost-effective investment.
www.unitileindia.com
Why use aRaised Floor?
……………….………..……....... 01
…………..........….. 03
……………………..….…..…..... 05
………………..……….….. 02
………………..……….….. 04
www.unitileindia.com
Common myths of Raised Access Floor System
Cannot be installed dueto height constraints.
A raised floor can be installed with a finished floor height a low as 75 mm.
FACTMYTH
www.unitileindia.com
Common myths of Raised Access Floor System
The cost of Raised Access Floor is2x the cost of IPS.
Level undulations on floor platerestricts use of raised floor.
The rough condition of mother slab prevents installation of RaisedAccess Floor.
Require IPS prior to Raised Access Floor construction.
There are significant savings inCAPEX and OPEX.
Access floors can be installed irrespective of the undulations onthe floor slab.
Access floors can be installed irrespective of the rough conditionsof the floor slab.
An access Floor is installed directlyon the mother slab.
v/sMYTH FACT
www.unitileindia.com
WORK HAS CHANGED, MOST OFFICES HAVEN’T.
Need to accommodate the dynamic needs of your business in an incredibly easy and efficient way?
Aspire for a profitable workspace?
Looking for flexible flooring solutions?
Unitile can help with raised flooring solutions that bring your people and places together in ways that reduce costs and improve performance.
GreenProduct
The freedom ofFlexibility
Return onInvestment
High SpeedConstruction
Aesthetics andLow-maintenance
1
2
3
45
6
www.unitileindia.com
1 Non-powered workstations.
2Unitile Grommets allow cables topass securely.
3Enhanced ceiling design freedomwith services underfloor.
Advanced Technology Platform
4Unitile understructure with typical FFH from75 mm to 200 mm.
5Underfloor service pathway to manage and protect any type of voice and data system.
6Carpet tile to fit on the panel with the help of tacky adhesive.
The rewarding benefits of Quick Installation
www.unitileindia.com
Early occupancy with great ease:
Early occupation in a facility results in enormous savings on skyrocketing rents.
Drastically reduces the fit out program schedule in a pre-occupied, speculated tenant building.
Raised floors eliminatesthe need for wet works likescreeding and tiling.
Guarantees a waterleveled floor.
The modularity of the system & the plenum beneath the floor lets you modify layouts at any stage of the project.
Access floor installation can be carried out simultaneously with others services.
www.unitileindia.com
High Speed Construction
Chennai - 20131,50,000 Sq. Ft.
Client Feedback:“Completed installation
as per committed timelines. i.e. 15 days for 1,50,000 sq. ft.”
Noida & Gurugram - 2014 7,50,000 Sq. Ft.
Raised Access Flooring supply & installation was
completed in 45 days.
Mumbai - 20171, 60,000 Sq. Ft.
Raised Access Flooring supply & installation was
completed in 24 days.
www.unitileindia.com
Location: MumbaiArea: 70,000 Sq. Ft.
Floor plate: 12,000 Sq. Ft.Undulation: 75 – 100 mm
www.unitileindia.com
Overcome level undulations
www.unitileindia.comwww.unitileindia.com
Location: MumbaiArea: 98,000 Sq. Ft.
Undulation: 80 – 120 mm
Overcome level undulations
The freedom of Flexibility
www.unitileindia.com
Freedom of configuring your workspace based on functional requirements.
Electrical, mechanical, communication, voice and data services are conveniently accessible to adapt to organizational change.
Future technology changes to be accomplished without extensive demolition or disruption.
Sustainable solution for space changes, renovations and reuse.
www.unitileindia.com
Location: MumbaiArea: 80,000 Sq. Ft.
Refurbishment & Flexibility
BEFORE RESTACK WORK AFTER RESTACK WORK
Location: Vashi, Navi MumbaiArea: 11,300 Sq. Ft.
www.unitileindia.com
Optimizing Existing space
Shopping Mall Hospital
www.unitileindia.com
Location: PuneArea: 1,35,300 Sq. Ft.
Shopping Mall General Office
Optimizing Existing space
www.unitileindia.com
Optimizing Existing space
Project: Muthoot Finance - Cochin.
Area: 25,000 Sq. ft.
Problem: Client wanted to convert the terrace floor to an open office. They had used ISMC structure to cast slab and wanted to hide ISMC channels.
Solution: Raised Access Floor could easily hide ISMC channels on the mother slab and hence it was the opted solution.
www.unitileindia.com
Location: ChennaiArea: 14,000 Sq. ft.
General OfficeParking lot
Optimizing Existing space
www.unitileindia.com
Projects: 9
Cities: 6
Total area: 1,82,986 Sq. Ft.
Co-sharing Workspaces
Prestige Trade Tower, BENGALURU
www.unitileindia.com
Projects: 2
Cities: 2
Total area: 10,76,391 Sq. Ft.
NOW A PAN-INDIARATE CONTRACT
GURUGRAM
Co-sharing Workspaces
Conceals data cables, cable tray wiring and otherunsightly equipment.
Gives more life to surface finish carpets due to perfect flat base.
Low noise, low downtime and minimal dust & dirt during refurbishment of the premise.
Maximize productivity and improves the working environments.
No loss of opportunity during restack/re-densification program.
Aesthetics &Function
www.unitileindia.com
Maintenance &Post Installation
www.unitileindia.com
Project: GIA - Mumbai
Area: 45,000 Sq. ft.
Problem: The client wanted a water leveled floor due to the nature of their business which involves diamonds.
Solution: The floor level undulations was derived using a laser leveling machine and the heights of the pedestals were pre-planned. Hence with the use of Raised Access Floors the client achieved a water leveled floor with dry construction, modularity and fast installation.
Water Leveled floors
Floors for the Environment
www.unitileindia.com
Materials and Resources
Unitile is specifically created from recycled components and materials that meet Singapore Green Building Standards (SGBC) for safety and low emission.
The panel infill is made up of recyclable contents such as non combustible cement.
Drastically reduces the dead loadon the base building
The dead load of 3” of raised flooring system is only 35 to 42 Kg/ Sq. m. v/s 3” of IPS (concrete) is 150 - 170 Kg / Sq. m.
Repeated reconfiguration involves breaking works thus results in the weakening of the base building.
Lifespan exceeding 25 years
Owning a raised flooring systemis a permanent asset for the tenant. On the completion of the lease period in a facility, the complete system can be dismantled and relocated to the customer’s new facility.
We have the honor of being the only companyin India to achieve the green certification from
Singapore Green Building Council (SGBC) with a two-tick remark.
Relocation
www.unitileindia.com
Pune
ChennaiPune – 2007
Chennai – 2016
Life of the raised floor - 9 yrs
Area – 27,000 Sq. Ft.
Relocation
www.unitileindia.com
Mumbai
Bengaluru
Mumbai – 2006
Bengaluru – 2014
Life of the raised floor - 8 yrs
Area – 25,000 Sq. Ft.
Relocation
www.unitileindia.com
Hongkong
Mumbai
Hongkong – 2004
Mumbai – 2010
Life of the raised floor - 6 yrs
Area – 80,000 Sq. Ft.
First Cost Competitive
www.unitileindia.com
Eliminate thecost of
screeding works
Early occupation of new facility ensures
cost savings of rentals along with
early revenue generation for your
company
Significantly reduces/eliminates
the requirement for suspended
ceilings
Perfectly water leveled floors lead to reduced costs in the installation
of modular furniture
Eliminates dependency on
expensive powered furniture
First Cost Competitive
www.unitileindia.com
Significant reduction in cable length & labour
costs during the installation process,
while getting rid of unnecessary cable trays
Cuts costs by at least half. Highly adaptive system for incredibly
easy spatial reconfigurations
As underfloor components can be covered as personal
tangible property, they qualify for accelerated
depreciation tax benefits
www.unitileindia.com
Location: Gurgaon, Bengaluru, Kolkata
Area: 65,660 Sq. Ft.
Power voice and data services rooted beneath the raised floor without cable trays.
Optimizing underfloor cable management
BFSI Sector Key Projects References – India
www.unitileindia.com
3,73,658 Sq. Ft.8,31,415 Sq. Ft.
10,850 Sq. Ft.31,871 Sq. Ft. 21,700 Sq. Ft.
1,44,311 Sq. Ft.
4,01,709 Sq. Ft. 2,54,803 Sq. Ft.
3,724 Sq. Ft.
2,65,190 Sq. Ft.
31,075 Sq. Ft.
39,148 Sq. Ft.40,762 Sq. Ft.
1,81,823 Sq. Ft. 1,57,895 Sq. Ft.2,59,614 Sq. Ft. 2,48,215 Sq. Ft.
1,40,845 Sq. Ft.
29,988 Sq. Ft.
16,54,994 Sq. Ft.
51,709 Sq. Ft.
1,91,533 Sq. Ft.
53,819 Sq. Ft. 53,819 Sq. Ft.
IT/ITES Sector Key Projects References – India
www.unitileindia.com
11,49,745 Sq. Ft. 7,75,700 Sq. Ft. 7,32,494 Sq. Ft. 5,59,356 Sq. Ft. 5,26,182 Sq. Ft. 4,70,522 Sq. Ft.
3,21,969 Sq. Ft. 2,92,993 Sq. Ft. 1,74,547 Sq. Ft. 1,68,046 Sq. Ft. 1,59,025 Sq. Ft. 1,32,944 Sq. Ft.
1,25,959 Sq. Ft. 1,21,782 Sq. Ft. 99,609 Sq. Ft. 70,449 Sq. Ft. 57,619 Sq. Ft. 27,125 Sq. Ft.
17,652 Sq. Ft. 17,050 Sq. Ft. 16,145 Sq. Ft. 8,115 Sq. Ft.
Pharma Sector Key Projects References – India
www.unitileindia.com
5,66,805 Sq. Ft. 1,98,238 Sq. Ft. 1,63,901 Sq. Ft. 1,09,221 Sq. Ft. 1,05,636 Sq. Ft. 99,738 Sq. Ft.
94,797 Sq. Ft. 71,579 Sq. Ft. 65,164 Sq. Ft. 53,119 Sq. Ft. 42,861 Sq. Ft.
39,116 Sq. Ft. 36,080 Sq. Ft. 23,250 Sq. Ft. 17,825 Sq. Ft.
7,384 Sq. Ft.9,870 Sq. Ft.
51,634 Sq. Ft.
13,993 Sq. Ft.36,124 Sq. Ft.
6,092 Sq. Ft.24,273 Sq. Ft. 17,394 Sq. Ft.19,730 Sq. Ft.
Government Sector Key Projects References – India
www.unitileindia.com
3,552 Sq. Ft.
19,375 Sq. Ft. 9,590 Sq. Ft.
1,937 Sq. Ft.
20,776 Sq. Ft. 15,500 Sq. Ft.
3,595 Sq. Ft.
57,878 Sq. Ft. 38,373 Sq. Ft.
1,582 Sq. Ft.
ASSAMSECRETARIAT
DISPUR
2,281 Sq. Ft. 2,260 Sq. Ft. 1,291 Sq. Ft.
48,513 Sq. Ft.
6,598 Sq. Ft. 6,436 Sq. Ft. 5,112 Sq. Ft.
13,293 Sq. Ft.
29,783 Sq. Ft.73,292 Sq. Ft.
Telecom Sector Key Projects References – India
www.unitileindia.com
4,70,522 Sq. Ft. 99,996 Sq. Ft. 97,628 Sq. Ft.
88,393 Sq. Ft.
57,694 Sq. Ft. 40,795 Sq. Ft.
6,124 Sq. Ft.28,481 Sq. Ft. 9,181 Sq. Ft.10,010 Sq. Ft.
Data Centre Sector Key Projects References – India
www.unitileindia.com
979 Sq. Ft.
3,58,236 Sq. Ft.
47,845 Sq. Ft.
1,27,932 Sq. Ft.
34,434 Sq. Ft.46,963 Sq. Ft.
1,07,866 Sq. Ft.
40,687 Sq. Ft.
67,124 Sq. Ft.
44,885 Sq. Ft.
34,229 Sq. Ft.
13,831 Sq. Ft.
31,699 Sq. Ft. 3,498 Sq. Ft.13,820 Sq. Ft.
Co-working Sector Key Projects References – India
www.unitileindia.com
2,39,251 Sq. Ft.11,23,460 Sq. Ft.
1,25,002 Sq. Ft.1,61,604 Sq. Ft. 1,45,841 Sq. Ft.
33,907 Sq. Ft.
14,46,617 Sq. Ft.
11,657 Sq. Ft. 10,689 Sq. Ft.
Media Sector Key Projects References – India
www.unitileindia.com
24,111 Sq. Ft.
92,904 Sq. Ft.
3,681 Sq. Ft.22,033 Sq. Ft.
36,231 Sq. Ft.99,438 Sq. Ft. 32,291 Sq. Ft.
10,011 Sq. Ft.
5,382 Sq. Ft. 25,887 Sq. Ft.
Construction & Real Estate Sector Key Projects References – India
www.unitileindia.com
16,846 Sq. Ft. 13,509 Sq. Ft.
10,118 Sq. Ft. 4,919 Sq. Ft.
36,382 Sq. Ft.
2,238 Sq. Ft.
14,359 Sq. Ft.
4,176 Sq. Ft.4,499 Sq. Ft.11,312 Sq. Ft.
35,359 Sq. Ft.
Chemical Sector Key Projects References – India
www.unitileindia.com
14,338 Sq. Ft.
1,550 Sq. Ft.
22,464 Sq. Ft.
5,564 Sq. Ft.
BONGAIGAONREFINERY
3,875 Sq. Ft. 559 Sq. Ft.
10,764 Sq. Ft.
23,465 Sq. Ft.
10,225 Sq. Ft. 9,795 Sq. Ft.
16,145 Sq. Ft. 14,768 Sq. Ft.
Consumer Durables Sector Key Projects References – India
www.unitileindia.com
2,217 Sq. Ft.
57,361 Sq. Ft.
15,607 Sq. Ft.50,288 Sq. Ft.
1,02,978 Sq. Ft.2,08,453 Sq. Ft. 1,76,226 Sq. Ft.
9,128 Sq. Ft.
24,509 Sq. Ft.45,790 Sq. Ft.
3,283 Sq. Ft.8,611 Sq. Ft.
Automobile & Engineering Sector Key Projects References – India
www.unitileindia.com
66,392 Sq. Ft.
36,866 Sq. Ft.
52,744 Sq. Ft.
10,075Sq. Ft.
21,355 Sq. Ft.
6,006 Sq. Ft.
59,621 Sq. Ft.
15,295 Sq. Ft.
1,162 Sq. Ft.
CLIENT SPEAKS
“Good product! Had a great experience throughout the project.”
07-03-2020
“Project team very cooperative & dedicated.”
24-12-2019
“Site team has given full-time support with timely project completion. Overall team has supported & suggested whenever required.”
21-12-2019
“Material delivery on time and execution also excellent. Superb supervision during work.”
31-05-2019
“Allianz Very good experience working with entire site team with utmost quality, co-operation, and timely delivery.”
04-04-2019
“Blackrock The superstition, quality control and service is absolutely high-level, would always recommend.”
28-03-2019
www.unitileindia.com
CLIENT SPEAKS
www.unitileindia.com
“Highly satisfied with great teamco-ordination. The entire team is fully trained and expert.”
16-03-2019
“Completed supply and installation as per site requirement and committed time line 1 week for 30,000 sq.ft area.”
“Very satisfied with the product, good workmanship by the coordinator.”
28-05-2017 28-05-2017
“Good Projects Team. Project was executed seamless without any escalation.”
21-03-2017
“Team has done a great job which has increased the bar of satisfaction of the client. The team manager has managed the critical job very efficiently and moved the project to closure very smoothly.”
25-03-2017
“Workmanship is very good. Quality of Product is good. Vendor support is excellent.”
03-12-2016
CLIENT SPEAKS
www.unitileindia.com
“Good experience and timely delivery, fast execution.”
11-05-2016
“We are very pleased with the overall performance of your product. The structure and surface finish resulted in a highly stable and almost noise neutral floor. The pedestals, tools and on-site cutting process made installations simple and quick. We are already seeing its advantages in quick work stations layout adjustments. In short, Unitile is performing as promised.”
02-08-2016
PHILIPPINES
“Product is very good and fulfills all requirement.“
12-10-2015
“Timely delivery, good execution, people were cooperative.”
31-12-2014
“I am extremely happy with the service provided which helped complete the project on time.”
07-10-2014
CLIENT SPEAKS
www.unitileindia.com
“Dedicated Team!! Terrific Product!! Excellent Overall Experience!! Looking forward to working with you in future.”
31-05-2014
“The execution was flawless and commitment level is highly satisfactory.”
“Delivery on time as committed and supported for installation works to meet the project timelines. Good work done by Ajit and Team.”
27-06-201420-01-2014
“Happy with on-site team’spro-activeness.”
05-08-2013
“Completed installation work as per committed timelines, i.e. 15 days for 1.5 lakh sq.ft area.”
02-12-2013
OUR PRESENCE
INDIAAhmedabad | Ankleshwar | Aurangabad | Bareilly | Bengaluru |
Chandigarh | Chennai | Cuttack | Goa | Gurgaon | Guwahati |
Hyderabad | Indore | Jaipur | Kanpur | Kolkata | Lucknow |
Mumbai | Nagpur | New Delhi | Pune | Raipur | Thane | Vadodara
INTERNATIONALAzerbaijan | Bahrain | Bangladesh | Egypt | Hong Kong | Indonesia | Kenya |
Nepal | Oman | Philippines | Qatar | Saudi Arabia | Singapore | Sri Lanka |
Tanzania | Turkey | UAE | Vietnam I Maldives I Nigeria I Bhutan